  • SMCC - HK JO

    SOIL INVESTIGATION REPORT

    F O R

    SOIL DATA FOR CP - 1061. DUKUH ATAS STATION

    2. TUNNEL SECTION3. BUNDERAN HI

    SEPTEMBER 2013

    CONTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT

    (UNDERGROUND SECTION CP-106)

  • i

    SOIL INVESTIGATION REPORT

    FOR CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT

    UNDERGROUND SECTION - CP106

    TABLE OF CONTENT

    1.0 INTRODUCTION 1 1.1 Project Content 1

    2.0 SOIL INVESTIGATION WORK 2.1 Location of Boreholes 2

    2.2 Exploratory Drilling 3

    2.3 Standard Penetration Test 3

    2.4 Undisturbed Soil Sampling 4

    2.5 Pressuremeter (LLT) Test 4

    2.6 Insitu Permeability Test 12

    2.7 Seismic Downhole Test 12

    2.8 Laboratory Tests 18 APPENDIX : A.1 DUKUH ATAS STATION Field Test Results -- Cross Sectional Profiles -- Log of Borings

    -- Photographs of Core Samples

    -- Pressuremeter (LLT) Test -- Casagrande and Permeability Test

    -- Downhole Seismic Test

    Laboratory Test Results -- Summary of Test -- Grain Size Distribution

    -- Unconfined Compression Test

  • ii

    A.1 TUNNEL SECTION Field Test Results -- Cross Sectional Profiles -- Log of Borings

    -- Photographs of Core Samples

    -- Pressuremeter (LLT) Test -- Casagrande and Permeability Test

    -- Downhole Seismic Test

    Laboratory Test Results -- Summary of Test -- Grain Size Distribution

    -- Unconfined Compression Test

    A.1 BUNDERAN HI STATION Field Test Results -- Cross Sectional Profiles -- Log of Borings

    -- Photographs of Core Samples

    -- Pressuremeter (LLT) Test -- Casagrande and Permeability Test

    -- Downhole Seismic Test

    Laboratory Test Results -- Summary of Test -- Grain Size Distribution

    -- Unconfined Compression Test

    -- Consolidation Test

    APPENDIX : B EQUIPMENT AND METHOD USED IN THIS INVESTIGATION -- Exploratory Drilling Machine -- Undisturbed Sampling -- Standard Penetration Test -- Pressuremeter Test -- Downhole Seismic Test -- Permeability Test

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    SOIL INVESTIGATION REPORT

    FOR CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT

    UNDERGROUND SECTION - CP106

    1.0 INTRODUCTION The purpose of this soil investigation work is to obtain subsurface of the deeper soil layers, in

    particular at the underground section of CP106 which includes the Dukuh Atas, Bunderan HI

    Stations, and the tunnel section between the two stations.

    The Soil Investigation includes drilling at eighteen locations and performing in-situ lateral Load Tests

    (LLT), Standard Penetration Test, undisturbed sampling, Downhole seismic Logging Test, and

    performing permeability tests in the sand layers

    The recovered undisturbed soil samples were tested in the laboratory for their index and

    mechanical properties .

    This report presents all data of the soil investigation

    1.1 PROJECT CONTENT Following are the features of this soil investigation work:

    a. Name of Project : Soil Investigation at MRT Underground Section CP106

    at Stations :Dukuh Atas and Bunderan HI and part of tunne between

    the above stations.

    c. Main Contractor : SMCC - HK JO

    d. Geotechnical Contractor : P.T. SOFOCO (Soil & Foundation Engineering Corporation)

    e. Scope of work I Field Work

    Wash-boring at 19 boreholes to 25m ~60m depth Core Drilling at 3 boreholes to 17 ~ 36m depth Standard Penetration Test 561 nos Cone Penetratio test 4 nos Downhole Seismic Logging Test . 3 nos Undisturbed Thin Walled Sampling 121 nos Pressuremeter Test 46 nos In Situ Permeability Test 7nos

    II Laboratory tests on undisturbed samples

    Index properties : Sieve Analysis, Liquid and Plastic Limits, Moisture Content , Bulk and Dry Density, Void Ratio , Wet Unit Weight 121 nos Uniaxial Unconfined Compression (Uc) Test 104 nos Consolidation Test 5 nos Chemical Test 12 nos

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    2

    2. SOIL INVESTIGATION WORK

    The soil investigation work consists of 19 boreholes that were carried out along the proposed

    underground railway track at the Dukuh Atas to the proposed BUnderan HI station

    Figure 1.1 Location Map of Boreholes at Dukuh Atas Station

    Figure 1.2 Location Map of Boreholes at Bunderan HI Station - 1

    Figure 1.2 Location Map of Boreholes at Bunderan HI Station -2

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    3

    The positions of the boreholes and their elevation and chainage is shown in the following Table 1.

