Page1Mackay Isaac Whitsunday Regional Office
Level 4, 44 Nelson StreetPO Box 257
Mackay QLD 4740
Our reference: SDA-0715-022257Your reference: DA-2015-82
10 August 2015
Chief Executive OfficerMackay Regional CouncilPO Box 41Mackay QLD 4740
Attention: Andrea McPherson
Dear Ms. McPherson,
Concurrence agency response—with conditions given under section 285 of the Sustainable Planning Act 2009 for Development Permit for Material Change of Use (Telecommunication Facility) over Lot 2 on SP168450, 790 Marlbourough-Sarina Road, Sarina QLD 4737
The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 27 July 2015.
Applicant details
Applicant name: NBN Co Limited C/- Visionstream Pty Ltd
Applicant contact details: PO Box 735Fortitude Valley QLD [email protected]
Site details
Street address: 790 Marlborough –Sarina Road, Sarina, - QLD 4737
Lot on plan: Lot 2 on SP168450
Local government area: Mackay Regional Council
SDA-0715-022257
Department of Infrastructure, Local Government and Planning Page 2
Application detailsProposed development: Development Permit for Material Change of Use
(Telecommunication Facility)
Referral triggers
The development application was referred to the department under the following provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 3, Item 1 – State-controlled Roads
ConditionsUnder section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditionsUnder section 289(1) of the Sustainable Planning Act 2009, the department must set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Approved plans and specificationsThe department requires that the following plans and specifications set out below and in Attachment 4 must be attached to any development approval.
Drawing/Report Title Prepared by Date Reference no.
Version/Issue
Aspect of development: Material Change of Use Overall Site Plan Visionstream Pty
Ltd19 May 2015 4MKY-51-33-
MARB-C2Revision 02
A copy of this response has been sent to the applicant for their information.
For further information, please contact Dylan Brown, Planning Officer, Mackay Isaac Whitsunday Regional Office on (07) 4898 6812, or email [email protected] who will be pleased to assist.
Yours sincerely
Patrick RuettjesManager (Planning) – Mackay Isaac Whitsunday Regional Office
cc: NBN Co Limited C/- Visionstream Pty Ltd, [email protected]: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditionsAttachment 3—Approved Plans and Specifications
SDA-0715-022257
Department of Infrastructure, Local Government and Planning Page 3
Our reference: SDA-0715-022257Your reference: DA-2015-82
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Schedule 7, Table 3, Item 1—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s):1. The development must be carried out generally in
accordance with the following plan:
Overall Site Plan, Visionstream Pty Ltd, 19 May 2015, Drawing No – 4MKY-51-33-MARB-C2, Revision 02.
At all times.
2. Direct access is not permitted between the Marlborough-Sarina Road and the subject site at any location.
At all times.
T13
SDA-0715-022257
Department of Infrastructure, Local Government and Planning Page 4
Our reference: SDA-0715-022257Your reference: DA-2015-82
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are: To ensure access to the state-controlled road from the site does not compromise the
safety and efficiency of the state-controlled road. To ensure the development is carried out generally in accordance with the plans of
development submitted with the application.
T13
SDA-0715-022257
Department of Infrastructure, Local Government and Planning Page 5
Our reference: SDA-0715-022257Your reference: DA-2015-82
Attachment 3—Approved plans and specifications
T13
SITE LOCATIONN
OVERALL SITE
PLAN
SITE CO-ORDINATES
LEGEND
16/04/2015
9061171
Drawing Title:
RevisionDrawing No.
Rev
APPROVED BY:CHECKED BY:DRAFTED BY:
Client:
Project:
Date Revision Details
NATIONAL BROADBAND
NETWORK
ERICSSON
Client:
CAD
VISIONSTREAM PTY LTD
236 East Boundary Road2 North Drive Virginia Park Bentleigh East VIC 3165
Tel- (03) 9258 5700 fax- (03) 9563 7481www.visionstream.com.au
PRELIMINARY
Client:
024MKY-51-33-MARB-C2
JRK
SG/AL
AK
QLD 4737
SARINA
MARLBOROUGH
SARINA
SITE No: 4MKY-51-33-MARB