Page1 Mackay Isaac Whitsunday Regional Office Level 4, 44 Nelson Street PO Box 257 Mackay QLD 4740 Our reference: SDA-0715-022257 Your reference: DA-2015-82 10 August 2015 Chief Executive Officer Mackay Regional Council PO Box 41 Mackay QLD 4740 Attention: Andrea McPherson Dear Ms. McPherson, Concurrence agency response—with conditions given under section 285 of the Sustainable Planning Act 2009 for Development Permit for Material Change of Use (Telecommunication Facility) over Lot 2 on SP168450, 790 Marlbourough-Sarina Road, Sarina QLD 4737 The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 27 July 2015. Applicant details Applicant name: NBN Co Limited C/- Visionstream Pty Ltd Applicant contact details: PO Box 735 Fortitude Valley QLD 4006 [email protected] Site details Street address: 790 Marlborough –Sarina Road, Sarina, - QLD 4737 Lot on plan: Lot 2 on SP168450 Local government area: Mackay Regional Council

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: , Local Government...Version/Issue Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty Ltd 19 May 2015 4MKY-51-33-MARB-C2 Revision 02 A copypleasedof this

Page1Mackay Isaac Whitsunday Regional Office

Level 4, 44 Nelson StreetPO Box 257

Mackay QLD 4740

Our reference: SDA-0715-022257Your reference: DA-2015-82

10 August 2015

Chief Executive OfficerMackay Regional CouncilPO Box 41Mackay QLD 4740

Attention: Andrea McPherson

Dear Ms. McPherson,

Concurrence agency response—with conditions given under section 285 of the Sustainable Planning Act 2009 for Development Permit for Material Change of Use (Telecommunication Facility) over Lot 2 on SP168450, 790 Marlbourough-Sarina Road, Sarina QLD 4737

The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 27 July 2015.

Applicant details

Applicant name: NBN Co Limited C/- Visionstream Pty Ltd

Applicant contact details: PO Box 735Fortitude Valley QLD [email protected]

Site details

Street address: 790 Marlborough –Sarina Road, Sarina, - QLD 4737

Lot on plan: Lot 2 on SP168450

Local government area: Mackay Regional Council

sarahwe
Received (Auto Date)
Page 2: , Local Government...Version/Issue Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty Ltd 19 May 2015 4MKY-51-33-MARB-C2 Revision 02 A copypleasedof this

SDA-0715-022257

Department of Infrastructure, Local Government and Planning Page 2

Application detailsProposed development: Development Permit for Material Change of Use

(Telecommunication Facility)

Referral triggers

The development application was referred to the department under the following provisions of the Sustainable Planning Regulation 2009:

Referral trigger Schedule 7, Table 3, Item 1 – State-controlled Roads

ConditionsUnder section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in Attachment 1 must be attached to any development approval.

Reasons for decision to impose conditionsUnder section 289(1) of the Sustainable Planning Act 2009, the department must set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2.

Approved plans and specificationsThe department requires that the following plans and specifications set out below and in Attachment 4 must be attached to any development approval.

Drawing/Report Title Prepared by Date Reference no.

Version/Issue

Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty

Ltd19 May 2015 4MKY-51-33-

MARB-C2Revision 02

A copy of this response has been sent to the applicant for their information.

For further information, please contact Dylan Brown, Planning Officer, Mackay Isaac Whitsunday Regional Office on (07) 4898 6812, or email [email protected] who will be pleased to assist.

Yours sincerely

Patrick RuettjesManager (Planning) – Mackay Isaac Whitsunday Regional Office

cc: NBN Co Limited C/- Visionstream Pty Ltd, [email protected]: Attachment 1—Conditions to be imposed

Attachment 2—Reasons for decision to impose conditionsAttachment 3—Approved Plans and Specifications

Page 3: , Local Government...Version/Issue Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty Ltd 19 May 2015 4MKY-51-33-MARB-C2 Revision 02 A copypleasedof this

SDA-0715-022257

Department of Infrastructure, Local Government and Planning Page 3

Our reference: SDA-0715-022257Your reference: DA-2015-82

Attachment 1—Conditions to be imposed

No. Conditions Condition timing

Schedule 7, Table 3, Item 1—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s):1. The development must be carried out generally in

accordance with the following plan:

Overall Site Plan, Visionstream Pty Ltd, 19 May 2015, Drawing No – 4MKY-51-33-MARB-C2, Revision 02.

At all times.

2. Direct access is not permitted between the Marlborough-Sarina Road and the subject site at any location.

At all times.

T13

Page 4: , Local Government...Version/Issue Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty Ltd 19 May 2015 4MKY-51-33-MARB-C2 Revision 02 A copypleasedof this

SDA-0715-022257

Department of Infrastructure, Local Government and Planning Page 4

Our reference: SDA-0715-022257Your reference: DA-2015-82

Attachment 2—Reasons for decision to impose conditions

The reasons for this decision are: To ensure access to the state-controlled road from the site does not compromise the

safety and efficiency of the state-controlled road. To ensure the development is carried out generally in accordance with the plans of

development submitted with the application.

T13

Page 5: , Local Government...Version/Issue Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty Ltd 19 May 2015 4MKY-51-33-MARB-C2 Revision 02 A copypleasedof this

SDA-0715-022257

Department of Infrastructure, Local Government and Planning Page 5

Our reference: SDA-0715-022257Your reference: DA-2015-82

Attachment 3—Approved plans and specifications

T13

Page 6: , Local Government...Version/Issue Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty Ltd 19 May 2015 4MKY-51-33-MARB-C2 Revision 02 A copypleasedof this

SITE LOCATIONN

OVERALL SITE

PLAN

SITE CO-ORDINATES

LEGEND

16/04/2015

9061171

Drawing Title:

RevisionDrawing No.

Rev

APPROVED BY:CHECKED BY:DRAFTED BY:

Client:

Project:

Date Revision Details

NATIONAL BROADBAND

NETWORK

ERICSSON

Client:

CAD

VISIONSTREAM PTY LTD

236 East Boundary Road2 North Drive Virginia Park Bentleigh East VIC 3165

Tel- (03) 9258 5700 fax- (03) 9563 7481www.visionstream.com.au

PRELIMINARY

Client:

024MKY-51-33-MARB-C2

JRK

SG/AL

AK

QLD 4737

SARINA

MARLBOROUGH

SARINA