    No Section BoreholeNo. Easting(X) Northing(Y) Elevation1 DUKUHATAS 106BR1 701663.901 9314121.169 6.1982 STATION 106BR2 701673.718 9314220.225 4.4643 106BR3 701673.718 9314220.225 4.7664 106BR4 701682.892 9314263.773 4.65 106BR5 701690.883 9314314.892 4.5866 106BR6 701688.912 9314176.912 9.3877 106BR7 701664.500 9314187.508 4.632 8 TUNNEL 106BR21REV 701590.249 9313453.243 11.1889 106BR21 701609.420 9313583.387 10.85410 106BR22 701620.826 9313839.795 10.83111 106BR23 701717.323 9314816.887 4.471 12 BUNDERANHI 106BR11 701713.173 9315025.132 4.8613 STATION 106BR12 701673.718 9314220.225 4.76614 106BR13 701710.385 9315136.459 4.68815 106BR14 701709.215 9315201.035 4.57616 106BR15 701707.823 9315255.609 4.51417 106BR16 701706.105 9315368.927 4.56518 106BR17 701706.944 9315427.511 3.63219 106BR18 701705.967 9315398.24 3.918

    2.2 Exploratory Drilling Four rotary-type drilling machines were mobilized to perform the exploratory drilling at 19 locations.

    The boreholes were advanced by rotary core drilling method as described in Appendix C.I.

    The diameter of the borehole was 89 mm and the cores are 70mm.

    The cores were placed in coreboxes for visual classification and identification of the soils

    encountered.

    2.3 Standard Penetration Test

    The standard penetration tests (SPT) were performed to determine the consistency of the subsoil

    and to obtain soil samples for visual description. The tests were carried out at every 1.5 m or 2.0

    depth intervals.

    The standard Automatic SPT system was used to ensure the free-fall of the SPT hammer with

    constant drop energy. The drilling logs in Appendix A display the SPT N-values, i.e., the blow counts

    required to penetrate the SPT split spoon sampler into the soil for the last 30cm penetration.

    Appendix C.2 describes the method of the test.The result of the borehole drilling and tests are

    describes in soil boring profiles, and is shown in Appendix A1. and to obtain an overall view of the

    soil layers, is presented in crossectional profiles as is shown in figure 2.1 to 2.5

    Table 1. Location of Boreholes

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    4

    Figure 2.1 Cross-sectional Soil Profile at Dukuh Atas Sstation

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    5

    Figure 2.2 Cross-Sectional Soil Profile at Dukuh Atas Station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    6

    Figure 2.3 Cross-sectional Soil Profile at Tunnel Section

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    7

    Figure 2.4 Cross-sectional Soil Profile at Bunderan HI Station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    8

    Figure 2.5 Cross-sectional Soil Profile at Bunderan HI station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    9

    2.4 Undisturbed Soil Sampling Undisturbed soil samples were taken from selected boreholes, particularly at the underground

    section of the railway line, particularly from borehole locations

    Stainless steel thin walled tubes of 75mm diameter and 1000m long tubes were used to recover

    cohesive soil samples and for further determination of their physical and engineering properties in

    the laboratory.

    The equipment and method used for sampling is presented in Appendix C.

    In total fifteen undisturbed samples were recovered for further testing of soil in the laboratory.

    2.5 Pressuremeter Test The elastic properties of the soil were determined by means of the Lateral Load Test equipment in

    boreholes to determine the elastic properties of the soil, such as the earth pressure at rest, yield and

    failure pressure, subgrade soil reaction and elastic modulus. The test consists of the insertion of a rubber tube probe into the borehole and by inflating the tube

    their pressure and corresponding increase of the probe radius are measured.

