DISTRICT IRRIGATION PLAN

KINNAUR, HP 2015-2020

Page 2: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 1

District Irrigation Plan, 2015-2020

Kinnaur, Himachal Pradesh

NABARD CONSULTANCY SERVICES PVT. LTD.

Corporate Office : 24, Rajendra PLakhse, NABARD Building, New Delhi – 110125

Reg. Office : Plot No. C24, G Block, 3rd Floor, NABARD Building

Bandra Kurla Complex, Bandra East, Mumbai-400051

Page 3: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 2

Page 4: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 3

Table of Contents

INTRODUCTION ................................................................................................................................................1

I. Background ...................................................................................................................................................1

II. Vision ...........................................................................................................................................................7

III. Objective .....................................................................................................................................................7

IV. Strategy/approach .......................................................................................................................................8

V. Programme Components ..............................................................................................................................8

VI. Rationale/ Justification .............................................................................................................................10

VII. Methodology ...........................................................................................................................................10

Chapter 1 : GENERAL INFORMATION OF THE DISTRICT.........................................................................12

1.1 District Profile ..........................................................................................................................................12

1.2. Demography ............................................................................................................................................15

1.3 Biomass and Livestock .............................................................................................................................16

1.4 Agro-Ecology, Climate, Hydrology and Topography ..............................................................................18

1.5 Soil Profile ................................................................................................................................................20

1.6 Soil Erosion and Run Off .........................................................................................................................24

1.7 Land Use Pattern.......................................................................................................................................24

Chapter 2 DISTRICT WATER PROFILE ..........................................................................................................28

2.1 Area Wise, Crop Wise Irrigation Status ...................................................................................................28

2.2 Production and Productivity of Major Crops ............................................................................................31

2.3 Irrigation Based Classification..................................................................................................................33

Chapter 3 Water Availability ..............................................................................................................................35

3.1 Status of Water Availability .....................................................................................................................36

3.2 Status of Ground Water Availability ........................................................................................................38

3.3 Status of Command Area ..........................................................................................................................41

3.4 Existing Type of Irrigation .......................................................................................................................42

Chapter 4 Water Requirement/Demand ..............................................................................................................44

4.1 Domestic Water Demand ..........................................................................................................................44

4.2 Crop Water Requirement ..........................................................................................................................45

4.3 Livestock Water Requirement ..................................................................................................................46

4.4 Industrial Water Demand ..........................................................................................................................47

4.5 Water Demand for Power Generation ......................................................................................................48

4.6 Total Water Demand of the district for various sectors ............................................................................50

4.7 Water Budget ............................................................................................................................................51

Chapter 5 Strategic Action Plan ..........................................................................................................................53

5.0.1 Strategic Plan for irrigation in PMKSY .................................................................................................53

5.1. Component wise and Year wise total Plan of the district: .......................................................................53

5.2 Strategic Action Plan for Blocks under AIBP ..........................................................................................57

Page 5: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 4

5.3.0 Strategic Action Plan for Blocks under Har Khet Ko Pani ....................................................................57

5.3.1 Action plan based on Member of Parliament Local Area Development Schemes (MPLAD) ..............60

5.4 Strategic Action Plan for Blocks under Per Drop More Crop ..................................................................61

5.5 Strategic action Plan for Blocks under Watershed Development Component .........................................63

5.6 Suggestions ...............................................................................................................................................65

5.7 Expected Outcome ....................................................................................................................................66

Annexure 1: Demography Details ................................................................................................................... i

Annexure 2 : Area wise Crop wise Irrigation Status .................................................................................... vii

Annexure 3: Production and Productivity of Crops ........................................................................................ ix

Annexure 4: Block wise Crop water Requirement ....................................................................................... xi

Annexure 5: Block wise Livestock water Requirement .............................................................................. xiii

Annexure 6: Strategic Action Plan Kinnaur 2016-2020 ............................ Error! Bookmark not defined.

Anexure 7: Details of Medium irrigation Project under AIBP component .................................................. xiii

Annexure 8: Year wise Action plan IPH- Har Khet Ko Pani Component- 2016-2020 ..................................xv

Annexure 9: Year Wise Action Plan- Department of Agriculture –Per Drop More Crop/ Har Khet Ko Pani

...................................................................................................................................................................... xix

Annexure 10: Year Wise Installation Plan Per drop More Crop (Supplementary water management activities)

.................................................................................................................................................................... xxiii

Annexure 11: Action Plan of DRDA for watershed activities for the year 2016-17, Project wise ........... xxix

a. Name of Batch-IWMP-I (Pooh-I,Nichar-II,Kalpa-III) ........................................................................xxx

b. Batch-IWMP II (Pooh-VI,Nichar-V,Kalpa-VI) ............................................................................ xxxviii

Annexure 12: Action Plan of DRDA for watershed activities for 2016-2020 ( IWMP Batch I-III) ........... xliv

Annexure 13: Action Plan of Horticulture Department Year wise ................................................................ liv

Page 6: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 5

List of Tables

Table 1-1 District Profile ....................................................................................................................................13 Table 1-2 Administrative set up of Kinnaur .......................................................................................................14 Table 1-3 Demography .......................................................................................................................................16 Table 1-4 Production of Animal Products in Kinnaur ........................................................................................16 Table 1-5 Biomass and Livestock .......................................................................................................................17 Table 1-6 Agro-Ecology, Climate, Hydrology and Topography ........................................................................18 Table 1-7 Soil profile of the district ....................................................................................................................22 Table 1-8 Block wise Land slope of Kinnaur .....................................................................................................24 Table 1-9 Problems for Land Development in Kinnaur District (per cent of Panchayats) .................................24 Table 1-10 Land use Classification .....................................................................................................................25 Table 3-1 Status of water Availability ................................................................................................................38 Table 3-2 Status of Ground Water Availability ..................................................................................................41 Table 3-3 Status of Command Area ..................................................................................................................41 Table 3-4 List of Tehsils/ Villages in Command Area ......................................................................................41 Table 3-5 Existing Type of Irrigation .................................................................................................................42 Table 4-1 Domestic Water Demand (MCM) ......................................................................................................44 Table 4-2 Crop Water Requirement in Million Cubic Meter ..............................................................................45 Table 4-3 Water requirement of crops in mm .....................................................................................................46 Table 4-4 Livestock water requirement ..............................................................................................................46 Table 4-5 Livestock water requirement ..............................................................................................................46 Table 4-6 Water Demand for Industries..............................................................................................................47 Table 4-7 Small and Micro Hydro Projects in Kinnaur ......................................................................................48 Table 4-8 Water Required for Power Generation ..............................................................................................49 Table 4-9 Total Water Demand of the district for various sectors (2015) ..........................................................50 Table 4-10 Total Water Demand of the district for various sectors (Projected for 2020) ..................................50 Table 4-11 Water Budget ....................................................................................................................................51 Table 5-1 a Department wise Action Plan for 3 Blocks of Kinnaur (Rs in Lakh) ..............................................56 Table 5-2 Department wise – Year wise, Action Plan of Kinnaur (Rs in Lakh) .................................................56 Table 5-3 Year Wise Phasing of Action Plan .....................................................................................................56 Table 5-4 Ministry Wise Funds Sought under PMKSY, Kinnaur ......................................................................57 Table 5-5 Ministry Wise Funds Sought under PMKSY, Kinnaur ......................................................................57 Table 5-6 Action plan Har Khet Ko Pani - Kalpa (IPH Schemes) ......................................................................58 Table 5-7 Action Plan Pooh- Har Khet Ko Pani -(IPH Schemes) ......................................................................59 Table 5-8 Action plan Nichar - Har Khet Ko Pani - (IPH Schemes) ..................................................................59 Table 5-9 Action Plan- Kinnaur- Har Khet Ko Pani - Kalpa (Agriculture Schemes) .........................................60 Table 5-10 Block wise Action Plan based on MPLAD Schemes ......................................................................61 Table 5-11 Action Plan- Per drop more crop ......................................................................................................62 Table 5-12 Action Plan- Per Drop More crop (Horticulture) ..............................................................................63 Table 5-13 Action Plan under Watershed Component........................................................................................63

Page 7: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 6

List of Figures

Figure 1.1 Administrative set up of Kinnaur ......................................................................................................13 Figure 1.2 Percentage of Inhabited-Uninhabited Villages in Kinnaur ................................................................14 Figure 1.3 Block wise Male, Female Children Population in Kinnaur ...............................................................15 Figure 1.4 Block wise SC, ST, General population and Households in Kinnaur ...............................................15 Figure 1.5 Livestock and Biomass ......................................................................................................................17 Figure 1.6 Percentage change in Land use – comparison of Land use in 2002 with 2015 .................................27 Figure 2.1 Block wise Area under Kharif and Rabi crops ..................................................................................29 Figure 2.2 Block wise Irrigation Status of Arable Area ......................................................................................29 Figure 2.3 Crop Wise, Area wise, Irrigation Status- Kinnaur .............................................................................29 Figure 2.4 Crop Wise, Area wise, Irrigation Status- Kalpa ................................................................................30 Figure 2.5 Crop Wise, Area wise, Irrigation Status- Pooh ..................................................................................30 Figure 2.6 Crop Wise, Area wise, Irrigation Status- Nichar ...............................................................................31 Figure 2.7 Block wise Irrigation status of Horticulture Plantations ....................................................................31 Figure 2.8 Production of Kharif and Rabi crops in Kinnaur (in quintals) ..........................................................32 Figure 2.9 Yield of Major Crops in Kg per Hectare ...........................................................................................33 Figure 2.10 Irrigation Based Classification (Exclusively for agricultural crops) ...............................................34 Figure 2.11 Irrigation of Horticultural crops and plantations (Area in hectares) ................................................34 Figure 4.1 Domestic water Demand Present (2015) and Projected (2020) .........................................................45 Figure 4.2 Industrial Units in Kinnaur ................................................................................................................47 Figure 4.3 Sectoral water Demand of Kinnaur ...................................................................................................50 Figure 4.4 Water Budget of Kinnaur...................................................................................................................51 Figure 5.1 Share of departments in PMKSY Budget ..........................................................................................54 Figure 5.2 Component wise Coverage of Command area in Action plan ...........................................................55 Figure 5.3 Department wise Planned Coverage of Area .....................................................................................55 Figure 5.4 Block wise Distribution of PMKSY Fund 2016-2020 (In Rs Crore) ................................................56

Page 8: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 7

List of Maps

Map 1: Location Map of Kinnaur .......................................................................................................................12 Map 2:River Valleys and General Elevation in Kinnaur ....................................................................................20 Map 3: Soil Map of Kinnaur ...............................................................................................................................22 Map 4 Land slope Map of Kinnaur .....................................................................................................................23 Map 5: Land use Land Cover map of Kinnaur District, 2002...........................................................................26 Map 6 : Land use Land Cover map of Kinnaur District, 2015...........................................................................26 Map 7 : Pre Monsoon Drainage Map of Kinnaur ..............................................................................................35 Map 8 : Post Monsoon Drainage Map of Kinnaur ..............................................................................................36 Map 9 : Ground water user map- Kinnaur ..........................................................................................................40

Page 9: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | i

Executive Summary

Water is of vital importance for human & animal life, for maintaining ecological balance and for

developmental efforts. With the ever increasing demand for water due to population growth,

urbanization and industrialization, making water available to multiple uses, planning and management

of water resources and utilization of water economically, optimally and equitably assumes greater

significance. Government of India formulated PMKSY with the vision of extending the coverage of

irrigation (Har Khet Ko Pani) and improving water use efficiency (More Crop Per Drop) in a focused

manner with end to end solution on water resource creation, distribution, management, field application

and extension activities. Under PMKSY an integrated planning and management of water resources,

through estimation of water budget for each of the district and sub districts and preparation of strategic

action plan to address the water gap through District Irrigation Plan (DIP) was envisaged. The present

report presents the District Irrigation Plan under PMSY in Kinnaur District.

Further, Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) incentivizes states to enhance

expenditures on irrigation and water resources management by making the access to PMKSY funds to

states conditional i.e., state will have access only if the expenditure in water resource development for

agriculture sector in the year under consideration is not less than the baseline expenditure, which is

defined as the average of the expenditure in irrigation sector irrespective of the department in the state

plan in three years prior to the year under consideration.

PMKSY will be implemented in area development mode only by adopting a ‘decentralized State level

planning and projectised execution’ structure that will allow States to draw up their own irrigation

development plans based on DIPs and SIPs with a horizon of 5-7 years. A three tier structure at

national, state and district level will oversee implementation and coordination of the program. The

District Level Implementation Committee will form the third tier of the PMKSY. The DLIC will be

chaired by the Deputy Commissioner, Kinnaur and comprises of the Departments of Agriculture,

Horticulture, District Rural Development Agency (DRDA), Irrigation and Public Health Department,

Forest Department, Lead bank of the District and any other line Departments in the District. The DLIC

will oversee the implementation and inter-departmental coordination at district level.

Page 10: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | ii

District Water Profile: Kinnaur district is entirely rural where households are predominantly

dependent on agriculture and allied activities for their livelihood. The gross cropped area in the district

is 21,425 ha (9,017 hectares is under agricultural crops and 12,408 ha is under horticultural plantations).

The natural water sources and irrigation infrastructure in the district contributes to an irrigated area of

59.35 percent in case of agricultural crops and 67.5 percent for horticulture plantations. Kalpa and Pooh

block have more than 70 percent of the area under irrigation due to their close proximity to snow-

capped mountains and glaciers which irrigate the agricultural lands downstream. However, in case of

Nichar block the crops are predominantly dependent on rains for irrigation. ). Kharif season is the main

cropping season in the district as about 83 percent (7,602 ha) of the arable area is utilised in cultivation

of various agricultural crops. Vegetables are the main agricultural crop cultivated in the district (36

percent area) followed by cereals (25 percent area), Coarse cereals (16.6 percent area) and pulses (16.4

percent). Oilseeds are cultivated in a negligible area of 4 ha in Kinnaur. Nearly 67 per cent of Kharif

cropped area is irrigated and during rabi season 29.3 per cent of the area is irrigated. Considering the

topography of Kinnaur, where land is a inelastic resource increasing the irrigation potential further is

the key to increasing the production and productivity of crops.

Crop Diversification: The crop diversification process initiated in 1960 and 1970s gained momentum

in the state of Himachal Pradesh including in Kinnaur district in 1990 and 2000. Further diversification

potential exists in different parts of the state and may be promoted through actively expanding irrigation

facilities in the state. This process will ensure that farmers receive decent income while the existing

food grain production takes care of the food security needs of the households. In Kinnaur district, the

crop diversification potential of the different blocks vary. For instance in the blocks of Kalpa and Pooh

the crop diversification is already fairly advanced and further improvement in farm income is possible

through quality improvement. In Nichar block diversification has begun and there is potential for more

area expansion in terms of growing fruits and vegetables by shifting area away from food grains

production. Integrated farming consisting of crop cultivation, dairy and fishery may be promoted in

the district.

Yield per Hectare of Major Crops: The yield levels of major crops in the district is higher in irrigated

conditions than under Rainfed conditions. Further, the absolute levels of yields reported in the district

are slightly lesser than the state average yields or potential yields as per the package of practices

recommended by the state agricultural university. By enhancing the water resources availability for

irrigation purpose through rainwater harvesting, soil & water conservation measures, the productivity

of crops can be enhanced further.

Page 11: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | iii

Availability of water sources: Kinnaur district falls under High Hills Dry temperate zones. The district

receives rainfall from the month of June till September. The district receives moderate rainfall, out of

which 75% occurs during monsoon period i.e. June to Sept. The parts of upper Kinnaur receive more

snowfall than the rainfall. The district receives heavy snowfall from November till March or sometimes

April. Snow fall in the higher reaches and rain fall in the lower areas recharge the ground water. Satluj

and spiti are the major rivers which flow through the district providing surface water. Further, springs,

nallahs and Khads are the other main sources for the irrigation and water supply in the district. Kinnaur

district has springs whose yield varies from 0.5 to 15 liters per second. In Kullu valley, ground water

generally occurs under confined to semi confined conditions. The district being hilly and mountainous,

traditional sources of ground water, mainly springs, has played a major role since past in providing

assured irrigation and water supply.

Including all the water sources, Kinnaur district has an estimated water source availability of 7.40

million cubic meters out of which 7.24 mcm (or 97.8%) is surface water and the rest 0.154 mcm (or

2.2%) is ground water.

Existing Type of Irrigation: In Kinnaur district close to 255 irrigation works were supplying water to

households for domestic and irrigation purpose. Out of the total works, traditional water harvesting

structures account for 71.7 percent and the rest are lift irrigation structures and individual tanks

accounting for 28.3% of the total irrigation works. Kinnaur as a whole does not have any ground water

sources being used for irrigation because of the low potential of ground water in the district. Also, the

number of water extraction devices in the district has been reported to be zero in all the three blocks.

Kuhls, khads and nallah are the major sources of irrigation and are used by farmers to draw water to

their fields under gravity flow by digging channels.

Kuhl system is the major irrigation system in the district, and the water users associations exists at

various pLakhses. In order to, ensure predictable, equitable and reliable distribution of water, their

needs to be sensitization amidst users about people participation in ensuring predictable supply of water

in the kuhl and technological interventions like ensuring sufficient storage capacity to the kuhl

&making head-works of two or three contiguous networks common to reduce maintenance cost for

users.

Page 12: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | iv

Demand for water sources: The present water demand of the district has been assessed to be 13.67

MCM annually. Out of the total water demand 10.6 mcm (78 percent) is the requirement from crop

production. Nearly 2.149 mcm is required for domestic and drinking purposes and another 0.9 mcm

(or 6%) is required for livestock water requirement purpose. There is no water requirement for

industries and power generation. Among the blocks Nichar block has highest water requirement with

5.37 mcm (39.2%), followed by Kalpa block with 4.4 mcm (or 32 %) and Pooh block with 1.16 mcm

(or 28.3%).

Water budget in the district: The water budget shows wide gaps between water availability and water

demand in the district. While the availability at present is 7.46 mcm, the present water demand is 13.67

MCM giving rise to an unmet demand of close to 6.21 mcm (or 45.4%). If the existing water availability

is continued the water gap is likely to increase further in future and as a result the unmet demand for

water is likely to go up reaching 13.70 The water budget analysis suggest that urgent efforts are

required to meet the water requirements of the district as the gap is likely to increase in future. Utilizing

the surface & ground water potential in the district, activities that promote ground water re-charge and

soil moisture and water conservation etc. are proposed in the Strategic Action plan, 2016-20 that will

address the challenge.

Component wise planned coverage of area: The strategic action plan envisages to provide assured

irrigation in an additional command area of 5,231.5 hectares. Under the component Hark Het Ko Pani

17 surface minor irrigation schemes, 7 lift irrigation scheme and lining of field channels 30,450 mtr in

length has been planned. This irrigation infrastructure will benefit a command area of 4196.5 ha (80

%) . Under AIBP, one medium Irrigation scheme Ropa to Sisao in Pooh block has been planned which

will contribute to a command area development to the tune of 800 hectares (15 %). The watershed

component is projected to achieve a culturable command area of 140 hectares by creation of 276 new

water harvesting structures, renovation of 4 farm ponds/ kuhls and laying 91 bench and crate wires.

Under, the component per drop more crop efficient water conveyance and precision water application

by 200 sprinkler irrigation structures and 10 drip irrigation structure has been planned. Also secondary

storage structures (60 in no.s), on farm development interventions (laying HDPE pipes) will bring an

addition command area of 95 hectares under assured irrigation.

Department wise planned coverage of area: Department wise, irrigation and public health

department will cover 3,671 ha or 71 percent of planned coverage of area followed by Agriculture

department having a coverage area of 1,410 ha or 26.96 %. The intervention of watershed department

Page 13: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | v

will provide irrigation infrastructure in a command area of 140 ha (2.6 %) and horticulture department

will ensure precision water application in an area of 10 ha by installation of 20 drip/ sprinkler structures.

Agriculture Technology Management Agency (ATMA) focused on awareness generation and capacity

building of the beneficiary farmers on water distribution, efficient use of water and water saving

technologies etc.

Block wise planned financial outlay: The block wise distribution of budget from 2016-2020 is highest

for Pooh block (Rs 6694.39 Lakh), followed by Kalpa and Nichar having a projected budget of Rs

2028.65 and Rs.1212.85 Lakh respectively.

Component wise planned financial outlay: Total plan for four years works out to Rs. 9935.90 lakh.

Maximum share of Rs.7381.80 lakh (74.29%) is for Irrigation and Public Health Department, followed

by Rural Development Department with Rs.2225.64 lakh (22.40%) and Agriculture Department with

Rs. 324.22 lakh (3.26%). Horticulture Department’s plan for four years is Rs. 4.2 lakh (0.49 %). While

working out the plan, phasing of ongoing irrigation projects has been considered. However, from the

proposal of departments, eligible activities under RIDF will be covered as per the funds requirement

of the State. Projects sanctioned under RIDF XXI for micro irrigation have not been shown separately

as it will be implemented by the Agriculture Department and covered under the plan of the Department.

Capacity building, extension and training is an important component of successful execution of the

plan, therefore, Rs. 103.29 lakh has been proposed in the plan from 2016-17 to 2019-20.

Strategic Action Plan under PMKSY in Kinaur District: The following is a brief statement of the

financial outlay of the activities proposed in the Strategic Action plan, 2016-20 that will address the

challenge of water resource management in Kinnaur District.

Component 2016-2017 2017-2018 2018-2019 2019-2020 Total Cost in Rs lakh

Accelerated Irrigation Benefits

Programme (AIBP)

600 900 1050 450 3000

Har Khet Ko Pani 3396.8 560 258 414 4628.8

Per Drop More Crop 17.298 24.002 27.429 12.731 81.46

i) Micro-irrigation 7.808 11.712 13.664 5.856 39.04

ii) Supplementary Water

Management activities

6.82 10.23 11.935 5.115 34.1

Page 14: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | vi

Component 2016-2017 2017-2018 2018-2019 2019-2020 Total Cost in Rs lakh

iii) Ext. And Trg. Under ATMA 2.67 2.06 1.83 1.76 8.32

Watershed 445.128 667.692 778.974 333.846 2225.64

Convergence with MGNREGA 0 0 0 0 0

Total 4459.226 2151.694 2114.403 1210.577 9935.9

Implementation Time Period: The planned activities and outlay will be spent between 2016-17 and

2017-20 period spending on an average of Rs 9935.90 lakh. Some of the activities may require 5 to 7

years and some other activities relating to extension, small irrigation works etc., are recurring and

hence will have a period of implementation less than a year.

Expected Outcome: The gross sown area of the district is 21,425 ha (including area under

horticulture) of which 13,751 ha is irrigated. Thus there is a gap of 7646 ha which can be converted

from rainfed to area under assured irrigation. As the water requirement of crops for the existing

cropping pattern works out to be 10.58 MCM and if the gross cropped area is to be brought under

irrigation 6.27 MCM water is required. Keeping in view the above constraints a plan to develop

291irrigation structures has been proposed, this will create a water potential of 5503 cubic metre. Also,

under the component Per Drop More Crop, 60 secondary storage structures have been planned in the

district which will create a water potential of 1200 cubic metres in a period of 5 years in the district.

On completion of all the projects proposed under PMKSY a command area of 5,231 ha is likely to be

developed in the district. This is likely to generate an additional income of Rs. 1000 lakh to the farmers

of the district. This is based on the assumption of atleast 50% of potential utilised and Rs. 40000 per

ha incremental income from rainfed to irrigated farming. This is also likely to create 9.1 lakh mandays1

of non-recurring employment and 2100 jobs2 annually on recurring basis. The interventions under

PMKSY will generate an irrigation potential to the tune of 5231 ha in the district as an outcome.

Monitoring and evaluation: The Strategic Action Plan of PMKSY will be monitored by the respective

departments through the regular reporting system and component wise progress will be monitored by

1 Non recurring employment is calculated by considering the labour component to be 20 % of the total financial outlay and dividing it by wage rate 2 Recurring employment is calculated by using the rationale that 1 job will be created in 2 hecatre of land irrigated additionally.

Page 15: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | ii

the District Level Irrigation Committee. Further, the activities, outputs and outcomes will be reported

in web based MIS of PMKSY for review at state and national level

Page 16: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 1

INTRODUCTION

I. Background

Preparation of decentralized area specific district planning process visualized in various plans took

concrete shape through the years and initiatives like specific guidelines on methodologies and

processes for preparation of district plans; framework for preparation of perspective plan, medium term

and annual plans by then planning commission in 1969 and the 73rd and 74th constitutional amendments

conferring constitutional status to Panchayats at district and sub district level; local self-government in

urban areas; constitution of district planning committee to consolidate the plans prepared at Panchayats

and municipalities and prepare a draft development plan for the whole district.

The decentralized planning process was further strengthened through emphasis by planning

commission on preparation of district level plans and making it an integral part of the process of

preparation of the states 11th five year plan. The Planning commission issued guidelines in August

2006 for preparation of the district plans. The guidelines define the District Planning as ‘the process of

preparing an integrated plan for the local government sector in a district taking into account the

resources (natural, human and financial) available and covering the sectoral activities and schemes

assigned to the district level and below and those implemented through local governments in a state.

The document that embodies this statement of resources and their allocation for various purposes is

known as the District Plan”.

