All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

Upload: everett-harper

Post on 03-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

All rights reserved 1

Managing Your Project Manager:

A Survival Guide for Data Professionals

January 2005

Karen Lopez

InfoAdvisors.com

Page 2: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

2All rights reserved

Karen López, I.S.P. Karen is the moderator of the Data

Modelling List. She has 18 years of data modelling experience on large, multi-project programs

She has a B.Sc. in Computer Technology / Information Systems from Purdue University

She is a former President of the Information Resource Management Association of Canada (IRMAC)

Page 3: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

3All rights reserved

Agenda

Warning Signs Getting it Right Survival Tips

Page 4: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

4All rights reserved

About this Presentation

We will be using an interactive format – your opinion counts

Opinions are good

Page 5: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

5All rights reserved

Why this Topic?

Because Project Management is HARD

Many IT professionals do not understand modeling

Your project manager will, in part or in whole, define the success of the project

Page 6: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

6All rights reserved

Karen’s Contribution

Contributor to Roundtable on Project Management, James Bullock (Editor), Gerald M. Weinberg (Editor), Marie Benesh (Editor), 2001, Dorset House, 093263348X

Page 7: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

7All rights reserved

Your Contribution

How many are project managers now?

How many have their project manager here?

Have you ever had to ask for MORE from your project manager?

Page 8: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

All rights reserved 8

Warning Signs

Page 9: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

9All rights reserved

Warning Signs

Your Project Manager is: Above pitching in Unwilling to remove

obstacles Compensated solely on

Project Plan dates

Page 10: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

10All rights reserved

Warning Signs

The project plan looks great, but…

Dates are hard and fast Level of effort isn’t The process is cutting

edge, but the project plan isn’t

Page 11: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

11All rights reserved

Warning Signs

Issue / Defect Lists Rudy’s Rutabaga Rule Perception of ‘No changes’ Lies, Damn Lies, and Statistics Analysis issues (every issue)

portrayed as ‘Data Model Issues’

Page 12: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

12All rights reserved

Warning Signs

You have a Methodology, but… The deliverables are more

important than the work they deliver

You are expected to spend more time preparing the documents than doing the work

More money is spent on publishing the deliverables than the tool used to prepare them

Page 13: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

13All rights reserved

Warning SignsWho will have update access to the

models? Just the Modelers? The Modelers and the DBAs The Modelers, the DBAs & the

Developers The Modelers, the DBAs the

Developers, the Project Managers, the Business Users, the Project Sponsors, and …

Page 14: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

14All rights reserved

Warning Signs

Done For Now (DFN) Milestones are met, for now Make up work never completed Great for an iterative effort, not

for a waterfall effort No scheduled task times for

iteration White Bread Warning The cost of fixing DFN grows

rapidly the further you go….

Page 15: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

15All rights reserved

Warning Signs

Finish-to-Start mindsets Nothing, absolutely nothing can

start until the data models are done

No tasks can start or be done in parallel

Outstanding Issues are always called Data Model Issues

No one understands that it is the modeling that is important, not the models.

Page 16: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

16All rights reserved

Warning Signs

YOU think your job is only data modeling…

You think everyone will see the value of the data modeling

You think everyone knows what a data model is

You think everyone agrees what a good data model is

You think everyone knows your jargon

You don’t understand it’s the modeling, not the models.

Page 17: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

17All rights reserved

Your Contribution

What warning signs have you experienced?

What warning signs have you been responsible for?

What are “Encouraging Signs” you have observed?

Page 18: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

All rights reserved 18

Can you answer…Who is your Project Manager?

Page 19: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

19All rights reserved

Just Who is your PM?

One? One from each project

partner? One and your Manager? One from each partner, the

official one, your manager, her manager and your spouse?

Page 20: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

All rights reserved 20

Getting it RightSome things to think about…

Page 21: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

21All rights reserved

Getting it Right: How long will it take?

1 hour per attribute…. 5 days per subject area… More than you think…. From now until the end of the

project…. What if Quality is Job Null?

Page 22: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

22All rights reserved

Getting it Right: How long will it take?

Questions to ask: What kind of project is this?

Strategic, Enterprise, long term value

Tactical, Enterprise, medium term value

Chaotic, agile, extreme, desperate, someone will is probably going to go to jail if we don’t get this done on time….

Page 23: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

23All rights reserved

Getting it Right: How long will it take?

Questions to ask: Where will the work be done

Just on the other side of the cube

In a few corporate locations Here, there, and everywhere Days away

Page 24: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

24All rights reserved

Getting it Right: How long will it take?

Questions to ask: What tools will we be using?

Our favorite data modeling tool A data modeling tool A modeling tool Tool? You need a special

tool? How much are they?

Page 25: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

25All rights reserved

Getting it Right: How long will it take?

Questions to ask: What process will we be using?

CMM-5 / Best Practice / ? Our usually methodology Process? What do you mean by

“process”. Here’s the project plan – that’s our

process.

Page 26: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

26All rights reserved

Your Contribution

How do you estimate modeling efforts?