    The tests were performed by allowing two loading cycles. The linear slope of the 2nd loading cycle

    was used to determined the stiffness of the soil.

    Th eelastic modulus is calculated according to the following equaotion:

    E = (1 +) . rm . Km where :

    E = Elastic Deformation Modulus = Poisson Ratio rm = radius of borehole Kmv= Modulus Coefficient of Soil Reaction ( = P/r) The results of the fourty four tests performed are shown in Appendix A3, and summarized as shown

    in the following Table

    Test

    Location Type of soil N-SPT Depth

    (meter) Coefficient of Soil Reaction km (MN/m3)

    Elastic Modulus

    Es (MN/m2)BR-1 Soft brown Silty Clay 7 3.0 ~ 4.0 51.8 2.85

    Stiff Brown Clayey Silt 31 8.0 ~ 9.0 368.0 20.92

    Hard Brown Sandy-Clayey Silt 19 13.0 ~ 14.0 252.6 140.93

    Vey Hard Black Sand 29 18.0 ~ 19.0 302.8 19.11

    Very Hard Black Sandy Silt 21 23.5 ~ 24.0 1585 59.61

    17 28.0 ~ 29.0 420.8 23.9

    Stiff grayish Brown Clayey Silt 25 33.0 ~ 34.0 132.1 8.16

    Medium Stiff& brown Sandy Silt

    24 38.0 ~ 39.0 666..7 34.23

    Very Sift grayish Brown Sandy Silt

    23 17.0 ~ 18.0 390.0 21.60

    Medium Dense blackish gray Silty Sand

    24 22.0 ~ 23.0 475.2 26.31

    Table 2. Summary Result of LLT Test

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    10

    Test Location

    Type of soil N-SPT Depth (meter)

    Coefficient of Soil Reaction km (MN/m3)

    Elastic Modulus

    Es (MN/m2)BR-3 Soft brown Silty Clay 38 5.0 ~ 6.0 156.1 58.68

    Stiff Brown Clayey Silt 27 10.0 ~ 11.0 301.25 113.25

    Hard Brown Sandy-Clayey Silt 22 15.0 ~ 16.0 465.0 174.8

    Vey Hard Black Sand 31 20.0 ~ 21.0 86.63 32.47

    Very Hard Black Sandy Silt 41 25.0 ~ 26.0 50.82 19.11

    26 30.0 ~ 31.0 281.3 16.3

    Stiff grayish Brown Clayey Silt 21 35.0 ~ 36.0 8074.5 30.36

    Medium Stiff& brown Sandy Silt

    34 40.0 ~ 41.0 21104.1 79.3

    Test Location

    Type of soil N-SPT Depth (meter)

    Coefficient of Soil Reaction km (MN/m3)

    Elastic Modulus

    Es (MN/m2)BR-4 Soft brown Silty Clay 2 4.5~ 5.5 34.4 2.52

    Stiff Brown Clayey Silt 23 9.0 ~ 10.0 125 8.67

    Hard Brown Sandy-Clayey Silt >50 13.0~ 14.0 21557.1 81.04

    Vey Hard Black Sand 23 18.0 ~ 19.0 23,910.1 89.89

    Very Hard Black Sandy Silt >50 23.0 ~ 24.0 6733.1 25.31

    26 29.0 ~ 30.0 128.9 7.19

    Stiff grayish Brown Clayey Silt 21 33.0 ~ 34.0 7,969.8 28.96

    Medium Stiff& Sandy Silt 23 38.0 ~ 39.0 14,031.5 52.75

    Test Location

    Type of soil N-SPT Depth (meter)

    Coefficient of Soil Reaction km (MN/m3)

    Elastic Modulus

    Es (MN/m2)BR-21 Soft brown Silty Clay 4 7.5 ~ 8.5 119.2 6.53

    Stiff Brown Clayey Silt 12.5 ~ 13.5

    Hard Brown Sandy-Clayey Silt 21 16.0~ 17.0 171.4 9.59

    Very Hard Black Sandy Silt 23 21.5 ~ 22.5 37,314.5 140.28

    BR-23 Dark Grey Fine Sand 30 16.0 ~ 17.0 263.2 16.9

    Test Location

    Type of soil N-SPT Depth (meter)