Government of India through a resolution in National Development Council on 29th May 2007

conceived a special Additional Central Assistance Scheme (ACAS) to address the slow growth of

agriculture and allied sectors by incentivizing states to draw up plans for their agriculture sectors more

comprehensively. The NDC resolution states "GoI will introduce a new Additional Central Assistance

Scheme to incentivize states to draw up plans for their agriculture sector more comprehensively, taking

agro-climatic conditions, natural resource issues and technology into account, and integrating

livestock, poultry and fisheries, etc. This will involve a new scheme for Additional Central Assistance

Page 17: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 2

(ACA) to State Plans, administered by the Union Ministry of Agriculture over and above its existing

Centrally Sponsored Schemes, to supplement the State-specific strategies including special schemes

for beneficiaries of land reforms. The newly created National Rainfed Area Authority will, on request,

assist States in planning for rainfed areas".

The NDC in its resolution advised the states to prepare a comprehensive district agriculture plans (C-

DAP) that will fully utilize available resources and will include allied agriculture sectors. Further, GOI

issued a manual on preparation of comprehensive district agriculture plans to help the states prepare

C-DAP. As per these guidelines, the objective of district planning is ‘to design an integrated and

participatory action plan for the development of local area in general and agriculture and allied sectors

in particular’. The objectives of Comprehensive District Agriculture Plan (C-DAP) are:

To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory process

involving various organisations and stakeholders.

To enable optimum utilisation of scarce natural, physical & financial resources.

To assess and plan for the infrastructure required to support the agriculture development.

To establish linkages with the required institutional support services, like credit, technology

transfer, ICT, research etc.

To evolve an action plan for achieving sustainable agricultural growth with food security and

cropping system that will improve farmers’ income.

The guidelines required the state/district authorities to (i) ensure that the agricultural plans are prepared

for the district and then integrated into the agricultural plans of the State based on the agro-climatic

conditions, availability of technology, trained manpower and natural resources; (ii) local needs / crops

/ feed and fodder / animal husbandry / dairying / fisheries / priorities are reflected in the plan; (iii)

productivity gaps for important crops and livestock and fisheries are reduced; and (iv) the returns to

the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process was the Government

of India guidelines issued in 2015 in the form of a template for the preparation of District Irrigation

Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri Krishi Sinchayee Yojana

(PMKSY) program and made the preparation of DIP and SIP mandatory for the states to receive funds

Page 18: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 3

from the program. The present report is a product of these long drawn efforts of Government of India

to strengthen the decentralized planning process in the country focusing on the vital resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological balance and promotion

of developmental activities. Considering its vital importance and ever increasing demand for water, in

the face of population growth, urbanization & industrialization and considerations of climatic change,

making water, an increasingly a scarce resource, available to multiple uses, planning and management

of this vital resources, utilization of water economically, optimally and equitably assumes greater

importance.

According to the 12th Five year Plan the water budget estimates of India by Ministry of Water

Resources suggests an availability of 1123 billion cubic meters (BCM) against a current estimated

demand of 710 BCM. The Standing Committee of the Ministry of Water Resources estimates that this

water demand will rise to 1093 BCM by 2025. Though the existing water availability in the immediate

future seems to be adequate, with the near constant supply of water resources in the face of increasing

demand on account of population growth, urbanisation and industrialization will strain the water

supply-demand balance.

The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to 1820 cubic

meters in 2001 while the international prescribed limit is 1800 cubic meters. The projected per capita

availability of water is 1341 cubic meters in 2025 and 1140 cubic meters in 2050 suggesting shortage

of water in the medium term3. Further, the all India water balance estimates does not reflect the

variations in water balance across time and space- certain areas having a positive water balance and

the others facing acute shortage. The problem is further accentuated by water quality related issues.

With the abundant surface and ground water supply in the first five decades since independence, more

than 80 percent of the total available water resources were allocated for irrigation purposes and the rest

meeting the domestic and industrial demands. In a recent study4on the demand for water from

3Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New Delhi. 4Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-2050:Business-as-usual scenario and deviations. Research Report 123, International Water Management Institute, Colombo.

Page 19: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 4

agriculture, domestic and industrial uses in 2000, 2025 and 2050 seems to suggest that domestic

demand (34 BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM

in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance water available

while agriculture demand for water will be (605 BCM in 2000, 675 BCM in 2025 and 637 BCM in

2050). This change is partly because of the changing sectoral contributions of India’s GDP and also

partly because of dynamics of irrigation development in the country where the initial expansion in area

under irrigation is propelled by the availability of abundant water resources and availability of good

quality land. This is no longer the case in many of the states where the availability of land and water

are serious constraints for further expansion of irrigation. Further, as per the erstwhile planning

commission up to March 2012 out of 141 million hectares of net sown area in the country 114 (or 81%)

million hectares is Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation

Potential Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of

the net sown area in the country dependent on rainfall which makes farming a high risk and less

productive.

The competing demands for water resources and the emerging issues and concerns were to be addressed

through certain basic principles and commonality in approaches in dealing with planning, development

and management of water resources5 under an Integrated Water Resource Management framework.

The main objectives of water resource management as delineated in National Water Policy 2012 are:

(i) Planning, development and management of water resources need to be governed by common

integrated perspective considering local, regional, State and national context, having an

environmentally sound basis, keeping in view the human, social and economic needs.

(ii) Principle of equity and social justice must inform use and allocation of water.

(iii) Good governance through transparent informed decision making is crucial to the objectives of

equity, social justice and sustainability. Meaningful intensive participation, transparency and

accountability should guide decision making and regulation of water resources.

5Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.

Page 20: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 5

(iv) Water needs to be managed as a common pool community resource held, by the state, under public

trust doctrine to achieve food security, support livelihood, and ensure equitable and sustainable

development for all.

(v) Water is essential for sustenance of eco-system, and therefore, minimum ecological needs should

be given due consideration.

(vi) Safe Water for drinking and sanitation should be considered as pre-emptive needs, followed by

high priority allocation for other basic domestic needs (including needs of animals), achieving food

security, supporting sustenance agriculture and minimum eco-system needs. Available water, after

meeting the above needs, should be allocated in a manner to promote its conservation and efficient use.

(vii) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff, river, lakes,

soil moisture, and ground water, sea, etc., are interdependent and the basic hydrological unit is the river

basin, which should be considered as the basic hydrological unit for planning.

(viii) Given the limits on enhancing the availability of utilizable water resources and increased

variability in supplies due to climate change, meeting the future needs will depend more on demand

management, and hence, this needs to be given priority, especially through (a) evolving an agricultural

system which economizes on water use and maximizes value from water, and (b) bringing in maximum

efficiency in use of water and avoiding wastages.

(ix) Water quality and quantity are interlinked and need to be managed in an integrated manner,

consistent with broader environmental management approaches inter-alia including the use of

economic incentives and penalties to reduce pollution and wastage.

(x) The impact of climate change on water resources availability must be factored into water

management related decisions. Water using activities need to be regulated keeping in mind the local

geo climatic and hydrological situation.

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the

constraints in providing assured irrigation as well as increasing efficiency and productivity of current

water use to bring more prosperity to the rural areas. Priorities of Government of India were reflected

in the Hon’ble President’s address to the joint Session of the Parliament of 16th Lok Sabha where he

indicated that “Each drop of water is precious. Government is committed to giving high priority to

Page 21: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 6

water security. It will complete the long pending irrigation projects on priority and launch the

‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need

for seriously considering all options including linking of rivers, where feasible; for ensuring optimal

use of our water resources to prevent the recurrence of floods and drought. By harnessing rain water

through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water

recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop” .

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five years

from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of Ministry of

Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture & Cooperation

and Ministry of Rural Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed

& Convergence with MGNREGA were brought together under the umbrella program of PMKSY.

Further the scheme seeks convergence with scheme likeMahatma Gandhi National Rural Employment

Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National

Solar Mission and Rural Electrification programmes (JLNNSM&REP), Rural Infrastructure

Development Fund (RIDF), Members of Parliament Local Area Development Scheme (MPLAD),

Members of Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds

(LBF), Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in

an area development mode only by adopting a decentralized state level planning and projectised

execution structure that will allow the state to draw up their own irrigation development plans based

on DIPs and SIPs with a horizon of 5-7 years. The program will be implemented as part of Rashtriya

Krishi Vikas Yojana (RKVY) with state agriculture department acting as the State Nodal Agency.

However, the implementing departments for the four components like AIBP, PMKSY (Har Khet Ko

Pani), PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the

respective program ministry/department.

The funds under this program would be provided to the states as per the pattern of assistance of

Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog. During

2015-16 the existing pattern of assistance of ongoing scheme was continued. An outlay of Rs. 50,000

crore has been approved for 2015-20. The financial assistance provided to the state governments from

this centrally sponsored scheme is subject to fulfillment of certain conditions.Firstly, a state will

become eligible to access PMKSY fund only if it has prepared the District Irrigation Plans (DIP) and

State Irrigation Plan (SIP), excepting for the initial year, and the expenditure in water resource

Page 22: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 7

development for agriculture sector in the year under consideration is not less than the baseline

expenditure, which is defined as the average of the expenditure in irrigation sector irrespective of the

department in the state plan in three years prior to the year under consideration. Secondly, States will

be given additional weightage for levying charges on water and electricity for irrigation purposes, so

as to ensure sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be

decided based on

share of percentage of unirrigated area in the state vis-à-vis national average including prominence

of areas classified under Desert Development Programme (DDP) and Drought Prone Area

Development Programme (DPAP)

increase in percentage share of expenditure on water resource development for agriculture sector

in State Plan expenditure in the previous year over three years prior to it and

Improvement in irrigation efficiency in the state.

II. Vision The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to ensure access

to some means of protective irrigation to all agricultural farms in the country, to produce ‘per drop

more crop’, thus bringing much desired rural prosperity.

III. Objective The objective of the PMKSY are to :

a) Achieve convergence of investments in irrigation at the field level (preparation of district level and,

if required, sub district level water use plans).

b) Enhance the physical access of water on the farm and expand cultivable area under assured irrigation

(Har Khet ko Pani),

c) Integration of water source, distribution and its efficient use, to make best use of water through

appropriate technologies and practices.

d) Improve on-farm water use efficiency to reduce wastage and increase availability both in duration

and extent,

e) Enhance the adoption of precision-irrigation and other water saving technologies (More crop per

drop).

f) Enhance recharge of aquifers and introduce sustainable water conservation practices

g) Ensure the integrated development of rainfed areas using the watershed approach towards soil and

water conservation, regeneration of ground water, arresting runoff, providing livelihood options and

other NRM activities.

Page 23: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 8

h) Promote extension activities relating to water harvesting, water management and crop alignment for

farmers and grass root level field functionaries.

i) Explore the feasibility of reusing treated municipal waste water for peri-urban agriculture, and

j) Attract greater private investments in irrigation.

IV. Strategy/approach To achieve these objectives PMKSY adopted strategies that include

a) Creation of new water sources; repair, restoration and renovation of defunct water sources;

construction of water harvesting structures, secondary & micro storage, groundwater development,

enhancing potentials of traditional water bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl

(H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.

b) Developing/augmenting distribution network where irrigation sources (both assured and protective)

are available or created;

c) Promotion of scientific moisture conservation and run off control measures to improve ground water

recharge so as to create opportunities for farmers to access recharged water through shallow tube/dug

wells;

d) Promoting efficient water conveyance and field application devices within the farm viz, underground

piping system, Drip & Sprinklers, pivots, rain-guns and other application devices etc.;

e) Encouraging community irrigation through registered user groups/farmer producers’

organisations/NGOs; and

f) Farmer oriented activities like capacity building, training and exposure visits, demonstrations, farm

schools, skill development in efficient water and crop management practices (crop alignment)

including large scale awareness on more crop per drop of water through mass media campaign,

exhibitions, field days, and extension activities through short animation films etc.

V. Programme Components PMKSY has following four components:

1 Accelerated Irrigation Benefit Programme(AIBP) a) To focus on faster completion of ongoing

Major and Medium Irrigation including National Projects.

Page 24: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 9

2 PMKSY (Har Khet ko Pani) a) Creation of new water sources through Minor Irrigation (both

surface and ground water) b) Repair, restoration and renovation of water bodies; strengthening carrying

capacity of traditional water sources, construction rain water harvesting structures (Jal Sanchay); c)

Command area development, strengthening and creation of distribution network from source to the

farm; d) Ground water development in the areas where it is abundant, so that sink is created to store

runoff/ flood water during peak rainy season. e) Improvement in water management and distribution

system for water bodies to take advantage of the available source which is not tapped to its fullest

capacity (deriving benefits from low hanging fruits). At least 10% of the command area to be covered

under micro/precision irrigation. f) Diversion of water from source of different location where it is

plenty to nearby water scarce areas, lift irrigation from water bodies/rivers at lower elevation to

supplement requirements beyond IWMP and MGNREGS irrespective of irrigation command. g)

Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at feasible locations.

3 PMKSY (Per Drop More Crop) a) Programme management, preparation of State/District Irrigation

Plan, approval of annual action plan, Monitoring etc. b) Promoting efficient water conveyance and

precision water application devices like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);

c) Topping up of input cost particularly under civil construction beyond permissible limit (40%), under

MGNREGS for activities like lining inlet, outlet, silt traps, distribution system etc. d) Construction of

micro irrigation structures to supplement source creation activities including tube wells and dug wells

(in areas where ground water is available and not under semi critical /critical /over exploited category

of development) which are not supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY

(Watershed) and MGNREGS as per block/district irrigation plan. e) Secondary storage structures at

tail end of canal system to store water when available in abundance (rainy season) or from perennial

sources like streams for use during dry periods through effective on-farm water management; f) Water

lifting devices like diesel/ electric/ solar pumpsets including water carriage pipes, underground piping

system. g) Extension activities for promotion of scientific moisture conservation and agronomic

measures including cropping alignment to maximise use of available water including rainfall and

minimise irrigation requirement (Jal Sarankchan); h) Capacity building, training and awareness

campaign including low cost publications, use of pico projectors and low cost films for encouraging

potential use water source through technological, agronomic and management practices including

community irrigation. i) The extension workers will be empowered to disseminate relevant

technologies under PMKSY only after requisite training is provided to them especially in the area of

promotion of scientific moisture conservation and agronomic measures, improved/ innovative

distribution system like pipe and box outlet system, etc. Appropriate Domain Experts will act as Master

Page 25: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 10

Trainers. j) Information Communication Technology (ICT) interventions through NeGP-A to be made

use in the field of water use efficiency, precision irrigation technologies, on farm water management,

crop alignment etc. and also to do intensive monitoring of the Scheme.

4 PMKSY (Watershed Development)

a) Effective management of runoff water and improved soil & moisture conservation activities such as

ridge area treatment, drainage line treatment, rain water harvesting, in-situ moisture conservation and

other allied activities on watershed basis. b) Converging with MGNREGS for creation of water source

to full potential in identified backward rainfed blocks including renovation of traditional water bodies

VI. Rationale/ Justification In reference to the status and need of irrigation, the water resource management including irrigation

related priorities was identified for Kinnaur district by the peoples’ representatives of district with

support from administration and technical experts. For instance the reports of Strategic Research and

Extension Plan (SREP) prepared under ATMA program, Comprehensive District Agriculture Plan (C-

DAP) prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP)

of NABARD and the Integrated District Development Plan etc identified number of irrigation related

issues for Kinnaur district including the (i) protection of crops from abiotic stress factors including

flashfloods; (i) promoting water use efficiency through sprinkler and drip irrigation; (iii) promoting

protected poly house cultivation to minimize risk factors and enhance quality and productivity; (iv)

Improvement of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of

soil conservation of arable & non-arable land through engineering measures; (vi) creation of new water

harvesting structures, check dams, ponds, tanks, etc and (vii) land improvement measures.

VII. Methodology During the course of preparation of District Irrigation Plan (DIP) the team visited Kinnaur district to

collect data and have interaction with all the stakeholders. Methodology adopted to prepare DIP is

outlined in brief as under:

Collection of primary and secondary data from field from various sources including published

documents and websites.

Various meetings were held to obtain ground level realities and data from key

personnel/stakeholders through structured, unstructured interviews, focused group discussions

etc.

Meetings with various State Government departments and related institutions were held

Page 26: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 11

Meeting through VC was also held with State Level authorities.

GIS maps of the area’s/clusters were studied to understand the land morphology, topography of

the district.

Focused group discussions and interaction with of agriculture officers, horticulture officers, soil

conservation officers, extension officers, rural development department, animal husbandry

department, irrigation officers both at blocks and district level for identifying the key issues and

focus areas of the region.

Discussion with NABARD officer of Kinnaur district was also held during the visit.

Team members also participated in the State Level workshop and held active discussions with GoI

officers, State Level officers and scientists of various institutions

On the basis of detailed discussion and analysis of data, the team arrived at the projections of various

components of PMKSY and Department wise plan for four years from 2016-17 to 2019-20 as

detailed in the plan

Page 27: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 12

Chapter 1 : GENERAL INFORMATION OF THE DISTRICT

1.1 District Profile Kinnaur district is located in the northeast corner of Himachal Pradesh in the Western Himalayas

and situated on the banks of river Satluj. It was formerly a part of the native state of Bushahr, until

recently known as Chini tehsil of former Mahasu district. As a separate district, it appeared on the

map of Himachal Pradesh on 1st May, 1960.

Map 1: Location Map of Kinnaur

The district is entirely hilly except few small, deep valleys in between. The district lies between 31°

06’ & 32° 06’ North latitudes and 77° 45’& 79° 00’ East longitudes and falls in the Survey of India

degree-sheet nos. 53I, 53E and 52L. The district has a total geographical area of 6401 sq km which

covers about 11.5 % area of the State. The district is bounded by Lahaul & Spiti district in the north,

Kullu district in the northwest, Shimla district in the southwest, Uttranchal State in the south and

international border with China (Tibet) in the east. It is about 235 Km away from the State capital

Shimla

Page 28: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 13

Table 1-1 District Profile

S. No. Name of the

District

District

Code

Latitude Longitude

1 Kinnaur 33 31° 06’ & 32°

06’ North.

77° 45’& 79° 00’

East Source: Central Ground Water Board Survey Report

Administrative Set up of Kinnaur

Kinnaur district is divided into five tehsils namely Nichar, Kalpa, Sangla, Pooh and Moorang and one

sub-tehsil namely Hangrang. The district headquarters, Recong Peo town falls in Kalpa tehsil. For

development purpose, the district has been subdivided in to 3 Community Development Blocks viz.,

Nichar, Kalpa and Pooh. For administrative purpose, the Deputy Commissioner is administrative

head of the district. He is responsible for general administration and maintenance of law and order.

He is assisted by one Additional District Magistrate whose headquarters is at Pooh, Assistant

Commissioner and other District Officers. For administrative convenience the district has been

divided into three sub-divisions . Each tehsil is under charge of Tehsildar while the in-charge of

subtehsil is Naib-tehsildar assisted by office Kanungo. Besides this, Block Development Officer is

posted in each community development block to super-wise and co-ordinate the development work

assigned to gram Panchayats in rural areas6

Figure 1.1 Administrative set up of Kinnaur

Source: Kinnaur Official Administrative website

The boundaries of the three community development blocks in the district are co-terminus with the

three sub-divisions of the district. Pooh sub-division comprises the tehsils of Morang and Pooh and

the sub-tehsil of Hangrang with headquarters at Pooh. This sub-division is biggest in term of area and

administrative head of this sub-division is Additional District Magistrate (ADM) and is assisted by

6 District Census Handbook, 2011, Kinnaur

Deputy Commisioner

AC to DC ADM POOHH

Tehsildar Poohh Tehsildaar Moorang

Naib Tehsildaar Yangthang

SDM Kalpa

Tehsildar Kalpa

Tehsildar Sangla

SDM Nichar

Tehsildar Nichar

Page 29: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 14

Asstt. Commissioner, Development in discharging executive as well as development functions. Kalpa

sub-division consists of the tehsils Kalpa and Sangla, while Nichar sub-division has only one tehsil

of the same name. The headquarters of Kalpa sub-division is at Kalpa (ReckongPeo) while that of

Nichar sub-division at Bhawanagar. Both sub-divisions are headed by sub-divisional officer (civil).

Jurisdictional changes have not occurred at district level during 2001-2011. However, 17 villages of

Morang tehsil has been shifted to Pooh tehsil.

Table 1-2 Administrative set up of Kinnaur

Administrative Setup

No. of Sub

Divisions 3 - Pooh,Kalpa,Nichar

No. of Tehsils 5 - Sangla,Pooh,Nichar,Morang,Kalpa. Sub Tehsil 1 - Hangrang

Development

Blocks 3 - Nichar,Kalpa,Pooh

Panchayats 65 Villages 660

Source: District Census Report 2011, Kinnaur

Towns and Villages

Inhabited Village

37%Uninhabited Village

63%

The district is entirely rural and has total number of

660 villages spreading over 5 tehsils and one sub-

tehsil of Hangrang sub-tehsil. Out of the 660

villages only 241 are inhabited while remaining 419

are un inhabited.

Tehsil/

sub Tehsil

Number of Villages

Hangrang 57

Pooh 97

Morang 127

Kalpa 84

Nichar 188

Sangla 110

Figure 1.2 Percentage of Inhabited-Uninhabited

Villages in Kinnaur

Page 30: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 15

1.2. Demography

Kinnaur is one of the smallest district in India in terms of population. As per 2011 census, the total

population of the district is 84,121 persons and ranks 620 in India (out of a total Indian districts of

640). The district occupies the 12th / last position in terms of sex ratio among the districts of the state

with a sex ratio of 819 female per 1000 male as compared to the state sex ratio of 972 female per

1000 male. The literacy rate of the district for male population is 87.2 percent, while for female it is

70.96 percent as compared to the state literacy statistics of 89 percent for male and 75.9 percent for

female.

The district has a population density of 13 inhabitants per square kilometre (34 /sq Km). In reality in

a mountainous district like Kinnaur, the density fails to measure the exact pressure of human

population on the resource base; so on the basis of actual inhabited area the population density will

be undoubtedly be much higher than 300. Kalpa block is the biggest block in the district as it accounts

for 39.5 percent of the district’s population, followed by Nichar and Pooh which comprise 33 percent

and 27 percent population of Kinnaur. The district of Kinnaur is predominantly tribal as ST

population accounts for 57.9 percent of the total population of the district followed by 24.5 percent

general population and 17.5 percent SC population. Total number of household in the district is

19,742 out of which 39% are in Kalpa block and 33% in Nichar block.

Figure 1.3 Block wise Male, Female Children Population in Kinnaur

Figure 1.4 Block wise SC, ST, General population and Households in Kinnaur

Source: Census of India, Kinnaur, Detaiils of Table 1.3 is annexed

12474

18312

15463

10732

14920

12220

2112

3183

2951

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

Pooh Kalpa Nichar

Males Females Children

31054647

6998

13933

4763

91106752

0

5000

10000

15000

20000

25000

0

1000

2000

3000

4000

5000

Pooh Kalpa Nichar

Nu

mb

er o

f M

emb

ers

Nu

mb

er o

f H

ou

seh

old

s

Blocks of Kinnaur

SC HH ST HH

General HH SC Members

ST Members General Members

Page 31: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 16

Amongst all blocks Nicchar has the highest SC population (6998). Children in the age 0-6 years

accounts for 9.8 percent of the total population of the district. Kalpa block has the highest number of

children followed by Nichar.

Table 1-3 Demography Population SC ST General Total

Name of

Block

V M F CH* Total NH NM NH NM NH NM NH NM

Pooh 278 12474 10732 2112 23206 745 3105 3867 15338 859 4763 5471 23206

Kalpa 194 18312 14920 3183 33232 1563 4647 4749 19475 1512 9110 7824 33232

Nichar 188 15463 12220 2951 27683 3100 6998 3468 13933 113 6752 6681 27683

Source: Census of India M-Male, F- Female, CH- Children 0 to 6 yr, NHH- no. of Household, NM- no. of members

1.3 Biomass and Livestock

Livestock rearing is the third most important occupation of Kinnaur’s economy after agriculture and

horticulture. In addition to providing milk, meat , hide and wool for commercial purposes the

livestock like yak and Churu (cross of cow and yak) are also used as beast of burdens and for

transportation in the tough terrains of Kinnaur.

Table 1-4 Production of Animal Products in Kinnaur

S.No. Animal Products Production in 2007 Production in 2015

1 Wool 143.38 quintals 142.215 qtl

2 Milk 8.33 tonnes 10.307 tonnes

3 Meat 649 tonnes 100.500 tonnes

4 Egg 7.63 lakh 22.563 Lakh

As per 2011 Livestock Census, the total livestock population of Kinnaur is 1, 37,825, an increase of

8.7 percent from the 2007 livestock population of 1,26,598. Sheeps and goats are the main animals

reared in Kinnaur as they comprise 48.3 percent and 24 percent of total livestock respectively. People

of Kinnaur used to rear hilly cows, sheep and goat which was earlier a major source of income. Now

Crossbred Marino sheep, Angora goats, Jersey cows and hybrid mules introduced in the area have

resulted in substantial improvement in the socio-economic status of the people. Hybrid cows are the

third most reared animal in the district, after goats and sheeps, as they constitute 8.6 percent of

livestock population. Drought animals constitute 5.7 percent of livestock population and drought

animals like yak and Churu are mainly reared in the sangla valley (in Kalpa). Kalpa block accounts

for 54.5 percent of the district poultry population (9,209) followed by Nichaar which has 37 percent.

