contents · contents lcff supplemental ... 2 – alameda county office of education (acoe) - 6382...
TRANSCRIPT
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
69
Contents LCFF Supplemental / Concentration Funds (LCAP) ..................................................................................... 73
Efficacy Work - 1262 ............................................................................................................................... 73
Whole School Intervention - 1260 .......................................................................................................... 74
Library Materials and Renaissance Learning - 1150 ............................................................................... 75
Expand College and Career - 1120 .......................................................................................................... 76
Linked Learning Career/Pathways - 1121 ............................................................................................... 77
Science, Technology, Engineering and Mathematics (STEM) Fabrication (FAB) Lab - 1160 ................... 78
Full Day Kindergarten - 1250 .................................................................................................................. 79
Helms/DeAnza Whole School Intervention - 1263 ................................................................................. 80
English Language Learner (ELL) Assessment & Reclassification - 1270 .................................................. 81
English Learner Master Plan - 4170 ........................................................................................................ 82
Class Size Reduction (CSR) Staffing for Secondary - 1251....................................................................... 83
Summer Out of School Time - 1290 ........................................................................................................ 84
Grad Tutor Program - 1280 ..................................................................................................................... 85
Reading Support - 1261 .......................................................................................................................... 86
Practices for African American Student Support/Success - 1180 ........................................................... 87
Puente Counseling Program - 1125 ........................................................................................................ 88
Support Services for High Performing Students - 1130 .......................................................................... 89
Additional Calendar Days for Teachers - 2312 ........................................................................................ 90
Professional Development Classified Training Day - 2311...................................................................... 91
Site Funding to Implement Single Plan for Student Achievement (SPSA) – RS 9670 ............................. 92
Collaboration & Professional Development - 6110 ................................................................................ 93
Implement California, English Language Learner (ELL) Standards with an Equity Lens - 2310 .............. 94
Practices for African American Student Support/Success - 2180 ........................................................... 95
School Community Outreach Workers (SCOWs) - 3110 ......................................................................... 96
Parent University and Volunteer Support - 3120 ................................................................................... 97
Practices for African American Student Support and Success (PAASSS) - 3180 ..................................... 98
Restorative Justice, BEST, Toolbox, Super Achievement - 4223 ............................................................. 99
Campus Safety Officers (CSO) - 4221 .................................................................................................... 100
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
70
Social Emotional Support - 4220 ........................................................................................................... 101
Increase Services for Visual and Performing Arts (VAPA) - 4230 .......................................................... 102
Expand Extra Curricular Coordination - 4250 ....................................................................................... 103
Expand Secondary Extra Curricular - 4251 ............................................................................................ 104
Playworks - 4222 ................................................................................................................................... 105
Technology Coaches - 4150 .................................................................................................................. 106
Full Service Community Schools - 4240 ................................................................................................ 107
Special Education - 4260 ....................................................................................................................... 108
Social Work Services - 4270 .................................................................................................................. 109
Social Work Services - 4272 .................................................................................................................. 110
Training for Foster Youth - 4271 ........................................................................................................... 111
Improve Health & Physical Fitness - 4231............................................................................................. 112
Typist Clerk Support for LCAP Data Entry - 5250 .................................................................................. 113
Adaptive Curriculum - 6250 .................................................................................................................. 114
Evaluations & Program Monitoring - 5260 ........................................................................................... 115
LCFF Base Funding ..................................................................................................................................... 116
Curriculum Development Instructional Support ................................................................................... 116
Pupil Services ........................................................................................................................................ 117
Student Instruction ............................................................................................................................... 118
Professional Development Recruitment ............................................................................................... 119
Community, Civic and Parent Engagement .......................................................................................... 120
Site Supervision and Security – Full Time ............................................................................................. 121
Site Supervision and Security - Hourly .................................................................................................. 122
Business Services .................................................................................................................................. 123
Human Resources ................................................................................................................................. 124
Facility Maintenance and Operations ................................................................................................... 125
Debt & Transfers ................................................................................................................................... 126
Board & Superintendent ....................................................................................................................... 127
General Services .................................................................................................................................... 128
Student Instruction – Direct Instruction ............................................................................................... 129
Student Instruction – Technology and Data Processing ....................................................................... 130
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
71
School Site Administration .................................................................................................................... 131
Restricted Grant Funding .......................................................................................................................... 132
Donation & Abatement Accounts - 911x / 9599 ................................................................................... 132
Title I - 3010 .......................................................................................................................................... 133
School Improvement Grant (SIG) - 3180 ............................................................................................... 134
Carl Perkins Career Tech Ed - 3550 ....................................................................................................... 135
21st Century After School Program - 4124 ........................................................................................... 136
Title III Immigrant Education - 4201 ..................................................................................................... 137
Title III English Language - 4203 ............................................................................................................ 138
Career Pathways Trust (CPT) 2 – Alameda County Office of Education (ACOE) - 6382 ........................ 139
Career Technical Education Incentive Grant (CTEIG) Program - 6387 .................................................. 140
California Partnership Academy - 6385 ................................................................................................ 141
California Partnership Academy - 7220 ................................................................................................ 142
Quality Education Investment Act (QEIA) - 7400 .................................................................................. 143
Project READ - 9011 .............................................................................................................................. 144
Sprint, Microsoft Voucher, Technology - 9012, 9030, 9908 ................................................................. 145
Miscellaneous Grant - District Disaster Preparedness – 9121 / 9132 .................................................. 146
Regional Occupation Program (ROP) - 9513 ......................................................................................... 147
Chevron - 9531 ...................................................................................................................................... 148
Miscellaneous Grants - “Gear Up” and College Awareness - 9569 / 9626 ........................................... 149
Career Pathways Trust (CPT) 1 – Peralta College - 9582 ...................................................................... 150
Irene Skully Family Foundation - 9595 .................................................................................................. 151
FAB Foundation - 9637 .......................................................................................................................... 152
Federal Pre-K Staff Development - 3345 .............................................................................................. 153
Title II - 4035 ......................................................................................................................................... 154
Math and Science Partnership - 4050 ................................................................................................... 155
Educator Effectiveness - 6264 ............................................................................................................... 156
Math Professional Development - 9630 ............................................................................................... 157
Alameda County Office of Education (ACOE) Integrated Middle School Science (IMSS) - 9638 .......... 158
Special Education Individuals with Disabilities Education Act (IDEA) - 3310-3320, 3395 ..................... 159
Special Education Mental Health Services - 3327 ................................................................................. 160
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
72
Special Education Early Intervention – 3385 ........................................................................................ 161
Department of Rehabilitation Transition - 3412 ................................................................................... 162
McKinney Vento Homeless Program - 5630 ......................................................................................... 163
Medi-Cal Billing- 5640 ........................................................................................................................... 164
California Promoting the Readiness of Minors in Supplemental Security Income (PROMISE) – 5840 . 165
State After School Program - 6010 ....................................................................................................... 166
Special Education State & Local - 6500-6515........................................................................................ 167
Special Education WorkAbility 1 - 6520 ................................................................................................ 168
Miscellaneous Grants - 9122, 9405, 9550, 9576, 9607 ......................................................................... 169
Medi-Cal Admin (MAA) Oral Health – 9133, 9134 ................................................................................ 170
School Based Medi-Cal - 9135............................................................................................................... 171
Local Parcel Tax - 9190 .......................................................................................................................... 172
West County Transportation - 9590 ..................................................................................................... 173
Kaiser Community Benefit - 9618 ......................................................................................................... 174
YMCA Morehouse - 9620 ...................................................................................................................... 175
Portola Science Trust - 9660 ................................................................................................................. 176
Tobacco Use Prevention Education (TUPE) Program - 9688 ................................................................ 177
Teen Pregnancy Prevention (TPP) – 9930 ............................................................................................. 178
High School Theater - 9933 ................................................................................................................... 179
CA Clean Energy - 6230 ......................................................................................................................... 180
Lottery Restricted - 6300 ...................................................................................................................... 181
Routine Repair & Maintenance - 8150 ................................................................................................. 182
Maintenance and Recreation District (MRAD) - 9200 .......................................................................... 183
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
73
LCFF Supplemental / Concentration Funds (LCAP)
Efficacy Work - 1262
Program
1262
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.01
Efficacy Work
$95,534
School Wide
1
Student
Achievement
for All
Description:
Peres Elementary currently implements the Efficacy framework to help adults improve student
performance by offering a practical, research-oriented approach that focuses on the following three key
areas: Mission: Academic proficiency and strong character for all students, Mindset: You aren’t born
smart; you get smart, and Method: Effective use of data as feedback to drive improvements. Peres has
been continuously improving student achievement over the last 7 years, and school stakeholders know
they have more work to do. One additional teacher is being hired to support the Peres work.
Recommendation:
Continue to support the Peres program and examine ways to replicate the success at more schools in
the district.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$95,534
1
$95,534
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
74
Whole School Intervention - 1260
Program
1260
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.02
Whole
School
Intervention
$914,522
School Wide
26.28
Student
Achievement
for All
Description:
This program is located at Stege & Dover Elementary Schools. The program includes coring in
ELA/Social Studies and Math/Science, a vice principal, two teachers for the learning center, a school
community outreach worker (SCOW), two aides for the learning center, extra teacher hourly for
professional development, monies for an extended year, collaboration time for teachers to learn about
and create a professional learning community at Stege. Additional counseling, a visual and performing
arts program and after school program support are also included.
Dover will see the addition of a vice principal and a teacher and teacher aide for the learning center.
(The standard staffing in Learning Centers is one teacher and one aid, this initiative provides for
additional staffing.)
