0 soil management screening of all soil to be re-used or disposed of re-use or disposal of excess...
DESCRIPTION
2 On-Campus Options for Re-use of Excess Soil Parking Lots o North Parking Lot o Lot D o South Parking Lot Roadway Areas o Bianculli Boulevard adjacent to Boston College High School Landscaped Areas/Landforms o Commencement Lawn o Soccer Field and Track o Behind Calf Pasture Pumping Station o Between Calf Pasture Pumping Station and Lot A (Quonset Huts) Site elevations to be determined by: Adjacent existing or proposed (e.g. Campus Quadrangle) elevations Storm surge concerns Views Utility Corridor and Roadway Relocation ProjectTRANSCRIPT
1
Soil Management• Screening of all soil to be re-used or disposed of• Re-use or disposal of excess soil
Utility Corridor and Roadway Relocation Project
Project Start January 2013Anticipated Completion June 2015
2
Re-use of Excess Soil• Excess soil estimate = 195,000 tons• Current cost to re-use = $0• Current cost to dispose offsite = $100 per ton• Cost avoidance potential = $19.5 million
Additional Benefits of Re-use• Re-use of landfill materials at the source• Site elevation increases to address storm surge
concerns• Avoidance of 6,800 truck trips needed to dispose
195,000 tons of excess soil will reduce vehicle emissions and on-campus traffic related to "to and from" truck trips
Utility Corridor and Roadway Relocation Project
3
On-Campus Options for Re-use of Excess Soil• Parking Lots
o North Parking Loto Lot Do South Parking Lot
• Roadway Areaso Bianculli Boulevard adjacent to Boston College High
School• Landscaped Areas/Landforms
o Commencement Lawno Soccer Field and Tracko Behind Calf Pasture Pumping Stationo Between Calf Pasture Pumping Station and Lot A (Quonset
Huts)
Site elevations to be determined by:• Adjacent existing or proposed (e.g. Campus
Quadrangle) elevations• Storm surge concerns• Views
Utility Corridor and Roadway Relocation Project
4
Screening• Visual screening to identify type of soil based on
composition so that it can be temporarily stored and managed appropriately
• Physical screening of soil that is filled with debris – glass, brick, metal, boulders – these materials represent risks of future settlement
On-Campus Location Options for Physical Screening and/or Temporary Storage• South Lot• Lot A• Lot B• Lot C• Lot D
Utility Corridor and Roadway Relocation Project