Green fodder is a major constraint in rearing the milch animals. Therefore grazing of animals in

forests/ pastures has become a practice of the farmers, which increases the pressure on pastures and

forest areas.

Page 32: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 17

Table 1-5 Biomass and Livestock

Name of

the

Block

Small

Animals

Large

Animals

Draft

Animal

(Buffalo

/Yak /Bulls

/Any Other

(Nos)

Poultry

(Nos)

Ducks

(Nos)

Pigs (Nos) Goats

(Nos)

Sheeps

(Nos)

Indigenous

Cows

(Nos)

Hybrid

Cow(Nos)

Pooh 777 0 0 10324 22998 1539 3425 2023

Kalpa 5026 10 11766 20414 2946 5534 3435

Nichar 3406 25 11139 23195 5101 3012 1730

TOTAL 9209 0 35 33229 66607 9586 11971 7188

Source: 19th Livestock Census, Department of Animal Husbandry, Kinnaur

Figure 1.5 Livestock and Biomass

Source: 19th Livestock Census, Department of Animal Husbandry, Kinnaur

.

77

7

0

10

32

4

22

99

8

15

39

34

25

20

2350

26

10

11

76

6

20

41

4

29

46 55

34

34

35

34

06

25

11

13

9

23

19

5

51

01

30

12

17

30

0

5000

10000

15000

20000

25000

30000

Poultry Pigs Goats Sheeps IndigenousCows

Hybrid Cow Draft Animal(Buffalo /Yak

/Bulls )

Nu

mb

er o

f A

nim

als

Livestock types

Pooh Kalpa Nichar

Page 33: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 18

1.4 Agro-Ecology, Climate, Hydrology and Topography

Himachal Pradesh is divided into four agro climatic zones. Kinnaur district falls under High Hills

Dry temperate zones. On the basis of criteria’s viz. altitude, rainfall and temperature Kinnaur district

is further divided into three Agro ecological situations as detailed in Table 1.6.

Table 1-6 Agro-Ecology, Climate, Hydrology and Topography

AEZ

TT

BA

NA

R

(mm

)

AM

R (

mm

)

NR

D

Average Weekly Temperature (0C) Elevation

Period

M1

M2

M3

Summer (Apr-

May)

Winter (Oct-

Mar)

Rainy (Jun-

Sep)

M1

M2

M3

M1

M2

M3

M1

M2

M3

High Hill Wet

Temperate

Hilly

AES-I

33837

9

816 68 73 Min= 4, Max =29, Mean=16

1400

2100

1750

High Hill

Temperate

Sloppy

AES-II

16730

8

0.

2

25.

2

12.

7

4.

5

25.

7

15.

1

-

7.2

20 6.

4

1800

2800

2300

High Hill

DryTemperate

& Cold Zone

Sloppy

AES-

III

118621

Min=-18, Max= 25, Mean= 3.5

2800

2800

Source: SREP KinnaurDistrict,: AEZ: Agro Ecological Zone Type, TT: Type of Terrain; BA: Type of Terrain; NAR: Normal annual

rainfall, AMR: Average Monthly Rainfall; NRD: No of Rainy Days: M1: Minimum, M2: maximum; M3: Mean

The entire district of Kinnaur comprises of series of mountains, which are punctuated by high passes

ranging in elevation from 5000 to 6500 metres and alternated with a succession of valleys and

pasturelands. The habitable part of Kinnaur is situated at about height ranging from 1220 meters

approximate to 3600 meters above sea level. As per Strategic Research and Extension Plan of Kinnaur

district, the elevation in AES III is more than 2800 metres, and that in AES I ranges between 1400-

2100 metres.

Page 34: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 19

Elevation Zone to total area of Kinnaur

S.No. Elevation Level

% age of area to total area

1 1300 - 1902

0.84

2 1902- 2504

3.14

3 2504 - 3107

6.82

4 3107 - 3709

12.34

5 3709 - 4311

17.55

6 4311 - 4913

25.74

7 4913 - 5516

27.38

8 5516 - 6118 5.90

9 6118 - 6720 0.29

10 Total 100

Climate and Rainfall: The climate of different parts of this district depends mainly on the elevation.

The summer season is from March to June. The southwest monsoon season, which follows thereafter,

continues till about the middle of September. The period from mid-September to November

constitutes the post monsoon season or transition period. The winter season is from December to

February

Most of Kinnaur enjoys a temperate climate due to its high elevation, with long winters from October

to March. The lower parts of the Satluj Jitney and the Baspa Valley receive monsoon rains. The upper

areas of the valleys fall mainly in the rain-shadow area. These areas are considered to be arid regions,

similar to the climate of Tibet and 60% of the precipitation is received as snow during winters.

The district receives rainfall from the month of June till September. The marginal shift in

the monsoon pattern has been noticed over the period of years. The average annual rainfall in the

district is 816 mm. However, much of the rainfall is received in parts of lower Kinnaur. There is a

progressive decrease in rainfall as one goes from west to east. The parts of upper Kinnaur receive

more snowfall than the rainfall.

The district receives heavy snowfall from November till March or sometimes April. During this

period, the area remains totally cut-off from rest of the area. The higher peaks of Kinnaur district are

completely covered with snow throughout the year.

Hydrology: Satluj is one of the major rivers systems of the district and the state. Satluj is an

antecedent river having deep and narrow gorges. The river Satluj enters from Tibet at Shiplika into

Page 35: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 20

Kinnaur and forms confluence with its tributary River Spiti at Khab Bridge. Satluj is joined by many

of its tributaries namely Parchhu Nalla, Spiti River, Tithang Nalla, Tinku Nalla, Bhagat Nalla, Shaiso

Khad, Kanam Khad, Kirang Khad, Tidong Khad and Rispa Nalla in Pooh subdivision, Kashang Nalla,

Pangi Nalla, Barang Nalla, Baspa river and its rivulets like Kharogla Nalla, Rupti Nalla, Shong Nalla,

Brua Khad in Kalpa sub-division and Panvi Nalla, Runger Nalla, Yula Nalla, Rukcharang Nalla and

Bhaba Khad in Nichar sub-division. It leaves Kinnaur district and enters Shimla district at Chaura

village cutting across the entire district and finally flows into the Arabian Sea. The Satluj and some

of its tributaries are prone to floods due to GLakhsial Lake Outbursts (due to heavy snow melting or

blockage of the exit), heavy rainfall or Cloud bursts.7

Map 2:River Valleys and General Elevation in Kinnaur

Source: An outline of the Geology and Tectonic Evolution of the Western Himalaya

Topography:

Kinnaur is located on the Indo tibetan border, surrounded by Tibet to the east and Garhwal Himalyan

to the south. About 200 km from Shimla is the strikingly beautiful district of Kinnaur where the river

Satluj carved deep gorges through the the high mountains. The Satluj river which rises on the southern

slopes of Kailash mountain near Mansarover in Tibet flows 130 km in Kinnaur. Less rainfall and the

desolate countryside of the district can by compared to that of the Leh and Ladakh region

1.5 Soil Profile

Soil type of Kinnaur is predominantly mountainous in nature. Types and characteristics of the soil

are influenced by several factors viz. slope, altitude, temperature and vegetation etc. GLakhsial

7 Disaster Management Report, Kinnaur

Page 36: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 21

processes have cast quite a pronounced effect on the soil and edaphic conditions in higher reaches.

Fluvio-gLakhsial terraces primarily contain boulders and clay. There is dearth of elluviation owing

to the scanty precipitation in frigid areas. Besides, depth of soil is usually shallow and soil profile is

Poohrly developed.

Soil in Kinnaur is mainly sandy clayey in texture and acidic in nature. Nevertheless, valley soil and

that on uplands present striking variations. Soil in valleys in the form of fine clay and less stony and

is richer in plant nutrient. It is because it has been formed of sediments and detritus material deposited

by Satluj river and its feeders. The soil map clearly indicates that upper Kinnaur has entisol which is

of poor quality and is stony with shallow soil profile. Grass and shrubs grow on this soil, occurring

on steep-slope. Main features of soil in Kinnaur include less developed profile, immaturity, thin cover

and leaching. Soil of Kinnaur can be divided into the following four categories;

(i) Entisols (skeletal soil):

Soil of higher tehsils of Hangrang, Pooh and Morang does fall under category of entisols. It is of

recent origin without well-formed soil horizons. Basically, it is thin soil on unconsolidated gLakhsial

debris. Most of it is not fit for agriculture in pockets near Labrang and Salgiu villages. This area is

near Satluj valley, Entisols are found in Tidong, Gyanthing, Satluj, Spiti, Ropa and Pejur/Taiti river

valleys. Higher altitude of these valleys make growing season short which renders entisols

agriculturally Poohr. Most of these areas remain under snow for more three months. Moreover, the

area lies in the zone III that is the zone of scanty precipitation. Irrigation is hardly possible in this

area as villages are situated higher up streams whereas river valleys are quite narrow and low 1.

(ii) Histosols (snow fields):

The soil type lies in temporary and permanent snowfields at higher altitude, therefore, the area is not

suitable for settlements.This type of soil occupies higher reaches of Kinnaur. Soil of this zone is

representative of cold desert. It has very little nutrients for plant cover and is acidic in nature but

vegetation present has high organic content in upper horizon.

(iii) Mollisols (Mountain meadow soil):

One of the most fertile soil types of Kinnaur. This soil seasonally undergoes freeze and thaw. It is

quite important for apple and other temperate fruits orchards. Soil map clearly indicates that soil

occupies river valleys those of Bhabha, Baspa and Satluj in its lower reaches. That is why Sangla and

Kalpa tehsils are agriculturally better-off. There are two pockets of the soil, one is in extreme south-

eastern comer while other is in lower south-western part of Nichar tehsil. Mollisols has its areal extent

in all three rainfall zones represented in the rainfall map. Environmental factors like climate, terrain,

vegetation cover, soil character, snow cover and soil moisture etc. create considerable variations in

the thickness of soil cover 3.

Page 37: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 22

(iv) Alfisols (submontane soil):

Alfisols lies around the mountain meadow soils and has least aerial coverage. Most of it lies in the

rainfall zone of above 1,000 mm. However, some of its area falls within the zone of 600-1,000 mm

of rainfall. Alfisols are primarily the soil of Nichar tehsil. This soil type occupies south-western

position and happens to be the lowest region in the district. It is a soil of deciduous woodland. This

type of soil is agriculturally very productive for common crops .8

Map 3: Soil Map of Kinnaur

Source: National Atlas Map

However as per the Agriculture Contingency Plan of Kinnaur the soil of kinnaur is categorised in three

classes viz. sandy loam soils, sandy soils and rock land. The third category, rock land captures 98 percent

area of the district.

Table 1-7 Soil profile of the district

Soil Type

S.No Major Soil Classes Area (in 000’Ha)

1 Sandy Loam soils 5.808

2 Sandy soils 1.745

3 Rock Land 616.247

Source: Department of Agriculture, Kinnaur

8 shodhganga.inflibnet.ac.in/bitstream/10603/18166

Page 38: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 23

As per the recent soil survey by NBSS & LUP (1997), more than 75 per cent of the geographical area

of Kinnaur is suffering from one or other soil degradation problem. The degradation problems, like

water erosion including topsoil loss and terrain deformation, flooding and acidity etc are the most

prominent degradation problems in the district.

Land Slope: Almost the entire districts of Kinnaur (except a narrow strip along the rivers) except

few area of sangla valley and hangrang valley have rock outcrops and very steep slopes. Sangla valley

and Hangrang valley have slope of 8 -25 % and all area of Kinnaur District have >25 % slope As

depicted in the map below, Less than eleven degrees slope in Kinnaur comprises of total 98.2 percent

of total area3.

Map 4 Land slope Map of Kinnaur

Source: An outline of the Geology and Tectonic Evolution of the Western Himalaya

Similarly, 19.14 percent area of Kinnaur lies between 11 to 21 degrees of slope. Maximum area of

Kinnaur (35.3) has 21 to 32 degrees of slope. This is followed by 32 to 42 degrees of slope

which encompasses 28.12 percent area of the district. Likewise, 42 to 53 degrees of slope have 6.89

percent of total area. Above 53 degree slope in Kinnaur has only 0.74 percent area

of the district.9 The block wise details of slope in Kinnaur is as mentioned below:

9 Natural Enviornment, Shodganga Report

Page 39: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 24

Table 1-8 Block wise Land slope of Kinnaur

C.D. Blocks Land Slope ( Area in hectraes)

0-3% 3-8% 8-25% >25%

Kalpa 997 4592 21669 143579

Nichar 194 955 6133 95459

Pooh 541 3820 30237 316132

1.6 Soil Erosion and Run Off

In Kinnaur, big rocks, boulders and stones are common features of its geographical area. . More than

85 per cent of the area is sloppy and prone to soil erosion. Because of fragility, these areas are exposed

to landslides and acute problems of soil erosion. Some man made factors like unbridled exploitation

of forest wealth, excessive grazing, unplanned developmental activities, non-scientific cultivation

practices, etc; have exacerbated the problem of soil erosion in the district

The problems and interventions regarding land development have been highlighted in Table 1.9. Land

sliding due to steep slopes, forest degradation and overgrazing of pastures etc; were the common

problems reported by majority of panchayats for land development.

Table 1-9 Problems for Land Development in Kinnaur District (per cent of Panchayats)

Sr No.

Problem

Pooh Kalpa Nichar District

1. Land sliding

50.00 100.00 100.00 83.33

2. Degraded forest 25.00 75.00 75.00 58.33

3. Shortage of grasses on the grasslands and pastures 75.00 100.00 75.00 83.33

4. Soil erosion due to high slopes 25.00 50.00 50.00 41.66

5. Intensive overgrazing 75.00 75.00 75.00 75.00

6. Monkey menace 25.00 25.00 50.00 33.33

7. Lakhsk of interest among the people regarding people´s

programmes

25.00 25.00 25.00 25.00

8. Infestation of grassland with Artemisia sp. Equisetum

typhoides, Rumex acetocella, Urtica dioca

25.00 25.00 50.00 33.33

Source: District Agriculture Plan, Kinnaur

1.7 Land Use Pattern

Kinnaur district has an area of 6401 sq. km or 6,40,100 hectares but because of the physiographic

constraints the area for land use is restricted and hence the cultivated or gross cropped area is 21,425

out of which 9,017 hectares is under agricultural crops (1.44 per cent) and 12,408 hectares under

horticulture crops. The percentage of net sown area to the total area in the district is 1.21 percent as

Page 40: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 25

compared to the state average of 10.5%. The major proportion of the area falls under permanent

pastures and other grazing land (about 51 per cent), wastelands (21 per cent) and forests (6.80 per

cent). Further there is moderate scope of increase in arable area in the district as the current fallow

land (1,513 hectares), other fallow land (83 hectares) and current waste land (3,254 hectares) can be

brought under cultivation by investments in reclamation fencing/ bunding and development of

irrigation1. Although Pooh is the largest block in Kinnaur as per geographical area, it is second to

Kalpa in terms of net sown area in the district. Kalpa accounts for 28.4 percent of the net sown area

as compared to Pooh having 25.9 percent net sown area of the district. Double/ multiple cropping is

practised in 22 percent of the cultivated area in the district. Pooh block has the highest cropping

intensity of 412 per cent as compared to the district average of 263 percent. Nichar block accounts

for 62 percent of the districts area under forest while Pooh block accounts for 81 percent of the

district’s total wasteland

Table 1-10 Land use Classification

Block

Name

N

V

TGA Area under Agriculture AF AW Area under other uses

GC

A

(1)

NS

A

(2)

AS

M

(1-2)

CI

(%)

PPGL M

L

CW OF

L

CF

Nicha

r

18

8

16730

8

2543 244

6

430 104.

0

7061 22383 88210 11 915 5 558

Kalpa 19

4

33837

9

4114 279

8

870 147.

0

2430

6

191 55948 58 784 45 728

Pooh 27

8

11862

1

2360 235

8

1036 100.

1

6216 10855

2

17788

5

32 155

5

33 227

Total 66

0

62430

8

9017 760

2

2336 3758

3

13112

6

32204

3

101 325

4

83 151

3

The Land use and land cover map of Kinnaur district for the year 2002 and 2015 is given below

Source:Department Of Agriculture, Kinnaur, NV: No. Of Villages, TGA: Total Geographical Area,

GCA: Gross Cultivated Area, ASM: Area Sown More than Once, CI: Cropping Intensity, NSA : Net Sown

Area, PPG: Permanent pastures and other grazing lands, ML: Land under misc. tree crops and groves

not included in area sown, CW: Culturable waste, OFL: Other fallow land, CF: Current fallows, AF:

Area under forest, AW: Area under wasteland

Page 41: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 26

Map 5: Land use Land Cover map of Kinnaur District, 2002

Map 6 : Land use Land Cover map of Kinnaur District, 2015

The land use maps of Kinnaur district (Map 1.7a and 1.7b) have been analysed for two periods viz.

2002 and 2015 to assess the change in land use witnessed in the area. Owing to the increase in

urbanisation in Kinnaur, area under forests and gLakhsiers has decreased by 5.29% and 17.5 %

respectively whereas built up land has increased by 0.01 %. The land under grasslands has increased

by 7.13% whereas area under river and water bodies showed a decline of 0.03 %. Over the past 13

Page 42: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 27

years, there has been a tremendous increase of 13.65 % in the area under rocky lands, barren land

area in the district has also increased in Kinnaur by 1.70 %. This may be attributed to the reduction

in the area under snow caps and gLakhsiers and their corresponding conversion into rocky and barren

land.

Figure 1.6 Percentage change in Land use – comparison of Land use in 2002 with 2015

0.01% -0.03%1.70%

-5.29%

7.15%

13.65%

-17.15%

-20.00%

-15.00%

-10.00%

-5.00%

0.00%

5.00%

10.00%

15.00%

20.00%

Changes (%)

Page 43: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 28

Chapter 2 DISTRICT WATER PROFILE

Kinnaur district lies is the High hill temperate zone. Majority of farmers in this district are marginal

and small farmers and average size of land holding is 1.38 ha. Rainfed farming is mostly practiced in

the area.

2.1 Area Wise, Crop Wise Irrigation Status

Kinnaur has a total gross cultivated area of 21,425 ha out of which 9,017 hectares is under agricultural

crops and 12,408 ha is under horticultural plantations. Further, about 59.35 percent area under

agricultural crops is irrigated and 40.4 percent is rainfed. As indicated in figure 2.1Nichar block has

the highest arable area i.e 3,618 ha followed by Kalpa (2,917 ha) and Pooh (2,482 ha). Kharif season

is the main cropping season in the district as about 83 percent (7,602 ha) of the arable area is utilised

in cultivation of various agricultural crops. On a contrary, in Rabi season about 1,415 hectares of land

is cultivated. Nearly 67 per cent of Kharif cropped area is irrigated and during rabi season 29.3 per

cent of the area is irrigated.

Pooh and Kalpa blocks have approximately 90 percent and 78 percent of the area under irrigation.

However, Nichar block lags far behind the two blocks as it has only 23 percent irrigated area. The

reason for this marked difference in irrigation status is that Kalpa and Pooh block are in proximity to

the snow-capped mountains and gLakhsiers which are a source of irrigation to the downstream

agricultural lands of these blocks. However in Nichar block such natural sources of irrigation are far

and few. The block wise area under irrigation is mentioned in Figure 2.2 below:

Page 44: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 29

Figure 2.1 Block wise Area under Kharif and Rabi

crops

Figure 2.2 Block wise Irrigation Status of Arable

Area

Source: Department of Agriculture, Kinnaur

*Details are presented in Annexure 2.

Vegetables are the main agricultural crop cultivated in the district because of their lower cropping

cycles and higher returns. About 36 percent (3,286 ha) of the total land is utilised for vegetable

production in the district. Cereals like wheat and maize occupy the second largest or 2,290 hectares

of area (or 25 percent) followed by coarse cereals like bajra and Millets which occupy 1,502 ha of

area (or 16.6 percent).

Figure 2.3 Crop Wise, Area wise, Irrigation Status- Kinnaur

Source: Department of Agriculture, Kinnaur

The crop wise irrigation scenario in the three block of the district his as under:

1. Kalpa block has maximum area under vegetable cultivation (1,054 ha), followed by cereals

(680 hectares) and pulses (555 hectares). These crops are mainly irrigated as about 71 percent

of the cultivated area under cereals, coarse cereals and pulses is irrigated.

28012446 2358

116 40

1260

0

500

1000

1500

2000

2500

3000

Kalpa Pooh Nichar

Kharif Rabi

Irrigated, 2274

Irrigated, 2256

Irrigated, 846

Rainfed, 643

Rainfed, 230

Rainfed, 2772

0

500

1000

1500

2000

2500

3000

3500

4000

Kalpa Pooh Nichar

Are

a in

Hec

tare

s

55.6% 55.3% 59.9%

100.0%67.1%

35.7%

44.4% 44.7% 40.1%

32.9%

64.3%

2290

1502 1488

4

3268

445

0

500

1000

1500

2000

2500

3000

3500

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

120.0%

Cereals CoarseCereals

Pulses Oil seeds Vegetables Other

AR

EA I

N H

ECTA

RES

PER

CEN

TAG

E

IrrIgated Rainfed Total Cultivated Area

Page 45: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 30

Figure 2.4 Crop Wise, Area wise, Irrigation Status- Kalpa

Source: Department of Agriculture, Kinnaur

2. Pooh block has maximum area under vegetable cultivation (1,124 ha), followed by cereals

(479 hectares) and pulses (405 hectares). These crops are mainly irrigated as about 90 percent

of the cultivated area under cereals, coarse cereals and pulses is irrigated.

Figure 2.5 Crop Wise, Area wise, Irrigation Status- Pooh

Source: Department of Agriculture, Kinnaur

3. Nichar block has maximum area under cereal cultivation (1,151 ha), followed by vegetables

(1,001 hectares) and coarse cereals (671 hectares). These crops are mainly rainfed as the

irrigation is available for only about 17-20 percent of the cultivated area under cereals, coarse

cereals and pulses is irrigated

75.1% 71.6% 71.9%

100.0%

89.6%

46.3%

24.9% 28.4% 28.1%10.4% 53.7%

680503 555

4

1054

1210

200

400

600

800

1000

1200

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

120.0%

AR

EA I

N H

ECTA

RES

PER

CEN

TAG

E

IrrIgated Rainfed Total Area Cultivated

99.2%

89.0% 89.4%

100.0%

88.5% 88.1%

0.8%

11.0% 10.6%

11.5%

11.9%

479

328405

1

1214

59

-100

100

300

500

700

900

1100

1300

77.0%

82.0%

87.0%

92.0%

97.0%

102.0%

Cereals CoarseCereals

Pulses Oil seeds Vegetables Other

AR

A I

N H

ECTA

RES

E

PR

CEN

TAG

E

IrrIgated Rainfed Total Area Cultivated

Page 46: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 31

Figure 2.6 Crop Wise, Area wise, Irrigation Status- Nichar

Source: Department of Agriculture, Kinnaur

Kinnaur district has maximum area under Apple cultivation which is followed by Almond, Apricot

and Walnut. In Pooh and Kalpa blocks, 90 percent and 80 percent of the arable area under horticulture

plantation is irrigated. However in case of Nichar block only 23 percent of the cultivated area is

irrigated.

Figure 2.7 Block wise Irrigation status of Horticulture Plantations

Source: Department of Agriculture, Kinnaur

2.2 Production and Productivity of Major Crops

The economy of Kinnaur is predominantly agriculture based where as large as 67.09 per cent of the

total working force is engaged in tilling the cultivable land. The space of arable land is small and the

cultivation is common on narrow strips along the browse of the mountains. The crops for the most

part are Poohr and a great scarcity of grain pervades. As a result, Public distribution system is heavily

relied upon in the district.

26.7% 26.7% 24.6%

100.0%

17.7% 19.2%

73.3% 73.3% 75.4% 82.3% 80.8%1151

671

528

2

1001

265

0

200

400

600

800

1000

1200

1400

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

120.0%

Cereals CoarseCereals

Pulses Oil seeds Vegetables Other

AR

EA I

N H

ECTA

RES

E

PER

CEN

TAG

E

IrrIgated Rainfed Total Area Cultivated

3599

844

3935

899

2693

437

0

1000

2000

3000

4000

5000

Kalpa Nichar Pooh

Are

a in

Hec

tare

s

Rainfed

Irrigated

Page 47: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 32

The district has a long spell of winter season from November to March, due to which cultivation is

carried out mainly in April-October. The crops cultivated in Kharif season cover much higher area as

compared to crop area in rabi season. The standard grains are barley, phaphra ( Fagopyrum

esculentum) and ogla (Fagopyrum emerginatum), barley is sown in March-april and harvested in July

after which fields are prepared for oogla and phaphra which are harvested in October. The other

grains are Bathu (Amaranthus), cheena (Panicum miliaceum) and poda (Paspalum ocribiculatum).

Over the years, the area under remunerative crops like vegetables and pulses have increased and area

under grains have decreased. Green peas and cabbage are the main vegetables cultivated in the block.