Recommendation:
The allocation will be increased for the raises recently approved by the board.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$632,324
$282,198
4.98
$914,522
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
75
Library Materials and Renaissance Learning - 1150
Program
1150
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.03
Library Materials
and Renaissance
Learning
$340,657
District
N/A
Student
Achievement
For All
Description:
Accelerate student learning with additional library books and instructional materials, as well as support
the K-8 Renaissance Learning assessment program (STAR Early Literacy, STAR Reading and
Accelerated Reader)
Data from the elementary program is used to do the following:
-pairing students with books at their independent reading level both in classroom libraries and school
libraries
-providing information to parents about students' reading levels, areas of strengths and areas where
extra support is needed
-placing students in intervention and/or acceleration groups which enables teachers to target specific
student learning needs
-providing learning tools and resources designed specifically to meet identified student learning needs
-identification and placement of students in summer learning intervention program
Data from the middle program is used to do the following:
-Inform teacher selection of texts based on students reading levels, providing greater access to the core
curriculum
-Make adjustments in teacher instructional practices
-Assign placement in secondary Intervention for Read 180
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$340,657
0
0
$340,657
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
76
Expand College and Career - 1120
Program
1120
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.04
Expand
College and
Career
$2,671,410
District
9.20
Student
Achievement
For All
Description:
- Provides Secondary Counselors at Greenwood Academy, Kennedy High, DeAnza High and
Richmond High
- Provides the Gateway to College program for students attending Greenwood Academy
Recommendation:
Continue the funding for the Secondary Counselors in the 2016-2017 school year.
The Counselors will provide the following support:
- Rising Scholars (11th & 12th grade cohorts)
- Richmond Promise
- Build college & career culture at site
- Assist with classroom presentations
- Assist with scholarships (provide seniors with brag sheet, resources, tips, etc.)
- Assist with College Apps
- Review personal statements
- Assist with Contra Costa College
- Registrar seniors for SAT college day
- Assist with PSAT 8/9, PSAT, SAT administration
- Review PSAT results with students
- Assist with Web Grants
- Assist with FAFSA completion
- Host College Presentations/ College visits
- Hold monthly collaborative meetings with counselors and CBOs
- Identify and recruit students for summer programs
- Assist with Signing/Decision Day
The district will also cover the cost for the College Board Advanced Placements exams at the
comprehensive and alternative high schools.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$2,628,835
$42,575
2.09
$2,671,410
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
77
Linked Learning Career/Pathways - 1121
Program
1121
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.05
Linked Learning
Career/Pathways
$1,067,293
District
6.40
Student
Achievement
For All
Description:
Pathways/Academies are the major reform initiative at our secondary schools. These monies will
support additional FTEs to support pathways by ensuring pure student cohorts, common prep time for
teachers to collaborate and plan, professional development/coaching, supplemental materials and
central office support staff.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,063,951
$3,342
2.40
$1,067,293
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
78
Science, Technology, Engineering and Mathematics (STEM) Fabrication (FAB) Lab - 1160
Program
1160
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.06
STEM
FAB
Lab
$372,839 District
1.0
Student
Achievement
For All
Description:
To implement Fab Lab and provide additional materials, supplies, and staff for the Fab Lab, as well as
professional development to staff on what a Fab Lab is and how to use the equipment proficiently to
create and make “almost anything.” Provide support staff to supervise the lab on weekdays and
weekends, supplies, materials, teacher hourly for ongoing training, summer institute, and supplemental
3D printers, laser cutters, and vinyl cutters. Also support the hybrid and mobile labs.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$370,565
$2,274
0.0
$372,839
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
79
Full Day Kindergarten - 1250
Program
1250
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.07
Full
Day
Kindergarten
$2,297,086
District
30.80
Student
Achievement
For All
Description:
For the 2016-17 school year each elementary site will provide full day kindergarten. Fairmont will be
unable to implement in 2016-17 due to space constraints.
Recommendation:
Increase funding of full day Kindergarten to implement district wide.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,384,493
$912,593
2.00
$2,297,086
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
80
Helms/DeAnza Whole School Intervention - 1263
Program
1263
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.08
Helms/DeAnza
Whole School
Intervention
$1,400,000
School Wide
12.50
Student
Achievement
For All
Description:
To sustain critical parts of the Schoolwide Improvement Grant/Quality Education Investment Act
(SIG/QEIA) components in order to continue to improve/increase student achievement and college
readiness. The plan is to phase out support over a 3 year period to mitigate severe and immediate loss
of state funding and programs for the new academic school year. Funding covers additional FTE for
class size reduction, coaching, additional social-emotional & health services, and supplies and
materials to sustain increased student academic outcomes.
Recommendation:
Decrease is due to not re-allocating the proportional increase from 2015-16.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,487,411
($87,411)
0.0
$1,400,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
81
English Language Learner (ELL) Assessment & Reclassification - 1270
Program
1270
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.09
ELL Assessment
& Reclassification
$1,465,517
District
9.97
Student
Achievement
For All
Description:
Continue to support and improve services for English Language Learner Assessments at the state and
local level, ensure reclassification process serves students and families in a seamless manner, and
purchase necessary materials and provide professional development so families and staff have a
comprehensive understanding of and access to the Registration, Assessment, and Placement (RAP)
center services.
Recommendation:
Continue funding for ELL students. Proportional increase from 15-16 not ongoing.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,478,258
($12,741)
2.05
$1,465,517
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
82
English Learner Master Plan - 4170
Program
4170
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.10
EL
Master
Plan
$1,577,226
District
19.05
Student
Achievement
For All Description: We will continue to implement the six components of the Master Plan for English Learners (MPEL).
Identification, Assessment, and Program Placement– Staff determines EL student placement by reviewing the following; Home
Language Survey (HLS), CEDLT score, District curriculum embedded placement essay (Inside/Edge placement test at secondary), state
approved achievement test, teacher recommendation, and parent input. Placement changes are determined by several indicators of progress
toward English fluency, including: a change in student's CELDT level, a next level score on an on-demand writing prompt, and (at
secondary) achieving a mastery-level score on an end-of-level test.
Instructional Programs– Elementary level programs are: English Language Development (ELD), Structured English Immersion (SEI),
Transitional Bilingual Education (TBE), and Dual Language Immersion (DLI) classrooms. Secondary Level programs are: SEI Sheltered
Content Classes and Secondary English Language Development (ELD). The instructional focus, aligned to CA ELD Standards, emphasizes
research-based strategies. Inside (MS) and Edge (HS) are the programs used in secondary schools. The focus is on rigorous daily
instruction, Integrated & Designated Instruction language development, Saturday EL Enrichment, and After School tutoring. In addition,
our Newcomer hubs at Helms Middle and Richmond High Schools will continue to support students enrolled fewer than 12 months.
Monitoring of Student Progress and Reclassification–English Learners are assessed annually with state-mandated and District-adopted
assessments to determine the student’s language proficiency level, growth in English language development, and academic performance.
The following assessments are used to identify students’ progress and/or areas of need: CELDT, ELD Benchmarks, District identified ELD
Placement Tests, Pathway to Reclassification and Seal of Bi-literacy.
Staffing and Professional Development– WCCUSD EL services are provided by CLAD & BCLAD certified teachers & administrators,
EL Coaches, content & language development EL Consultants, Bilingual Grad Tutors, and a Project Assistant.
Professional development is provided in various areas ranging from Elementary Integrated and Designated ELD, CA ELA/ELD Standards,
content embedded Specially Designed Academic Instruction (SADIE) and ELD for Secondary, with strategies to support
newcomers/immigrant students in all trainings. Student performance data is also used to determine PD offered to staff. Other supports
included ELD Coaching and support, an ELD Train–the-Trainer model to build capacity, targeted EL writing strategies, online ELD
Benchmarks and online Report Card workshops. Teachers, staff and administrators attend conferences and seminars on the CA ELA/ELD
Standards, Long Term English Learners (LTELs), ELs with Disabilities, etc. through the SCCOE Learning Circle Network, CCCOE,
CABE, etc.
Parent and Community Involvement– The EL K-12 staff and the Community Engagement office provide district and school site
presentations and professional development on EL students programs, EL student language proficiency levels, academic performance, and
technical assistance on instructional program decision-making to parents (i.e., ELAC, MDAC, MPEL Advisory, etc.).
Evaluation and Accountability– We provide teacher and administrator support to access online tools to monitor EL student performance
data through: Illuminate, CELDT scores, ELD Benchmarks and EL writing assessments, Report Cards, IDRL (K-1), STAR Reading
Assessment (in Spanish), ELA Benchmarks (in Spanish) and ELA Writing Benchmarks (in Spanish).
Recommendation:
Provide additional teaching staff for instructional program to keep class sizes in TBE small with no combination
grades and provide a hub for the program at Bayview.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,514,411
$62,815
3.03
$1,577,226
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
83
Class Size Reduction (CSR) Staffing for Secondary - 1251
Program
1251
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.11
Class Size
Reduction
Staffing for
Secondary
$1,864,458
School Wide
16.80
Student
Achievement
For All
Description:
The 2016-17 LCAP includes additional staffing at secondary schools with an unduplicated count above
60%. The schools and full time equivalent are as follows:
Richmond High School 5.20 (FTE)
Kennedy High School 3.0 (FTE)
Pinole Valley High School 3.6 (FTE)*
Greenwood Academy 4.0 (FTE)
DeJean Middle School 1.6 (FTE)*
Crespi Middle School 1.4 (FTE)*
Pinole Middle School 2.0 (FTE)*
(Note DeAnza and Helms are receiving targeted assistance)
Recommendation:
Increase the allocation over the 2015-16 school year to include the four new schools* and support
lower class sizes at the secondary level.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,162,781
$701,677
16.80
$1,894,458
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
84
Summer Out of School Time - 1290
Program
1290
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.12
Summer Out
of
School Time
$748,002
District
N/A
Student
Achievement
For All
Description:
Continue to provide Summer out-of-school time services to highest need students. Funding supports
staffing and general supplies and materials.
Recommendation:
Decrease is due to not re-allocating the proportional increase from 2015-16.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$818,257
($70,255)
N/A
$748,002
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
85
Grad Tutor Program - 1280
Program
1280
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.13
Grad
Tutor
Program
$1,917,251
School Wide
43.53
Student
Achievement
For All
Description:
Graduate Tutors are positions that provide academic support to low performing students at their
assigned schools, including an emphasis on ELs to improve English proficiency. In 15-16, there are 40
full time Graduate Tutor positions.
Grad Tutors, at the elementary level, are especially focused on supporting the learning center model
(serving students who are 2 or more levels below grade level) at high need schools. This includes
professional development for the tutors.
