STATE GRID BRAZIL HOLDING
Strategic Growth Plan and Investment Perspectives in Brazil
September, 2015
11
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
In 2015 has an annual revenue of R$ 943,716,757.29 ( ¥ 1,57 billion) and it will exceed R$3 billion (¥ 5 bi) after the operation of the assets already auctioned untill now.
SGBH’s investments cover 4 regions and 12 states of Brazilian territory.
For the future, SGBH has plans of to invest also in Distribution and Generation, with special focus on renewable energy.
State Grid Brazil Holding – SGBH – is the Brazilian Subsidiary Company of the Giant “State Grid Corporation of China”.
In 2010, Brazil was chosen for the first major investment of the conglomerate in non Asian countries: Had invested about R$ 3,97 billion (¥ 6,61 bi), acquiring its first seven (7) Transmission Companies.
SGBH owns 16 and has 51% participation in 5 concessionaires, totaling 21 of 140 Transmission Companies operating in Brazil nowadays.
SGCC
SGID
State Grid Brazil HoldingPresident: Mr. Cai
Project ManagementVP: Mr. Chang Zhongjiao
Business Development and
AdminVP: Mr. Qu Yang
Operation and Maintenance
VP: Mr. Ramon Haddad
OM Department
Operation Division
Technical Division
Maintenance Division
Expansion Division
Environment Division
East Regional
West Regional
Center Regional
Southwest Regional
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
SGBH Organization Chart
With a lean Organizational structure, SGBH now operates with about 400 Brazilian and 30 Chinese employees.
9
SGBH - STATE GRID BRAZIL HOLDING S.A.
9
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
ETEE ETIM ITE SPTE SMTE PCTE RPTE TPN TPS PTE MRT
BMTE
LTI
CTE
ARTE
LTMC
IRTE
PPTE
ASSETS IN OPERATION ASSETS UNDER CONSTRUCTION
51%
51% 51% 51%
51%
ACTE
LNT
Brown fields investments
Green fields investments
III - Mar, 2012 Auction:Teles Pires TransmissionIII - Mar, 2012 Auction:Teles Pires Transmission
I -2010 First Acquisition: 7 Trasmission Concessionaires
I -2010 First Acquisition: 7 Trasmission Concessionaires
V - Dec, 2012 Auction:
Paranaiba
V - Dec, 2012 Auction:
ParanaibaVI - Nov, 2013
Auction:Marechal Rondom
VI - Nov, 2013 Auction:Marechal Rondom
IV -Dec, 2012 Acquisition: 5 Transmission Concessionaires
IV -Dec, 2012 Acquisition: 5 Transmission Concessionaires
XRTE
VIII- 2015 Acquisition:2 Transmission Cocessionaires
VIII- 2015 Acquisition:2 Transmission Cocessionaires
II- Dec, 2011 Auction:Luziania NiquelandiaII- Dec, 2011 Auction:Luziania Niquelandia
VII - Feb, 2014 Auction:1st Bipolo Belo Monte
VII - Feb, 2014 Auction:1st Bipolo Belo Monte
IX - July, 2015 Auction:2nd Bipolo Belo MonteIX - July, 2015 Auction:2nd Bipolo Belo Monte
11
Investment milestones (2010-2015)
First M&A projects from Plena Transmission (December, 2010) SGBH took over first 7 Transmission Concessionaires
New building (November, 2011) SGBH acquired an office building in Rio de Janeiro.
First Auction (December, 2011) State Grid and Furnas won the Lot H: Luziânia-Niquelândia
Transmissora (LNT)
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
11
Investment milestones (2010-2015)
Auction (March, 2012) SGBH and Copel won the Lot A ( Matrinchã-TPN) and Lot B
(Guaraciaba-TPS) of Teles Pires Transmission System
M&A projects from ACS Transmission Companies (December, 2012) SGBH took over the first phase of ACS projects: 5 Transmission
Concessionaires
Auction (December, 2012) SGBH, Furnas and Copel won the Lot G : Paranaíba Transmissora
(PTE)
Auction (November, 2013) SGBH won the Lot P to construct Marechal Rondom substation
(MRT)
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
11
Investment milestones (2010-2015)
Auction (February, 2014) SGBH, Furnas and Eletronorte won the first dipole of ±800kV Belo
Monte UHVDC transmission project
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Startup of Integrated System Operation Center - COS-SGBH, in Rio de Janeiro (May, 2014)
To optimize the management of assets operation.