Farming in Kinnaur is largely irrigated and the main sources are the Kuhls drawn from the streams

fed by the gLakhsiers. However, in Nichar block the arable area is mainly rainfed. The production of

Kharif crops under irrigated system accounts to 2,01,000 quintal and under rainfed system a

production of 17,500 quintals is accounted. Likewise, during Rabi season the production of

agricultural crops under irrigated system is far more than rainfed system (as depicted in Figure 2.8)

Figure 2.8 Production of Kharif and Rabi crops in Kinnaur (in quintals)

Source: Department of Agriculture, Kinnaur

The yield of major crops grown in Kinnaur district is depicted in Figure 2.9below:

17500

201000

3094 590

R A I N F E D I R R I G A T E D

Kharif Rabi

Page 48: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 33

Figure 2.9 Yield of Major Crops in Kg per Hectare

Source: Department of Agriculture, Kinnaur

2.3 Irrigation Based Classification

Kinnaur district has a total gross cropped area of 21,425 ha out of which 13, 751 ha is irrigated (both

agriculture and horticulture area) and 36 percent is rainfed so the district is predominantly irrigated

As per Agriculture department, Kinnaur, the gross irrigated area for agricultural crops is 5,373 ha,

which is 59.3 percent of the total cropped area. The percentage of gross irrigated area to gross

cropped area is maximum in Pooh block (90.6 percent), followed by Kalpa (77.8 percent) and Nichar

block (23.3 percent).

Table 2-1 Irrigation Based Classification

Block Irrigated (Area in ha) Rainfed (Area in ha)

Block

Gross

Irrigated

Area

Net

Irrigated

Area

Partially

Irrigated/Protective

Irrigation

Un-Irrigated or

Totally

Rainfed

Kalpa 2271 2229 559 84

Pooh 2256 2238 208 22

Nichar 846 490 582 2190

Total 5373 4957 1349 2296

Total 13751.47 13335.47 1349 6325.44 Source: Department of Agriculture & Horticulture, Kinnaur, 2014-2015

A total of 2,645 ha of area is under rain fed cultivation out of which 1,296 ha is totally rainfed while

1,349 ha is under protective/partial irrigation. The percentage of rain fed area to gross cropped area

is highest in Nichar block (51 percent) followed by Kalpa block (19.5 percent) and Pooh block (8

percent). The area under partial/protective irrigation is highest in Nichar block, which is the block

with maximum proportion of rain fed area in the district.

15

00

16

00

14

00

19

00

12

00

13

50

0

70

00

70

0

14

00

W H E A T R I C E B A R L E Y M A I Z E M I L L E T P O T A T O P E A O I L S E E D O T H E R N O N

F O O D C R O P S

Page 49: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 34

Figure 2.10 Irrigation Based Classification (Exclusively for agricultural crops)

Source: Department of Agriculture, Kinnaur

As discussed, the horticultural crops are cultivated in an area of 12,408 hectares out of which 67

percent area is irrigated and 33 percent is rainfed.

Figure 2.11 Irrigation of Horticultural crops and plantations (Area in hectares)

Source: Department of Horticulture, Kinnaur

2271

2229

559

84

2256

2238

208

22

846

490

582

2190

0 500 1000 1500 2000 2500

Gross Irrigated Area

Net Irrigated Area

Partially Irrigated/Protective Irrigation

Un-Irrigated or Totally Rainfed

Nichar Pooh Kalpa

Irrigated, 8378

Rainfed, 4029

Page 50: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 35

Chapter 3 Water Availability

Kinnaur has an isolated and rugged physiography. The topography of the district presents an intricate

mosaic of mountain ranges, hills and deep valleys with altitudinal variations ranging from 1500-6500

metres. The scenarios of water availability in the district have been assessed based on the pre

monsoon and post monsoon drainage maps of Kinnaur (As depicted in Map 7 and 8).

Map 7 : Pre Monsoon Drainage Map of Kinnaur

Page 51: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 36

Map 8 : Post Monsoon Drainage Map of Kinnaur

The comparison of the pre-monsoon and post monsoon drainage map of the district shows that during

pre-monsoon the tributaries of river are spread in lesser catchment area but post monsoons because

of increase in water levels in the main river, its tributaries and sub tributaries cover much larger

catchment area. This clearly underlines the dependence on rain water in the area.

3.1 Status of Water Availability The important water resources of Kinnaur are as follows:

a) River and khads (Tributaries)

The Satluj- This is the principal river of Kinnaur, almost dividing the district into two parts.

In its passage through Kinnaur, the Satluj river successively crosses three more or less parallel

mountain ranges; the Zhaskar mountains, the Great Himalaya and the Dhauladhar. The

significant tributary streams and rivers that flow into the main Satluj river from the south or

along its left bank are successively the Tiang, Hogis, Gyamthing, Tiding, Baspa, Duling,

Ramni and Panwi khads and likewise those entering from the north or along right bank are

Page 52: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 37

the Spiti river, Ropa, Kirang, Kashang, Pangi, Choling and Bhaba khads. In between there are

many streams that meet the Satluj river and its tributaries. The Satluj descends from about

3,050 m (the point of its entrance in the district) to 1,200 meter at Chaura flowing almost the

whole way between narrow cliffs and, therefore, there is no open ground worth mentioning

all along its banks. The water of the river is more or less discoloured. Cultivated fields in

terraces are generally at considerable height from its bank and thus are immune to the turbidity

of water, which is largest in June to August. The river is not navigable. After Satluj leaves the

district boundary near Chaura, it enters Shimla district.

The Baspa- This river is the feeder of Satluj and passes through the famous Sangla valley. It

is next to Spiti in size and is about 72 km in length and joins Satluj at Karchham. Zupki,

Thatang, Bering, Rukti and Suti are its important tributaries. This river has a potential for the

propagation of brown trout ( Salmo fario).

The Wangar/Bhaba- This torrent is formed by the junction of two streams, namely, Bhaba

and Sooreh and joins Satluj on the right side.

The Tidong- It is about 56 km in length. The Ropa- It is about 43 km in length and falls in

Satluj near the village of Shyaso. The Spiti – It rises from Kunzam range by the confluences

of Kunzam La Togpo and the streams Kabzima and Pinglung. After travelling a distance of

about 152 km it joins Satluj at Khab in Kinnaur district.

b) Lakes and Tanks- A small lake with its grassy banks, lies at village Nako in Pooh sub division.

The other mentionable lake of appreciable size is Sapni lake situated about 3 km above Mane village.

There is another small lake above the villages of Jani and Ramni in tehsil Nichar. Its area is about

420 m2 with a depth of about 15 m.

c) Springs and Spring-heads- Springs are scattered all over the area and occur at the foot, on the

sides, shoulders, saddles and depressions of a mountain or a hill. Where possible, the water from

spring is used for drinking as well as for irrigation through kuhls. The spring water mostly comes

from snow. In Nichar tehsil, there are number of hot water springs, the waters of which are used for

bath and washing of clothes. The bauris (kunda) for the most part built of hewn stone, descending by

steps; not more than half to one meter deep, are often shaded by trees or an arched roof. The water is

limpid and cool in all the seasons. One existing in or near every settlement, these sources are presently

in a state of disappear and neglect.

d) Snow Fields/GLakhsier and Ice Caves – The area above 5,200 m from the mean sea level

remains under permanent snow. The area between 3,050 to 5,200 m remains covered with snow for

more than six months in a year. The tract falling between 2,000 to 3,050 m remains under snow for

Page 53: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 38

three to six months. The higher reaches of mountains like Pargial and Raldang Kailash are worth

mentioning as the snow fields.

Kinnaur district has no major and medium irrigation schemes, however, rainwater harvesting

structures are constructed under MGNREGA, IWMP, DCs fund etc to provide a sustainable means

of irrigation to the farmers of the district. A total of 8 rainwater harvesting structures have been

approved and constructed in Recong peo circle having a storage capacity of 1.05 Million cubic

meters. The treated water from sewage treatment plant is not used in the district for irrigation

purposes. Hence, the prospective water sources in the blocks are Kuhls, Minor irrigation tanks under

Lift irrigation system and flow irrigation system,

The block wise status of water availability is as follows:

Table 3-1 Status of water Availability

S.No. Sources Kharif B.C.M Kharif Area

1 Surface irrigation

2 Surface Minor irrigation/

LIS/FIS

Kalpa Block 4.6 x10-5 1156

Nichar Block 4.7 x10-5 1350.96

Pooh Block 3.4 X 10-5 393

3 Various Water bodies

including rain water harvesting 1.050X 10-6

4 Treated effluent received from

STP --

Kalpa Block 0.4 MLD

Pooh Block NA

Nichar Block NA Source: Irrigation Department, Kinnaur

3.2 Status of Ground Water Availability

The district can be divided broadly into two hydrogeological units viz. Porous Formations comprising

unconsolidated sediments and the Fissured Formations comprising hard rocks. The Porous

Formations are fluviatile deposits, occurring along the Baspa River, Ropa Gad, Taiti Gad, Wenger

Gad, Tidong Gad in the lower reaches and in the upper reaches generally underlain by gLakhsio-

fluviatile deposits. These form potential aquifers. Along the Baspa River in Sangla valley, about 40

sq.km and along Ropa River valley, 7 sq. km area is ground water worthy, with expected thickness

of 20 to 30 m below Riverbed. However, there are other numerous isolated small valley fills, which

are also ground water worthy.

Fissured formations are constituted by hard rock formations, belonging to crystalline rocks. These

rocks are generally, massive and devoid of primary porosity. However, due to the tectonic activities,

Page 54: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 39

secondary porosity has developed along fracture / joints and fault zones. Weathered zone, rarely form

an aquifer because of the little thickness of the weathered mantle, due to the topographical slope in

the area. In hard rock terrain of district Kinnaur, the ground water is distributed either along

structurally weak / fractured zones, faults and landslides zones or along the contacts of the different

rock formation in the topographically favorable areas. In the Satluj River valley,the areas around

Taranda, Tapri, between Oling and Lipa, Morang and Tabling are most promising for exploration.

The other ground water potential areas are along Baspa River, Tidong Gad, Taiti Gad and Spiti River.

The occurrence of the large numbers of springs in these zones, are indicative of existence of these

zones10.

Rainfall is the major source of groundwater recharge, apart from the influent seepage from the rivers,

irrigated fields and inflow from upland areas, whereas, discharge from ground water mainly takes

pLakhse from effluent seepages of ground water, in the form of springs and base flow in streams etc.

The area therefore is not considered for estimation of the ground water resources, being discontinuous

aquifers

Ground Water Quality

National Hydrograph Network Stations have not been established in the district so far. However, the

water samples were collected form various sources like spring and handpumps during the various

hydrogeological studies, which reveal that the overall ground water quality is good and is suitable for

all type of uses.

Status of Ground Water Development

The entire demand for domestic and irrigational use, is fulfilled by means of either spring or nallah

sources. Most of these sources are perennial, with low to moderate seasonal fluctuation. Such sources,

are tapped by the irrigation department for its further use.

So far ground water exploration has not been carried out by CGWB in Kinnaur district because of

difficulty in transporting the heavy machinery. However, Irrigation department of the State has drilled

number of shallow bore wells, fitted with handpump in various parts of the district for domestic use.

The depth of these bore wells, ranges between 100 to 120 feet. At pLakhses, where the discharge is

sufficient, depending upon the need, they are energized. These handpumps are installed in hardrocks,

hilly terrain and also along river valleys. Tubewells are absent in all these valleys. In future, the areas

of Sangla and Ropa valley, can be taken up for ground water exploration.

10 Central Ground Water Board Report, Kinnaur District

Page 55: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 40

The district being hilly and mountainous, traditional sources of ground water, mainly springs, has

played a major role since past in providing assured irrigation and water supply. These include, the

nallas and springs. In some areas, even at present these are the only sources of water of the

settlements. However, modern means for tapping ground water have been employed in recent years

Map 9 : Ground water user map- Kinnaur

Source: Central Ground Water Board Report, Kinnaur

Page 56: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 41

Ground water development on small scale is seen in the valley areas, particularly in the Baspa valley.

Handpumps have been installed in these areas and are energized for water supply. There exists, a

scope to explore the ground water potential in remaining low lying valley areas. The area of the district

is feasible only for drilling shallow to medium depth bore wells.

Table 3-2 Status of Ground Water Availability

Status of Block as per Central Ground Water Board Notification

Ground Water (MCM)

Critical Semi-Critical Safe Draft Recharge Gap NA NA NA NA NA NA

3.3 Status of Command Area Kinnaur district does not have any canal. Kuhls, Nallahs, khads and rivers are the major sources of

water in the district. The total developed command area with irrigation facilities is 20 percent in

Kinnaur District. The undeveloped command area in the district is 3,567 ha. Kalpa and Pooh block

have major proportion of developed command area in the district. The block wise command area is

mentioned in the Table 3.3 below:

Table 3-3 Status of Command Area

Name of the

village/Blocks

Information of canal

command

Information on the other services

command, Kuhls, in Hectares

Total Area in

Hectares

TA DA UDA TA DA UDA DC UDC

1 2 3 4 5 6 7 3+6 4+7

Kalpa 0 0 2456 1156 1300 1156 1299.69

Pooh 0 0 3286.31 1350.96 1935 1350.96 1935.35

Nichar 0 0 725 393 332 2899.96 331.93

Total 0 0 0 6467 2899.96 3566.97 5406.92 3566.97

TA- Total Area, DA- Developed Area, UDA- Undeveloped Area, DC- Developed Command, UDC- Undeveloped Command

The details of villages which fall in developed command area of the blocks are as mentioned below:

Table 3-4 List of Tehsils/ Villages in Command Area

Block Villages in Command Area

Kalpa Block Boktu , Karalang ,Rangkulan, Khwangi , Powari, Mebar Ralli , Sapni Tehsil,

Sangla, Chansu Tehsil, Upper Shong , Badseri , Builti , Panpokanda, Lower

Shong, Pangi Tehsil , Nichla Baturi, Kalpa, Chakka, Kupa, Leeche Nallah to

laple Bio Barang, Nalzo to panchayat bhawan pangi

Nichar Block Chagoan, Jani, Runang, Kilba, Neol Yulla.

Pooh Block NA

Source: Irrigation and Public Health Department, Kinnaur

Page 57: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 42

3.4 Existing Type of Irrigation

As discussed in Chapter 2, Pooh and Kalpa blocks, have maximum cultivable area (up to 60 percent)

under irrigation mostly through kuhls and tanks. The major irrigation projects in Kinnaur are handled

by the IPH Department and minor irrigation schemes are run by the State Department of Agriculture.

There are 99 major Kuhls in the district out of which 63 are present in Pooh. The total command area

of these major kuhls is 6,835 ha out of which 1,709 ha is irrigated (as per district agriculture plan).

The status of existing irrigation schemes as provided by IPH Department is depicted in Table 3.5

below.

Table 3-5 Existing Type of Irrigation Source

Irrigation

Surface Irrigation Ground Water Other

source

Treated

effluent

discharge

from STP

Water extraction

devices/lift

Total

Can

al

Bas

ed

Tan

ks

Po

nd

s

Res

erv

oir

s T

ub

e w

ells

Op

en w

ells

Bo

re w

ells

Ele

ctri

city

Pu

mp

Die

sel

Pu

mp

Oth

ers

Irri

gat

ion

sou

rces

Wat

er

extr

acti

ng

un

its

Kalpa-

sources

- - - - 21 .4MLD - - - - -

Kalpa-CA 2920.63

Nichar-

Sources

- - - - 5 - - - - - -

Nichar- CA 665.53

Pooh-

Sources

63

Pooh-CA 3249.55

CA = Command Area, MLD= Million litres per day

Kinnaur as a whole does not have any ground water sources being used for irrigation because of the

low potential of ground water in the district. Also, the number of water extraction devices in the

district has been reported to be zero in all the three blocks. Kuhls, khads and nallah are the major

sources of irrigation and are used by farmers to draw water to their fields under gravity flow by

digging channels.

As per the District Agriculture Plan of Kinnaur (based on 2007-2008 field survey), there are 84 minor

kuhls, in the district being used as a water source for irrigation. Kalpa block has 72 percent of the

minor kuhls of the district. The total command area under irrigation from minor Kuhls is 3825.6 ha

and the actual irrigated area is 361 hectares.

Table 3.6 Status of Irrigation sources- Kuhls and Tanks

Status of

Scheme

Source Type Pooh Kalpa Nichar District Total

Completed Kuhl (Minor under

Deptt. of Agriculture

Number 10 60 14 84

Page 58: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 43

Status of

Scheme

Source Type Pooh Kalpa Nichar District Total

Amount spent(Lakh

Rs.)

10.67 31.63 1.78 44.08

Villages covered 12 22 5 39

Beneficiaries (No.) 700 568 1005 2273

Command area (ha) 3696.3 89 240 3825.26

Actual irrigated Area

(ha)

50 89 222 361

Individual Tank

irrigation

Number - 72 - 72

Amount spent(Lakh

Rs.)

- 7.2 7.2

Villages covered - 16 16

Beneficiaries (No.) - 72 72

Command area (ha) - 4.38 4.38

Actual irrigated Area

(ha)

- 4.38 4.38

Source: District Agriculture Plan, Kinnaur

Page 59: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 44

Chapter 4 Water Requirement/Demand

Planning (irrigation) interventions is a prudent exercise which must be done meticulously after taking

into cognisance the current resource availability vis a vis the current needs and future demand. Since,

there is always a time lag between planning and implementation an assessment of future demand

along with present needs is a pre requisite for make the plans more executable. The present chapter

deals with the current (2015) and projected (2020) demand of water for various sectors. The demand

for water has been assessed on the basis of data obtained from different departments.

4.1 Domestic Water Demand

Data of Census 2011 and 2001 has been considered to arrive at the growth rate of population of the

district. As per Census 2011, the district has shown an annual growth rate of 0.739%. Table 4.1 below

indicates the block-wise population of the district. Current population (in 2015) has been calculated

by assuming a growth rate of 2.956% (0.739% × 4 Years) over a period of four years (from 2011-

2015). Projected population has been calculated in similar way by assuming a growth rate of 3.695

% (0.739% × 5 Years) over the period of five years (from 2015-2020).

It has been assumed that per capita daily water requirement of people residing in urban areas of the

district is 150 Litres and for population in rural areas, the daily per capita daily water requirement is

70 Litres. Using the same norms domestic water supply demand has been worked out and given in

Table 4.1 below

Table 4-1 Domestic Water Demand (MCM)

Block Population in 2011

Projected population in 2015

Projected population in 2020

Water Gross demand (MCM)

Water Gross demand (MCM)

Pooh 23206 23274.6 23360.6 0.595 0.597

Kalpa 33232 33330.23 33453.39 0.852 0.855

Nichar 27683 27764.83 27867.42 0.709 0.712

Total 84121 84370 84681 2.156 2.164

Page 60: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 45

Figure 4.1 Domestic water Demand Present and Projected (2020)

It can be inferred from the figure that considering the growth rate of population of the district, the

quantity of water required in 2020 for domestic consumption shall be approximately 2.164 MCM

which is 1.003 times more than the present water requirement.

4.2 Crop Water Requirement

Kinnaur has small arable area due to which cultivation is carried out on narrow browse of mountain

strips.

Area under different crops has been discussed in Chapter 2 (Figure 2.8). Taking into account, the

water requirement (Table 4.2), requirement of water for different crops have been worked out.

Existing water potential available (being utilized) has been assumed as the water used in irrigated

land.

Table 4-2 Crop Water Requirement in Million Cubic Meter

S.No. Block Area

sown

(Ha)

Irrigated

area (ha)

Crop

Water

Demand

Water

Potential

Required

Existing

Water

Potential

Water

Potential to

be created

1 Kalpa 7415 5873 3.2016 3.2016 0.6192 2.5824

2 Pooh 6859 6192 3.0363 3.0363 0.3252 2.7111

3 Nichar 7156 1691 4.3461 4.3461 3.3705 0.9756

Total 21430 13756 10.584 10.584 4.3149 6.2691

Detailed sheet in annexure 4.

It can be concluded from the table that in 3 blocks, a total water potential of 6.26 MCM is to be

created in the district to fulfil the requirement of crops. The crop wise water requirement has been

taken based upon discussion with Agronomists of Agriculture University as per practice prevailing

in the State which is as under:

0.852

0.709

0.595

0.855

0.712

0.597

33,330 27,765

23,275

33,453

27,867

23,361

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

Kalpa Nichar Pooh

Water Gross demand in 2015 (MCM) Water Gross demand in 2020 (MCM)

Projected population in 2015 Projected population in 2020

Page 61: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 46

Table 4-3 Water requirement of crops in mm

Crop Depth of each irrigation No. of watering Total water requirement

Paddy 50 12 600

Wheat 30 5 150

Maize 30 2 60

Vegetable Crops 30 6 180

Horticultural Crops 60

4.3 Livestock Water Requirement

The requirement of water for livestock of the district has been derived from last two livestock census

(2001 & 2012). The table below represents the animal wise water requirement as well as total water

requirement of the district for livestock.

Table 4-4 Livestock water requirement

Animal Population Water requirement (MCM)

2001 2012 Annual Growth % 2015 (E) 2020 (P) 2015 2020

Poultry 5237 9209 4.31% 10401 12644 0.001 0.001

Pigs 0 35 10.00% 46 68 0.000 0.000

Goats 30325 33229 0.87% 34100 35590 0.075 0.078

Sheeps 70333 66607 -0.56% 66607 66607 0.146 0.146

Indigenous Cow 10989 9586 -1.46% 9586 9586 0.227 0.227

Hybrid Cow 22093 11971 -8.46% 11971 11971 0.284 0.284

Draft Animal 3321 7188 5.38% 8348 10594 0.198 0.251

Total Animal 142446 137825 141058 147060 0.931 0.988

The block wise water estimation for livestock is as follows;

Table 4-5 Livestock water requirement

Name of the Block

Total No of Livestock in 2015

Present Water Demand (MCM)

Water Demand In 2020(BCM)

Exisiting water potential (BCM)

Water Potential to be created (BCM)

Kalpa 50647 0.37 0.38 0.37 0.0160

Nichar 48627 0.32 0.32 0.32 0.0084

Pooh 41784 0.25 0.26 0.25 0.0100

TOTAL 141058 0.93 0.97 0.93 0.0345

Based on the projected water requirement for livestock in 2020, the gap has been assessed. The total

potential which has to be created for livestock in 2020 is 0.0345 MCM. This has been assessed on

the terms of the following:

Page 62: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 47

Per capital daily water requirement for cows/buffaloes 65 litres, sheep/goats/pigs 6 litres and

Poultry 0.25 litres.

For projecting the water demand of livestock, growth rate as deduced from census has been

considered during calculations. In case of livestock with decreasing growth rate of population,

the present population has been considered. It is assumed that present water requirement of

livestock is met from existing water usage and hence existing potential is equal to existing

demand.

4.4 Industrial Water Demand

Kinnaur has 333 industrial units and all of them are registered. Owing to the severe topographical

conditions and tribal status of Kinnaur, there are no Large and Medium scale enterprises in the district.

Recong peo is the only Industrial area with 42 plots out of which 37 have been allocated and only 23

are in production. The details of existing small and micro enterprises is as given below:

Figure 4.2 Industrial Units in Kinnaur

Kinnaur has highest number of Woolen ,silk & Artificial Thread Based cloth workshops followed by

Agro based micro enterprises.

The water requirement of existing small/micro enterprises and workshops is being met by the present

water supply schemes of IPH department. The water demand of these enterprises is negligible. Since

there are no major water consuming industries in the district the water potential to be created for

industries has been taken to be zero.

Table 4-6 Water Demand for Industries

Block Power Generation (MW)

Water Demand( MCM)

Water Demand in 2020 (MCM)

Existing Water Potential (MCM)

Water potential to be created (MCM)

Kalpa 0 0 0 0 0

Nichar 0 0 0 0 0

73

169

4620 12

0

50

100

150

200

Agro Based Woolen , Silk and

Artifical Thread

based Cloths

Wood/ Wooden

Based Furniture

Metal based steel

fabrication

Repairing and

Servicing

Others 13

Nu

mb

er

of

Un

is

Industry Type

Page 63: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 48

Block Power Generation (MW)

Water Demand( MCM)

Water Demand in 2020 (MCM)

Existing Water Potential (MCM)

Water potential to be created (MCM)

Pooh 0 0 0 0 0

Total 0 0 0 0 0

4.5 Water Demand for Power Generation

Himachal Pradesh has abundant water resources, with five major rivers flowing from the western

Himalayas. It has a power potential of about 23,000 MW. About 6,480 MW has been harnessed till

now by public sector units and private and joint venture companies.

All the hydel projects in Kinnaur are run off the river projects and no storage is involved. The major

hydroelectric power projects of the district are as mentioned below:

Shongtong-Karcham Hydro-Electric Project (450 MW) : Shongtong Karchham Hydro

Electric Project, a run-of-river scheme, on the river Satluj in Distt. Kinnaur of HP, envisages

construction of 102.50 m long diversion barrage, near village Powari, to divert 406 cumecs

discharge to four sedimentation chambers, each 300 m long.

HPSEB has 4 hydro power projects in Rongtong, rukti, SVP- Bhaba and Bhaba Aug with a

capacity of 2, 1.50, 120 and 4.5 MW respectively. The corresponding design discharge for

these four projects is 4.25 cumecs (Rongtong), 0.5 cumecs (Rukti), 21.20 cumecs (SVP-

Bhaba) and 10 cumecs (Bhaba Aug).

Karcham wangtoo is a private hydro prower project with a capacity of 1000 MW and design

discharge of 421 cumecs. Baspa-II is another private hydro power project with a capacity of

300 mw and design discharge of 52 cumecs.