Recommendation:
To revise the allocation of Graduate Tutors to sites with an UDC of 55% and above. The allocation will
be increased for the raises recently approved by the board.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,923,975
($6,724)
5.40
$1,917,251
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
86
Reading Support - 1261
Program
1261
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.14
Reading Support
$484,052 School Wide
5.14
Student
Achievement
For All
Description:
Read 180/System 44 is the secondary reading intervention program for the district. This program is a
comprehensive, research-based intervention that uses a blended learning model.
Classes are available to mainstream, special education (RSP, NSH, and SH), and EL students and are
run at reduced class size with a maximum of 24 students in a mainstream push-in class. The program
was updated and expanded starting in 14-15 as a required component of the middle school Project Read
grant. Formal mid-year and end-of-year data reviews are completed by Scholastic/Houghton Mifflin
Harcourt.
Teachers participate in ongoing professional development with peer observation and goal planning,
known as “cadre days”.
Recommendation:
Increase the number of classes offered so that the program can be fully implemented at all middle and
high schools. This program was not broken out before, but has been offered. The District is creating a
new program number for it so it can be tracked separately.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$484,052
5.14
$484,052
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
87
Practices for African American Student Support/Success - 1180
Program
1180
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.15
Practices for
African American
Student
Support/Success
$400,000
District
N/A
Student
Achievement
For All
Description:
Our goal is to ensure that all students are college and career ready able to make life choices with
productive and positive outcomes. We have a special lens on our African American students who have
been traditionally underserved. We have implemented or expanded some practices, strategies and
frameworks that support this goal and lens.
Practices for African American Student Support and Success (PAASSS) currently include the African
American Male Pipeline Project, African American Support Collaborative Student workshops, Efficacy
framework, model and training, afterschool program for Richmond Steelers, Growth
Mindset/Brainology, and African American Honors Gala event.
We will continue to work with our stakeholders to ensure that our African American students are
prepared for college, career, and life.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$400,000
N/A
$400,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
88
Puente Counseling Program - 1125
Program
1125
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.16
Puente
Counseling
Program
$60,000
School Wide
0.0
Student
Achievement
For All
Description:
The Puente staff will work with school staffs to monitor student progress towards college readiness, as
well as help to motivate students to be successful in high school. Students engage in leadership and
cultural activities, including visits to a range of colleges and universities. Staffs also regularly
engage parents in workshops focused on supporting children in their college and career goals.
Puente students also take an accelerated 9th and 10th grade sequence of college preparatory English
that integrate Latino and multicultural literature into the district’s mandated core curriculum.
This program will be piloted at Richmond High School
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$60,000
0.0
$60,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
89
Support Services for High Performing Students - 1130
Program
1130
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1.17
Support Services
for High
Performing
Students
$100,000
District
N/A
Student
Achievement
For All
Description:
Implement innovative programs for high performing students to promote deep and rigorous learning in
all content areas, including the arts. Students are identified through a variety of data sources so
services and programs can be tailored to meet their learning needs. Professional development on
working with high performing students is provided to enable teachers and administrators to plan and
deliver effective, high quality programs.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$100,000
N/A
$100,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
90
Additional Calendar Days for Teachers - 2312
Program
2312
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 2.01
Additional
Calendar
Days for Teachers
$3,781,822
District
N/A
PD & Recruitment
of High Quality
Staff
Description:
Provide teachers with 6 additional days (on top of the instructional calendar days) for teacher and
certificated personnel, preparation and professional development opportunities that are in-person and
on-line. Professional learning will focus on the California Standards WCCUSD Areas of Focus,
classroom management, social-emotional learning, and parental engagement.
Recommendation:
During the 2015-16 school year, 4 days were available to teachers outside the regular instructional day.
An additional 2 days have been added to teacher and all instructional related work year calendars.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$2,918,731
$863,091
N/A
$3,781,822
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
91
Professional Development Classified Training Day - 2311
Program
2311
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 2.02
Professional
Development
Classified
Training Day
$461,317
District
N/A
PD & Recruitment
of High Quality
Staff
Description:
The money will be used to train classified support staff. Staff who have support roles in schools and
classrooms will learn about the California standards, classroom management, relevant social-emotional
learning programs, and parental engagement.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$11,317
$450,000
N/A
$461,317
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
92
Site Funding to Implement Single Plan for Student Achievement (SPSA) – RS 9670
Program
RS 9670
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 2.03
Site Funding to
Schools
$3,800,000
District
18.33
PD & Recruitment
of High Quality
Staff
Description:
Site funding to schools for implementation of school plans.
Recommendation:
Decrease due to carry-over not reflected in 2016-17 initial allocation. This figure will be available once
we close the year out.
Identified change includes $400,000 increased allocation.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$4,137,197
($337,197)
$3,800,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
93
Collaboration & Professional Development - 6110
Program
6110
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 2.04
Collaboration
&
Professional
Development
$524,776
District
2.00
PD & Recruitment
of High Quality
Staff
Description:
Instructional Leadership Team (ILT) Academy (Summer Institute, beginning of the year, mid-year, and
end-of-the year check-ins) and Best Practices conferences, coaching, and ongoing collaboration
activities, academic conferencing and data analysis support, writing calibration sessions, districtwide
gatherings for PD and data chats, national board certification collaboration, elementary report card
meetings, piloting online systems (i.e. Edivate), Principal Cadre planning and collaboration,
collaboration work with Pivot Learning, and general professional development work. These monies
provide for extra teacher hourly costs, contract with Pivot Learning for ILT coaching, and PD Location
costs for ILT Professional Development.
Response to intervention is also supported with this funding.
Recommendation:
Funding support remains the same.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$524,776
$0
2.00
$524,776
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
94
Implement California, English Language Learner (ELL) Standards with an Equity Lens - 2310
Program
2310
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 2.05
Implement
California
Standards, ELL
Standards
w/Equity Lens
$152,035
District
1.15
PD & Recruitment
of High Quality
Staff
Description:
Provide professional development, coaching, and data support tools for certificated staff.
Recommendation:
Decrease is due to not re-allocating the proportional increase from 2015-16.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$158,330
($6,295)
0.00
$152,035
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
95
Practices for African American Student Support/Success - 2180
Program
2180
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 2.06
Practices for
African American
Student
Support/Success
$175,000
District
N/A
PD & Recruitment
of High Quality
Staff
Description:
Our goal is to ensure that all students are college and career ready able to make life choices with
productive and positive outcomes. We have a special lens on our African American students who have
been traditionally underserved. We have implemented or expanded some practices, strategies and
frameworks that support this goal and lens.
We will provide additional training for teachers in support of our Practices for African American
Student Support and Success (PAASSS). Professional development will range from Mindset Works
and the Growth Mindset Teacher Leader development and coaching series to Efficacy, building
emotional intelligence, and culturally responsive and relevant practices.
We will continue to work with our stakeholders to ensure that our African American students are
prepared for college, career, and life.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$175,000
$175,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
96
School Community Outreach Workers (SCOWs) - 3110
Program
3110
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 3.01
Community
Outreach
Workers
$2,134,651
District
41.5
Parent &
Community
Engagement
Description:
Continue strengthening parent engagement for targeted schools by funding School Community
Outreach Workers (SCOWs). School Community Outreach Workers support family engagement and
partnerships school wide. SCOW’s are responsible for: processing parent, caretaker and community
requests for assistance/support by providing district resources and coordinating comprehensive
responses; developing, producing and distributing community related materials; assisting with the
distribution of resources to increase parent understanding and leadership to support their child's goals
toward high school graduation and college and career planning; supporting effective and consistent
practices for home-to-school communications about school programs, student progress and site-based
and district parent programs; participating in the recruitment and development of parent leaders to
serve on various site and district leadership bodies, including but not limited to: School Site Council
(SSC) English Language Advisory Committee (ELAC) and other district advisory committees;
assisting in researching and editing content for newsletters, websites and other weekly
communications; facilitating training for parents and all community members regarding empowering
parents toward more participation at their site and at the district level; assisting school sites in creating
educational equity and closing the achievement gap through parent engagement maximization;
assisting schools in developing and enhancing parent communications, school site plans and school
reporting for parent involvement; developing ongoing partnerships with local, regional, state and
federal advocates, children's advocates, senior services, disability advocates and other community
groups to increase resources and support for district students and staff.
Recommendation:
Revise allocation model to include schools with an UDC of 55% or above.
Improve the recruitment and retention of School Community Outreach Workers by offering more hours
and benefits with full time positions.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,568,694
$565,957
8.02
$2,134,651
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
97
Parent University and Volunteer Support - 3120
Program
3120
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 3.02
Parent University
/ Volunteer
Support
$497,038
District
0.50
Parent &
Community
Engagement
Description:
Funding to support Parent University, a program using California PTA School Smarts curriculum,
designed to foster parent engagement and create active parent leaders. Parent University is a seven
session program, implemented at 20 sites throughout the District, additional funding supports the
expansion of the program in 2016-17. Funding will also be used to offer ongoing parent leadership and
parent training opportunities throughout the school year, including the annual Parents as Partners
Conference. Home visit programming training will also be offered to staff to increase home visit
programs to strengthen family engagement at focused school sites.
Funding is also used to lower barriers for parent volunteers and participation by offering free
fingerprinting programs and promotion of districtwide volunteerism.
Recommendation:
Add additional funds for parent conference, home visit training for staff, and year round parent training
opportunities.
Increase funding for Parent University implementation and expansion. Continue funding for lower
barriers for parent volunteers and participation (volunteer program). 0.50 Central School Community
Outreach Workers to support Foster Youth (.5FTE—match with EHCY funding) and Low Income
Youth.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$497,021
$17
$497,038
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
98
Practices for African American Student Support and Success (PAASSS) - 3180
Program
3180
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 3.03
Practices for
African American
Student Support
and Success
(PAASSS)
$175,000
District
N/A
Parent &
Community
Engagement
Description:
Our goal is to ensure that all students are college and career ready able to make life choices with
productive and positive outcomes. We have a special lens on our African American students who have
been traditionally underserved. We have implemented or expanded some practices, strategies and
frameworks that support this goal and lens.
We are implementing the following PAASSS supplemental programs to increase parent voice, parental
involvement, and parental communication: Parent Efficacy Trainer of Trainer Model, African
American Parent Group, and African American Support Collaborative.