11
Investment milestones (2010-2015)
Second Phase of M&A projects from ACS (July, 2015) SGBH took over the second phase of ACS M&A projects: 2
Transmission Concessionaires
Auction (July, 2015) SGBH won the second bipole of ±800kV Belo Monte UHVDC
transmission project
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
12
Main Project: Establish a centralized control and maintenance center to enhance the operation management
- Integrate the original system and resources, which was located in different regional operation centers, to establish a unified operation and monitoring center in Rio;
- Realize the centralized monitoring, remote control, online training and emergency management functions. Access to ONS (National System Operator) for centralized dispatching.
Achieve leading O&M performance
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
11
SGBH OPERATION CENTERS
TOC-EAST Ribeirão Preto - SP
TOC-OESTE Itumbiara - GO
TOC- CENTER Samambaia – DF
TOC-NORTHEAST São João do Piauí – PI
TOC-SOUTHWEST Imbirussú - MSTOC- ARARAQUARA
Araraquara - SP
TOC-CENTER
TOC-EAST
TOC-WEST
TOC-SOUTHWEST
TOC-NORTHEAST
TOC- ARARAQUARA
2011
2012
2014
2015
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Integration Plan – COS Project
MOTIVATIONS:
Resources Optimization;
Technological evolution allowing reliable remote control;
Standardization of procedures;
O&M Processes Improvement;
Standardization of Supervision and Control Systems: NARI - Open 3000;
Reduced Operating errors;
Improvement of Operation and Maintenance Teams.
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
13
SGBH Integration Plan
COS-STATE GRID
Rio de Janeiro - RJ
COR-LESTE Ribeirão Preto - SP
Back up Center
When SB TL Equipament Concessionaries ROC
MAY 06 05 2TR, 2RT PCTE, RPTE EAST
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Back up Centers
14
SGBH Integration Plan
COS-STATE GRID
Rio de Janeiro - RJ
TOC-EAST Ribeirão Preto - SP
TOC-WEST Itumbiara - GO
When SE LT Equipament Concessionaries ROC
MAY 06 05 2TR, 2RT PCTE, RPTE EAST
SEPT 09 08 2TR, 4RT,2RT ETIM, ITE, CTX WEST
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
15
SGBH Integration Plan
COS-STATE GRID
Rio de Janeiro - RJ
TOC-EAST Ribeirão Preto - SP
TOC-WEST Itumbiara - GO
When SE LT Equipment Concessionaries ROC
MAY 06 05 2TR, 2RT PCTE, RPTE EAST
SEPT 09 08 2TR, 4RT,2RT ETIM, ITE, CTX WEST
TOC-CENTER Samambaia – DF
Back up Centers
NOV 05 05 8TR, 6RT, 2BCS SPTE,SMTE,ETEE,LNT CENTER
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
16
COS-STATE GRID
Rio de Janeiro - RJ
COR-LESTE Ribeirão Preto - SP
COR-OESTE Itumbiara - GO
COT-NORDESTE São João do Piauí – PI
TELES PIRES TRANSMISSION SYSTEM
SGBH Integration Plan
Backup Center: Milagres SB
2015 Integration
COR-NORDESTE Milagres – CE
COR-CENTRO Samambaia – DF
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
ITE ETIM
SE Cuiabá
BM Rondonópolis
SE/BM RibeirãozinhoSE/BM Rio Verde
SE Barra do Peixe SE Itumbiara
COR Oeste
BM Araporã
SE Marimbondo
CTX
SE Paranatinga
SE Cláudia
SE Paranaíta
MTE
GTE
SE/BM Sinop
Legenda
In Operation 500kV
In Operation 230kV
Future Operation 500kV
SGBH Integration Plan Green field projects under construction:
NameLength of transmission lines at
500kV(km)Number of 500kV
substations Matrinchã (TPN) 2010 4Guaraciaba (TPS) 950 3
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Improvements
Optimization of resources: Operation Mode of SGBH Instalations;
Implementation of SGBH Contingency Plan for Operation
Improvement of maintenance team: COR operators are available for maintenance activities;
Unified Supervision and Control System - OPEN3000 ( NARI) – System customize to attend SGBH requirements;
Better Tasks Division in Operation Center;
Real time operation closer to the Technical team;
Uniformity of Operating Procedures;
Agility and better treatment of the Operative Information;
Uniformity of Training.
