© 2012 bentley systems, incorporated integrated asset management roads and highways jugal makwana...

33
© 2012 Bentley Systems, Incorporated Integrated Asset Integrated Asset Management Management Roads and Highways Roads and Highways Jugal Makwana Jugal Makwana Bentley Systems Bentley Systems

Upload: pierre-elman

Post on 15-Dec-2015

219 views

Category:

Documents


2 download

TRANSCRIPT

© 20

12 B

entle

y Sy

stem

s, In

corp

orat

ed

Integrated Asset ManagementIntegrated Asset ManagementRoads and HighwaysRoads and Highways

Jugal MakwanaJugal MakwanaBentley SystemsBentley Systems

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

2 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Why What When Where How

Asset Management

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

3 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

*BMI Infrastructure Report Q4-2011

6.4

51.7

Asset Creation Asset Maintenance Asset Upgrade

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

4 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

What? It depends on who we ask

PavementEngineer

Bridge Engineer

Senior Mgmt

Safety Analyst

AB

D

Roads Engineer

C

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

5 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

TRAFFIC LIGHTTRAFFIC LIGHT

BRIDGEBRIDGE

BARRIERBARRIER

POT HOLEPOT HOLE

STREET LIGHT:STREET LIGHT:

STREET SIGNSTREET SIGN

TRAFFICTRAFFIC

ALIGNMENTALIGNMENT

ROAD CONDITIONROAD CONDITION

LANES/WIDTHSLANES/WIDTHS

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

6 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

If we put the pieces together:

Category of road Length in Km

Total road network 3.34 million

National Highways 65,569

State Highways 1,30,000

Major Distt. Road, Rural road & Urban road

3.14 million

?

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

7 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Improving the Condition of the Asset

Better Condition

Better Work More Work

BetterQuality

OptimumService Levels

MoreMoney

BetterIntervention

Current Funding More Funding

From Opus International

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

8 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Better Condition

Better Work More Work

BetterQuality

OptimumService Levels

MoreMoney

BetterIntervention

Current Funding More FundingXX??Better AssetBetter Asset

ManagementManagementPracticesPractices

From Opus International

Improving the Condition of the Asset

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

9 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

The AASHTO definition of Asset Management supports this conclusion:

Conclusion Asset Management needs Information!

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

10 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Engineering Information Management through Asset LifeCycle

Asset & Project Portfolio Info Management

(APPIM)

Asset Information Management

(AIM)

Project Information

Management(PIM)

AssetLifecycle

Information Management

(ALIM)

Source: ARC Advisory Group

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

11 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Engineering Information Management (EIM)Through Bentley’s Integrated Asset Information Solution

Bentley traditional market

Design and Project Information

EIM - AssetWise

Asset Information and Decision

Supportbut when we bring them together we provide

asset lifecycle management

Each deliver value in their own right

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

12 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Engineering Information Management (EIM)An operations information modeling platform for delivering asset lifecycle information management

Bentley traditional market

Design And

ProjectWise

Map/Civil/Bridge

MicroStation

More….

Asset Model

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

13 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Engineering Information Modeling

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

14 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

What is Engineering Information Management?An operations information modeling platform for delivering asset lifecycle information management

Bentley traditional market

Design And

AssetWise

ProjectWise

MXRoad

MicroStation

More….

SuperLoad

OPTRAM

Insight

LRS and applications

ProjectWise and AssetWise provide

powerful Information Management

Asset Model

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

15 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Asset Information ProvidesDecision Support !

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

16 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet

TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet

BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet

BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet

BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet

BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet

POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet

POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet

STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet

STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet

STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet

STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

17 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet

TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet

BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet

BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet

BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet

BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet

POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet

POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet

STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet

STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet

STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet

STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

18 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Managing more than just physical Road Assets…

Road Works Accidents

Traffic Data Enquiry Management

Parks and Places, BBQ’s…

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

19 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Exor at a Glance

19

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

20 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Solutions footprint…depth and breadth…

EXOR

SOLUTIONS

Road network definition, Customer Service Desk, Field Data collection, Asset recording, Inspections recording, Road condition recording,

Structures recording, traffic volume recording, safety / crash data, Street works notices / permits, asset valuation / depreciation

Construction records, Document management, Spatial data management , Road Information, Structures Information, Traffic

Information, Safety / Crash Information

Contract management, Works ordering and budgeting management, Multi-year

programming, Road works co-ordination, Safety Analysis

Pavement modelling, Asset valuations, Traffic

congestion

Executive Information

Data Recording

Information Management

Operations and Management

Strategic Management & Planning

Executive

Exor Database, Loaders, Web ServicesField Data Collection software

Integrate with other systems like

HDM-4

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

21 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Exor Business Applications

Exor Business Applications

AssetWise – Exor Road Asset Management

Oracle Spatial

Database

Geographic Information

Systems

Existing Legacy

Systems

Existing Legacy

SystemsInformation DashboardInformation Dashboard

GIS/ Spatial Display

Other

Departmental and Corporate

Systems

Integration Using API’s

Exor Hub Technology

Oracle Spatial

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

22 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Oracle Spatial

Database

Asset Valuation Manager

Asset Valuation Manager

Street Lighting Manager

Street Lighting Manager

Maintenance ManagerMaintenance Manager

Schemes ManagerSchemes Manager

Traffic Interface Manager

Traffic Interface Manager

Structures ManagerStructures Manager

Safety ManagerSafety Manager

UKPMSUKPMS

Enquiry ManagerEnquiry Manager

MapCaptureMapCapture

MobileMobile

Public Rights of WayPublic Rights of Way

Noticing ManagerNoticing Manager

Permitting ManagerPermitting Manager

Street Gazetteer Manager

Street Gazetteer Manager

CIM / FIMCIM / FIM

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

23 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

ExorHub

PMS / Condition

Projects

Traffic Data

CRASH(Safety)

Sharing Data without DuplicationSharing Data without Duplication

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

24 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Data Displayed with Integrated Mapping

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

25 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Select Multiple Work Requests and Create a Work Order from the Map

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

26 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Example Engineering reporting – Assets along a route

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

27 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

1 13$ 26,000

Reconstruction Project

185 $ 1,500Planned Maintenance

8 11.5$ 5,000Pothole Repair

(2000)

(100)

(2500)

$8,000$2,000

$6,300$2,100

$16,100$4,600

$3,150$2,100

$500 $100

Segment Cost

Cost per mile

Exor provides powerful reporting across data sets

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

28 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

100.07 101.52 101.7 101.83 101.95 102.16 102.54

5.6 6.2 7.0 8.0 7.0 6.4

Width

102.54100.07 101.52 101.75 101.9 102 102.4

30 40 31 29 41 25

Roughness

100.07 101.52 101.75 101.83 101.95 102 102.54102.4

Merge ResultsWidth < 8

AND

Roughness <40

And Merge Query functionality like this

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

29 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Information Manager: Actionable Intelligence

29

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

30 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Information Manager: Actionable Intelligence

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

31 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

Global Adopters

31

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

32 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

National Road Works Portal www.roadworksonline.org.uk

© 2

012

Ben

tley

Syst

ems,

Inco

rpor

ated

33 | WWW.BENTLEY.COM India Geospatial Forum –February 2012

• Engineering Information Management for Integrated Asset Management

• Enhances interoperability– Other Bentley Asset Lifecycle solutions– Third Party Solutions

• Proven Solutions

• Post Go-Live Support– Active user Community– Enhancements– Safeguard user investment

Summary