We will continue to work with our stakeholders to enhance programs and ensure that our African
American students are prepared for college, career, and life.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$175,000
N/A
$175,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
99
Restorative Justice, BEST, Toolbox, Super Achievement - 4223
Program
4223
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.01
Restorative
Justice, BEST,
Toolbox, Super
Achievement
$690,801
District
1
Student
Engagement &
Climate
Description:
Social-emotional supports must be in place to enhance optimum academic growth. We will continue to
implement the social-emotional practices and strategies of Restorative Justice, BEST, Toolbox,
Mindful Life, and Super Achievement so that they become part of our school and district culture and
climate. Peacemaker strategies/services are also being piloted at selected schools. Adding one
counselor to coordinate programs.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$530,612
$160,189
FTE
$690,801
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
100
Campus Safety Officers (CSO) - 4221
Program
4221
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.02
Campus Safety
Officers (CSOs)
$2,528,500
District
Student
Engagement &
Climate
Description:
Provide enhanced student safety with contract services for Campus Safety Officers.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$2,528,500
$0
$2,528,500
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
101
Social Emotional Support - 4220
Program
4220
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.03
Social Emotional
Support
$1,493,466
District
4.45
Student
Engagement &
Climate
Description:
Social-emotional support – allocate psychologists plus budget allocation to each high school to support
school climate
Recommendation:
The allocation will be increased for the raises recently approved by the board. The calculation is in
progress. Site allocations are also being increased by $25,000 at 6 high schools.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,322,125
$171,341
0
$1,493,466
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
102
Increase Services for Visual and Performing Arts (VAPA) - 4230
Program
4230
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.04
Increase Services
for VAPA
$1,200,215
District
4.40
Student
Engagement &
Climate
Description:
The funding for Visual and Performing Arts covers costs materials and supplies for elementary and
secondary school sites, and for the elementary and secondary Arts and Music Programs. In addition to
support of the secondary programs and District level performances and art shows, money is allocated
for use in areas such as equipment repair, equipment replacement, facility use rental, in-district
mileage, and transportation for student rehearsal, performance and field trips. Augment program with
culturally relevant practices, material, and training.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$348,079
$852,136
3.40
$1,200,215
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
103
Expand Extra Curricular Coordination - 4250
Program
4250
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.05
Expand Extra
Curricular
Coordination
$269,959
District
1.40
Student
Engagement &
Climate
Description:
The 2016-17 LCAP included providing a per pupil allocation as well as a prep period for each
comprehensive middle school, high school and two continuation high schools in order to promote
student engagement in co-curricular and extracurricular activities. These activities include Associated
Student Body programs and clubs as well as the arts, music and athletics. Each school was provided a
per pupil allocation based upon an unduplicated student count/enrollment weighted formula. Each
school is charged with engaging their students toward adding or enhancing co-curricular and
extracurricular programs at their schools.
Recommendation:
Is to continue funding for co-curricular and extracurricular coordination activities for the 2016-2017
school year.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$289,373
($19,414)
0.00
$269,959
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
104
Expand Secondary Extra Curricular - 4251
Program
4251
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.05
Expand
Secondary Extra
Curricular
$295,000
District
0.33
Student
Engagement &
Climate
Description:
The 2016-17 LCAP included providing a per pupil allocation as well as a prep period for each
comprehensive middle school, high school and two continuation high schools in order to promote
student engagement in co-curricular and extracurricular activities. These activities include Associated
Student Body programs and clubs as well as the arts, music and athletics. Each school was provided a
per pupil allocation based upon an unduplicated student count/enrollment weighted formula. Each
school is charged with engaging their students toward adding or enhancing co-curricular and
extracurricular programs at their schools.
Recommendation:
Is to continue funding for co-curricular and extracurricular activities for the 2016-2017 school year.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$292,000
$3,000
0.00
$295,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
105
Playworks - 4222
Program
4222
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.06
Playworks
$1,461,819
School Wide
N/A
Student
Engagement &
Climate
Description:
Provide “Playworks” at elementary schools with greater than 65% English Language Learner (ELL),
Low Income (LI) and foster youth students.
Recommendation:
Playworks and the District will partner to increase opportunities for safe and meaningful play for every
kid in 's elementary schools. For the duration of the 2016-17 school year, Playworks will provide a mix
of services addressing the unique needs of each partnering school. The following services will be made
available for schools:
1. Playworks will provide Playworks Program Coordinator to organize and implement Playworks
programming on site, daily. Available for 26 schools.
2. Playworks will provide an on-site shared Site Coordinator to both implement and model recess
programming for school designated recess teams. Available for 8 schools.
3. Playworks will provide professional development services to school staff, enabling the school
to take ownership of the initiation and implementation of their recess programming. Available
for up to 2 schools.
4. Playworks will provide full day professional development workshops for all noon supervisors
before the first day of school.
Decline due to not re-allocating the increase from 2015-16.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,463,333
($1,514)
N/A
$1,461,819
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
106
Technology Coaches - 4150
Program
4150
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.07
Technology
Coaches
$269,409
School Wide
2.0
Student
Engagement &
Climate
Description:
The funding provides additional services to teachers through a technology coaching program.
Technology coaches assist teachers from highest need schools to successfully integrate technology into
the curriculum. The coaches model lessons, collaborate with teachers, provide feedback and
demonstrate how to use technology to differentiate instruction and integrate it into daily practice for
adults and students.
Recommendation:
Increase allocation to include additional materials and supplies.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$249,605
$19,804
0
$269,409
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
107
Full Service Community Schools - 4240
Program
4240
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.08
Full Service
Community
Schools
$960,426
District
N/A
Student
Engagement &
Climate
Description: Current community schools sites: Coronado Elementary, DeAnza, El Cerrito, Greenwood
Academy, Hercules, Kennedy, Pinole Valley, and Richmond high schools, also contributes to
coordination at Helms Middle School & Dover Elementary. Site coordinators assist the Community
Engagement team in setting up Full Service systems including Community Schools Teams, Care
Teams, site-based coordination of community partnerships, health and wellness programs, and program
data tracking to support measurement of student outcomes. Responsible for overseeing connecting
supportive services to sites based on needs, working collaboratively with Community Engagement
Team and site based School Community Outreach Workers. Increased existing coordination contracts
to continue to expand services to serve all students. Add Community Schools Coordinator positions at
DeJean Middle School and Crespi Middle School. Add Community Schools Coordination funding to
support collaboration with Seneca Center’s Unconditional Education program to add 3 Full Service
Community Schools Elementary Schools sites.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,015,689
($55,263)
$960,426
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
108
Special Education - 4260
Program
4260
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.09
Special
Education
$4,872,937
District
9.60
Student
Engagement &
Climate
Description:
Special Education students constitute approximately 12.5% of the unduplicated count student
population. Special Education provides targeted services to students based upon their Individual
Education Plans. The cost of providing targeted services is a significant portion of the general fund
Special Education budget.
Recommendation:
Increase speech therapy services by adding hours to therapist workdays.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$3,623,841
$1,249,096
9.60
$4,872,937
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
109
Social Work Services - 4270
Program
4270
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.10
Social Work
Services
$441,554
School Wide
3.80
Student
Engagement &
Climate
Description:
Beginning in 2014-15 full-time psychologists were provided at the two highest needs Middle Schools -
DeJean and Helms, and one additional day of psychology services at next highest needs Middle
Schools – Crespi and Pinole Middle. Full-time psychologists were provided at the three highest needs
High Schools – Kennedy, Richmond High and DeAnza. Psychology services were also increased at
the Alternative High School with two additional days of psychology services at Greenwood Academy.
At the elementary level one additional day of psychology services at the nine highest needs elementary
schools was provided – Verde, Lake, Dover, Downer, Chavez, Lincoln, Grant Nystrom and King was
provided. Also, a 70% psychologist was placed at Stege for the pilot Whole School Intervention
Model.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$439,470
$2,084
0.00
$441,554
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
110
Social Work Services - 4272
Program
4272
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.11
Social
Work
Services
$70,000
School Wide
1.00
Student
Engagement &
Climate
Description:
To expand the mental health support for highest needs students at highest needs middle schools,
funding will be used to support licensed social worker and mental health clinicians at Helms and
DeJean Middle Schools
Recommendation:
Add additional funding for licensed mental health clinician.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$70,000
1.00
$70,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
111
Training for Foster Youth - 4271
Program
4271
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.12
Training for
Foster
Youth
$248,294
District
1.0
Student
Engagement &
Climate
Description:
Develop and provide trainings on foster youth data policy and practice to stakeholders; provide
ongoing consultation to school level staff on foster youth data issues as needed. Add itinerant Social
Work Specialist position to provide case management and support to Foster Youth and families
districtwide. Provides summer experiential program for foster youth / Upward Bound – Mills College.
Recommendation:
Modify program, continue to use a portion of the funding for policy and practice training to staff,
stakeholders, and school sites. In addition, utilize funding to support convening of monthly Foster
Parent Collaborative and Foster Youth Collaborative to provide direct support to foster you and parents
throughout the District.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$28,294
$220,000
1.0
$248,294
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
112
Improve Health & Physical Fitness - 4231
Program
4231
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4.13
Improve
Health &
Physical Fitness
$97,597
District
N/A
Student
Engagement &
Climate
Description:
Improve student welfare and physical fitness. Augment school PE supplies for program improvement.
Was previously funded within the LCAP in another category.
Recommendation: Was previously funded within the LCAP in another category. Recommend that it
is in its own program for clarity and increase funding to help the schools with supplies and support.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$120,597
($23,000)
$97,597
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
113
Typist Clerk Support for LCAP Data Entry - 5250
Program
5250
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5.01
Typist Clerk
Support for LCAP
Data Entry
$760,471
District
15.97
Basic
Services
For All
Description:
Continue to extend the workday for elementary typist clerks and extra support for targeted elementary
and secondary schools for data collection and entry.
Recommendation:
Continue the program at the existing level.
Decrease is due to not re-allocating the proportional increase from 15-16.
