© crown copyright met office development of nwp-based nowcasting at the met office -the nowcasting...

34
© Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting October 2011 Susan P Ballard, Zhihong Li, David Simonin, Jean-Francois Caron, Cristina Charlton-Perez, Nicolas Gaussiat, Lee Hawkness-Smith, Helen Buttery, Graeme Kelly, Robert Tubbs, Dingmin Li +DAE Exeter + Humphrey Lean, Emilie Carter, Nigel Roberts….

Upload: erin-collins

Post on 27-Mar-2015

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

© Crown copyright Met Office

Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration ProjectWorkshop on Use of NWP for Nowcasting October 2011

Susan P Ballard, Zhihong Li, David Simonin, Jean-Francois Caron, Cristina

Charlton-Perez, Nicolas Gaussiat, Lee Hawkness-Smith, Helen Buttery, Graeme Kelly, Robert Tubbs, Dingmin Li +DAE Exeter + Humphrey Lean, Emilie Carter, Nigel Roberts….

Page 2: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Contents

• Introduction and Plans

• NWP based Nowcasting compared to UKPP conventional nowcasts

• Impact of Doppler Winds and Observation Errors

• Impact of Observations and Background Errors

• Impact of Analysis Increments and Boundary Conditions

• Conclusions and future work

© Crown copyright Met Office

Page 3: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Aims

• Hourly cycling 1.5km resolution NWP for southern England - NDP

• 6-12hour forecasts (12hours would allow 6 member lagged ensembles)

• Needs new supercomputer

• Olympics demonstration

• Compare UKV (UK 1.5km 3hourly 3D-Var), UKPP (conventional nowcast) and NDP (nowcasting demonstration project)

Page 4: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

© Crown copyright Met Office

Nowcasting Model Domain

Model Resolution VAR Time Window Cycling Forecast

Length

UK4 / UKV 4 km / 1.5km 3D-Var 4/3km 3 hr 3 hr T+36

South UK Fixed 1.5 km 3D/4D-Var 1.5/3km 1 hr 1 hr T+6 or T+12

Page 5: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Techniques:

3DVAR, 4DVAR, latent heat and moisture nudging

Needs:

Hourly analyses and forecasts to customer within 15mins of data time

Therefore data must be in Met Office in real time

With 4D-Var can exploit high spatial and temporal resolution

High temporal resolution eg every 5 -15mins may help to offset poor or limited horizontal resolution

Exploit more observations – type and time frequency eg GPS, AMDAR, Meteosat imagery (clear and cloudy) use of radar Doppler winds, reflectivity and refractivity data

Nowcasting Data Assimilation Strategy

Page 6: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

© Crown copyright Met Office

UKPP – Met Office Nowcast– forecasts of surface rain rate valid at 21Z 3/6/2007

radar

T+3 T+2

T+1 T+0

Page 7: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

© Crown copyright Met Office

Impact of hourly 4D-Var data assimilation Including latent heat nudging of 15minRadar derived rain rates – forecasts of surface rain rate valid at 21Z 3/6/2007

radar

T+3 T+2

T+1 T+0 Zhihong Li

Page 8: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

© Crown copyright Met Office

Impact of Doppler Radial Winds on Fractional Skill Score for rainfall >0.2mm accumulation – scale 55km

Forecast skill is improved for rain accumulations with low threshold – effectively all rain (~ 1 hour gain)

FSS – Roberts and Lean

ΔFSS – 0.2 mm acc – scale 55km

ΔF

SS

Page 9: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Impact of Doppler Radial Wind Assimilation on RMSE differences in fit to surface winds and Satwinds

© Crown copyright Met Office

RepError= error derived from O-B statistics approx 2-3m/sObs Error = standard deviation of superobs approx 1-2m/s

Page 10: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

© Crown copyright Met Office

Doppler Wind Observation Error

• 4 months of data O-B

• Increase with range

• Range from 2.4 to 3.2 m/s

Page 11: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Observation Error

Distance

σ2o

σ2b

Background error covariance

Hollingsworth–Lonnberg

•Rely on the use of departure between the background and observation (innovations)

• Construct a histogram of background departure covariance against distance

Page 12: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

15Z 18th May 2011

UKV T+6 radar UKV T+0

Page 13: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Impact of Observations T+0 NDP

No obs All obs

No GPSNo doppler wind

Zhihong Li

Page 14: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Background ErrorsJean-Francois Caron

• NMC method – Met Office - SOAR horizontal correlation function

• UKV T+24/T+12, 30 cases

• 180km for streamfunction, 130km for velocity potential and unbalanced pressure and 90km for humidity and logm

• UKV T+6/T+3

• 130 to 30km for velocity potential and stream function

• 60 to 5km for unbalanced pressure and 40 to 5km for humidity

• NDP T+6/T+3 every 6 hours, 75

• 60 -10km vel pot, stream fn , 30-2km unbalanced pressure and 30-2km for humidity

• Ensembles – Meteo France

• Brousseau et al 2011

• 6 members, 26 days, 3hour range

Page 15: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Impact of new Cov Stats and MOPS/LHN in NDP T+0

radarAll obs Zhihong Li/Jean-Francois Caron

Page 16: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Impact of background errors on screen Temperature

Page 17: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Balance and Boundary Updates- rms pstar tendency - NDP

4D-Var Analysis increments at T-30mins, start of window T-30mins

Top – 15Z, 9Z lbc

Middle – 16Z, 15Z lbc

Bottom – 17Z, 15Z lbc

Zhihong Li

Page 18: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Conclusions• Operational convective scale NWP beating

advection type precipitation nowcast from about T+2.5hours

• Good progress being made in use of radar data in NWP-based nowcasting

• However many challenges still to extract the full benefit from the radar data and other observations

• Only just getting access to observations to test real benefit in NWP-based nowcasting

• Modifications to background errors, linear model and other options in DA likely to improve skill

© Crown copyright Met Office

Page 19: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Other Scientific Challenges

• Matching the observations during the assimilation cycle and first 2 hours of forecast

• Balance and control variables, adaptive vertical grid

• Precipitation bias in rates and area – data assimilation and modelling problems. Model too cellular and can miss some convection – maybe need for more 3dimensional parametrizations?

• Computer resources – should be able to produce forecast within 1 hour

Page 20: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

© Crown copyright Met Office

Questions and answers

Page 21: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

6 March 2011 15UTC – Robert Tubbs

SEVIRI Channel 5

SEVIRI Channel 9

UKV Analysis simulated Ch 5

UKV Analysis simulated Ch 9

Page 22: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Thunderstorms 28th June 201112UTC

radarUK4 T+3UKV T+3

Page 23: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Thunderstorms 28th June 201112UTC

radarUK4 T+3UKV T+9

Page 24: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Radar Rain Rates 28/6/2011

9UTC

11UTC

10UTC

12UTC

Page 25: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Hourly cycling NDP – 12UTCoriginal version

T+2T+3

T+1 T+0

Zhihong Li

Page 26: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

NDP forecasts for 12UTC 28 June 2011latest UKV-type version

T+2

T+1

T+3

T+0

Zhihong Li

Page 27: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

UKPP forecasts for 12UTC 28 June 2011

T+0T+1

T+2T+3

Page 28: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Background

Aim: to replace current UKPP nowcasting system

Hazardous weather , especially flood risk

Boscastle, North Cornwall16th August 2004 Estimated Cost £500million

Data Assimilation/analysis vital for these short period forecastsof 0-6 hours

Page 29: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Current Nowcasts - UKPP

• UKPP analysis of surface rain rate every 5 mins at 2km

• Radar composite plus 2DVAR of UK4 and MSG outside radar area

• Nowcasts every 15mins to 7 hours using T-30, T-15 and T+0 rain analyses to derive field of motion

• Blend UK4 and nowcast using STEPS

• 8 member ensemble

• Hourly temperature, precip type, cloud, wind, visibility etc

• Start 1min after DT but waits 7mins for radar rates and satellite imagery

• Available within 15mins

Page 30: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Comparison of NWP forecasts and STEPS (advection) Nowcasts of Precipitation – RMSF error of 1hour accumulation > 1mm

RMSF=

Exp(Sum/N)0.5

Sum= sum(i-1,N)

Log(Fi/Oi)2

where O=radar estimate

Both smoothed to6km

Page 31: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Nowcasting System

• NWP-based nowcasting system is non-hydrostatic model that resolves convection explicitly.

• Nonlinear Unified Model (UM) is 1.5 km resolution (360 x 288 x 70 levels), has model top at 40 km, and uses 50 s timestep.

• Linear Perturbation Forecast (PF) model and its adjoint: 3 km resolution (180 x 144 x 70 levels) and 100 s timestep.

• 4D-Var uses hourly assimilation windows with linearization states for PF model updated every 10 minutes and UKV every 10mins in OPS

• Observations are extracted in the observation time window T-30 to T+30 minutes. Might change to T-60 to T+0.

• 4D-Var increments are added to UM at initial forecast time T-30 mins (first UM time step). Might change to T-60.

• Runs using latest UKV as boundary conditions, 45min cutoff time

Page 32: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Hourly 3D/4D-Var DA cycle

• Assimilation/Obs window T-0.5 to T+0.5

• LH and cloud (RH) nudging from T-1 to T+0

Schematic diagram of 3D/4D-Var DA cycle with MOPS cloud and LH nudging in SUKF 1.5km hourly nowcasting system

Page 33: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Observations currently available • Surface fields (u, v, p ,T, RH, visibility) [1 min] 1 hr

• Wind profiler (u, v) [15 min] 15min

• Doppler radar radial winds [5 min] 3 per hr NDP*

• Radar reflectivity both direct and indirect [5 min] not used

• Rain rates (radar-derived) [15 min] 15 min NDP

• GPS (integrated humidity path) [10 min] 10min

• Scatterometer winds [~5 min] 1 hr

• Cloud-track winds (Atmospheric Motion Vectors AMVs)

[low res. 30 min, high res. 15 min] low res. only used 1 hr

• VAD Velocity Azimuthal Display winds [1 hr] 1 hr NDP*

• Radiosondes [12 hours or when reported] when reported NDP

• 3D cloud analysis (MOPS) [1 hr] 1 hr NDP

• AMDAR aircraft-derived T, u, v [1 hour batches] 1 hr NDP

• Geostationary Satellite Imagery (clear radiances) [15 min] 1 hr NDP

Page 34: © Crown copyright Met Office Development of NWP-based Nowcasting at the Met Office -The Nowcasting Demonstration Project Workshop on Use of NWP for Nowcasting

Observations coming soon

Potential for assimilation of following observations:

• Cloud track winds (u, v) or Atmospheric Motion Vectors (AMVs) at high resolution available but not yet assimilated operationally

• Radar reflectivity (indirect and direct assimilation)

• Satellite-derived cloud top

• Surface cloud cover and cloud base (manual and automatic reporting)