Kinnaur has various small and micro hydel projects being developed by Himuja. The details

of such project along with capacity envisaged is as mentioned below:

Table 4-7 Small and Micro Hydro Projects in Kinnaur

No. Firm_ Name Project_ Name

Stream Basin Cap_

MW

District Status

1 Patel Infrastructure (P) Ltd.

Burua Stage-I Burua Satluj 5 Kinnaur S&I in progress

2 Guru Energy (Sole Prop.)

Chaunda-II Chaunda Satluj 2.2 Kinnaur S&I in progress

3 Mohan Hydro (Sole Prop.)

Upper Hurba Hurba/Baspa Satluj 3 Kinnaur S&I in progress

4 Deepak Energy (Sole Prop.)

Hurba-II Hurba/Baspa Satluj 3 Kinnaur S&I in progress

Page 64: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 49

No. Firm_ Name Project_ Name

Stream Basin Cap_

MW

District Status

5 Thames Hydro Energy Project (Partnership)

Jangi Kirang Jangi kirang Satluj 2.5 Kinnaur S&I in progress

6 Tirung Valley Hydro Projects, (P) Ltd.

Lamber Lamber Satluj 5 Kinnaur S&I in progress

7 Manyaap Vidyut Prakash (P) Ltd.

Mangsa Garang

Mangsa Garang

Satluj 2.4 Kinnaur S&I in progress

8 Patel Infrastructure (P) Ltd.

Upper Panwi Panwi Satluj 4 Kinnaur S&I in progress

9 Uday Hydro Electric Project (Partnership)

Raura Top Raura Satluj 2.5 Kinnaur S&I in progress

10 Tara Energy (Sole Prop.)

Runga Runga Satluj 1 Kinnaur S&I in progress

11 Kin Hydro Power Developers (Partnership)

Sailan Sailan Satluj 1.5 Kinnaur S&I in progress

12 Rai Energy (P) Ltd. Shailpya Shailpya Satluj 2.4 Kinnaur S&I in progress

13 Yeti Hydro Power (Partnership)

Shushang Shushang Nala/Baspa

Satluj 1 Kinnaur S&I in progress

14 Patel Infrastructure (P) Ltd.

Soldan-II Soldan Satluj 4 Kinnaur S&I in progress

15 DM Corporation (P) Ltd.

Sunen Sunen/Sasso/Pooh

Satluj 2.2 Kinnaur S&I in progress

16 DM Corporation (P) Ltd.

Tingoo Tingoo Satluj 2.1 Kinnaur S&I in progress

The district does not have any thermal/ nuclear power plant where water is consumed. However, the

various hydroelectric plants in Kalpa, Nichar and Pooh have power generation capacity of 969 MW,

1295 Mw and 100 Mw respectively. Thus, total power generation capacity comes out to be 2364 MW

in the district. The water after power generation is used downstream side for irrigation. Since water

is not being consumed in Hydro Power generation, no water potential needs to be created for power

generation and hence the potential to be created has been taken to be zero in the district.

Table 4-8 Water Required for Power Generation

Block Power Generation

(MW)

Water Demand

(BCM)

Water Demand in 2020 (BCM)

Existing Water

Potential (BCM)

Water potential

to be created (BCM)

Kalpa 969 17610 17610 17610 0

Nichar 1295.6 15714 15714 15714 0

Pooh 100 605 605 605 0

Page 65: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 50

4.6 Total Water Demand of the district for various sectors

The present water demand of the district has been assessed to be 13.67 MCM annually. Out of the

total water demand 10.6 mcm (78 percent) is the requirement from crop production. Nearly 2.149

mcm is required for domestic and drinking purposes and another 0.9 mcm (or 6%) is required for

livestock water requirement purpose. There is no water requirement for industries and power

generation.

Figure 4.3 Sectoral water Demand of Kinnaur

This sections presents the total water demand of the district and has been calculated by summing up

all major sectors consuming water. The current water demand has been indicated in Table 4.9 and the

projected water demand has been depicted in Table 4.10.

Table 4-9 Total Water Demand of the district for various sectors (2015)

Blocks Demand from components (MCM)

Domestic Crop Livestock Industrial Power Generation Total

Kalpa 0.852 3.20 0.37 0 0 4.4

Nichar 0.709 4.35 0.32 0 0 5.4

Pooh 0.595 3.04 0.25 0 0 3.9

Total 2.156 10.6 0.9 0.0 0 13.67

The present water demand of the district has been assessed at 13.66 MCM annually, with Nichar

block having maximum water requirement (5.4 MCM).

Table 4-10 Total Water Demand of the district for various sectors (Projected for 2020)

Projected Demand in 2020

Blocks Demand from components (MCM)

Domestic Crop Livestock Industrial Power Generation Total

Kalpa 0.85 3.20 0.38 0 0 4.4

Nichar 0.71 4.35 0.32 0 0 5.4

Pooh 0.60 3.04 0.26 0 0 3.9

Domestic 16%

Crop78%

Livestock6%

Industries0%

Power Generatiom0%

Page 66: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 51

Total 2.157 10.6 1.0 0.0 0 13.71

During 2020, total water requirement of the district has been assessed at 13.71 MCM. Hence, there

is will be an increment in water demand by 0.05 MCM by various sectors in Kinnaur.

4.7 Water Budget

The water budget shows wide gaps between water availability and water demand in the district. While

the availability at present is 7.46 mcm, the present water demand is 13.67 MCM giving rise to an

unmet demand of close to 6.21 mcm (or 45.4%). If the existing water availability is continued the

water gap is likely to increase further in future and as a result the unmet demand for water is likely

to go up reaching 13.70 mcm.

Figure 4.4 Water Budget of Kinnaur

Kinnaur district has negligible ground water. Less than 5 percent of the domestic and livestock water

needs are being met by ground water. Surface water is the predominant source which caters to all the

sectoral needs of water viz. domestic, livestock, crop, industry and power generation. The water

budget for the district is mentioned in Table 4.11 below:

Table 4-11 Water Budget

Name of

Blocks

Existing water Total Water Demand (MCM) Water Gap (MCM)

availability/ Usage

(MCM)

(MCM)

Surface Ground Present Projected

(2020)

Present Projected

(2020) Water Water

Kalpa 1.7774 0.0610 1.8383 4.4207 4.4368 2.5824 2.5984

Nichar 4.3450 0.0513 4.3963 5.3719 5.3829 0.9756 0.9866

Pooh 1.1249 0.0421 1.1670 3.8781 3.8904 2.7111 2.7233

Total 7.2473 0.1543 7.4016 13.6707 13.7100 6.2691 6.3084

7.4

13.67

6.26 6.3

0

2

4

6

8

10

12

14

16

Existing WaterAvailablity

Present WaterDemand

Present Water Gap Projected water Gap

Page 67: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 52

The total water gap for the district has been estimated at 6.31 MCM during 2020. The gap is maximum

in case of Pooh with 2.72 MCM, followed by Kalpa and Nichar having a water gap of 2.59 MCM

and 0.986 MCM respectively.

Page 68: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 53

Chapter 5 Strategic Action Plan

65 million hectares out of the 141 million hectares net sown area in the country i.e. 45% is presently

covered under irrigation. In the case of Himachal Pradesh about 20% of the net sown area of 5,38,000

hectares i.e. 1,06,000 hectares is provided with assured irrigation. Substantial dependence on rainfall

makes cultivation in the unirrigated areas a high risk and less productive proposition. Empirical

evidences suggest that assured or protective irrigation encourages farmers to invest more in farming

technology and inputs leading to productivity enhancement and increased farm income. The

overarching vision of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) is to ensure access to

some means of protective irrigation to the cultivated land in the country, to produce ‘per drop more

crop’, thus ushering in much desired rural prosperity.

The total geographical area of Kinnaur district is 6,24,308 hectares, but because of slopy and

mountainous terrain , the cultivated or gross cropped area under agriculture is 9,017 hectares and the

area under horticulture crops is 12,408 hectares. The net irrigated area in the district is only 13,751

hectares. It is pertinent to mention that agriculture/ horticulture is an integral anchor of the economic

backbone of Kinnaur district providing direct employment to large section of the population. Majority

of land being rainfed exposes the farmers to uncertainties of monsoon. There is moderate scope of

increase in arable area in the district by bringing the current fallow land (1,513 hectares), other fallow

land ( 83 hectares) and current waste land (3,254 hectares) under cultivation through investments in

reclamation, fencing / bunding and large scale provision of irrigation facilities.

5.0.1 Strategic Plan for irrigation in PMKSY

The strategic action plan presents the estimated area planned to be brought under irrigation and the

financial outlays required for completion of the proposed projects for the period 2016-17 to 2019-20.

5.1. Component wise and Year wise total Plan of the district:

Total plan for four years works out to Rs. 9935.90 lakh (Figure 5.1). Maximum share of Rs.7381.80

lakh (74.29%) is for Irrigation and Public Health Department, followed by Rural Development

Department with Rs.2225.64 lakh (22.40%) and Agriculture Department with Rs. 324.22 lakh

(3.26%). Horticulture Department’s plan for four years is Rs. 4.2 lakh (0.49 %). While working out

the plan, phasing of ongoing irrigation projects has been considered. However, from the proposal of

Page 69: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 54

departments, eligible activities under RIDF will be covered as per the funds requirement of the State.

Projects sanctioned under RIDF XXI for micro irrigation have not been shown separately as it will

be implemented by the Agriculture Department and covered under the plan of the Department.

Capacity building, extension and training is an important component of successful execution of the

plan, therefore, Rs. 103.29 lakh has been proposed in the plan from 2016-17 to 2019-20. Few of the

schemes of IPH department are MLA priority schemes, i.e. these are the schemes suggested by

Hon'ble MLAs in the annual action plan, these schemes amount to Rs. 1881 lakh and have been

described later in the chapter.

Figure 5.1 Share of departments in PMKSY Budget

The strategic action plan envisages to provide assured irrigation in an additional command area of

5,231.5 hectares. Under the component hark het ko pani a command area of 4196.5 ha (80 percent

share) is planned to be covered by irrigation infrastructure, AIBP contributes command area

development to the tune of 800 hectares in the plan (15 %). The watershed component and per drop

more component envisages to develop irrigation potential in a command area of 140 ha (3 %) and

95 ha (2 %) respectively.

IPH, 74.29%

Agriculture, 3.26%

Horticulture, 0.04%

Rural development, 22.40%

Page 70: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 55

Figure 5.2 Component wise Coverage of Command area in Action plan

Department wise planned coverage of area: Department wise, irrigation and public health

department will cover 3,671 ha or 71 percent of planned coverage of area followed by Agriculture

department having a coverage area of 1,410 ha or 26.96 %. The intervention of watershed department

will provide irrigation infrastructure in a command area of 140 ha (2.6 %) and horticulture department

will ensure precision water application in an area of 10 ha by installation of 20 drip/ sprinkler

structures. Agriculture Technology Management Agency (ATMA) focused on awareness generation

and capacity building of the beneficiary farmers on water distribution, efficient use of water and water

saving technologies etc.

Figure 5.3 Department wise Planned Coverage of Area

The block wise distribution of budget from 2016-2020 is highest for Pooh block (Rs 6694.39 Lakh),

followed by Kalpa and Nichar having a projected budget of Rs 2028.65 and Rs.1212.85 Lakh

respectively. The Block wise distribution of PMKSY funds for 2016-2020 is as depicted in Figure

5.4 :

AIBP15%

Har Khet Ko pani80%

Per Drop More Crop2%

Watershed3%

3671

140

1410

4.50

500

1000

1500

2000

2500

3000

3500

4000

IPH RDD Agriculture Horticulture

Are

a in

Hec

tare

s

Departments

Page 71: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 56

Figure 5.4 Block wise Distribution of PMKSY Fund 2016-2020 (In Rs Lakh)

The details of schemes from various departments in each block is mentioned in the table below:

Table 5-1 Department wise Action Plan for 3 Blocks of Kinnaur (Rs in Lakh)

Department Wise Kalpa Pooh Nichar Total

IPH Department 1185.8 5826 370 7381.8

Agriculture Department 106.9926 110.2348 106.9926 324.22

Horticulture Department 1.3992 1.4416 1.3992 4.24

Rural Development Department 734.4612 756.7176 734.4612 2225.64

Total 2028.653 6694.394 1212.853 9935.9

Table 5-2 Department wise – Year wise, Action Plan of Kinnaur (Rs in Lakh)

Department Wise 2016-

2017

2017-

2018

2018-

2019

2019-

2020 Total Cost (Rs. In Lakh)

IPH Department 1476.36 2214.54 2583.63 1107.27 7381.8

Agriculture Department 65.85 96.83 112.395 49.145 324.22

Horticulture Department 0.847806 1.272 1.484 0.635855 4.24

Rural Development Department

445.128 667.692 778.974 333.846 2225.64

Total 1988.186 2980.334 3476.483 1490.897 9935.9

The overall phasing has been done in such a way that Rs 1988.186 lakh will be spent under the four

components of PMKSY during the first year, Rs 2980.334 lakh during second year and Rs 3476.48

lakh and Rs 1490.897 lakh during third and fourth years respectively.

Table 5-3 Component wise, Year Wise Phasing of Action Plan

Component 2016-2017

2017-2018

2018-2019

2019-2020

Total Cost in Rs lakh

AIBP 600 900 1050 450 3000

Har Khet Ko Pani 925.76 1388.64 1620.08 694.32 4628.8

Per Drop More Crop 17.298 24.002 27.429 12.731 81.46

i) Micro-irrigation 7.808 11.712 13.664 5.856 39.04

ii) Supplementary Water Management activities

6.82 10.23 11.935 5.115 34.1

iii) Ext. And Trg. Under ATMA 2.67 2.06 1.83 1.76 8.32

Watershed 445.128 667.692 778.974 333.846 2225.64

Convergence with MGNREGA

Total 1988.18 2980.33 3476.48 1490.89 9935.9

2028.653 1212.85

6694.394

0

5000

10000

Kalpa Nichar Pooh

Page 72: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 57

The funds under PMKSY are to be provided by three different ministries, viz Ministry of Water

Resources, Ministry of Agriculture and Farmer Welfare/ Department of Agriculture and Cooperation

and Department of Land Resources. The Ministry wise funds sought are as mentioned below:

Table 5-4 Ministry Wise Funds Sought under PMKSY, Kinnaur

Name of

Ministry

2016-2017 2017-2018 2018-2019 2019-2020 Total Cost in

Rs lakh

MoWR 1476.36 2214.54 2583.63 1107.27 7381.8 MOA & FW

DAC &FW

65.692 98.538 114.961 49.269 328.46

DoLR -MoRD 445.128 667.692 778.974 333.846 2225.64

Total 1987.18 2980.77 3477.57 1490.39 9935.9

5.2 Strategic Action Plan for Blocks under AIBP

Under the Accelerated Irrigation Benefits Programme (AIBP) Component a medium irrigation

project “Ropa to Siaso” has been proposed in Pooh Block. As per the direction of hon'ble Deputy

Speaker H.P Vidhan Sabha and MLA Kinnaur the MIP Ropa-Siaso Scheme has been included in the

schemes of Pooh Block. This scheme will be executed in 8 years and provision of Rs. 3000 lakhs out

of the total cost of Rs. 6000 lakh has been made for 2016-20.This scheme is an indispensable source

of irrigation for the villagers of Gram Panchyats Ropa, Giabong & Sunnam. The area proposed for

irrigation is calculated to be GCA 3660 Ha & CCA=2600 ha And the source is Rakhmobolong Nallah

& Chokchain Nallah. The area to be irrigated is rich belt of Apple and other cash crop. Out of the

proposed CCA of 2600 Ha, 800 Ha is proposed to be provided irrigation facilities during 2016-20.

Table 5-5 Ministry Wise Funds Sought under PMKSY, Kinnaur

Sr.

No.

Name of the Scheme Command

Area/Irrigatio

n Potential

(Hact.)

Period of

Implementation.

Estimated cost

(Rs in Lakh).

1 Medium Irrigation Project Ropa to

Siaso

800 4 Years 3000

Total Rs 3000 Lakh

The details of the scheme are presented in Annexure 7.

5.3.0 Strategic Action Plan for Blocks under Har Khet Ko Pani

Under the component hark het ko pani a total command area of 4196.50 is to be brought under assured

irrigation by 19 surface minor irrigation schemes, 7 lift irrigation structures and lined field channels

Page 73: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 58

of 30,450 metres. The total estimated cost required for these works is Rs 4628.8 lakh. These irrigation

interventions will be implemented by IPH and agriculture Department from 2016-2020 as mentioned

below:

The arable land in Kinnaur district is located in small patches, as such there is not much scope

of constructing major and medium irrigation projects. However considering the topographical

constraints and availability of sources, 21 minor irrigation schemes, (both flow and lift will be taken

up under PMKSY (Har Khet ko Pani) by IPH department. These schemes will provide assured

irrigation in a command area of 2071 hectares with an estimated cost of Rs 4382 lakh The block wise

details of the proposed schemes are as under :-

a. Kalpa

A total of eight flow irrigation schemes with an estimated cost of Rs 1186 lakh has been envisaged

for Kalpa block. The period of implementation of these schemes ranges from two to four years

and an additional command area of 795 hectares will be brought under assured irrigation by the

envisaged schemes. The details of the schemes are mentioned in Table 5.6 below:

Table 5-6 Action plan Har Khet Ko Pani - Kalpa (IPH Schemes)

Sr.

No.

Name of the Scheme Command

Area /

Irrigation

Potential (Ha)

Period of

Implementation.

Estimated cost

(Rs in Lakh).

1 FIS Kharogla to Kuppa 262 4 years 751

2 Renovation of FIS Chansu (Zario) 40 2 Years 20

3 FIS Dimti to Shananged in GP

Sapni

40 4 Years 140.8

4 Renovation of FIS Nalzo to

Panchayat Bhawan in GP Pangi

74 2 Years 50

5 Renovation of FIS nichla Baturi 50 2 Years 45

6 Remd. of FIS Rang kulang in

Tehsil kalpa

126 2 years 50

7 Remd of FIS Powari 40 2 Years 40

8 Renovation. of FIS Khwangi

Tellingi

163 4 Years 90

Total 795 1186.8

Year wise action plan has been presented in Annexure 7

Page 74: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 59

b. Pooh

A total of eight schemes (two lift irrigation and six flow irrigation schemes) with an estimated cost

of Rs 2826 lakh has been envisaged for Pooh block. The period of implementation of these schemes

ranges from two to four years and an additional command area of 1025 hectares will be brought under

assured irrigation by the envisaged schemes. The details of the schemes are mentioned in Table 5.7

Table 5-7 Action Plan Pooh- Har Khet Ko Pani -(IPH Schemes)

Sr.

No.

Name of the Scheme Command

Area/Irrigatio

n Potential

(Hact.)

Period of

Implementation.

Estimated cost

(Rs in Lakhs).

1 Renovation of FIS Yatan Gkharga

in GP Spillow

115 4 Years 276

2 Remd. of FIS Lungsu to Babja in

GP Charang

74 4 Years 180

3 LIS Thitang Khad to Pooh 300 4 Years 950

4 LIS Spilow to Karla 300 4 Years 980

5 Remodelling of FIS Rolling in GP

Rispa

28 4 Years 150

6 Remd. Of FIS Sarver in GP Labrang 23 3 Years 70

7 Remd. of FIS Panasaring in GP

Lippa

162 4 Years 150

8 Remd.FIS Hopsang to Garden

Colony

23 3 Years 70

Total 1025 2826

Year wise action plan has been presented in Annexure 7

c. Nichar

A total of five flow irrigation schemes with an estimated cost of Rs 370 lakh has been envisaged

for Nichar block. The period of implementation of these schemes ranges from two to four years

and an additional command area of 251 hectares will be brought under assured irrigation by the

envisaged schemes. The details of the schemes are mentioned in Table 5.8

Table 5-8 Action plan Nichar - Har Khet Ko Pani - (IPH Schemes)

Sr.

No.

Name of the

Scheme

Command

Area/ Irrigation

Potential (Hect)

Period of

Implementation

.

Estimated cost

(Rs in Lakhs).

Page 75: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 60

1 FIS Roura Miru

42 4 Years 150

2 Renovation of FIS Kilba 53 2 Years 40

3 Renovation of FIS Kuching Punang 57 3 Years 60

4 Remd. Of FIS Nanspo Tranda in GP

Tranda

55 2 Years 50

5 Renovation. of FIS Jani 44 3 Years 70

Total 251 370

Grand Total 2071 Ha 4382.8

Year wise action plan has been presented in Annexure 7

Under har het ko pani, Agriculture department has proposed construction of field channels across a

length of 30,450 metres which will provide irrigation to a command area of 1323 hectares with a cost

of Rs 244 lakh. The department has also proposed 5 lift irrigation schemes in 2017-2018 with an

estimated cost of Rs. 3 lakh for providing irrigation to an additional command area of 2.5 hectares

Table 5-9 Action Plan- Kinnaur- Har Khet Ko Pani - Kalpa (Agriculture Schemes)

Sr.

No.

Name of the

Scheme

Command Area/

Irrigation

Potential (Ha)

Period of

Implementation.

Estimated cost

(Rs in Lakhs).

1 5 Lift Irrigation Schemes to be

executed by AD in Kalpa, Pooh and

Nichar Blocks.

2.5 4 Years 3

2 Lined Field Channels 1323 4 244.00

Year wise implementation details of the above schemes are provided in Annexure 6.

5.3.1 Action plan based on Member of Parliament Local Area Development Schemes (MPLAD)

The PMKSY guidelines clearly specify that while preparing District Irrigation Plans (DIP),

suggestions of Hon’ble Members of Parliament and Members of Legislative Assembly are to be

invited and included after due technical consideration. The Planning Department of Govt. of

Himachal Pradesh has an ongoing programme wherein the Hon’ble MLA’s indicate their priorities

for two irrigation schemes every year for inclusion in the Annual Plan. Out of the proposals indicated

in the tables 5.6.a to5.8, the details of MLA’s priority schemes along with the priority year are given

in table 5.10

Page 76: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 61

Table 5-10 Block wise Action Plan based on MPLAD Schemes

Sr.

No.

Name of Block Name of the Scheme Constituency Year of

Priority

Estimated

cost (Rs in

Lakhs).

1 Kalpa FIS Kharogla to Kuppa Kinnaur 2014-15 751

2 Pooh LIS Spilow to Karla Kinnaur 2014-15 980

3 Nichar FIS Roura Miru

Kinnaur 2015-16 150

Details in Annexure 7

5.4 Strategic Action Plan for Blocks under Per Drop More Crop

The PMKSY emphasizes optimum utilization of available water resources to produce ‘Per Drop More

Crop’, leading to productivity enhancement and increased farm incomes ushering in rural prosperity.

Under, the component per drop more crop efficient water conveyance and precision water application

has been ensured by envisaging installation of 200 sprinkler irrigation structures and 10 drip

irrigation structures. Secondary storage structures (60 nos. each 20,000 ltr capacity)) at tail end of

canal system has been proposed to store water when available in abundance (rainy season) or from

perennial sources like streams for use during dry periods through effective on-farm water

management; on farm development by laying 50, 000 mtr High-density polyethylene (HDPE) pipes

has been proposed. The creation of secondary storage structures will result in creation of water

potential to the tune of 1200 cubic metres.

Extension activities has been planned by ATMA for capacity building and training of farmers and

officers so as to ensure promotion of scientific moisture conservation , agronomic measures including

cropping alignment, maximisation of available water use including rainfall and minimisation of

irrigation requirement

The details of activities proposed in Kalpa, Pooh and Nichar Blocks under PMKSY (Per Drop More

Crop) are given in table 5.11.

Page 77: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 62

Table 5-11 Action Plan- Per drop more crop

Sr

.

N

o.

Component Activity Total

Number/

Capacity

(Cum)

Pondage

Capacity

Comman

d Area /

Irrigatio

n

potential

(Ha)

Period of

Implement

ation

Estimated cost (

Rs. In Lakhs )

(Cum)

1 Per Drop

More Crop

(Micro

Irrigation)

Non-

DPAP Drip

10 Nos. 5 4 Years 5

2 Non- DPAP

Sprinkler

200 Nos. 80 -do- 30

3 Per Drop

More Crop

(Supplementa

ry water

management

activities)

Secondary

Storage

Structures

60 Nos.

(20000

Ltrs.

Capacity

each)

1200

-do- 21.60

4 On Farm

Developme

nt

(Distributio

n

pipe/raised

bed and

furrow

system etc.)

50000

mtrs.

(HDPE

Pipe)

-do- 12.50

6 Extension

ATMA

Training -do- 8.32

Total 1200 85 Ha 77.42 Lakhs

Details in Annexure 7 and 8

Page 78: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 63

Further since Kinnaur district has a lot of potential for increasing productivity of fruits by bringing

cultivated area under irrigation. The strategic plan under Per Drop More Crop for horticulture and

plantation works for Kalpa, Pooh and Nichar blocks is as follows:

Table 5-12 Action Plan- Per Drop More crop (Horticulture)

Sr.

No

.

Component Activity Total Number/

Capacity

(Cum)

Command

Area /

Irrigation

potential

(Ha)

Period of

Implementati

on

Estimated cost ( Rs.

In Lakhs )

1 Per Drop More

Crop (Micro

Irrigation)

DPAP

Drip

20 10 4 Years 4.24

Year wise implementation details of the above schemes are provided in Annexure 7 and 8.