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$1,084,875
($324,404)
0.00
$760,471
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
114
Adaptive Curriculum - 6250
Program
6250
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5.02
Adaptive
Curriculum
$200,469
District
N/A
Basic
Services
For All
Description:
These funds are utilized to purchase on-line programs for students with disabilities and to provide
training to teachers to use these on-line programs. LCAP funds were used to purchase one year
licenses for the following programs:
Moby Max (Language Arts/Math) K-12 NSH/RSP
Reading A-Z (Language Arts/Math) K-12 NSH/RSP/SH
Raz Kids (Language Arts) K-12 RSP/NSH
Read and Write for Google (Language Arts) K-12 NSH/RSP/SH
Unique (Language Arts/Math) K-12/Transition SH
News-2-You (Language Arts/Math K-12/Transition SH
Boardmaker Online (Symbol Based Instruction) Pre-K-Transition SH Autism
Read Naturally Online (Language Arts) K-12 NSH/RSP
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$141,469
$59,000
N/A
$200,469
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
115
Evaluations & Program Monitoring - 5260
Program
5260
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5.03
Evaluations &
Program
Monitoring
$380,000
District
1.00
Basic
Services
For All
Description:
WCCUSD is contracting for services to help authentically evaluate and progress monitor the LCAP
actions and services for Goals 1 – 5.
It is critical that WCCUSD stakeholders are able to know and understand what is working well, not
working well, and what should be expanded with rationale and data.
Recommendation:
2015-16
Total
Allocation
2016-17
Identified
Change
New Jobs
Created
(FTE)
2016-17
Total
Allocation
$0
$380,000
1.00
$380,000
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
116
LCFF Base Funding
Curriculum Development Instructional Support
Base
Funding/Unrestricted
Function
2100, 2110,
2130, 2180
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1
Curriculum
Development
Instructional Support
$3,710,525 District 22.18
Student
Achievement
For All
Description:
Activities primarily for assisting instructional staff in planning, developing and evaluating the
process of providing learning experiences for students. This includes curriculum development,
staff support and assistance.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
117
Pupil Services
Base
Funding/Unrestricted
Function
3000-3999
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1
Pupil Services $10,774,274
District
&
School
25.64
Student
Achievement
For All
Description:
Activities involving assisting, counseling and assessment for students; assisting students with
guidance and testing; and programs for educational, college and career planning.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
118
Student Instruction
Base
Funding/Unrestricted
Function
1020
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 1
Student Instruction $1,180,786 School Wide 11.42
Student
Achievement
For All
Description:
Activities, services and supplies and equipment concerned with direct instruction with students.
Response to Intervention Program.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
119
Professional Development Recruitment
Base
Funding/Unrestricted
Function
2140, 7410
7420
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 2
Professional
Development
Recruitment
$1,174,800 District 3.20
PD &
Recruitment of
High Quality
Staff
Description:
In-House Instructional Staff development program and recruitment and staff development and
recruitment for non-instructional staff.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
120
Community, Civic and Parent Engagement
Base
Funding/Unrestricted
Function
2495, 4000,
5000, 7180
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 3
Community, Civic and
Parent Engagement $1,097,152 District 5.0
Community and
Parent
Engagement
Description:
Community, Parent and Civic engagement and communications includes community outreach,
public information office and facility use by civic and community organizations.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
121
Site Supervision and Security – Full Time
Base
Funding/Unrestricted
Function
83xx
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4
Site
Supervision and
Security
$4,419,945 School Wide 18.0
Student
Engagement
and Climate
Description:
Activities concerned with maintaining order and safety in school building on the school grounds
and in the vicinity of schools. Site supervision and safety using Campus Safety Officers and
School Resource Officers. Disaster preparedness program. School Resource Officer contracts
have been reduced.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
122
Site Supervision and Security - Hourly
Base
Funding/Unrestricted
Function
4100, 4200, 4900
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 4
Site
Supervision and
Security
$0 School Wide 0
Student
Engagement
and Climate
Description:
Hourly extra help for after school activities. The majority of after school programs are paid
through parcel tax, grants and fund raising.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
123
Business Services
Base
Funding/Unrestricted
Function 73xx
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
Business Services $3,769,829 District 34.75
Basic
Services
For All
Description:
Activities, services and supplies concerned with the fiscal operations of the school district
including budget, accounting, accounts payable, payroll, accounts receivable and fund
management.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
124
Human Resources
Base
Funding/Unrestricted
Function
74xx, 7120
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
Human Resources $2,980,593 District 23.0
Basic
Services
For All
Description:
Activities, services and supplies concerned with maintaining an efficient staff for the school
system. Including activities such as placements, transfers, credentialing and negotiations.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
125
Facility Maintenance and Operations
Base
Funding/Unrestricted
Function
8xxx, 7600
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
Facility Maintenance
and Operations $14,020,171
District
&
School
182.00
Basic
Services
For All
Description:
Activities, services and supplies and equipment concerned with keeping the physical plans and
grounds of all sites open and operating and in a satisfactory state of repair and condition. This
includes such items as custodial, plant operations and utilities.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
126
Debt & Transfers
Base
Funding/Unrestricted
Function
9xxx
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
Debt
&
Transfers
$988,731
District
0
Basic
Services
For All
Description:
Debt Service loan payment and State Special School fee.
The loan was refunded in 2006 and will be paid off January 1, 2024. There is a pre-payment
penalty.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
127
Board & Superintendent
Base
Funding/Unrestricted
Function
7110, 7130
7150, 7190
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
Board
&
Superintendent
$2,582,273
District
7.0
Basic
Services
For All
Description:
Activities, services and supplies concerned with establishing and administering policy for the
school district and the operations of the Superintendent’s Office and Board meetings. Includes
School Board, Superintendent, External Audit, Legal expenses.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
128
General Services
Base
Funding/Unrestricted
Function
7520 - 7551
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
General
Services $3,387,599
District
20.33
Basic
Services
For All
Description:
Activities, services and supplies and equipment concerned with purchasing and warehouse
operations, furniture services, central print shop, district “pony mail” delivery, central mailroom
and site copy machine repair services.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
129
Student Instruction – Direct Instruction
Base
Funding/Unrestricted
Function
1000
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
Student
Instruction $104,204,044 School Wide 1034.64
Basic
Services
For All
Description:
Activities, services and supplies and equipment concerned with direct instruction with students.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
130
Student Instruction – Technology and Data Processing
Base
Funding/Unrestricted
Function
77xx, 2420
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
Student
Instruction
$6,847,452
District
36.0
Basic
Services
For All
Description:
Activities, services and supplies and equipment concerned with technology and data processing
including hardware, software and support.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
131
School Site Administration
Base
Funding/Unrestricted
Function
2700, 7200, 7210
7500, 7510
2016-17
Proposed
Allocation
Level
of
Service
Total Jobs
Included
(FTE)
Goal 5
School Site
Administration $19,540,008
District
182.37
Basic
Services
For All
Description:
Activities, services and supplies concerned with directing and managing the operations of school
sites including principals, vice principals and clerical support staff at the site.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
132
Restricted Grant Funding
Donation & Abatement Accounts - 911x / 9599
Restricted/Grant Funding
911x 9599
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Donation & Abatement Accounts
$68,546
School Wide
2.20
Student Achievement
For All
Description: Donation & Abatement accounts are set up for every school in the District. There is a donation receiving protocol for schools and funds are placed in accounts so that schools can use them as donors intend. The school board acknowledges these donations and the district sends thank you letters for the donor’s tax records. Abatement accounts are set up for the collection of lost textbook or library books. Funds collected are to be used to re-purchase books.
Recommendation: The District does not budget in advance for such donations and abatements, budgets are established when funds are received. Any unused funds are carried over to the new school year and posted to budgets for spending after the books are closed.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
133
Title I - 3010
Restricted/Grant Funding
3010
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Title I
$6,200,000
School Wide
26.87
Student Achievement
For All
Description: Title I is designed to help students to achieve proficiency on challenging State academic achievement standards (California standards). Our Title I schools are schoolwide programs, with a special emphasis on children who are failing, or most at risk of failing, to meet the California standards. Schools spend their allocations in a variety of areas to meet the needs of students, ranging from supplemental personnel and curriculum, and parental involvement activities to supplies/materials, technology, and professional development. Single Plans for Student Achievement for each school detail these plans. Title I monies are also spent on federal mandatory set-asides (parent involvement, intervention) for a total of $1,997,020 and discretionary set-asides (homeless program, neglected program, additional parental involvement, preschool program, and summer school) for a total amount of $1,578,680.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
134
School Improvement Grant (SIG) - 3180
Restricted/Grant Funding
3180
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
School Improvement
Grant
$0
School Wide
0
Student Achievement
For All
Description: The School Improvement Grant (SIG) monies are a state grant that was written for DeAnza and Helms. The grant ended in 2014-15, and the carryover dollars are being used to fund the following services: Additional Assistant Principal, part-time coach, additional teacher time to support the Freshman house, BACR health contract, 5 early start days for the staff and students, additional teacher hours for collaboration, and supplementary supplies and materials.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
135
Carl Perkins Career Tech Ed - 3550
Restricted/Grant Funding
3550
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Carl Perkins Career
Tech Ed
$267,831
District
0
Student Achievement
For All
Description: This grant provides opportunities to improve Career Technical education courses and course progression. It provides for materials and equipment, as well as additional instructional and curriculum planning hours. It also provides professional development opportunities for CTE teachers. The CTE program is dedicated to integrating academic and CTE instruction, and serving special populations, such as ELs, Special Education students, and students who are underserved. The grant provides funding to the following schools: DeAnza, El Cerrito, J.F. Kennedy, Pinole Valley, Richmond, and Hercules High Schools.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
136
21st Century After School Program - 4124
Restricted/Grant Funding
4124
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
21st Century After School
Program
$365,798
School Wide
.30
Student Achievement
For All
Description: For the school year: Stege & Washington; for the summer: Ford, Grant, Montalvin, Stege, & Washington WCCUSD receives funding through the 21st Community Learning Center (21st CCLC) federal grant program administered by the California Department of Education (CDE) to implement Expanded Learning Programs (school year and summer) at Ford, Grant, Montlavin, Stege, and Washington. The Expanded Learning Programs focus on improving student outcomes by supporting the development of their physical, social-emotional, and academic skills. The WCCUSD Expanded Learning Programs are open to all students at the host school at no cost to families. In some cases, schools may determine specific criteria for priority student enrollment, such as low academic performance or social needs. This is a competitive grant that expires June 30 2017.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
137
Title III Immigrant Education - 4201
Restricted/Grant Funding
4201
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Title III Immigrant Education
$83,651
District
0
Student Achievement
For All
Description: Title III - Immigrant Education Program funds are specifically targeted to eligible immigrant students
and their families through supplementary programs and services to assure that these students meet the
same challenging grade level California State Standards as mainstream students.
