© agilix agile development consulting 看, カン 板, バン kan ban 30 min intro cesario ramos

12
© AgiliX Agile Development Consulting 看 , 看看 看 , 看看 Kan Ban 30 min intro Cesario Ramos

Upload: mary-linscott

Post on 14-Dec-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

看 , カン 板 , バン Kan Ban

30 min intro

Cesario Ramos

Page 2: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

Page 3: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

Focus on FLOW

Cycle Time = Work In ProgressAvg Completion Rate

(Little’s Law)

Page 4: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

Overproduction

Delay

Hand-offsTask Switching

Defects

InventoryRelearning

Seeing WASTE

Page 5: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

Why KanBan

• By reducing the WIP all kinds of WASTE will emerge.

• Bottlenecks in the process become clear.

• You’ll get an average cycle time.• You’ll get an average wait time.

Page 6: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

Scrum v.s. KanBan

• Velocity• Sprint• WIP per sprint• Roles• Cannot

change sprint.• Item must fit

in sprint

• Cycle Time• No timebox• WIP per state • No Roles• Can change at

any time.• No timebox…

Page 7: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting | |

WIP and Cycle Time

Source: M Griffiths

Page 8: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting | |

Bottlenecks

Source: M Griffiths

Page 9: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

Page 10: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

One metric to rule them all

Lead Time =

CycleTime *

Work In Progress +

Delay Between Sub-Processes

Page 11: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

Improve Kan Ban bottlenecks using A3

• Lead Time gives us a clear indication for potential wastes.

• Analyze waste to determine current situation

• Specify future state• Find root cause by walking the gemba• Propose counter measures for attacking

root cause.• Make a plan.• Sell it to management.

Page 12: © AgiliX Agile Development Consulting 看, カン 板, バン Kan Ban 30 min intro Cesario Ramos

© AgiliX Agile Development Consulting

看 , カン 板 , バン Kan Ban

30 min intro