5.5 Strategic action Plan for Blocks under Watershed Development Component

The PMKSY (Watershed Development) emphasizes effective management of runoff water and

improved soil and moisture conservation activities like construction of water harvesting structures

such as check dams, nalla bunds, farm ponds, tanks etc. The capacity building of the stakeholders,

entry point activities, soil and moisture conservation, livelihood activities for the landless persons

and production systems and micro enterprises for small and marginal farmers as well as convergence

with MGNREGS for creation of new irrigation sources, water harvesting structures on individual

lands of vulnerable sections, upgradation/ desilting of traditional water bodies, water conservation

works etc. are to be given top priority.

Among the four components, PMKSY (Watershed) covers a planned area of 140 hectares through

various watersheds covered under Integrated Watershed Management Project (IWMP). Given the

hilly terrain and with steep slopes, soil and water conservation was given importance through creation

of new water harvesting structures including 4 farm ponds, 117 tanks and 155 Kuhls. In order to

enhance the capacity of existing infrastructure renovation has been given equal importance. The plan

includes renovation of 3 farm ponds and 1 Kuhl. The soil and water conservation in the district is to

be ensured by creation of 99 Bench Terracing & Crate Wire structures. The details are given in table

5.13.

Table 5-13 Action Plan under Watershed Component

Page 79: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 64

Total Proposed Structures-Watershed

Sr.

No.

Activity Total

Nos.

Capacity

(Cum)

Command

Area/

Irrigation

Potential

(Ha)

Period of

Implementation

(in Years)

Estimated

Cost (Rs.

in Lakhs)

Newly Created Water Harvesting Structures

1 Farm Ponds 4 115 2 4 6.70

2 Percolation Tanks

(Irrigation Tanks)

117 320 30 4 320.51

3 Other Ground Water

Recharge Structure

( Kuhal and Pipeline)

155 70886

(Rmt.)

105 4 271.23

Water Harvesting Structures to be Renovated

4 Percolation Tanks 3 45 2 3 1.73

5 Other Ground Water

Recharge Structure

1 2 1 3 0.28

6 Land Development 8 92 3 42.79

Soil and Moisture Conservation

7 Bench Terracing and

crate wire

91 23663

(Rmt.)

4 487.21

Entry Point Activities

8 DPR 4 1 3.00

9 Institutional &Capacity

Building (I&CB)

77 3465

Participants

2 97.63

10 Livelihood 385 5393 (SHG

formations

etc.)

4 274.79

11 Production and Micro

Enterprises

170 5279 4 265.13

12 Monitoring 4 32.25

13 Evaluation 4 32.40

14 Consolidation 4 161.25

15 Administration 4 225.14

Total 140 Ha 2225.04

Page 80: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 65

5.6 Suggestions

For successful implementation of PMKSY plan it is suggested that:

All the stakeholders should convene meeting of concerned Gram Panchayat and then finalise

the village plan and prepare DPR.

All the structures planned should be geo tagged and marked on map, so that social auditing of

the projects can be conducted. This will also avoid duplicity and wastage of resources.

The Departments should supplement each other so that the maximum irrigation efficiency is

achieved.

Agriculture and Horticulture Department should take micro irrigation projects in the command

of minor irrigation projects which are either completed or likely to be completed in near future.

Where ever feasible, solar pumpsets should be installed.

Priority should be given to projects to minimize the gap in potential created and potential

utilized.

Execution of the schemes should be properly planned to avoid time and cost overrun.

There should be smooth fund flow for timely completion of the project and to avoid cost

escalation.

Period of implementation:

It is proposed that the planned activities and outlay will be spent in a period of 4/5 years. Some of the

activities relating to extension, small irrigation works etc., are recurring and hence will have a period

of implementation less than a year. Through these activities PMKSY program is expected to increase

the water availability meeting the water demand from multiple sources. A total of Rs.99.36 crore will

be spent during the next 4 years covering 5231.25 hectares of land.

Monitoring and Evaluation

The Strategic Action Plan of PMKSY will be monitored by the respective departments through the

regular reporting system and component wise progress will be monitored by the District Level

Irrigation Committee. Further, the activities, outputs and outcomes will be reported in web based MIS

of PMKSY for review at state and national level. Some of the key indicators that will be used to

monitor and evaluate the progress of PMKSY include:

Page 81: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 66

1. Annual irrigation water supply per unit irrigated area measured as the ratio of total volume of

irrigation water supplied at intake divided by total area irrigated in all seasons

2. Potential created and utilized measured as the ratio of total potential utilized (measured crop area)

to irrigation potential created

3. Output (agricultural production) per unit irrigated area measured as the ratio of total value of

agriculture production divided by the total irrigated area.

4. Output (agricultural production) per unit irrigation water supply measured as the ratio of total

value of agriculture production divided by the total volume of irrigated water supplied.

5. Total Operations & Maintenance (O&M) cost per unit irrigated area measured as the total

Management, Operation and Maintenance (MOM) costs for the system divided by total area

irrigated (potential utilized).

6. Total Operations & Maintenance (O&M) cost per unit volume of water supplied measured as total

Management, Operation and Maintenance (MOM) costs for the system divided Total volume of

water supplied (all uses)

7. Equity performance measured as actual area irrigated in head, middle and tail divided by

Command area in head, middle and tail.

5.7 Expected Outcome

As stated above in earlier Chapters gross sown area of the district is 21,425 ha (including area under

horticulture) of which 13,751 ha is irrigated. Thus there is a gap of 7646 ha which can be converted

from rainfed to area under assured irrigation. As the water requirement of crops for the existing

cropping pattern works out to be 10.58 MCM and if the gross cropped area is to be brought under

irrigation 6.27 MCM water is required. Though the water (surface and ground water) is available in

the district yet it will not be feasible to create irrigation potential to the extent of 100 % as the

construction of irrigation project may not be economically viable even if it is technically feasible. In

hilly area due to tough terrain, high head, small and fragmented land holdings, per ha.cost may be

very high.

Keeping in view the above constraints a plan to develop 291irrigation structures has been proposed,

this will create a water potential of 5503 cubic metres. Under Har Khet ko Pani and Per Drop More

Crop an area of 4,196.50 ha and 95 ha will be developed by installing new lift irrigation and flow

Page 82: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 67

irrigation schemes. Potential of 85 ha is proposed to be created under PMKSY ‘Per Drop More Crop-

Micro irrigation component’. Sprinkler and drip irrigation schemes have been proposed under this

programme. It is proposed to cover about 80 ha and 5 ha under sprinkler and drip irrigation schemes

respectively. On completion of these projects, it is expected that an additional irrigation potential of

approximately 45.05 ha will be created due to saving of water. Also, 60 secondary storage structures

have been planned in the district which will create a water potential of 1200 cubic metres in Kinnaur.

On completion of all the projects proposed under PMKSY a command area of 5,231 ha is likely to

be developed in the district. This is likely to generate an additional income of Rs. 1000 lakh to the

farmers of the district. This is based on the assumption of atleast 50% of potential utilised and Rs.

40000 per ha incremental income from rainfed to irrigated farming. This is also likely to create 9.1

lakh mandays11 of non-recurring employment and 2100 jobs12 annually on recurring basis. The

interventions under PMKSY will generate an irrigation potential to the tune of 5,231 ha in the district

as an outcome.

The average productivity of land in Rainfed area is 2136 kg/ha while the same is 4034 kg/ha. Hence,

with extended irrigation facility to 3138 hectare, the incremental yield would be 5955 MT

approximately.

The interventions under PMKSY may result into increased acreage under crops thereby contributing

to both agricultural and horticultural production. At the same time, it will create livelihood

opportunities for the local population and contribute in generating direct and indirect employment.

The strategic action plan of Kinnaur for 2016-2020 is presented below:

11 Non recurring employment is calculated by considering the labour component to be 20 % of the total financial outlay and dividing it by wage rate 12 Recurring employment is calculated by using the rationale that 1 job will be created in 2 hecatre of land irrigated additionally.

Page 83: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 68

Page 84: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 69

Strategic Action Plan-Kinnaur

S.No Concerned

Ministry/ Department Component Activity

Total

Number/Capacity

(Cum)

Command

Area/Irrigation

Pontential (Ha)

Period of

Implementation

(5/7 Yrs)

Estimated

cost (in

Rs.)

1 MoWR AIBP

Major Irrigation -- -- -- --

2 MoWR IPH Medium Irrigation Project Ropa to Siaso 800 4 Years 3000

Total AIBP 800 4 3000

3 MoWR IPH Har khet ko

pani Surface Minor Irrigation 19 2271 4 2451.8

MoWR Agriculture Lift Irrigation 5 2.5 2017-2018 3.00 4 MoWR IPH Lift Irrigation 2 600 4 1930

5 MoWR Ground Water Development -- -- -- --

6 MoWR RRR of Water Bodies -- -- -- --

7 MoWR Construction of Field

Channels

7.1 MoWR Agriculture Lined Field Channels 30450 mtr 1323 4 244.00 7.2 MoWR Unlined Channels -- -- -- --

Total Har Khet Ko pani 4196.50 4 4628.8

8 MoWR

Per drop more

crop (Micro

Irrigation)

Micro Irrigation -- -- -- --

9

MOA &

FW-DAC

& FW

Horticulture DPAP Drip 20 10 4 4.24

10 MOA &

FW DPAP Sprinkler

11 MOA &

FW Agriculture Non -DPAP Drip 10 Nos 5.00 4 years 5.00

12 MOA &

FW Agriculture Non-DPAP Sprinkler 200 Nos 80.00 4 Years 30.00

13 MOA &

FW Per drop more

crop

(Supplementary

water

Topping up of MGNREGA -- -- -- --

14 MOA &

FW

Drought Proofing through

Check Dams/Water Harvesting

Structures

-- -- -- --

Page 85: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 70

S.No Concerned

Ministry/ Department Component Activity

Total

Number/Capacity

(Cum)

Command

Area/Irrigation

Pontential (Ha)

Period of

Implementation

(5/7 Yrs)

Estimated

cost (in

Rs.)

15 MOA &

FW Agriculture

management

activities) Secondary Storage Structures

60 nos ( each 20000 ltr. Capacity) - 4 Years 21.60

16 MOA &

FW Agriculture

On Farm Development

(Distribution pipe/raised bed

and furrow system etc.)

50000 mtr (HDPE Pipe) - 4 Years 12.50

ATMA-

Agriculture

8.32

Total per Drop more Crop 95.00 4 81.66

17 DoLR-

MoRD Newly created WHS

17.1 DoLR-

MoRD Farm Ponds

4 Nos. (115 cum) 2 4 years 6.70

17.2 DoLR-

MoRD Check Dams --- -- -- --

17.3 DoLR-

MoRD Nallah Bunds -- -- -- --

17.4 DoLR-

MoRD

Percolation Tanks/Water

Storage Tanks

217 nos( 100 nos

each 20000 ltr )

.capacity and 117

nos 320 cum

capacity)

30 4years 324

17.5 DoLR-

MoRD

Other Ground Water Recharge

Structure

155 Nos(70886

Rmt) 105 4 years 271.23

17.6 DoLR-

MoRD Fishery ponds/cattle pond -- -- --

18 DoLR-

MoRD

water

Harvesting

structures to be

renovated

Renovated WHS

18.1 DoLR-

MoRD Farm Ponds -- -- -- --

18.2 DoLR-

MoRD Check Dams -- -- -- --

18.3 DoLR-

MoRD Nallah Bunds -- -- -- --

Page 86: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 71

S.No Concerned

Ministry/ Department Component Activity

Total

Number/Capacity

(Cum)

Command

Area/Irrigation

Pontential (Ha)

Period of

Implementation

(5/7 Yrs)

Estimated

cost (in

Rs.)

18.4 DoLR-

MoRD Percolation Tanks

3 (45 cum) 2 4 years 1.73

18.5 DoLR-

MoRD

Other Ground Water Recharge

Structure 1 (2 cum) 1 4 years 0.28

18.6 DoLR-

MoRD Fishery ponds/cattle pond -- -- -- --

18.7 (A)

Land

Development Activity- wise

8 - 4 42.79

18.7 Soil and Activity- wise

(B)

Moisture

Conservation

Bench Terracing & Creat Wire 91 (23663 Rmt) - 4 years 487.21

18.7 ( C)

Entry Point

Activities Activity- wise

18.7 (D) DPR - 4 - 2016-17 3.00

Participants

Name of

Institute

18.7 (E ) I & CB - 77 3465

UHF, Nauni,

C.S., KVK,

Palampur,

Central Sail &

Water moisture

conservatiion,

Chandigarh etc. 97.63

Beneficiaries

18.7 (F) Livelihood - 385 5393 4 274.79

18.7 (G)

Production &

Micro

Enterprises

Activity- wise

170 5279 4 265.13

18.7 (H) Monitoring - - 4 32.25

18.7 (I) Evaluation - - 4 32.40

Page 87: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | 72

S.No Concerned

Ministry/ Department Component Activity

Total

Number/Capacity

(Cum)

Command

Area/Irrigation

Pontential (Ha)

Period of

Implementation

(5/7 Yrs)

Estimated

cost (in

Rs.)

18.7 (J)

Consolidation Activity- wise 161.25

18.7 (K) Administration - - 4 225.14

Grand Total Watershed Component 140.00 2225.64

PMKSY Budget Kinnaur District 5231.50 9936.10

Page 88: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | i

Annexure 1: Demography Details

Name of

Block and

village

covered

Population

M F CH No. of SC

members

No .of ST

members

Total No of

household

Pooh Block 12489 10873 2119 3105 15338 5471

Sumra 130 116 22 9 211 65

Chango 742 689 133 18 1143 322

Malling Dogri 3 1 - 1 2 2

Malling 181 167 29 32 266 79

Nako 281 309 65 17 532 128

Yangthang 49 33 21 16 18 22

Leo 419 371 80 18 688 161

Hango 148 137 22 28 249 78

Dung 39 42 12 81 22

Hangmat 79 84 15 48 119 42

Chuling 136 136 29 - 262 60

Ka 13 13 - 20 4 17

Up Mohal

Thoropa

29 4 - 2 29 31

Ropa 148 202 32 145 204 101

Samtat 52 51 8 42 56 27

Giabong 288 277 22 247 233 144

taling 25 32 5 4 50 15

Rush Kulang 139 179 31 160 152 74

Sunam 247 349 67 193 378 144

Dhupak 11 6 4 14 2 5

Chelit 24 - - 5

Labrang khas 261 325 52 206 331 139

Namkalang 9 6 1 4 3 7

Spillow 435 322 68 95 324 203

Kanam 252 275 50 353 473 200

Gyamil 23 2 1 6

Shyaso 56 54 8 3 99 30

Danmochhe 158 99 28 30 108 101

Up Mohal

labrang

120 123 23 50 127 73

poo 1491 556 138 251 555 324

Khabo 68 29 4 - 58 17

Namgia khas 173 157 39 1 296 90

Tashi gang 45 43 10 1 83 23

Dubling 277 159 31 94 170 105

dabling 19 15 3 - 34 13

Horang Pawa 19 17 7 - - 13

Page 89: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | ii

Name of

Block and

village

covered

Population

M F CH No. of SC

members

No .of ST

members

Total No of

household

Nesang Khas 195 176 33 29 273 99

takto 89 86 22 - 175 22

Lippa khas 594 567 103 200 845 280

lapo 11 13 2 - - 5

Asrang khas 170 168 48 70 262 84

sheelapur 53 50 6 - 103 21

swaden 67 75 9 - 142 28

rejing 22 - - 4 1 1

Thuwaring 159 180 22 - 339 70

Gramang 254 235 42 - 471 119

Jangi Khas 703 472 128 62 560 209

Khadura 151 139 17 - 229 54

Rarang Khas 402 446 65 126 720 165

Paranga 44 23 7 10 25 20

Bato 8 3 - 10 6

kutian 101 113 8 - 194 60

Ribba Khas 445 449 70 39 816 235

Holdang 306 250 52 15 415 133

Skiba 122 131 25 42 152 74

Akpa Khas 247 223 61 69 167 125

Up Muhal

Holdo

3 3 - - 1 2

Rispa Khas 263 229 44 101 345 103

Lijing 13 6 4 4 7 6

Khokpa 177 196 42 83 269 78

Shiling Khas 270 219 46 133 205 140

Roowang 75 66 24 7 46 35

Swaling 20 21 4 3 25 10

Lambar 100 35 10 3 40 26

Thangi Khas 356 280 64 10 554 132

Kurpo 10 6 - 7 9 5

Surting Ting 7 - - - - 1

Kunu Khas 47 47 9 - 76 29

Charang

Khas

86 86 13 1 164 57

Kalpa Block 18312 14920 3183 4647 19475 7824

Ragura 269 245 47 1 446 112

Khwanta 380 381 59 189 559 182

Mebar 3 2 - - 2

Japredin 4 3 2 - - 1

Change 1 - - - 1 1

Boktu 4 2 2 - 2 2

Pangi 422 453 78 130 702 201

Purbani Khas 255 196 25 23 330 102

Rawa 45 16 - 2 29 13

Page 90: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | iii

Name of

Block and

village

covered

Population

M F CH No. of SC

members

No .of ST

members

Total No of

household

Mehduda

Dalang

Talampi

116 106 36 35 124 58

Pawari 241 207 59 85 219 98

Telangi 119 123 27 1 229 44

Tarkhwa 178 208 32 32 343 72

Maki Mrang 88 102 15 1 19 47

Khwangi 1258 925 234 294 717 529

Kothi 908 730 182 21 1010 468

Duni 280 240 51 5 377 132

Kashmir 164 193 34 115 242 90

Gonang 6 12 3 10 8 5

Goli 5 8 5 13 - 3

Dumdumka 2 3 2 5 - 1

Radule 78 113 21 11 169 40

Kastyo 3 6 2 - 9 2

Dakhaye 42 43 10 16 69 21

Talancho 81 78 113 47 109 34

Rogi 189 161 50 147 115 78

Shuda Rang 456 387 95 94 563 222

Saryo 209 206 38 - 409 91

Kalpa 633 603 111 110 882 12

Brelangi 378 341 78 192 362 310

Reckong Peo 1529 868 201 195 674 531

Yuwarangi 1263 674 589 29 627 459

Raang 204 184 28 34 220 127

Yusaring 327 341 66 314 317 146

Rali 122 112 32 63 94 56

Mebar Khas 130 148 26 44 213 51

Barang Khas 255 279 51 14 516 105

Tangling 248 247 43 25 409 129

Thikru 58 63 9 88 33 23

Kilba Khas 1032 441 105 387 407 233

Kanahi Khas 416 186 45 11 196 199

Patyo 5 - - 1

Sapni Khas 530 528 104 - 965 232

Shenan Den 74 93 19 6 148 42

Baturi 100 105 13 - 198 48

Barua Khas 470 497 122 260 688 212

Dhar Wadang 141 3 - 22 8 10

Shobre

Yanang

507 19 6 50 19 35

Nagassaring 3 1 - - 4 1

Shaung 349 334 76 36 587 171

Limoden 11 11 2 - 4 11

Chasu Khas 282 258 53 24 441 121

Jareyo 392 65 19 3 60 52

Page 91: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | iv

Name of

Block and

village

covered

Population

M F CH No. of SC

members

No .of ST

members

Total No of

household

Chindo 3 4 1 - - 2

Sangla 1250 1160 229 544 1393 570

Kupa 237 284 54 196 277 127

Kamru 485 451 104 143 711 234

Lakhshonden 19 15 4 - 34 6

Goroden 67 88 18 16 138 39

Thapa saring 234 242 56 174 190 112

Panpo Kanda 7 5 2 5 2 3

Boning Saring 296 332 62 101 523 153

Batseri 231 240 48 126 330 108

Seringche 33 42 12 20 48 19

Kharogla 76 49 8 19 83 28

Rakchham 313 284 51 10 490 139

Mastrang 52 - - 4 - 2

Chitkul 317 265 52 103 358 127

Nichar 15463 12220 2951 6998 13933 6681

Majhgaon 301 283 59 139 391 142

Nainsaring 3 3 1 5 - 2

Shagarcha 107 100 26 90 96 52

Dabling 38 39 8 - - 21

Pashpa 13 16 3 8 15 10

Burang 118 32 3 50 - 33

Hurba 54 67 22 16 92 24

Shorang 86 25 9 2 34 36

Gharshu 66 89 19 4 144 43

Doyam 5 3 1 - 8 2

Basharang 3 5 - - 8 3

Chhota

kamba

195 206 57 122 236 107

Bara Kamba 278 286 97 233 257 135

Salrang 16 12 4 - 27 8

Rock

Charang

25 31 5 - 52 16

Kachrang 86 74 19 78 79 46

Kandar 98 88 22 17 142 56

Nathpa 181 175 44 156 193 87

Homte 78 82 20 3 143 36

Kafnu 413 411 98 476 271 205

Yangpa 643 631 177 573 637 280

Huri 94 91 20 - 180 41

Masrang 12 6 3 - 17 5

Chhirem 2 2 - 4 - 1

Katgaon 371 333 77 167 410 224

Karaba 143 117 36 6 239 56

Surcho 41 32 11 - 73 20

Shango 201 195 46 193 196 104

Page 92: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | v

Name of

Block and

village

covered

Population

M F CH No. of SC

members

No .of ST

members

Total No of

household

Baiyee 65 71 20 - 116 30

Rarang 777 16 5 4 21 37

Kangarang 21 19 6 11 29 9

Puje 300 308 45 - 601 147

Agade 29 25 9 - 4 20

Linge 41 30 5 - 64 19

Grade 198 216 37 22 365 125

Kashpo 277 246 35 6 444 99

Nigani 226 246 44 1 446 98

Paring Khor 6 4 3 - 9 2

Kangosh 320 275 71 306 249 152

Sungra 1436 1233 283 932 699 785

Punaspa 30 20 2 26 6 19

Saki Charang 149 144 24 160 113 79

Baro 72 77 10 5 137 35

Solding 74 81 21 133 21 33

Palingi 274 189 44 54 191 176

Ponda 77 95 19 - 160 47

Ralpa 42 76 16 - 101 32

Change 314 270 65 - 487 154

Gramang 191 202 50 50 313 98

Nigul Sari 457 327 88 195 238 213

Thachh 54 47 11 54 38 30

Chaura 218 137 36 19 166 86

Kafaur 124 89 15 109 93 47

Shilani 111 91 28 50 107 41

Tikrang 8 3 1 5 4 4

Chhonda 54 40 12 3 70 30

Nanaspo 132 129 27 166 91 65

Karape 44 29 15 - 19 23

tranda 112 137 29 - 246 66

Burcha 95 56 9 - 68 53

Joktaring 110 107 30 1 202 52

Panvi 1013 329 86 57 584 226

Yasang Dhar 81 11 7 - 10 7

Shakamrang 62 56 17 69 49 24

Raag Panung 109 82 22 46 112 45

Urabaning 83 4 2 - 9 16

Tapri 568 517 183 82 591 284

Dharmaling 471 453 99 473 446 208

Yasang 147 149 43 64 232 58

Rali Santhang 33 24 6 17 39 13

Urni 227 273 48 236 264 108

Yulla 213 216 42 146 249 105

Kutano 251 256 60 238 221 118

Meeru 216 255 47 122 312 105

Ghumaruning 29 49 7 26 44 14

Page 93: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | vi

Name of

Block and

village

covered

Population

M F CH No. of SC

members

No .of ST

members

Total No of

household

Runang 142 89 24 108 40 63

Choling 330 184 46 101 150 118

Kagstal 14 3 - 2 13 3

Jani 209 205 38 205 206 112

Ramni Khas 225 202 48 240 174 92

Shuthanag 10 6 2 16 - 3

Punang Khas 912 370 118 97 246 251

Page 94: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | vii

Annexure 2 : Area wise Crop wise Irrigation Status

Kharif Rabi Total Horticulture and Plantations

Blocks Crops IRR RF TO IRR RF TO IRR RF TO IRR RF TO

Kalpa i.Cereals 499 163 662 12 6 18 511 169 680 3599 899 4498

ii. Coarse Cereals 352 123 475 8 20 28 360 143 503

iii. Pulses 391 141 532 8 15 23 399 156 555

iv. Oil seeds 1 4 4 4

v. Vegetables 935 84 1019 9 26 35 944 110 1054

vi. Other 51 58 109 5 7 12 56 65 121

Total 2229 569 2801 42 74 116 2274 643 2917

Pooh i.Cereals 469 469 6 4 10 475 4 479 3935 437 4372.51

ii. Coarse Cereals 291 28 319 1 8 9 292 36 328

iii. Pulses 361 42 403 1 1 2 362 43 405

iv. Oil seeds 1 1 1 0 1

v. Vegetables 1067 138 1205 7 2 9 1074 140 1214

vi. Other 49 49 3 7 10 52 7 59

Total 2238 208 2446 18 22 40 2256 230 2486

Nichar i.Cereals 153 582 735 154 262 416 307 844 1151 844.47 2693.44 3537.91

ii. Coarse Cereals 117 241 358 62 251 313 179 492 671

iii. Pulses 75 306 381 55 92 147 130 398 528

iv. Oil seeds 2 2 2 0 2

v. Vegetables 113 623 736 64 201 265 177 824 1001

vi. Other 30 116 146 21 98 119 51 214 265

Total 490 1868 2358 356 904 1260 846 2772 3618

District

Total

i.Cereals 1121 745 1866 172 272 444 1273 1017 2310 8378.47 4029.44 12408.42

ii. Coarse Cereals 760 392 1152 71 279 350 831 671 1502

iii. Pulses 827 489 1316 64 108 172 891 597 1488

iv. Oil seeds 4 4 4 4

v. Vegetables 2115 845 2960 79 229 308 2194 1074 3268

Page 95: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | viii

Kharif Rabi Total Horticulture and Plantations

Blocks Crops IRR RF TO IRR RF TO IRR RF TO IRR RF TO

vi. Other 130 174 304 29 112 141 159 286 445

Total 4957 2645 7602 415 1000 1415 5352 3645 9017 13730.47 7674.44 12408

Page 96: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | ix

Annexure 3: Production and Productivity of Crops

Seaso

n

Rainfed

Irrigated Total

Khar

if

Cer

elas

Coar

se

cere

als

Puls

es

oil

seed

Fib

re

crops

Any o

ther

crops

Pro

duct

io

n q

tl/y

ear

Yie

ld

Cost

of

cult

iva

tion

Pro

duct

io

n q

tl/y

ear

Yie

ld

Cost

of

cult

iva

tion

Pro

duct

io

n q

tl/y

ear

Yie

ld

Cost

of

cult

iva

tion

Kg /ha Rs/ha Kg /ha Rs/ha Kg /ha Rs/ha

Whea

t

Ogla Rajma

sh

Gobh

i

sarso

n

- Maize 17500 Detaile

d below

9677 2.01 lkh Detail

ed

below

9888 2.19 lkh Detail

ed

below

9777

Barle

y

phapr

a

Pea Detaile

d below

Detail

ed

below

Detail

ed

below

Paddy Vegetab

les

Detaile

d below

Detail

ed

below

Detail

ed

below

Maize leucerne Detaile

d below

Detail

ed

below

Detail

ed

below

potato Detaile

d below

Detail

ed

below

Detail

ed

below

Rabi Whea

t

- - - - Vegetab

le

3094 Detaile

d below

7226 590 Detail

ed

below

7000 3684 Detail

ed

below

7113

barley - - - - leucerne Detaile

d below

Detail

ed

below

Detail

ed

below

Page 97: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | x

PER HECTARE YIELD PRICIPAL CROPS,

Food crops Yield per hectare

Wheat 1500 Kg

Rice 1600 Kg

Barley 1300-1500 Kg

Maize 1800-2000 Kg

Millet 1200 Kg

Other Food Crops

Potato 13500 Kg

Pea 60-80 Qtl/Ha

Non Food crops

Oilseed 600-800 Kg

Other Non Food crops 1400 Kg

Page 98: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xi

Annexure 4: Block wise Crop water Requirement

Kharif Rabi

Particulars Cereal

s

(Maize

)