The purpose of the Title III - Immigrant Education Program is to pay for enhanced instructional opportunities to Newcomer and immigrant students and their families. Schools are provided the following services:
Educational personnel, including bilingual graduate tutors, coaches, and consultants
The identification and acquisition of supplemental educational materials and technology
Basic instructional services designed to assist Newcomer students to acquire English Language Development and achieve proficiency in elementary and secondary schools in the our district
Family literacy, parent training, and community outreach activities coordinated with community-based organizations (CBOs) and institutions of higher education (IHEs) that have expertise in working with Newcomer and immigrant students and families
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
138
Title III English Language - 4203
Restricted/Grant Funding
4203
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Title III English
Language
$980,699
District &
School
6.00
Student Achievement
For All
Description: Title III – English Language Program funds are specifically targeted to eligible English Learner students
and their families through supplementary programs and services to assure that these students meet the
same challenging grade level California Standards as mainstream students.
The purpose of the Title III – English Language Program funds is to pay for enhanced instructional opportunities for English Learners and their families. The following services are provided to schools:
English Language Arts/English Language Development standards aligned professional development
Educational personnel, including graduate tutors, coaches, and consultants
Tutorials, mentoring, and counseling
Identification and acquisition of educational materials, software, and technology
Basic instructional services and other instructional and assessment services designed to assist English Learners to achieve proficiency in elementary and secondary schools in our district
Family literacy, parent training, and community outreach
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
139
Career Pathways Trust (CPT) 2 – Alameda County Office of Education (ACOE) - 6382
Restricted/Grant Funding
6382
2016-17 Proposed Allocation
Level of
Service
Total Jobs Included
(FTE)
Goal 1
CPT 2 - ACOE
$252,574
School Wide
1.0
Student Achievement
For All
Description: WCCUSD partnered with Alameda County Office of Education and Contra Costa County Office of Education in the development of the R4 (Resilient Youth, Ready to Learn, Ready for Work, Ready for Life) grant. The resilient youth are young people in court, community, continuation, and alternative schools. The R4 grant brings together various community based organizations and the two county agencies in supporting these high risk student populations to continue and complete their education and build their work force skills. The industry sector pathways that this grant will focus on are: Building, Construction and the Trades; Public Service; Education, Child Development and Family services, and Hospitality, Tourism and Recreation. This grant focuses on the WCCUSD alternative programs at Greenwood Academy and Vista High School.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
140
Career Technical Education Incentive Grant (CTEIG) Program - 6387
Restricted/Grant Funding
6387
2016-17 Proposed Allocation
Level of
Service
Total Jobs Included
(FTE)
Goal 1
CTEIG
$1,842,442 School Wide
Student Achievement for
All
Description:
This program was established as a state education, economic, and workforce development initiative with the goal of providing pupils with the knowledge and skills necessary to transition to employment and postsecondary education. The funding is being used to enhance our current CTE offerings, as well as to build new CTE pathways and programs. Our work is focused on several areas, including building a new education pathway, providing stipends to teachers to clear or obtain a CTE credential, and upgrading computer labs to supporting pathway teachers to meet monthly with our postsecondary partners, providing prep periods for planning, funding middle school pathway development, and providing release time for curriculum planning.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
141
California Partnership Academy - 6385
Restricted/Grant Funding
6385
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
California Partnership
Academy
$635,180
School Wide
2.07
Student Achievement
For All
Description: This resource supports district wide high quality Pathways/Academies, including the following:
Pathway lead teacher prep period for Pathway planning and coordination
Release time for teacher collaboration and professional development
Equipment
Tutoring
Substitutes
Study Trips
Supplies and materials needed for a particular Pathway
CPA grants are funded at the following schools: DeAnza, El Cerrito, J.F. Kennedy, Pinole Valley, and Richmond High Schools There are two grants funds that will be spent over a two-year period. Grant ends 2017.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
142
California Partnership Academy - 7220
Restricted/Grant Funding
7220
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
California Partnership
Academy
$285,120
District
.77
Student Achievement
For All
Description: This resource supports district wide high quality Pathways/Academies, including the following:
Pathway lead teacher prep period for Pathway planning and coordination
Release time for teacher collaboration and professional development
Equipment
Tutoring
Substitutes
Study Trips
Supplies and materials needed additionally that are particular to the Pathway
CPA grants are currently funded at: DeAnza, Kennedy, Pinole Valley, Richmond, and El Cerrito High Schools.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
143
Quality Education Investment Act (QEIA) - 7400
Restricted/Grant Funding
7400
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
QEIA
$0
School Wide
1.0
Student Achievement
For All
Description: This funding is carryover only for prior year grant awards. Harding, Peres and Helms must complete spending this school year.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
144
Project READ - 9011
Restricted/Grant Funding
9011
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Project READ
$89,550
School Wide
0
Student Achievement
For All
Description: Project READ (PR) is now at all of WCCUSD middle schools. It is a 5 year state grant that began in July 2013 and ends in June 2018. It is an intensive program serving a competitively selected group of schools and is dedicated to increasing student reading and ELA outcomes through teacher and leader professional development, parent and family support, and adaptive technology. Funds are used to purchase technology, software, supplies and materials for successful implementation and program maintenance. The evidence-based implementation practices for teaching reading across content areas are in alignment with the California Standards that promote readiness for college, career, and/or community life. A Project READ coach supports teachers to implement best practices.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
145
Sprint, Microsoft Voucher, Technology - 9012, 9030, 9908
Restricted/Grant Funding
9012, 9030, 9908
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Sprint MS Voucher Technology
0
District &
School
N/A
Student Achievement
For All
Description: This funding is carryover only for prior year grant awards. Sprint is focused at Kennedy High School and the Microsoft voucher program is a district wide technology purchase grant.
Recommendation: These grants will have only their carryover for 2016-17 unless new awards are received.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
146
Miscellaneous Grant - District Disaster Preparedness – 9121 / 9132
Restricted/Grant Funding
9121 9132
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Miscellaneous Grant
0 District
& School
0 Student
Achievement For All
Description: Miscellaneous grant is directed to district disaster preparedness.
Recommendation: Final carryover will be spent in 2016-17.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
147
Regional Occupation Program (ROP) - 9513
Restricted/Grant Funding
9513
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Regional Occupation
Program (ROP)
$1,082,407
School Wide
10.87
Student Achievement
For All
Description: CTE/ROP is the Contra Costa County Office of Education's career training program designed for high
school juniors and seniors. The goal of CTE/ROP is to help students gain knowledge and skills for
future careers.
In addition to the skills developed for specific fields, each class helps students develop a résumé, review
effective interviewing techniques and identify sources of employment.
If students are uncertain about their college major or career choice, CTE/ROP provides an opportunity
to explore a career field. Students use the skills they develop in CTE/ROP to gain higher paying part-
time work to help pay for college expenses.
Internships and hands-on experience provide students the opportunity to “try-out” career choices before
investing time and money in college or post-secondary training.
