© 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Upload: godwin-watts

Post on 30-Dec-2015

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

© 2008 Eventure Events. All rights reserved.

Mitigating Business Risks

with Strategic Workforce Planning

Lina DoucetBruce Power

Page 2: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Agenda

• Introduction• WFP Model• Business Requirements• Technical Solution• Business Impact• Key Points• Contact• Questions

Page 3: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Bruce Power

• Bruce Power is a Canadian Nuclear Plant Operator• Canada's first private nuclear generating company and

the source of more than 20% of Ontario Canada's electricity

• Located approximately 250 kilometres northwest of Toronto

• Lina Doucet, Bruce Power Workforce Planning Team– Former Business Consultant with 15 years of experience in

business development, training and process improvement now working in the Energy Sector

Page 4: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Business Assumptions

• Business plan driven or work driven?

• Workforce planning: a human capital management or financial exercise?

• Centralized/top-down approach vs. demand-based?

Page 5: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Business Drivers

• Fiscal responsibility to optimize the size of our workforce and minimize staffing costs

• Work efficiencies required for optimisation are aligned with WANO 1 initiatives

• Prepares the company for the upcoming labour shortage

• Positions our company to be more competitive and mitigate risk in a changing business environment

Page 6: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Bruce Power’s Workforce Planning Model

• Based on mitigating risk – critical skills / staffing costs• Long Term Workforce Model (5 years) with ramp down

curve establishes year end Job Level Targets• JLTs based on staffing requirements (eg work analysis)

“filtered” with benchmarking results / best practice / 5 year implementation plan

• All staffing actions (including hiring, staff movements, retention strategies etc.) based on CWS (Critical Workforce Segments)

• A network of Divisional Staffing Planning SPOCs (single points of contacts) are active in the WFP Process

Page 7: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Business goals and activities

Staffing budget

Corporate staffing level targets

Long-term business plan

Page 8: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Talent segmentation

Diversity

Skills requirements

Assess future workforce

Long-term business plan

Long-term business plan

Page 9: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Demographics

Attrition assumptions

Talent pools

Assess current workforce

Assess future workforce

Long-term business plan

Assess future workforce

Page 10: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Long-term business plan

Assess current workforce

Assess future workforce

Gap analysis

Assess current workforce

Job level targets and 5-year workforce plans

Workforce redistribution across divisions and job families

Gap between future and current workforce (numbers, skills, etc.)

Page 11: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Long-term business plan

Assess current workforce

Assess future workforce

Gap analysis Staffing strategiesEmployee retention plans

Employee development and career plans

Employer of choice initiatives

Succession plans

Employment equity plan

Employee relations strategy

Page 12: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Workforce Modelling

Page 13: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Current Workforce

Model

ProjectsFinance &

CSLAW

Power Marketing

Group A

Group B

Group C

Group E

Group D

Retirements

Page 14: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Current Workforce

Model

ProjectsFinance &

CSLAW

Power Marketing

Group A

Group B

Group C

Group E

Group D

Staff Movements

Page 15: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Current Workforce

Model

ProjectsFinance &

CSLAW

Power Marketing

Group A

Group B

Group C

Group E

Group D

Hiring

Page 16: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Current Workforce

Model

ProjectsFinance &

CSLAW

Power Marketing

Group A

Group B

Group C

Group EGroup D

Future 8 Unit

Workforce Model

Group A

Group B

Group CGroup D

Group E

Page 17: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Fundamental WFP Principles

• All staffing actions based on long-term business goals (not everyday “urgent requests” or “what was”) & criticality of positions (including $$$)

• Talent management based on building the future workforce

• Approved (i.e., executive buy-in and sign off) formal staffing actions required to mitigate risks related to an aging workforce and pending labour shortage

Page 18: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Bruce Power – Workforce PlanningBusiness Requirements

• Company’s HR Division used several Excel spreadsheets to manage its Workforce Planning Process (WFP) creating a localized source of business intelligence with limited transparency to line managers

• Some line managers used customized databases or local spreadsheets to analyze staffing requirements and develop hiring plans based on their own source of data and assumptions

• Historically, company was using traditional approach to WFP by rolling up line demand for staff (12 to 18 month plan)

Page 19: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Bruce Power – Workforce PlanningBusiness Requirements

• Need for automation:– As the company was experiencing growth, an ageing

workforce and stringent regulatory requirements, automating the WFP process was required

• Market Survey:– Company did a market scan to find off-the-shelf

solutions / WFP software– Decision was made to accept tenders to develop in-

house product

Page 20: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Technical Solution

• Bruce Power uses SAP BW 3.5 for strategic reporting

• Leveraged SAP’s Business Planning Simulation Module (BPS) within Business Warehouse, to automate the existing Workforce Planning Process

Page 21: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Hiring Plan

Page 22: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Reports

Page 23: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Executive Dashboard

Page 24: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Business Impact

• Desktop solution provides managers with full transparency to business assumptions

• Divisional single point of contact reviews / validates data on an ongoing basis

• What if scenario “self serve” capability has reduced re-work and multiple revisions to hiring plan.

• Hiring process has been streamlined (e.g. staffing request forms have been eliminated, requisitions can be created based on on-line hiring plan, HR reports and analysis can be done by line managers)

Page 25: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Business Impact (continued)

• Executive Dashboard provides mission critical data to Executive Vice Presidents and CEO

• Enhanced Analytics (staff movement trends, talent pools, staffing level forecast, etc.)

• WFP Module designed for “total workforce management” (temps, contractors, regular, etc.)

• Module can produce “HR What if scenarios” for acquisitions, Green Field / Brown Field Projects, new divisions, negative growth management/ downsizing, etc

Page 26: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

Key Points

• Utilize BPS planning function to automate Hiring Plan generation process

• BPS is a strong module for what-if scenario analysis

• Using BPS can ease the integration of workforce planning and business planning

• Scope control was key during the project.– Resist temptation to enhance design beyond scope

Page 27: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

© 2008 Eventure Events. All rights reserved.

Lina Doucet Bruce Power

[email protected]

1 (866) 748-4787 ext. 5458

Page 28: © 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power

© 2008 Eventure Events. All rights reserved.

Questions?