Coarse

cereals

(Ragi,

Millets

)

pulses

(Rajmah/urad

)

Oil

seeds

Vegetable

s

Others Cereals

(Wheat

)

Coarse

cereals

(Barley

)

pulses

(Gram

/

masur)

Vegetable

s

Others Horticultur

e and

Plantations

Total

Kalpa Total Area 662 475 532 4 1019 109 18 28 23 35 12 4498 7415

Total Water

Requiremen

t (mcm)

0.397

2

0.285 0.3192 0.002

4

1.8342 0.196

2

0.027 0.042 0.013

8

0.063 0.021

6

2.6988 3.201

6

Rainfed

Area

163 123 141 84 58 6 20 15 26 7 899 1542

Water

Requiremen

t for

Rainfed

Area (mcm)

0.097

8

0.073

8

0.0846 0 0.1512 0.104

4

0.009 0.03 0.009 0.0468 0.012

6

0.5394 0.619

2

0

Pooh Total Area 469 319 403 1 1205 49 10 9 2 9 10 4373 6859

Total Water

Requiremen

t (mcm)

0.281

4

0.191

4

0.2418 0.000

6

2.169 0.088

2

0.015 0.0135 0.001

2

0.0162 0.018 2.6238 3.036

3

Rainfed

Area

0 28 42 0 138 0 4 8 1 2 7 437 667

Water

Requiremen

t for

Rainfed

Area (mcm)

0 0.016

8

0.0252 0 0.2484 0 0.006 0.012 0.000

6

0.0036 0.012

6

0.2622 0.325

2

Page 99: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xii

Kharif Rabi

Particulars Cereal

s

(Maize

)

Coarse

cereals

(Ragi,

Millets

)

pulses

(Rajmah/urad

)

Oil

seeds

Vegetable

s

Others Cereals

(Wheat

)

Coarse

cereals

(Barley

)

pulses

(Gram

/

masur)

Vegetable

s

Others Horticultur

e and

Plantations

Total

0

Nicha

r

Total Area 735 358 381 2 736 146 416 313 147 265 119 3538 7156

Total Water

Requiremen

t (mcm)

0.441 0.214

8

0.2286 0.001

2

1.3248 0.262

8

0.624 0.4695 0.088

2

0.477 0.214

2

2.1228 4.346

1

Rainfed

Area

582 241 306 623 116 262 251 92 201 98 2693 5465

Water

Requiremen

t for

Rainfed

Area (mcm)

0.349

2

0.144

6

0.1836 0 1.1214 0.208

8

0.393 0.3765 0.055

2

0.3618 0.176

4

1.6158 3.370

5

Page 100: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xiii

Annexure 5: Block wise Livestock water Requirement

Pooh

Population Water Demand

2012 2015 2020 2015 (E 2020 (P)

Poultry 777 878 1067 0.000080 0.000097

Pigs 0 0 0 0.000000 0.000000

Goats 10324 10595 11058 0.023202 0.024216

Sheeps 22998 22998 22998 0.050366 0.050366

Indigenous

Cow

1539 1539 1539 0.036513 0.036513

Hybrid

Cow

3425 3425 3425 0.081258 0.081258

Draft

Animal

2023 2350 2729 0.055742 0.064738

Total

Animal

41086 41784 42815.11269 0.247161 0.257188

Kalpa

Population Water Demand

2012 2015 2020 2015 2020

Poultry 5026 5676 6411 0.000517966 0.000584988

Pigs 10 13 17 0.00002847 0.000037011

Goats 11766 12074 12391 0.026443115 0.027136402

Sheeps 20414 20414 20414 0.04470666 0.04470666

Indigenous

Cow

2946 2946 2946 0.06989385 0.06989385

Hybrid

Cow

5534 5534 5534 0.13129415 0.13129415

Draft

Animal

3435 3989 4633 0.094648239 0.109923896

Total

Animal

49131 50647 52346.03387 0.36753245 0.383576957

Nichar

Population Water Demand

2012 2015 2020 2015 2020

Poultry 3406 3847 4344 0.000351013 0.000396433

Pigs 25 33 42 0.000071175 9.25275E-05

Goats 11139 11431 11731 0.025033984 0.025690327

Sheeps 23195 23195 23195 0.05079705 0.05079705

Indigenous

Cow

5101 5101 5101 0.121021225 0.121021225

Hybrid

Cow

3012 3012 3012 0.0714597 0.0714597

Draft

Animal

1730 2009 2333 0.047668545 0.055361962

Total

Animal

47608 48627 49759 0.316402693 0.324819224

Page 101: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xiii

Anexure 6: Details of Medium irrigation Project under AIBP component

SALIENT FEATURES OF MEDIUM IRRIGATION PROJECT ROPA TO SIASO

1 Estimated cost 6000 Lakhs.

2 Area proposed for irrigation GCA = 3660 Ha CCA = 2600 Ha

3 Annual intensity of irrigation 90%

4 Name of source Rakhmobolong Nallah = 70 cusec. Chokchain Nallah = 50 cusec.

5 Total Discharge of sources 120 cusec.

6 Date of measurement of discharge 28-08-2015

7 Water requirement 82.63 cusec.

8 Length of Kulh/ Channel 35 km.=35000 rmt.

9 No. of Intakes 2 Nos.

10 No. of Diversion Weir 2 Nos.

11 No. of Disilting Divices 2 Nos.

12 No of Escapes 1 in each Km.

13 Nallah Crossings 7 Nos.

14 Duty of Irrigation 1 ltr per sec.

Page 102: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xiv

This plan is for a period of 8 years. However considering the implementation period as per DIP mandate, the cost and command area are

considered to be 30 crores and 800 ha respectively for a shelf period of 4 years.

Page 103: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xv

Annexure 7: Year wise Action plan IPH- Har Khet Ko Pani Component- 2016-2020

YEAR 2016-17

S No. Name of

Block

Name of scheme Deptt Components Activity Capacity CCA

in ha

Period of

implementation

Estimated Cost

in Lakhs

1 Kalpa Construction of FIS

Kharogla to Kuppa

IPH MSERW 250mm 14475mtrs, head weir, plum

concrete RD 150 to 175.50mtrs, anchor block

Minor

Irrigation

10 cusecs 262 3 years 750.8

2 Nichar Construction of FIS Roura

Miru

IPH GI pipe of 150mm to 80mm dia fully flanged,

civil structure and protection work

Minor

Irrigation

70 lps 42 3 years 150

3 Pooh Renovation of FIS Yatan

Gkharga in GP Spillow

IPH Outlet 5 Nos Desilting Chamber, MSERW

Pipe 350 mm, CC lining 3600 Rmt. Wire

crates, PCC

Minor

Irrigation

5.43

cusecs

115 3 years 276

4 Pooh Remd. of FIS Lungsu to

Babja in GP Charang

IPH Desilting tank , HDPE Pipe 315mm, Composit

lining 4400 Rmt, RCC cut cover, wire crates

Minor

Irrigation

6 cusecs 74 3 years 180

Page 104: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xvi

5 Kalpa Renovaton of FIS Chansu

(Zario)

IPH CC lining,Protection work Minor

Irrigation

1.05

cusecs

40 3 years 20

6 Pooh Construction of LIS

Thitang Khad to Pooh

IPH CC lining and outlet chamber Minor

Irrigation

60 cusecs 300 3 years 950

7 Pooh Construction of LIS

Spilow to karla

IPH CC lining and outlet chamber Minor

Irrigation

300

cusecs

300 3 years 980

Total 1133 3306.8

YEAR 2017-18

List Name of

Block

Name of scheme Deptt Components Activity Capacity CCA

in ha

Period of

implementation

Estimated Cost

in Lakhs

1 Kalpa Construction of FIS Dimti to

Shananged in GP Sapni

IPH CC lining and protection

work.

Minor

Irrigation

10 cusecs 40 3 Years 140

2 Pooh Remoudling of FIS rolling in

GP Rispa

IPH Outlet 5 Nos.desilting tank 1

Nos. MSERW pipe.

Minor

Irrigation

6.42 cusecs 28 3 Years 150

3 Kalpa Renovation of FIS Nalzo to

Panchayat Bhawan in GP

Pangi

IPH CC lining patra

cutting,protection works.

Minor

Irrigation

15 cusecs 74 3 Years 50

4 Nichar Renovation of FIS Kilba IPH CC lining HDPE,Protection

works

Minor

Irrigation

10 cusecs 53 6 Years 40

Page 105: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xvii

YEAR 2017-18

List Name of

Block

Name of scheme Deptt Components Activity Capacity CCA

in ha

Period of

implementation

Estimated Cost

in Lakhs

5 Nichar Renovation of FIS Kuching

Punang

IPH CC lining,wallDiversion

work,creat works

Minor

irrigation

10.50 cusecs 57 3 Years 60

6 Kalpa Renovation of FIS nichla

Baturi

IPH Head work,CC lining Minor

irrigation

10 cusecs 50 3Years 45

Total 302 485

YEAR 2018-19

List Name of

Block

Name of scheme Deptt Components Activity Capacity CCA in

ha

Period of

implementation

Estimated Cost

in Lakhs

1 Pooh Remd. Of FIS Sarver in

GP Labrang

IPH Outlet MSREW pipe,PCC

Wall

Minor

Irrigation

3 cusecs 23 3years 70

2 Nichar Remd. Of FIS Nanspo

tranda in GP tranda

IPH HDPE pipe, CC lining Minor

Irrigation

5.43

cusecs

55 3years 50

3 Kalpa Remd. of FIS Rang

kulang in Tehsil kalpa

IPH CC lining,protection work Minor

Irrigation

6 cusecs 126 3years 50

4 Kalpa Remd of FIS Powari IPH CC lining,Head

work,protection work

Minor

irrigation

8 cusecs 40 3years 40

Total 244 210

YEAR 2019-20

Page 106: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xviii

List Name of

Block

Name of scheme Deptt Components Activity Capacity CCA

in ha

Period of

implementation

Estimated Cost

in Lakhs

1 Pooh Remd. of FIS

Panasaring in GP

Lippa

IPH Outlet 5 Nos ,CC lining,PCC

wall,RCC cut covers & wire crate

covers

Minor

Irrigation

7 cusecs 162 5 years 150

2 Pooh Remd.FIS hopsang to

garden colony

IPH Outlet MSREW pipe,PCC

Wall,RCC cut cover

Minor

Irrigation

5.5

cusecs

23 5years 70

3 Nichar Renovation. of FIS

Jani

IPH CC lining,HDP pipe protection

work

Minor

Irrigation

5.5

cusecs

44 5 years 70

4 Kalpa Renovation. of FIS

Khwangi Tellingi

IPH Cc lining and protection works Minor

Irrigation

15 cusecs 163 5 years 90

Total 392 380

Page 107: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xix

Annexure 8: Year Wise Action Plan- Department of Agriculture –Per Drop More Crop/ Har Khet Ko Pani ANNUAL ACTION PLAN YEAR 2016-17

S.no. Name

of

Block

Name of Scheme Deptt. Components Activity CCA

in ha

Period of

Implementation

Estimated

Cost in

Lakhs

1 Kalpa C/o Distribution channel

from main Kuhl Khargola to

Kuppa.

Soil cons. Lined Field

channels.20*20cum

1500 mtr

C.C. linning kuhl 262 2 Year 11.00

2 Nichar C/o Distribution channel

from main Roura Miru

Soil Cons. Lined field

channels.20*25cum 600

mtr

C.C. linning kuhl 42 1Year 5.00

3 Pooh C/o Distribution channel

from main Kuhl Gkharga in

GP Spillow.

Soil Cons. Lined field

channels.20*25 cum

4000 mtr

C.C. linning kuhl 115 2 years 30.00

4 Pooh C/o Distribution channel

from main Kuhl Lungsu to

Babja in GP Charang.

Soil Cons. Lined field channels.

20*25cum 3700 mtr

C.C. linning kuhl 180 2 year 28.00

5 Kalpa C/o Distribution channel

from main Kuhl Chansu

(Zario

Soil cons. Lined field channels.

20*25cum 700 mtr

C.C. linning kuhl 40 1 Year 5.00

6 Pooh C/o Distribution channel

from Thitang Khad to Pooh

Soil cons. Lined field channels.

25*30cum 550 mtr

C.C. linning kuhl 300 1 year 11.00

TOTAL 939 90.00

Page 108: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xx

ANNUAL ACTION PLAN (Agriculture) YEAR 2017-18

S.no. Name

of

Block

Name of Scheme Deptt. Components Activity CCA

in ha

Period of

Implementation

Estimated

Cost in

Lakhs

1 Kalpa C/o Distribution channel from

main Kuhl Dumti to

Shananged in GP Sapni.

Soil cons. Lined Field channels.

1200 mtr

C.C. linning kuhl 40 2 Year 9.00

2 Pooh C/o Distribution channel from

main Kuhl Roiling in GP

Rispa.

Soil Cons. Lined field

channels.20*25cum

1000 mtr

C.C. linning kuhl 28 2 year 8.00

3 Kalpa C/o Distribution channel from

main Kuhl Nalzo to Panchyat

Bhawan in GP Pangi.

Soil Cons. Lined field

channels.20*30 cum

2500 mtr

C.C. linning kuhl 74 2 years 20.00

4 Nichar C/o Distribution channel from

main Kuhl Kilba

Soil Cons. Lined field channels.

2000 mtr

C.C. linning kuhl 53 3 year 15.00

5 Nichar C/o Distribution channel from

main Kuhl Cuching Punang

Soil cons. Lined field channels.

2000 mtr

C.C. linning kuhl 57 2 year 16.00

6 Kalpa C/o Distribution channel from

main kulh nichla Baturi

Soil cons. Lined field channels.

20*25cum 500 mtr

C.C. linning kuhl 50 1 year 4.00

TOTAL 302 72.00

Page 109: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxi

ANNUAL ACTION PLAN (Agriculture) YEAR 2018-19

S.no. Name

of

Block

Name of Scheme Deptt. Components Activity CCA

in ha

Period of

Implementation

Estimated

Cost in

Lakhs

1 Pooh C/o Distribution channel

from main Kuhl Sarver in GP

Labrang.

Soil cons. Lined Field channels.

2000 mtr

C.C. linning kuhl 23 2 Year 15.00

2 NIchar C/o Distribution channel

from main Kuhl Nanspo to

Tranda in GP Tranda

Soil Cons. Lined field

channels.20*30cum

1500 mtr

C.C. linning kuhl 55 2 year 11.00

3 Kalpa C/o Distribution channel

from main Kuhl Rangkulang

in Tehsil Kalpa

Soil Cons. Lined field channels.

700 mtr

C.C. linning kuhl 126 1 year 6.00

4 Kalpa C/o Distribution channel

from main Powari

Soil Cons. Lined field channels.

2000 mtr

C.C. linning kuhl 40 2 year 16.00

TOTAL 244 48.00

ANNUAL ACTION PLAN (Agriculture) YEAR 2019-20

S.no. Name of

Block

Name of Scheme Deptt. Components Activity CCA

in ha

Period of

Implementation

Estimated

Cost in Lakhs

1 Pooh C/o Distribution channel from

main Kuhl Panasaring in GP

Lippa

Soil cons. Lined Field

channels. 1000 mtr

C.C. linning kuhl 162 2 Year 9.00

2 Kalpa C/o Distribution channel from

main Kuhl at Jani

Soil Cons. Lined field

channels. 8*10 =

2000 mtr

C.C. linning kuhl 44 1year 16.00

3 Nichar C/o Distribution channel from

main Kuhl Khwangi Tellingi.

Soil Cons. Lined field

channels. 1000 mtr

C.C. linning kuhl 163 2 YEAR 9.00

Page 110: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxii

ANNUAL ACTION PLAN (Agriculture) YEAR 2019-20

S.no. Name of

Block

Name of Scheme Deptt. Components Activity CCA

in ha

Period of

Implementation

Estimated

Cost in Lakhs

TOTAL 369 34.00

Page 111: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxiii

Annexure 9: Year Wise Installation Plan Per drop More Crop (Supplementary water management activities)

Annual Action Plan Per drop More Crop (Supplementary water management activities)

YEAR 2016-17

S.no. Deptt. Activity Name of Block Total Nos. Total Amount in Lakhs

Kalpa Sangla Nichar Pooh

Nos Amt Nos Amt Nos Amt Nos Amt

1 Soil Cons. Sprinkler Irrigation System 10 1.50 10 1.50 10 1.50 10 1.50 40 6.00

2 do Secondary Storage Structure 5 1.80 5 1.80 5 1.80 5 1.80 20 7.20

13.20

Annual Action Plan Per drop More Crop (Supplementary water management activities)

YEAR 2017-18

S.no. Deptt. Activity Name of Block Total

Nos.

Total

Amount in

Lakhs Kalpa Sangla Nichar Pooh

Nos Amt Nos Amt Nos Amt Nos Amt

1 Soil Cons. Sprinkler Irrigation

System

10 1.50 10 1.50 10 1.50 10 1.50 40 6.00

2 Do Secondary Storage

Structure

5 1.80 5 1.80 5 1.80 5 1.80 20 7.20

3 Do Lift Irrigation System 1 0.60 1 0.60 2 1.20 1 0.60 5 3.00

Page 112: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxiv

4 Do Drip irrigation System 2 1.00 2 1.00 3 1.50 3 1.50 10 5.00

21.20

Annual Action Plan Per drop More Crop (Supplementary water management activities)

YEAR 2018-19

S.no. Deptt. Activity Name of Block Total

Nos.

Total Amount in

Lakhs Kalpa Sangla Nichar Pooh

Nos Amt Nos Amt Nos Amt Nos Amt

1 Soil Cons. Sprinkler Irrigation

System

15 2.25 15 2.25 15 2.25 15 2.25 60 9.00

2 Do Secondary Storage

Structure

5 1.80 5 1.80 5 1.80 5 1.80 20 7.20

3 Do Distribution of HDPE

pipes

6000 mtr 1.50 6000 mtr 1.50 6000 mtr 1.50 6000 mtr 1.50 24000 mtr 6.00

22.00

Page 113: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxv

Annual Action Plan Per drop More Crop (Supplementary water management activities)

YEAR 2019-20

S.no. Deptt. Activity Name of Block Total

Nos.

Total

Amount

in

Lakhs

Kalpa Sangla Nichar Pooh

Nos Amt Nos Amt Nos Amt Nos Amt

1 Soil Cons. Sprinkler

Irrigation

System

15 2.25 15 2.25 15 2.25 15 2.25 60 9.00

2 Do Distribution

of HDPE

pipes

6500 mtr 1.625 6500 mtr 1.625 6500 mtr 1.625 6500 mtr 1.625 26000 mtr 6.50

15.50

Page 114: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxvi

Annexure 10: Year wise plan for extension activities under ATMA

Sr. No. Component Activities Block wise / Activity-wise targets 2016-2017

Kalpa Nichar Pooh Total No of Days No of Units Unit Cost Amount in Rs

1 Moistture Convervation cropping alignment i) Training of farmer 20 20 20 60 1 60 250 15000

ii) Training of officers 2 2 2 6 2 12 500 6000

iii) Demonstration 4 4 4 12 _ 12 4000 48000

2 Efficient use of water i) Training of farmer 20 20 20 60 1 60 250 15000

ii) Training of officers 2 2 2 6 2 12 500 6000

iii) Demonstration 4 4 4 12 _ 12 4000 48000

3 Water requirment Based Cropping plan i) Training of farmer 15 15 15 45 1 45 250 11250

ii) Training of officers 2 2 2 6 2 12 500 6000

iii) Demonstration 2 2 2 6 _ 6 4000 24000

4 Farm school 1 1 1 3 _ 3 29000 87000

Grand Total 266250

Sr. No. Component Activities Block wise / Activity-wise targets 2017-18 Kalpa Nichar Pooh Total No of Days No of Units Unit Cost Amount

1 Moistture Convervation cropping alignment i) Training of farmer 15 15 15 45 1 45 250 11250

ii) Training of officers _ _ _ _ _ _ _ _

iii) Demonstration 5 5 5 15 _ 15 4000 60000

2 Efficient use of water i) Training of farmer 15 15 15 45 1 45 250 11250

ii) Training of officers _ _ _ _ _ _ _ _

iii) Demonstration 5 5 5 15 _ 15 4000 60000

3 Water requirment Based Cropping plan i) Training of farmer 15 15 15 45 1 45 250 11250

ii) Training of officers _ _ _ _ _ _ _ _

iii) Demonstration 2 2 2 6 _ 6 4000 24000

Page 115: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxvii

Sr. No. Component Activities Block wise / Activity-wise targets 2017-18 Kalpa Nichar Pooh Total No of Days No of Units Unit Cost Amount

4 Farm school 1 _ _ 1 _ 1 29000 29000

Grand Total 206750

Sr. No. Component Activities Block wise / Activity-wise targets 2018-19

Kalpa Nichar Pooh Total No of

Days

No of

Units

Unit Cost Amount

1 Moistture Convervation cropping

alignment

i) Training of farmer 15 15 15 45 1 45 250 11250

ii) Training of

officers

_ _ _ _ _ _ _ _

iii) Demonstration 4 4 4 15 _ 12 4000 48000

2 Efficient use of water i) Training of farmer 15 15 15 45 1 45 250 11250

ii) Training of

officers

_ _ _ _ _ _ _ _

iii) Demonstration 4 4 4 15 _ 12 4000 48000

3 Water requirment Based Cropping plan i) Training of farmer 15 15 15 45 1 45 250 11250

ii) Training of

officers

_ _ _ _ _ _ _ _

iii) Demonstration 2 2 2 6 _ 6 4000 24000

4 Farm school _ 1 _ 1 _ 1 29000 29000

Grand Total 182750

Sr. No. Component Activities Block wise / Activity-wise targets 2019-2020

Kalpa Nichar Pooh Total No of Days No of Units Unit Cost Amount

1 Moistture Convervation cropping alignment i) Training of farmer 12 12 12 36 1 36 250 9000

ii) Training of officers _ _ _ _ _ _ _ _

iii) Demonstration 4 4 4 12 _ 12 4000 48000

Page 116: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxviii

Sr. No. Component Activities Block wise / Activity-wise targets 2019-2020

Kalpa Nichar Pooh Total No of Days No of Units Unit Cost Amount

2 Efficient use of water i) Training of farmer 12 12 12 36 1 36 250 9000

ii) Training of officers _ _ _ _ _ _ _ _

iii) Demonstration 4 4 4 12 _ 12 4000 48000

3 Water requirment Based Cropping plan i) Training of farmer 12 12 12 36 1 36 250 9000

ii) Training of officers _ _ _ _ _ _ _ _

iii) Demonstration 2 2 2 6 _ 6 4000 24000

4 Farm school _ _ 1 1 _ 1 29000 29000

Grand Total 176000

Page 117: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxix

Annexure 10: Action Plan of DRDA for watershed activities for the year 2016-17, Project wise

Sr.No Name of Project Component Physical Plan for

2016-17

Financial Plan for 2016-17

In Rs Crore

1 IWMP-I Water Harvesting Structures 34 ha. 0.977

Land Development 169 ha. 0.0655

Soil & Moisture Conversation 1043 ha. 1.443

Livelihood 22 Nos. 0.45

Production & Micro Int. 490 Nos. 0.744

Monitoring & Eva. 12 Nos. 0.105

Training 15 No. 0.19

Admin - 0.26

Total 1246 Ha. 4.2345

2 IWMP-II Water Harvesting Structures 38 ha. 1.17

Land Development 463 ha. 0.50

Soil & Moisture Conversation 1096 ha. 1.283

Livelihood 81 Nos 0.352

Production & Micro Int. 191 Nos. 0.7510

Monitoring & Eva. 6 Nos. 0.13

Training 27 Nos. 0.244

Admin - 0.21

Total 1597 ha. 4.64

G. Total 2843 ha. 8.8745

Page 118: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxx

Name of Batch-IWMP-I (Pooh-I,Nichar-II,Kalpa-III)

(Rs. in cr. and area in ha.)

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

17.1

z

Farm Ponds

Capacity(cum) 115 0.067 115 0.067 26 ha. 0.0419

C.A. in ha. 2 - 2 - -

Nos. 4 - 4

17.2 Check dams Capacity (cum) - - - -

17.3 Gully Plug Capacity - - - - - -

Nos. 5 - 5 - -

17.4 Nalla

Bandhs CA. in ha. - - - -

17.5 Tanks

Capacity (cum) 1510 0.77 705 0.39

204ha. 0.31

CA in ha. 15 - 8 - -

Nos. 38 - 19 - -

17.6

Other

ground water

recharge

structure

Capacity (cum) - - - -

Kuhal Capacity (cum)

CA in ha. 47 1.003 24 0.52

Nos. 53 26

Fishery

ponds/cattle

ponds Capacity (cum) - - - -

Total Capacity (cum) 1625 1.84 820 0.977 - -

Page 119: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxi

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

CA. in ha. 64 - 34 204

ha. 0.3479

Nos. 95 - 54 - - -

18 WHS to be renovated

18.1 Land

Development Farm Ponds Capacity (cum) - - - -

18.2 Check dams Capacity (cum) - - - - -

18.3 Nalla

Bandhs Capacity (cum) - - - - -

18.4 Percolation

Tanks Capacity (cum) - - - - -

18.5

Others

ground water

recharge

structure

Capacity (cum) - - - - -

18.6

Fishery

ponds/cattle

ponds Capacity (cum) - - - - -

Total

Capacity (cum) - - - - -

CA. in ha. - - - - -

Nos. - - - - -

18.7 (A)

Afforestation

(on

Wasteland) CA. in ha. - - - - -

Nos. - - - - -

Afforestation

(on total land

including

Wasteland)

CA. in ha. 125 0.04 63 0.02 0.5 ha 0.00448

Page 120: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxii

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

18.7 (A) Nos. 5 - 3 - -

Horticulture

(on

Wasteland) CA. in ha. - - - - -

Nos. - - - - -

Horticulture

(on total land

including

Wasteland)

CA. in ha. 81 0.063 81 0.033 4 ha. 0.0178

Nos. 10 - 5 - - -

Agriculture

(on

Wasteland) CA. in ha. - - - - -

Agriculture

(on total land

including

Wasteland)

CA. in ha. - - - - -

Pasture (on

Wasteland) CA. in ha. - - - - -

Pasture (on

total land

including

Wasteland)

CA. in ha. 49 0.025 25 0.0125 0

.5 ha. 0.0002

Nos. 7 - 4 - -

Other if any CA. in ha. - -

Total (on

Wasteland) CA. in ha.

Total (on

total land

CA. in ha. 255 0.128 169 0.0655 5 ha 0.02248

Nos. 22 - 12 - -

Page 121: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxiii

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

including

Wasteland)

18.7 (B)

Soil & Moisture

Conservation

Staggered

trenching CA. in ha. - - - -

Contour

Bunding CA. in ha. - - - -

Graded

Bunding CA. in ha. - - - -

Bench

Terracing CA. in ha. 537 1.27 237 0.64

114

ha. 0.663

Nos. 11 - 5 - -

Other if any CA. in ha. 1465 1.483 806 0.803 656

ha 0.9574

Nos. 30 - 16

Total CA. in ha. 2002 1043 1.443 770 ha 1.6204

Nos. 41 2.753 21 - - -

18.7 (

C)

Vegetative and

Engineering

Structure

Earthen

Checks Capacity (cum) - - - -

18.7 (D) EPA CA. in ha. - - - -

18.7 (D) Nos. - - -

18.7 (D) Brushwood

Checks Rmt. - - - -

18.7 (D) Gully plugs Capacity (cum) -- - - - - -

Loose bolder Capacity (cum) - - - -

Gabion

Structure Capacity (cum) - - - -

Others if any Capacity (cum) - - 400 ha 0.6

Page 122: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxiv

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

CA. in ha. - - - -

18.7 (D) Nos.

Total Capacity (cum)

CA. in ha.

18.7 (D) Nos. - -

1.Water

Bowari Capacity (cum) - - - -

CA. in ha. - - - -

Nos. - - - -

2. Tank Capacity (cum)

18.7 (D) CA. in ha.

18.7 (D) Nos.

3. check

Dam Capacity (cum)

CA. in ha.

18.7 (D) Nos.

4. Kuhal Rmt. - -

CA. in ha. - -

18.7 (D) Nos. - - -

5. fish Pond Capacity (cum) - -

CA. in ha. - - - -

18.7 (D) Nos. - - - -

6. . Pond Capacity (cum) - - - -

CA. in ha. - - - -

18.7 (D) Nos. - - - -

7. Other Capacity (cum) - - - -

CA. in ha. - - - -

18.7 (D) Nos.

Total Capacity (cum)

Page 123: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxv

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

Rmt.

18.7 (D) CA. in ha. - - 32

Nos. - - 50

18.7 (E) DPR No (s) - - - 0.15

18.8 (F) I&CB

SHG

Formation

(New

Created)

- - - -

Livelihood activities for the

asset-less persons No .of SHG 37 - 14 7 No. -

18.9 (G) Total No. of Members of SHGs 417 - 58 59 -

Existing SHG - - - -

No SHGs assisted - - - -

1. Total No. of SHGs members - - - -

UG

Formation - - - -

1. No. of UG 343 - 130 45 No. -

2. Total No. of Members of UGs 955 - 363 851 -

Formation of

Federation - - - -

Total No. of Members - - - -

Capacity

Building - - - -

No. of Training 29 0.37 15 0.19 57 0.4289

No. of Persons trained 1490 - 800 - -

Other if any - - - -

Total - - - -

No. of

Activities - 69 1.36 22 0.45 8 0.13527

Page 124: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxvi

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

No. of

Beneficiaries - 986 - 108 -

No. of SHGs

formed - - -

Seed money

distributed - - - - -

GIA - - - - -

Olther if any - - - - -

Total - - - - -

- - - - -

18.10

(H)

Production &

Micro

Enterprises

Agriculture

related

activities - 257 0.086 149 0.037 -

Horticulture

related

activities - 135 0.29 27 0.126 - -

Animal

Husbandry

activities - 411 0.225 36 0.044 - -

Sericulture

- - - - -

No. of

activities - - - - -

No. of

Beneficiaries - - - - -

Beekeeping

No. of

activities - 101 0.13 50 0.025 - -

No. of

Beneficiaries - 74 - 10 - - -

Poultry No. of

activities - 1 0.022 1 0.022 - -

Page 125: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxvii

SN Components

Sub-

components

activities

Unit

Total

Targets

of DIPs

Year-

wise

Annual

Action

Plan

Achievements

Reporting

month-

Physical

Plan

Financial

Plan Upto pr. year

Physical

Plan

Estimated

cost 2016-17 2016-17 Phy. Fin.

No. of

Beneficiaries - 56 - 56 - - -

Fisheries

No. of

activities - 1 0.037 - - - -

No. of

Beneficiaries - 49 - - -

Bio-fuel Plantation

Area

Covered - - - - -

No. of

Beneficiaries - - - - -

Other if any please specify

No. of

activities - 16 0.97 8 0.49 14 No. 0.18263

No. of

Beneficiaries - 235 - 120 1252 -

Total - 922 1.76 271 0.744 14 No. 0.18263

18.11 (I) Monitoring - 6 0.105 3 0.0525 - -

18.12(J) Evaluation - 6 0.105 3 0.0525 3 0.01

18.13 Consolidation - 3 0.525 - - -

18.14(L) Admn. - 1.04 0.26 - 0.4679

Grand Total 2321 ha. 9.986 1246 ha. 4.2339 1488 3.97

Page 126: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxviii

Batch-IWMP II (Pooh-VI,Nichar-V,Kalpa-VI) (Rs. in cr. and area in ha.)

SN Components Sub-components/ activities. Unit Total Targets of DIPs Year-wise Annual Action

Plan

Physical

Plan

Estimated

cost Physical Plan

Financial

Plan

17 2016-17 2016-17 17.1 Farm Ponds Capacity(cum) - - - -

17.2 Check dams Capacity

(cum) - - - -

Gully Plug Capacity - - - -

17.3 Nos. - - - -

Nalla Bandhs

CA. in ha. - - - -

Nos. - - - -

17.4

Tanks

Capacity

(cum) 784 1.39 472 0.7

CA in ha. 40 20 -

Nos. 52 26 -

17.5

Other ground water recharge structure

Capacity

(cum) - - - -

CA in ha. - - - -

Nos. - - - -

Kuhal Capacity

(cum) - - - -

CA in ha. 35 0.934 18 0.47

Nos. 68 0 34 -

17.6

Fishery ponds/cattle ponds

Capacity

(cum) - - - -

CA. in ha. - - - -

Nos. - - - -

Total

Capacity

(cum) 784 2.324 472 1.17

CA. in ha. 75 0 38

Page 127: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xxxix

SN Components Sub-components/ activities. Unit Total Targets of DIPs Year-wise Annual Action

Plan

Physical

Plan

Estimated

cost Physical Plan

Financial

Plan

17 2016-17 2016-17 Nos. 120 0 60

18 WHS to be renovated

18.1 Farm Ponds Capacity

(cum)

18.2 Check dams Capacity

(cum)

CA. in ha.

Nos.

18.3 Nalla Bandhs Capacity

(cum)

CA. in ha.

Nos.

18.4 Percolation Tanks Capacity

(cum)

CA. in ha.

Nos.

18.5 Others ground water recharge structure Capacity

(cum)

CA. in ha.

Nos.

18.6 Fishery ponds/cattle ponds Capacity

(cum)

CA. in ha.

Nos.

Total Capacity

(cum)

CA. in ha.

Nos.

Page 128: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xl

SN Components Sub-components/ activities. Unit Total Targets of DIPs Year-wise Annual Action

Plan

Physical

Plan

Estimated

cost Physical Plan

Financial

Plan

17 2016-17 2016-17 Land Development

18.7 (A) Afforestation (on Wasteland) CA. in ha.

Nos.

Afforestation (on total land including Wasteland) CA. in ha. 92 0.023 92 0.023

Nos. 6 0 6 -

Horticulture (on Wasteland) CA. in ha.

Horticulture (on total land including Wasteland) CA. in ha. 357 0.45 357 0.45

Agriculture (on Wasteland) CA. in ha.

Agriculture (on total land including Wasteland) CA. in ha.

Pasture (on Wasteland) CA. in ha.

Pasture (on total land including Wasteland) CA. in ha. 14 0.027 14 0.027

Nos. 6 0 6 0

Other if any CA. in ha.

Total (on Wasteland) CA. in ha.

Nos.

Total (on total land including Wasteland) CA. in ha. 463 0.5 463 0.5

Nos. 17 0 17 -

18.7 (B) Soil & Moisture Conservation

Staggered trenching CA. in ha.

Contour Bunding CA. in ha.

Graded Bunding CA. in ha.

Bench Terracing CA. in ha. 380 0.573 380 0.573

Nos. 7 0 7 0.71

Other if any CA. in ha. 1431 1.75 716 -

Nos. 26 - 13 -

Total CA. in ha. 1811 2.323 1096 1.283

Nos. 33 - 19

18.7 ( C)

Vegetative

and

Engineering

Structure

Earthen Checks Capacity

(cum) - - - -

EPA

CA. in ha.

Nos.

Page 129: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xli

SN Components Sub-components/ activities. Unit Total Targets of DIPs Year-wise Annual Action

Plan

Physical

Plan

Estimated

cost Physical Plan

Financial

Plan

17 2016-17 2016-17 Brushwood Checks Rmt.

Gully plugs Capacity

(cum)

Loose bolder Capacity

(cum)

Gabion Structure Capacity

(cum)

Others if any Capacity

(cum)

Total Capacity

(cum)

1.Water Bowari Capacity

(cum)

2. Tank Capacity

(cum)

3. check Dam Capacity

(cum)

4. Kuhal Rmt. - - - -

5. fish Pond Capacity

(cum)

6. . Pond Capacity

(cum)

7. Other Capacity

(cum) - - - -

Total Capacity

(cum)

CA. in ha.

Nos.

18.7 (E) DPR No (s)

18.8 (F) I&CB

SHG

Formation

(New Created)

Livelihood

activities for No .of SHG 31 - 10 -

Page 130: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xlii

SN Components Sub-components/ activities. Unit Total Targets of DIPs Year-wise Annual Action

Plan

Physical

Plan

Estimated

cost Physical Plan

Financial

Plan

17 2016-17 2016-17 the asset-less

persons

Total No. of

Members of

SHGs

Existing SHG

No SHGs

assisted

1. Total No. of

SHGs members

UG Formation

1. No. of

UG 258 - 85

2. Total No.

of Members of

UGs 648 - 280

Formation of Federation

Total No. of

Members

Capacity Building

No. of Training 43 0.427 27 0.244

No. of Persons

trained 1730 - 986 -

Other if any

Total

No. of Activities - 178 1.005 81 0.352

No. of Beneficiaries - 1249 - - -

No. of SHGs formed -

Seed money distributed -

GIA -

Olther if any -

Total -

18.10

(H) Agriculture related activities - 83 Nos. 0.06 36 0.028

Page 131: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xliii

SN Components Sub-components/ activities. Unit Total Targets of DIPs Year-wise Annual Action

Plan

Physical

Plan

Estimated

cost Physical Plan

Financial

Plan

17 2016-17 2016-17 Production &

Micro

Enterprises

Horticulture related activities - 81 Nos. 0.31 34 0.14

Animal Husbandry activities - 95 Nos 0.13 43 0.033

Sericulture

-

No. of activities -

No. of Beneficiaries -

-

Beekeeping No. of activities - 2 Nos 0.047 2 0.047

No. of Beneficiaries - 6 Nos 0 6 -

Poultry No. of activities - 2 Nos. 0.01 2 0.01

No. of Beneficiaries - 4 Nos. - 4 -

Fisheries No. of activities -

No. of Beneficiaries -

Bio-fuel

Plantation

Area Covered -

No. of Beneficiaries -

Other if any

please specify

No. of activities - 74 Nos 0.493 74 0.493

No. of Beneficiaries - 532 No 0 532

Total 337 No. 1.05 191 0.751

18.11 (I) Monitoring - 6 0.13 3 0.065

18.12(J) Evaluation - 3 0.13 3 0.065

18.13(K) Consolidation - 3 0.38 - -

18.14(L) Admn. - 0.84 0.21

Grand Total - 2349 ha. 9.109 1597 ha 4.64

Page 132: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xliv

Annexure 11: Action Plan of DRDA for watershed activities for 2016-2020 ( IWMP Batch I-III)

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

17

WHS newly to be created

17.1

Farm Ponds Capacity(cum) 115 0.067 115 - - - 0.067 - - -

C.A. in ha. 2 - 2 - - - - - - -

Nos. 4 - 4 - - - - - - -

17.2

Check dams Capacity (cum) 1821 0.23 900 321 300 300 0.12 0.04 0.04 0.03

CA. in ha. 24 - 12 4 4 4 - - - -

Nos. 6 - 3 1 1 1 - - - -

17.3 Nalla Bandhs CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

- - - - - - - - - -

17.4

Percolation

Tanks Capacity (cum) 520 0.82 174 173 173 - 0.28 0.27 0.27 -

CA in ha. 3 - 1 1 1 - - - - -

Nos. 26 - 10 8 8 - - - - -

17.5

Other ground

water recharge

structure

Capacity (cum) - - - - - - - - - -

CA in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

17.6

Fishery

ponds/cattle

ponds/

Capacity (cum) - - - - - - - -- - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Total Capacity (cum) 2456 1.117 1189 494 473 300 0.467 0.31 0.31 0.03

Page 133: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xlv

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

CA. in ha. 29 - 15 5 5 4 - - -

Nos. 36 - 17 9 9 1 - - -

18 WHS to be renovated

18.1

Land

Development

Farm Ponds Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

- - - - - - - - - -

18.2

Check dams Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

18.3 Nalla Bandhs Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

18.4

Percolation

Tanks Capacity (cum) 45 0.017 33 12 - - 0.01 0.007 - -

CA. in ha. 2 - 1 1 - - - -- - -

Nos. 3 - 2 1 - - - -- - -

18.5

Others ground

water recharge

structure Capacity (cum) 2 0.003 2 - - - 0.003 - - -

CA. in ha. 2 - 1 - - - - -- - -

Nos. 1 - 1 - -- - - - - -

Page 134: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xlvi

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

18.6

Fishery

ponds/cattle

ponds Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Total Capacity (cum) 47 0.0173 35 12 - - 0.013 0.007 - -

CA. in ha. 4 - 3 1 - - - - - -

Nos. 4 - 3 1 - - - - - -

18.7 (A)

Afforestation (on

Wasteland) CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Afforestation (on

total land

including

Wasteland)

CA. in ha. 92 0.023 46 46 - - 0.0115 0.0115 - -

Nos. 6 - 3 3 - - - - - -

Horticulture (on

Wasteland) CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Horticulture (on

total land

including

Wasteland)

CA. in ha. 479 0.51 316 244 - - 0.266 0.244

Nos. 15 - 10 5 - - - -

Agriculture (on

Wasteland) CA. in ha.

Nos.

Agriculture (on

total land

including

Wasteland)

CA. in ha.

Page 135: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xlvii

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

Nos.

Pasture (on

Wasteland) CA. in ha.

Nos.

Pasture (on total

land including

Wasteland) CA. in ha. 179 0.092 92 37 30 20 0.0475 0.0255 0.012 0.007

Nos. 18 - 9 5 2 2

Other if any CA. in ha.

Nos.

Total (on

Wasteland) CA. in ha.

Nos.

Total (on total

land including

Wasteland) CA. in ha. 750 0.625 408 292 30 20 0.325 0.281 0.012 0.007

Nos. 49 - 28 17 2 2

18.7 (B)

Soil & Moisture

Conservation

Staggered

trenching CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Page 136: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xlviii

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

Contour

Bunding CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Graded Bunding CA. in ha. - - - - - - - - - -

Nos.

Bench Terracing CA. in ha. 890 1.337 440 354 48 48 0.703 0.53 0.052 0.052

Nos. 18 - 11 5 1 1 - - - -

Other if any CA. in ha. 1836 2.766 623 722 353 138 0.94 1.11 0.53 0.186

Nos. 50 - 18 16 12 4 - - - -

Total CA. in ha. 2726 4.103 1063 976 401 286 1.643 1.64 0.582 0.238

Nos. 68 - 29 21 13 5 - - - -

18.7 Vegetative and

Engineering

Structure

Earthen Checks Capacity (cum) - - - - - - - - - - ( C)

18.7 (D)

EPA

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Brushwood

Checks Rmt. - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Gully plugs Capacity (cum) 206 0.113 206 - - - 0.113 - - -

CA. in ha. 75 - 75 - - - -

Nos. 5 - 5

Loose bolder Capacity (cum) - - - - - - - - - -

Page 137: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | xlix

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Gabion Structure Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

Others if any Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos.

Total Capacity (cum) 206 0.113 206 - - - 0.113

CA. in ha. 75 - 75 - - -

Nos. 5 - 5 - - -

1.Water Bowari Capacity (cum)

CA. in ha.

Nos.

2. Tank Capacity (cum) 981 2.381 415 243 151 172 0.73 0.68 0.554 0.417

CA. in ha. 55 - 24 13 10 8 - - - -

Nos. 101 - 47 21 18 15 - - - -

3. check Dam Capacity (cum) 40 0.93 10 12 14 7 0.16 0.25 0.33 0.19

CA. in ha. 46 - 8 10 16 6 - - - -

Nos. 12 0 3 3 4 2

Page 138: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | l

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

4. Kuhal Rmt. 98736 2.687 43829 27639 15169 11859 0.995 0.97 0.408 0.314

CA. in ha. 579 190 216 113 60

Nos. 141 - 72 34 22 13

5. fish Pond Capacity (cum) - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

6. . Pond Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos. - - - - - - - - - -

7. Other Capacity (cum) - - - - - - - - - -

CA. in ha. - - - - - - - - - -

Nos.

Total Capacity (cum) 1227 3.311 631 255 165 176 0.89 0.93 0.884 0.607

Rmt. 98736 2.687 43829 27639 15169 11859 0.995 0.97 0.408 0.314

CA. in ha. 749 - 297 239 139 74

Nos. 259 127 58 44 30

18.7 (E) DPR No (s)

18.8 (F) I&CB SHG Formation

(New Created)

18.9 (G)

Livelihood

activities for the

asset-less persons

No .of SHG 149 0.405 51 54 37 7 0.11 0.13 0.09 0.075

Total No. of

Members of

SHGs

Existing SHG 1219 - 388 505 260 66 - - - -

No SHGs assisted - - - - - - - - - -

Page 139: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | li

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

1.

Total No. of

SHGs members - - - - - - - - - -

UG Formation - - - - - - - - - -

1. No. of UG 661 - 231 266 90 74

2. Total No. of

Members of UGs 2153 - 771 940 228 214

Formation of

Federation

Total No. of

Members

Capacity

Building - - - - - - - - - -

No. of Training 79 0.944 46 33 - - 0.524 0.42

No. of Persons

trained 3465 - 1908 1557 - - - - - -

Other if any - - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

Total - - - - - - - - - -

No. of Activities 247 2.365 103 76 57 11 0.802 0.77 0.615 0.178

No. of

Beneficiaries 2235 891 717 548 79 - - - -

No. of SHGs

formed - - - - - -

Seed money

distributed - - - - - - - - - - -

GIA - - - - - - - - - - -

Page 140: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | lii

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

Olther if any - - - - - - - - - - -

Total - - - - - - - - - - -

- - - - - - - - - - -

18.10

(H)

Production &

Micro

Enterprises

Agriculture

related activities 340 0.146 185 96 53 6 0 0.065 0.045 0.026 0.01

Horticulture

related activities 216 0.61 61 57 88 10 - 0.305 0.122 0.122 0.061

Animal

Husbandry

activities 506 0.355 79 349 69 9 - 0.077 0.134 0.07 0.074

Sericulture - - - - - - - - - - -

No. of activities - - - - - - - - - - -

No. of

Beneficiaries - - - - - - - - - - -

- - - - - - - - - - -

Beekeeping

No. of activities 12 0.12 7 5 - - - 0.022 0.025 0.08 -

No. of

Beneficiaries 80 - 16 10 54 - - - - - -

Poultry

No. of activities 3 0.032 - - 3 - - - - 0.032 -

No. of

Beneficiaries 60 - - - 60 - - - - - -

Fisheries

No. of activities 1 0.037 - - 1 - - - - 0.037 -

No. of

Beneficiaries 49 - - - 49 - - - - - -

Bio-fuel

Plantation

Area Covered - -

No. of

Beneficiaries - - - - - - - - - - -

Other if any

please specify No. of activities 107 1.304 34 42 28 3 - 0.495 0.535 0.214 0.06

No. of

Beneficiaries 326 - - - - - - - - - --

18.11 (I) Monitoring 14 0.28 7 - 7 - - 0.14 - 0.14

Page 141: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | liii

SN Components

Sub-

components Unit Total Targets of DIPs Year-wise Annual Action Plan

/activities.

Physical Plan Financial Plan

Physical

Plan

Estimated

cost

2016-

17

2017-

18

2018-

19

2019-

-20

2016-

17

2017-

18

2018-

19

2019-

-20

18.12(J) Evaluation 14 0.28 7 - 7 - - 0.14 - 0.14 -

18.13 Consolidation 1 1.04 - - - 1 - - - - 1.04

(K)

18.14(L) Admn. 2.33 - - - - - 0.58 0.58 0.58 0.58

Page 142: Pradhan Mantri Krishi Sinchayee YojanaPage | 3 Table of Contents INTRODUCTION

Page | liv

Annexure 12: Action Plan of Horticulture Department Year wise S.NO. Year Component Activity Total Capacity

(cum) Command Area/ Irrigation Potential (Ha)

Estimated Cost (lakhs)

1 2016-17 Per crop more crop

DPAP Drip 5 2.5 1.06

2 2017-18 Per crop more crop

DPAP Drip 5 2.5 1.06

3 2018-19 Per crop more crop

DPAP Drip 5 2.5 1.06

4 2019-20 Per crop more crop

DPAP Drip 5 2.5 1.06

Total

4.24