Funding is used to provide: teachers, training, supplies, materials, and equipment that
supplement/support the specific program needs of the class, i.e. tools for the auto class, small MAC lab
for the digital art design class.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
148
Chevron - 9531
Restricted/Grant Funding
9531
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Chevron
$1,225,000
School Wide
6.0
Student Achievement
For All
Description: This grant funding source supports a variety of related projects as part of the Chevron STEM Initiative in our district. The grant will be completed in 2016-17. The grant requires specific mathematics and science coaching and professional development to take place. The Chevron STEM Initiative funds coaching for all middle school science and high school biology teachers; summer mathematics institutes for grades Pre K-12; mathematics coaching support for all middle and high school mathematics teachers and selected grade 6 teachers; teacher additional hourly pay; funding for acquisition and implementation of the Mobile Fab Lab and Crespi Hybrid Fab Lab; and creation of the Community STEM Centers at specific school sites, with funding for science kits, other supplies and materials, and related mathematics and science professional development and community support.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
149
Miscellaneous Grants - “Gear Up” and College Awareness - 9569 / 9626
Restricted/Grant Funding
9569 9626
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Miscellaneous Grants
N/A District 0 Student
Achievement For All
Description: These grants are for “Gear Up” and College Awareness.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
150
Career Pathways Trust (CPT) 1 – Peralta College - 9582
Restricted/Grant Funding
9582
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
CPT 1 Peralta
$152,590 District
& School
1.0 Student
Achievement For All
Description: South Richmond Stem Initiative is a K-14 early college model. In the 2016-17 School year the focus will be to hire teachers to teach in the blended learning model. The Freshman House Program will be designed into three cohorts of students and teachers. Each cohort of students will be taking college and career courses in content and technical courses that will be the foundation of the early college model. The blended learning model will consist of teachers functioning as facilitators to instruct students and engage them with a technology platform that supports direct instruction and student lead progress toward their own learning. Students entering Kennedy High School will have the opportunity to earn a high school diploma and Community College Associate Degree as they avail themselves to dual credit, articulated, and concurrent college courses. The foundational program will start with the design of the Freshman House Program.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
151
Irene Skully Family Foundation - 9595
Restricted/Grant Funding
9595
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
Irene Skully Family
Foundation
$397,668
School Wide
3.8
Student Achievement
For All
Description: The Irene Scully Foundation has provided support for Peres Elementary School. The funding pays for the following: vice principal, tech teacher, part-time school psychologist, dropout prevention/community specialist, and supplemental supplies and materials
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
152
FAB Foundation - 9637
Restricted/Grant Funding
9637
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
FAB Foundation
$145,050
District
2.0
Student Achievement
For All
Description: This grant funds the implementation of the district’s Fab Lab at Kennedy High School. The grant requires funding to be allocated for a Fab Lab manager for three years (ending in 2016-17), as well as supplies and material costs to support a high functioning Fab Lab.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
153
Federal Pre-K Staff Development - 3345
Restricted/Grant Funding
3345
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 2
Federal Pre-K Staff
Development
$2,261 School Wide 0 PD & Recruitment
of High Quality Staff
Description: Federal staff development funding for Pre School Special Education Staff in the following areas:
Preschool Foundations
Common Core
PECS (Picture Exchange Communication System)
Social Emotional (sensory diet, behavior support)
Early Childhood Mental Health
Developmentally appropriate speech and language and occupational therapy trainings
Relevant trainings for students with autism, low incidence and multi-categorical identification for teachers and instructional assistants
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
154
Title II - 4035
Restricted/Grant Funding
4035
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 2
Title II
$1,529,174
District
7.95 PD & Recruitment
of High Quality Staff
Description: Title II funds must be used to increase student academic achievement through strategies that improve teacher and principal quality and increase the number of highly qualified teachers in the classroom and highly qualified principals and assistant principals in schools. These funds should be used to support professional learning that improves both the content knowledge of teachers in core academic areas, and the classroom practices of all teachers, as well as learning that supports principals in becoming high impact educational leaders. When using Title II funds for professional development for teachers and principals, the focus must be on deepening the knowledge of academic subjects and the California Standards. Professional development activities must: • Be an integral part of broad school-wide and districtwide educational improvement efforts; • Provide knowledge and skills to teachers in order to help students meet challenging State academic standards; • Improve classroom management skills; • Be sustained, intensive, and classroom-focused and are not one-day or short-term workshops
Funds are allocated for: professional learning for teachers; professional learning for administrators, exam fees, National Board certification, and Coursework.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
155
Math and Science Partnership - 4050
Restricted/Grant Funding
4050
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 2
Math and Science
Partnership $499,996
District &
School 3.0
PD & Recruitment of High Quality
Staff
Description: This California Mathematics and Science Partnership grant is a three-year grant to provide STEM-focused coaching and professional development support for selected Grades 3-5 teachers across the district. Year 1 of the grant was completed in 2014-15, Year 2 is currently in progress in 2015-16, and Year 3 will take place in 2016-17. The grant is known in our district as “STEM-West”. The activities of the two coaches and one program specialist, funded by this grant, are fully integrated into all district STEM center activities, including mathematics and science professional development and Fab Lab implementation.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
156
Educator Effectiveness - 6264
Restricted/Grant Funding
6264
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 2
Educator Effectiveness
$286,962
District
2.60 PD & Recruitment
of High Quality Staff
Description: California’s SB-77 Section 58 provides new funding for professional learning for every district, county office of education, charter school, and state special school throughout the state. This funding source is referred to as Educator Effectiveness monies. The state requires that these funds be spent in the following four ways:
Beginning teacher and administrator support and mentoring, including, but not limited to, programs that support new teacher and administrator ability to teach or lead effectively and to meet induction requirements,
Professional development, coaching, and support services for teachers who have been identified as needing improvement or additional support by local educational agencies,
Professional development for teachers and administrators that is aligned to the state content standards, and
To promote educator quality and effectiveness, including, but not limited to, training on mentoring and coaching certificated staff and training certificated staff to support effective teaching and learning.
The funding must be spent over 3 years (2015-16, 2016-17, 2017-18). The board approved spending these monies in the following areas: Teacher Induction Program (TIP), new teacher training, WCCAA mentor program, PAR, on-line personalized learning platform, professional learning on the California Standards, EL standards, and NGSS standards, integrating technology into daily practice, growth mindset, leadership, data analysis and action, and developing a culture of high expectations.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
157
Math Professional Development - 9630
Restricted/Grant Funding
9630
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 2
Math PD
$50,000 School Wide 0 PD & Recruitment
of High Quality Staff
Description: The district STEM center created this program in 2011 in order to set up MOUs and contracts for mathematics professional learning our district mathematics staff provides to other districts throughout our region. This program is known locally as the Mathematics Coaching Consortium, and has provided, through contracts between our district and other districts, mathematics professional development for over 50 coaches and their respective districts in this partnership. Our district then utilizes the funding to fund our own mathematics coaching positions. We have strategically used this funding for upper elementary mathematics content coaching, in support of the mathematics coaching initiatives in our grant-funded programs.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
158
Alameda County Office of Education (ACOE) Integrated Middle School Science (IMSS) - 9638
Restricted/Grant Funding
9638
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 2
ACOE IMSS
$0
District
0 PD & Recruitment
of High Quality Staff
Description: The Integrated Middle School Science Project was a partnership with the Alameda County Office of Education and Cal State East Bay University. The remaining funds for this grant are used to provide professional learning experiences for teachers in the core area of science.
Recommendation: Carry over will be available October 2016
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
159
Special Education Individuals with Disabilities Education Act (IDEA) - 3310-3320, 3395
Restricted/Grant Funding
3310-3320, 3395
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Special Education
IDEA
$6,492,865
School Wide
114.47
Student Engagement and
Climate
Description: The Federal Funding sources for Special Education are mainly targeted toward providing the special assistance required within a student’s Individual Education Program (IEP) and the coordination of those services. These programs are for Pre-K through age 22.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
160
Special Education Mental Health Services - 3327
Restricted/Grant Funding
3327
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Special Education
Mental Health
$343,259 School Wide .80 Student
Engagement and Climate
Description: AB114 requires districts to provide Educationally Related Mental Health (ERMS) services to special education students who require mental health support per their Individual Education Program (IEP)s. These funds are used to hire school psychologists who have behavioral and counseling training to provide behavioral services and counseling as stated in the student’s IEPs. Funds are also used for students whose IEP’s place them in residential placements within and out of the State of California as well as the transportation of those students to residential facilities.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
161
Special Education Early Intervention – 3385
Restricted/Grant Funding
3385
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Special Education
Early Intervention
$83,664 School Wide .60 Student
Engagement and Climate
Description: 3385 provides funding for Part C of IDEA that provides school staff to provide services to all infants and toddler who are identified, evaluated, assessed, and served in the all areas of development , not just in those areas related to the suspected disability. This includes providing an IFSP (Individual Family Service Plan) and school staff providing the necessary services to facilitate a child’s development and enhance the family’s capacity to facilitate the child’s development through a home-based support program.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
162
Department of Rehabilitation Transition - 3412
Restricted/Grant Funding
3412
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Dept. of Rehab
Transition $247,459 School Wide 2.70
Student Engagement and
Climate
Description: This Cooperative Contract is designed to jointly serve the mutual clients of the Department of Rehabilitation (DOR) Greater East Bay District and the through the combining of resources. TPP staff work closely with the DOR counselors throughout the referral, eligibility and planning processes to ensure coordinated service provision that will lead to successful employment outcomes.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
163
McKinney Vento Homeless Program - 5630
Restricted/Grant Funding
5630
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
McKinney Vento Homeless
$124,595
District
.84 Student
Engagement and Climate
Description: The McKinney Vento Homeless Program supports the Families In Transition (FIT) office, focused on removing educational barriers for homeless children and youth. Program includes educational enrollment, coordination of services to support educational outcomes—tutoring, transportation, social-emotional learning programs, etc. Funding covers .34 FTE FIT Student Support Services Supervisor, .5 School Community Outreach Worker, School Supplies, Transportation Services, Technical Assistance, and Resource Fair.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
164
Medi-Cal Billing- 5640
Restricted/Grant Funding
5640
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Medi-Cal Billing
$850,000
District
6.30 Student
Engagement and Climate
Description: The district receives Medi-Cal reimbursement funds for those students who are Medi-Cal eligible and receive any of the following services: transportation, speech therapy, occupational therapy, physical therapy, nursing services, 1:1 aide due to medical needs, and psychological services. These funds must be used to expand, not supplant current district programs and services. These funds are used to purchase additional nurses, health aides, Program Specialists, and clerical support. Also, the funds are used for child care, a Special Education Parent Liaison, instructional materials, testing materials, assistive technology and trainings.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
165
California Promoting the Readiness of Minors in Supplemental Security Income (PROMISE) –
5840
Restricted/Grant Funding
5840
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
California Promise $112,681
District
1.10 Student
Engagement and Climate
Description: Promoting the Readiness of Minors in Supplemental Security Income (PROMISE) is a joint initiative of the U.S. Department of Education (ED), the U.S. Social Security Administration (SSA), the U.S. Department of Health and Human Services (DHHS), and the U.S. Department of Labor (DOL) to promote positive outcomes for children who receive Supplemental Security Income (SSI) and their families. The purpose of PROMISE is to improve the provision and coordination of services and supports for child SSI recipients and their families in order to achieve improved outcomes, such as completing postsecondary education and job training to obtain competitive employment in an integrated setting that may result in long-term reductions in the child recipient’s reliance on SSI. This agreement will allow the California Department of Rehabilitation (DOR) as the CaPROMISE Grant Administrator and the West Contra Costa Unified School District (WCCUSD) to work collaboratively to the DOR’s PROMISE Grant proposal. Under this agreement the WCCUSD will recruit, enroll, and serve children ages 14 to 16 who are SSI recipients and residing within the boundaries of the WCCUSD. The contract covers the following personnel: 1.0 FTE Employment Specialist, .10 FTE Staff Secretary.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
166
State After School Program - 6010
Restricted/Grant Funding
6010
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 1
State After School
Program $3,573,129 School Wide 2.95
Student Engagement
& Climate
Description: State competitive grant providing after school programs at the following sites:
Bayview Highland Peres Crespi Chavez King Riverside DeJean Coronado Lake Sheldon Helms Dover Lincoln Stege Korematsu Downer Mira Vista Tara Hills Fairmont Montalvin Verde Ford Murphy Washington Grant Nystrom Wilson
The After School Programs receive funding through the After School Education and Safety (ASES) grant program administered by the California Department of Education (CDE). The programs focus on improving student outcomes by supporting the development of their physical, social-emotional, and academic skills. The programs are open to all students at the host school at no cost to families. In some cases, schools may determine specific criteria for priority student enrollment, such as low academic performance or social needs. The WCCUSD Expanded Learning programs currently serve 3,921 students. 46% of all program participants are designated as English Language Learners. 86% of program participants are eligible for Free or Reduced Price lunch.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
167
Special Education State & Local - 6500-6515
Restricted/Grant Funding
6500-6515
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Special Education State & Local
$54,444,822 District
& School
627.16 Student
Engagement and Climate
Description: Special Education State and Local Funding is used to provide the special education services to special education students as required by their IEPs. By definition, these are students who have needs that go beyond the basic classroom settings for regular education, although many students also participate in regular education classes and receive support services in a variety of settings. These services include: Resource Specialist Program, Special Day Class - Non-Severely Handicapped, Special Day Class – Severely Handicapped, Full Inclusion Support Services, Speech Therapy, Counseling, Behavioral Services, Occupational Therapy, Physical Therapy, Adaptive Physical Education, and placement in Non-Public Schools, Residential placement, Services for students in Juvenile Hall and County/State prisons. Special Education also receives funding from Base and Supplemental Concentration funds in the amount of: Base=$9.5m Supp/Conc=$3.7m Base/Encroachment=$25.4m and is also supported by other federal and state funds.