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Green field projects under construction:
NameLength of transmission lines
(±800kV) Number of substations
Belo Monte I (BMTE)
20922
(±800kVconvert station)
Belo Monte II (XRTE)
25182
(±800kVconvert station)
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Main Projects
20
20
Equipment Total 2015Total 2016
(PTE)Future
(BMTE+XRTE)
Substations 42 44 46
+- 800kV Transmission Lines -- -- 02
500 kV Transmission Lines 30 33 33
440 kV Transmission Lines 06 06 06
230 kV Transmission Lines 12 12 12
138 kV Transmission Lines 07 07 07
Transmission Lines (km) 9,145.00 9,737.00 15,314.00
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
2012 2013 2014 2015 (*Until August)0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
99.9474% 99.9512% 99.9671% 99.9881%
Achieve leading O&M performance
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Focus on removing defects, obtain leading operational indicatorsThrough introducing the equipment defect management system of SGCC, we carry out the inspection and elimination any equipment problems, and improve the equipment availability to 99.9%.
Achieve leading O&M performance
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Focus on removing defects, obtain leading operational indicatorsThrough intensive training, SGBH has a high performance maintenance team to attend contingencies minimizing the unavailability of equipment.
12
“Valor1000” Winner (2012 and 2014) Best Energy CompanyReceived recognition from Valor Economic newspaper, one of Brazil’s foremost news media in economic and business. In 2012 and 2014, SGBH ranked first in the “Electric Energy” sector.
Achieve leading O&M performance
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
“SGCC Rio Tower (2012) – Av. Presidente Vargas, 955 Rio de Janeiro, RJIn 2012, State Grid Brazil Holding inaugurated its headquarters in Rio de Janeiro. With an investment of more than R$ 200 million ( ¥ 330 million RMB) , the head office occupies a building certified Green Building Gold, granted by the US Green Building Council organization, establishing sustainable construction criteria.
Strengthen Local Cooperation and Technology Exchange
- On April, 2011, SGCC and Eletrobras signed the MOU in Beijing during President Dilma’s visit to China. Minister of MME witnessed the signing process.
- On August, 2011, the MOU between SGCC and ONS was signed in Rio de Janeiro.
- Organize experts exchange with EPE, ANEEL and other related parties
- Send our local staffs to SGCC’s training centers in China.
- On July 2014, Signed BM cooperative agreement under the witness of presidents of Brazil and China.
Added Value to Brazilian Power Sector
- Best practices in design, construction, dispatching, O&M and management of large power grid.
- Introduce UHV and smart grid technology to Brazil.
- SGCC united with Eletrobras companies won the auction of first bipole of Belo Monte transmission project.
- SGCC won the auction of second dipole of Belo Monte transmission project.
Strategic cooperation and Technological exchanges
13
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Signed MOU with Eletrobras in Bei Jing
Signed BM cooperative agreement under the witness of presidents of Brazil and China
Adhere to high environmental standards and balance the business development with the preservation of nature
– The Fauna Monitoring Program;– Prevention and Control Forest Fires Program;– Contribute to improvement or maintenance Nature Reserves;– Technical and financial resources to create urban planning on
the use of urban properties for environmental balance.
Sponsor tax incentive projects to fulfil Social responsibility
– Estrada Cultural Project , to teach music to teenagers who live in the Mare’s slam. More than 200 children benefit from the Project;
– Cinemagia, free movies to bring art and entertainment for adults and children in many cities across Brazil;
– Promote championships organized by the Brazilian Table Tennis Confederation in 2014;
– Indoor Social Responsibility, provide scholarships for employees who want to learn English.
Environmental protection and social responsibility
14
OVERVIEW OF STATE GRID BRAZIL HOLDING S.A.
Strategic Growth Plan
Vision: Accomplish R$20 Billion investment by 2020, enter the generation (hydro, solar and wind power) and distribution sector.
Mission: to invest sustainably in the Brazilian power sector by practicing as an outstanding corporative citizen with local roots pursuing long-term growth objectives.
16
SGBH directs its attention towards three levels to reach sustainable growth.:
Corporate Development
• Localization• Become an integrated energy player with assets in Generation, Transmission and Distribution.• Expand investment portfolios, including new energy(wind, biomass etc.)• Focus on green-field and brown-field opportunities.
Social Contribution
• Actively contribute to development of communities and environmental protection.• Management team recognized as a top performer.• provide more working opportunities.
Industry Contribution
• Reach best-in-class operational level.• Introduce more cutting-edge technology.• Strengthen Local Cooperation and Technology Exchange.
Wait a moment, please!
This is not the end of the presentation
Gabriela Desire – [email protected] of Operation Division
CONTACTS
Leandro Burlandy – [email protected] Specialist Engineer – Technical Division