Where/how have your estimates been the most inaccurate?

Shouldn’t we just double all our estimates?

Page 27: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

27All rights reserved

Getting it Right: How much will it cost?

.5 FTE per average project … 2 FTEs if you wait too late in the

project More than you think It depends…how much money

do you have? The Orange Juice Test

Page 28: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

28All rights reserved

Your Contribution

How do you estimate these non-labor costs?

When/how did you once mis-estimate cost?

Page 29: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

29All rights reserved

Getting it Right: Who should be involved?

Data Modeler Logical Physical

Enterprise Architect DBA Process Modeler Requirements Analysts Business Analysts Subject Matter Experts ???

Page 30: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

30All rights reserved

Your Contribution

Who should be involved? When should they be involved? Who shouldn’t be involved?

Page 31: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

31All rights reserved

Getting it Right: When?

Right from the start Defining Scope Recruiting existing modeling

resources Preparing modeling environment Tailoring standards Recruiting People Training

Page 32: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

32All rights reserved

Timing is Everything

When’s a good time to start modeling? Just before the code is delivered “Can

you fix this”? When they need a database “Please

Hurry!” When the other modeling is happening

“Our tool can’t generate a working database…can yours?”

From the beginning “How can I help you?”

Page 33: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

33All rights reserved

Your Contribution

How do you balance the timing of modeling?

How early do you get to be involved?

What is the best way to get yourself in the early stages of the project?

Page 34: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

All rights reserved 34

Survival TipsSome things to think harder about…

Page 35: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

35All rights reserved

Survival Tips

Be collaborative (even if they don’t deserve it ) Intranet PDFs Spare copies of Diagrams I think I can… Feel their pain

Page 36: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

36All rights reserved

Survival Tips

Say Baseline (or whatever word you chose), not Done Baselines: Versions with

expected changes Done: No expected changes Baseline everything, not just the

data models

Page 37: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

37All rights reserved

Survival Tips

Don’t be the Data Gang / Clique / Opposing Team Do Lunch Share Knowledge Sit with the team Talk the team up, not down

Page 38: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

38All rights reserved

Survival Tips

Know the Project Plan A plan is not just a Gantt Chart Current and future tasks Provide insight to the PM on

Risks and Contingencies Identify problems when you

have proposed solutions

Page 39: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

39All rights reserved

Survival Tips

Know the Issues List Be more ready with stats than

anyone else Know the complexity of Issues Make sure that Issues are really

Issues

Page 40: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

40All rights reserved

Survival Tips Win the Confidence of the PM

Admit to mistakes Accurately reiterate others’

viewpoints, even if you don’t agree

Feel the pain Know the political goals as

well as the project goals Get to the point where the PM

asks you first

Page 41: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

41All rights reserved

Survival Tips

Acknowledge philosophical differences The earlier in the debate, the

better Once the decision is made,

don’t waste everyone else’s time revisiting it

Know how to express the pros and cons of all sides

Page 42: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

42All rights reserved

Survival Tips

Be a Professional Track your errors Track the causes Build tools to overcome these

errors Document your procedures Leverage your tools

Page 43: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

43All rights reserved

Survival Tips

Be a Professional Know more about the tool than

anyone else on the team Be literate in other modeling

techniques and tool Know the lingo of other

approaches

Page 44: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

44All rights reserved

Survival Tips

Be a Professional Know the limits of your tool Leverage its features Manage the Sizzle Produce readable diagrams Produce really readable

diagrams Never present a diagram without

the model…

Page 45: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

45All rights reserved

Your Contribution

What are your best survival tips?

How did you learn them? Do you record formal post-

project reviews?

Page 46: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

46All rights reserved

Finally…

You will fail if you think your only job is to produce a high quality data model

Carry your ammo, but don’t be trigger happy

Be able to address every problem / challenge / issue with Cost, Benefit, and Risk

Page 47: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

47All rights reserved

Online Data Modelling Resources

InfoAdvisors (http:///www.infoadvisors.com) The Data Model List Product User Discussion

Groups (ERwin, Advantage Repository, Visible Analyst/Advantage, ER/Studio, DBArtisan, CaseWise)

Page 48: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

48All rights reserved

Recommended Books Data Modeling Essentials, Simsion and Witt Building Quality Databases with IDEF1X, Thomas

Bruce, The Data Modeling Handbook, Michael Reingruber &

William Gregory, 1994, Wiley QED, ISBN0-471-05290-6

A Practical Guide to Logical Data Modeling, George Tillmann, 1993,

McGraw-Hill, $45, ISBN 0-07-064615-5

Page 49: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

49All rights reserved

Recommended Books

Secrets of Consulting, Gerald Weinberg, 1986, Dorset House, 0932633013

Page 50: All rights reserved 1 Managing Your Project Manager: A Survival Guide for Data Professionals January 2005 Karen Lopez InfoAdvisors.com

50All rights reserved

InfoAdvisors

11066 Sheppard Ave East

Toronto, ON CANADA

[email protected]

http://www.infoadvisors.com