Recommendation: For 2016-17, per projected enrollment, there will be a reduction of four special education classroom. Reduce Special Ed Administrator and 7 FTE Teachers/Aides.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
168
Special Education WorkAbility 1 - 6520
Restricted/Grant Funding
6520
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Special Education WorkAbility 1
$258,622 District
& School
7.45 Student
Engagement and Climate
Description: With an emphasis on providing work-based learning, WorkAbility 1 promotes the involvement of key stakeholders (students, families, educators, youth-serving organizations, workforce development organizations, and business partners) in planning and implementing an array of services that culminate in successful student transition to employment, lifelong learning, and quality adult life. .
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
169
Miscellaneous Grants - 9122, 9405, 9550, 9576, 9607
Restricted/Grant Funding
9122, 9405, 9550, 9576, 9607
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Miscellaneous Grants
0 District
& School
0 Student
Engagement and Climate
Description: These miscellaneous grants are for the following:
- Lake School/ Lowes for supplies - School Safety - UC Berkeley “Lighthouse” grant - AT&T Foundation - Alliance for Healthier Generation
Recommendation: Grants will spend down prior year carryover in the new year. If new grants are awarded they will be added at that time.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
170
Medi-Cal Admin (MAA) Oral Health – 9133, 9134
Restricted/Grant Funding
9133 9134
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Medi-Cal Admin (MAA)
Oral Health $166,515
District
0.93
Student Engagement and
Climate
Description: These funds are generated through services provided to Medi-Cal eligible students and are spent on services to these students, purchase of intervention and instructional supplies, technology and staff development. The Oral Health component is a reimbursement of supplies used for student oral health assessment.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
171
School Based Medi-Cal - 9135
Restricted/Grant Funding
9135
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
School Based
Medi-Cal $427,120
District
4.93
Student Engagement and
Climate
Description: Funding for coordination and implementation of school based psychological services at Highland, Tara Hills and Sheldon Elementary Schools.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
172
Local Parcel Tax - 9190
Restricted/Grant Funding
9190
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Local Parcel
Tax $9,732,165 School Wide 81.21
Student Engagement and
Climate
Description: The parcel tax program includes support for a wide variety of services to students of the District. The parcel tax funding, renewed in November of 2012, is accounted for in a locally restricted account and is subject to the review by the Citizens Budget Advisory Committee. The parcel tax was passed with an overwhelming community majority of 75%, illustrating the level of commitment for educational programs shared by this community. The parcel tax expires in 2018-19. The Board of Education authorized a poll to consider placing a renewal of the parcel tax on the November 2016 ballot. The School Board reached an agreement to share parcel tax revenues with local charter schools in 2015-16 and going forward.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
173
West County Transportation - 9590
Restricted/Grant Funding
9590
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
West County
Transportation $64,810 District .50
Student Engagement and
Climate
Description: This grant provides free bus passes for income-eligible students districtwide.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
174
Kaiser Community Benefit - 9618
Restricted/Grant Funding
9618
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Kaiser Community Benefit
$0
District
N/A Student
Engagement and Climate
Description: This Kaiser grant allows WCCUSD to partner with Catholic Charities of the East Bay to support Restorative and Trauma-informed practices by providing training for mental health providers, administrators, faculty, staff, students, parents and community partners.
Recommendation: Carry over will be available October 2016
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
175
YMCA Morehouse - 9620
Restricted/Grant Funding
9620
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
YMCA Morehouse
$98,579 School Wide .90 Student
Engagement and Climate
Description: Funding is used to support Director of James Morehouse Project position (currently a Teacher on Special Assignment). Funding is provided through funds raised for the James Morehouse Project, fiscally sponsored by the YMCA of the East Bay. Funding for this position is contingent upon funds raised by the James Morehouse Project/YMCA of the East Bay.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
176
Portola Science Trust - 9660
Restricted/Grant Funding
9660
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Portola Science
Trust N/A School Wide 0
Student Engagement and
Climate
Description: A community benefactor donated funding to the former Portola Middle School as a bequest in their will. The school site plans for and uses these funds per the donor’s request, for science, at what is now Korematsu Middle School.
Recommendation: Each year the school receives funding. The principal plans the expense and budget is added at that time.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
177
Tobacco Use Prevention Education (TUPE) Program - 9688
Restricted/Grant Funding
9668
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
Tobacco Use
Prevention $10,000 School Wide 0
Student Engagement and
Climate
Description: The Tobacco Use Prevention Education (TUPE) Program is a three-year collaborative prevention program with Contra Costa County Office of Education. WCCUSD sites include: Crespi, DeJean, Helms, Hercules, Korematsu, Pinole Middle, DeAnza, El Cerrito, Hercules High, Kennedy High, Pinole Valley High, Richmond High, and Greenwood Academy. Program elements include tobacco-prevention peer educators, youth health coalition, anti-tobacco advocacy, and anti-tobacco media literacy. Funds are used to support reimbursement for substitutes for lead staff at each school site.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
178
Teen Pregnancy Prevention (TPP) – 9930
Restricted/Grant Funding
9930
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
TPP
$30,000 School Wide 0
Student Engagement and Climate
Description:
The program includes the following work:
Part-time liaison works with school sites
Assessing additional agency/partner resources within the district
Participating in Community Advisory Groups
Assisting with Youth Leadership Council activities
Identifying classes for Get Real and Be Proud! Be Responsible! (BPBR) interventions
Coordinating parent consent forms and parent meetings
Convening school principal meetings and classroom observations
Coordinating the use of substitute teachers and training
Professional development on intervention
Assisting with program dissemination and presentations to the School Board
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
179
High School Theater - 9933
Restricted/Grant Funding
9933
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 4
High School
Theater $129,717 School Wide 1.0
Student Engagement and
Climate
Description: This is a locally created resource to account for the use of the De Anza and El Cerrito High School Theaters by internal and external users. The goal is to accumulate funding in order to provide an equipment replacement program for the theaters.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
180
CA Clean Energy - 6230
Restricted/Grant Funding
6230
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 5
CA Clean
Energy $1,000,000 District
1.0
Basic Services for All
Description:
The allocated funding for West Contra Costa Unified for year one (2013-14) was $1.4 million; year 2 (2014-15) was $1.2 million; year 3 (2015-16) $1,792,167.00 million.
The District submitted plans in February of 2015 for five energy efficiency projects for year 1 & 2 at Hanna Ranch Elementary for a LED lighting retrofit and energy management system controls; Richmond High School, Collins Elementary, Grant Elementary and Lake Elementary for LED lighting retrofits. The projects were approved and completed before the start of the 2015-2016 school year.
In February 2016, the District submitted projects for Verde Elementary and Kennedy High School LED Lighting Retrofits. These schools were selected based upon strict energy savings and other eligibility criteria. The project funding has been approved by the California Energy Commission and the projects are scheduled to be completed during the summer of 2016.
Recommendation: Projects will be ongoing during the summer of 2016. New allocations will be added to the 2016-17 when award information is received.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
181
Lottery Restricted - 6300
Restricted/Grant Funding
6300
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 5
Lottery Restricted
$1,090,125
District
0 Basic
Services for All
Description: The primary use of these funds is for instructional materials such as textbooks for all grades and schools. It is estimated that the District will receive $41/ADA for 2016-17.
Recommendation:
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
182
Routine Repair & Maintenance - 8150
Restricted/Grant Funding
8150
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 5
Routine Repair &
Maintenance $6,600,000
District
45.95
Basic Services for All
Description: The maintenance department is responsible for the routine maintenance of all school sites throughout the district. The employees are mainly journey level craftsperson with specialties in areas such as plumbing, electrical and carpentry. This program is set up as a restricted category due to Education Code 17070.75 which requires all school districts that accept funds through the State School Building Program to set aside funding each year to for the purpose of providing ongoing and major maintenance to its buildings. There is an allowance by the State to make alternative calculated contribution amounts during the period that the LCFF is implemented, with the understanding that a full 3% must be in place no later than 2020-21. Based upon this allowance the District can reduce the annual contribution in 2015-16 and 2016-17 while still building a deferred maintenance program. The first interim figures include carry over from prior year.
Recommendation: The flexibility provided by the State allows the district to adjust the contribution over the next two years. Therefore, the contribution will be reduced as compared to the normal 3% requirement.
West Contra Costa Unified School District
Budget Planning 2016-17 Local Control Accountability Plan (LCAP) One Pagers
183
Maintenance and Recreation District (MRAD) - 9200
Restricted/Grant Funding
9200
2016-17 Proposed Allocation
Level of
Service
Jobs Included
(FTE)
Goal 5
MRAD $5,604,624 District
& School
.67 Basic
Services for All
Description: In 1994 an effort to raise and sustain funding for the school district the District formed a Maintenance and Recreation District. In 1996 the formation of MRAD was followed by an election to continue these levies. This allows the District to levy taxes to support the maintenance and operations of fields and outdoor areas for the purpose of public use. The FTE for MRAD are charged to the general fund, which is reimbursed by MRAD fund.
Recommendation: