Page 1: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Hensel Phelps Technical

Assistance Program (TAP)

Page 2: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

IntroductionsCharles Eaton and Brad Lewis

Page 3: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Agenda

Hensel Phelps Procurements

Project Delivery Methods Subcontract Insurance \ Bonding

Project Administration Quality Control Safety

Paving the Way To Success

Introduction

Page 4: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Hensel Phelps started

as an SBE in 1937

Who We Are

Introduction

Page 5: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Who We Are

Introduction

Page 6: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Federal

Education

Healthcare

Hospitality

Avi

ati

on

Mission Critical

Renewa

ble En

ergy

Market Focus

Approximately 80% of our work is managed through the design-build delivery method.

30%

70%

Private

Procurement

Page 7: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Why An Information Sheet?

Years in Business, Volume, & Safety Record○ Annual Sales past two years○ Current volume on hand – Backlog○ Current employee count○ Safety Record for the past three years

Financial Backing○ Long Term and Short Term Loans○ Bonding Capacity

References○ General Contractor/Owner References○ Vendor/Supplier References

To help us match the right scope and project to you!

Procurement

Subcontractor Relationships / Marketing

Page 8: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

• Provide as much information as possible, but make sure you include: Point of Contact w/email and fax number Small Business Status Bonding ability

This is your tool to provide current information to us!

• Update your information Semi-annually or when contacts change

Most applicable CSI Division – Do Not overburden Divisions The States were you work Brief Description of Company Services

Procurement

Subcontractor Relationships / Marketing

Page 9: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Procurement

Subcontractor Relationships / Marketing

Page 10: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

How to get in front of the right person?

Contact Project Estimator and find out who has been assigned to your scope.

Procurement

Bidding

Page 11: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Communicate early with HP’s Estimator:

• Discuss scope to be bid:Applicable specification sectionsPlans including detailsProject sequencing and schedule

• Relate your capacity and capabilities.• Advise of your SBE Status.• Are there special bid requirements?

Procurement

Bidding

Page 12: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Design-Bid-Build

Design-Build

CM at Risk

Procurement

Project Delivery Methods

Page 13: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

g / Interview

Procurement

Project Delivery MethodsIssue RFQ

Award: Based on Qualifications & Price

Page 14: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Elements of the 6 Step Quality Process Quality Process Log Procurement Phase Purchasing Meetings Pre-Mobilization Meetings Preparatory Meetings Initial Inspections Follow-up Inspections Source Inspections Final Inspections Commissioning Process Overview Project Closeout

Quality Control

Page 15: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Safety Start Up Packet

Safety Plan

Haz Com Plan

– Inventory

– Questionnaire

Activity Hazard Analysis (AHA)

Competent Person

– Trainings

Safety

Page 16: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

We All Have A Purpose – Work Safe!

Safety

Page 17: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Financial Management

Business Plan

Realistic Business Growth

Steps for Success

Paving The Way to Success

Page 18: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Financial Management

Steps for Success

Paving The Way to Success

Page 19: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Bonding, Working Capital and Competitive Pricing

Develop relationships

– Insurance Agent

– Surety Bond Producer and Surety Company

– Banker

– Attorney

– CPA

Steps for Success

Page 20: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Project Management

Closely manage projects and incorporate early warning systems to catch potential problems

Incorporate supervisory and field training in your operations

Pre-plan your work

Steps for Success

Page 21: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Estimating and Job Cost Reporting

Hire experienced estimator, even if only on a part-time or “as-needed” basis

Put into place an automated job costing system

Steps for Success

Page 22: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Business Plan

Steps for Success

Paving The Way to Success

Page 23: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Comprehensive Business Plan

Develop business plan, including establishing a succession plan

Train your Staff

Establish clear job descriptions including fair compensation structure

Steps for Success

Page 24: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Changes in Scope or Line of Business

Exhaust opportunities in your core competency before seeking work in other areas

Steps for Success

Page 25: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Realistic Growth

Steps for Success

Paving The Way to Success

Page 26: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Realistic Growth

Manage your expansion and growth

Grow incrementally in keeping with your management, bonding and financial resources

Consider the formation of a joint venture with a firm in the new location or one with more direct experience with the type of work being bid

Steps for Success

Page 27: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

SMART Goals

Specific

Measurable

Attainable

Realistic

Timely

Steps for Success

Page 28: Hensel Phelps  Procurements  Project Delivery Methods  Subcontract Insurance \ Bonding  Project Administration  Quality Control  Safety  Paving

Hensel Phelps started

as an SBE in 1937

Closing