- P&ID - Piping & Instrument Diagram. What is P&ID. Basic Engineering document Indicating -Process Requirement -Equipment in the Plant-Piping and Piping Component-Instrument and Logic Relations. What should be indicated on P&ID?. Process requirement. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: - P&ID - Piping & Instrument Diagram

-- P&IDP&ID --Piping & Instrument Piping & Instrument

DiagramDiagram

Page 2: - P&ID - Piping & Instrument Diagram

What is P&IDWhat is P&ID

Basic Engineering documentBasic Engineering document Indicating Indicating -Process Requirement -Process Requirement

-Equipment in the -Equipment in the PlantPlant -Piping and -Piping and Piping ComponentPiping Component --Instrument and LogicInstrument and Logic    RelationsRelations

Page 3: - P&ID - Piping & Instrument Diagram

What should be indicated on P&ID?

Process requirement

- PFD : all line and flow, every item

- not on PFD : relieving system, pump minimum flow,compressor anti surge flow, isolation system

- item for maintenance, operation, pre-commissioning,commissioning, start-up

Page 4: - P&ID - Piping & Instrument Diagram

What should be indicated on P&ID?

Equipment

- all equipment with exact number and components : all nozzles, manholes, internals

- type of connection to piping

- equipment item number, service name, major specification

Page 5: - P&ID - Piping & Instrument Diagram

What should be indicated on P&ID?

Piping

- all lines for normal operation, startup, shutdown, emergency, special operation, and maintenance

- all piping components (valves etc.) and notes on them (CSO, CSC, TSO)

- line information : line no., size, fluid symbol, piping service class, insulation

- configuration requirement : No Pockets, Free Draining

Page 6: - P&ID - Piping & Instrument Diagram

What should be indicated on P&ID?

Instrumentation

- instrumentation for controlling, monitoring, emergency shutdown, sequence control, interlock, automatic start/stop

- field instrument

- control and shutdown valves with their type, size, failure status

- pressure relief valves with their set pressure and size

- kind of signal : pneumatic, electric, hydraulic, capillary tubing,softlink

Page 7: - P&ID - Piping & Instrument Diagram

What should be indicated on P&ID?

Other

- battery limit between client and contractor

- area battery limit

- change of responsibility between Piping and Instrument, Contractor and Vendor

- extent of packaged equipment supply

- breaks of line information : line number, piping service class, insulation

Page 8: - P&ID - Piping & Instrument Diagram

What information can you What information can you get?get?

For EquipmentFor EquipmentOutline/InternalsOutline/Internals

For PipingFor PipingLine No./Size/Material/Insulation/Line Line No./Size/Material/Insulation/Line Configuration/Piping Component TypeConfiguration/Piping Component Type

For InstrumentFor InstrumentTag No./Function/Control MethodTag No./Function/Control Method

Page 9: - P&ID - Piping & Instrument Diagram

P&ID is used for P&ID is used for

Detail Engineering of each disciplinesDetail Engineering of each disciplinesPiping layout/Material PurchasePiping layout/Material Purchase

Instrument Logic/DCS Plan, etcInstrument Logic/DCS Plan, etc

Planning of Planning of Construction/Commissioning/Plant Construction/Commissioning/Plant Operation/MaintenanceOperation/Maintenance

Page 10: - P&ID - Piping & Instrument Diagram

P&ID IFA

How to Develop/Finalize

Process Verification Proj.Spec Discipline Comments

P&ID IFH

P&ID IFC

P&IDAs Built

Company Comments

HAZOPSIL Study, etc.

Detail Design Feedback

Vendor Data Input

Field Change Feedback

Page 11: - P&ID - Piping & Instrument Diagram
Page 12: - P&ID - Piping & Instrument Diagram

P&ID Symbols

Page 13: - P&ID - Piping & Instrument Diagram

P&ID Symbols

Page 14: - P&ID - Piping & Instrument Diagram

P&ID Symbols

Page 15: - P&ID - Piping & Instrument Diagram

P&ID Symbols

Page 16: - P&ID - Piping & Instrument Diagram
Page 17: - P&ID - Piping & Instrument Diagram
Page 18: - P&ID - Piping & Instrument Diagram

P&ID Practices

Page 19: - P&ID - Piping & Instrument Diagram

Control valve loop

1

FC 4” 300#

PC 005

PY 005

PV 005

I /P

H

L

PT 005

4”

Page 20: - P&ID - Piping & Instrument Diagram

LT/FT Cascade Control

FC 4” 300#

FV 102

4”

6”-PL-10042-AA11-N

FT 102

FE 102

300#

LT 105

DISP

SP

LI 105

H

L

FC 102

6”-PL-10042-AA11-N

Page 21: - P&ID - Piping & Instrument Diagram

Split range control(1)

1

H

L

PT 001

I/P

8”-PG-10043-AA11-N

FC/TSO 4” 300#

PY 001D

PV 001B

I/P

6”-PG-10042-BA21-N

FC 4” 300#

PY 001C

PV 001A

a

2xa

2x(a-50)

0 100 PIC OUTPUT

100

0

A B

CV

OP

EN

ING

6”

6”-PG-10043-BA21-N

6”

4”

PY 001A

PY 001B

P

PC 001

Page 22: - P&ID - Piping & Instrument Diagram

Split range control(2)

1

2”-PG-10102-AA11-N

I/P

3”-PG-10101-AA11-N

1-1/2”

PY 001D

PY 001A

a

2x(50-a) 2x(a-50)

0 100 PIC OUTPUT

100

0

A B

CV

OP

EN

ING

I /P

FC 1”

PY 001C

PV 001A

PC 001

AH

AL

PT 001

FC

PV 001B

2”

3”

1-1/2”

2”

PY 001B

Page 23: - P&ID - Piping & Instrument Diagram

Place equipment and its componentsConnect main pipingComplete control valve loop Place other instrument and connect

signals Indicate safety devices incl. alarmPlace piping components (Valve/Fitting)

as requiredCheck detail and add items required incl.

vent/drain connection