    Coefficient of Soil Reaction km (MN/m3)

    Elastic Modulus

    Es(MN/m2)BR-11 Soft brown Silty Clay 8 2.5 ~ 3.5 56.7 3.30

    Stiff Brown Sity Clay 19 7.5 ~ 8.5 81.1 4.74

    Hard Brown Sandy-Cemented Silt 37 12.5 ~ 13.5 100.0 6.60

    Hard Brown Clayay SILT 35 17.5 ~ 18.5 450 25.94

    Hard BlackSilty Clay 15 22.5 ~ 23.5 61.7 3.65

    Hard BlackSilty Clay 16 27.5 ~ 28.5 233.3 13.60

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    11

    Test

    Location

    Type of soil N-SPT Depth (meter)

    Coefficient of Soil Reaction km (MN/m3)

    Elastic Modulus

    Es(MN/m2)BR-15 Soft brown Yellowish Silty Clay 3 4.0 ~ 5.0 42.0 2.54

    Medium Stiff Clayey Silt 18 9.0~ 10.0 337.5 16.88

    Hard grey Sandy-Clayey Silt 44 14.0 ~ 15.0 350 20.30

    Vey Hard Black Sand 31 19.0~ 20.0 450 25.94

    Very Stiff Dark Grey Silty Clay 16 24.0 ~ 25.0 16825.2 59.24

    Very Stiff Dark Grey Silty Clay 18 27.8 ~ 28.8 8854.9 31.18

    BR-17 V. Loose Clayey Sand 2 4.0 ~ 5.0 28.0 1.74

    Soft Black & Brown Clay 11 9.0~ 10.0 63.7 4.49

    Black Silty Cay trace Organic 3 14.0 ~ 15.0 32.5 2.13

    Medium stiff Grey Sity Clay 8 19.0~ 20.0 148.9 11.47

    Stiff grey Brwn Sity clay 11 25.0 ~ 26.0 54.2 4.74

    Very Stiff Brown Yellowish Silty Clay

    23 29.0 ~ 30.8 12061.6 42.47

    2.6 Insitu Permeability Test In situ permeability tests have been performed in selected boreholes at the f tunnel location.

    The test consist of inserting a steel casing to the designated depth where sand is encountered, and

    after sealing the casing from possible infiltration of surface water into the borehole, then drilling at

    inside the casing is performed until reaching approximately 1.0m below the bottom of casing and to

    form a un-cased cylindrical shaft cavity and to enable to measure the lateral water flow.

    The method used for measuring the soil permeability is by means of the falling head method.

    After firstly measuring the initial level of the ground water table, then the casing is filled with water

    until reaching the top of the casing pipe. The water drop-down is measured at certain time

    intervals until reaching the stable or up to the first initial water level.

    By tabulating, calculation and graph, the soil permeability can be determined, and the results are

    shown in Appendix A.

    A summary of the insitu permeability tests is shown in Table 3 below.

    Permeability Test Location Type of soil Depth

    (meter) cm/second meter/day

    BR21 v. dense Sand 21 ~ 22.0 2.62 x 10-4 2.27 x 10-1

    BR22 v. dense Sand 21.50 2.62 x 10-4 2.267x 10-1

    BR2-Rev v. dense Sand 16.00 5.72 x 10-5 4.95x 10-2

    BR23 v. dense Sand 18.50 2.49 x 10-4 2.415x 10-1

    BR15 v. dense Sand 19.00 9.66 x 10-5 8.344x 10-2

    BR16 v. dense Sand 15.00 7.27 x 10-6 6.28x 10-3

    BR17 v. dense Sand 32.50 2.97 x 10-6 2.566x 10-3

    Table 3 Soil Permeability by Falling Head in Sand Layer

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    12

    2.6 Seismic Downhole Test In situ seismic downhole tests have been performed in three boreholes and at each Dukuh Atas

    station (at BR 3), at the Tunnel Section at ( BR 15) and ( BR21),

    The test consist of inserting a steel casing to the designated depth where sand is encountered, and

    after sealing the casing from possible infiltration of surface water into the borehole, then drilling at

    MECHANICAL PARAMETER S FROM DOWNHOLE SEISMIC TEST AT T BOREHOLE: BR-03

    Depth (m)

    Vp (m/s)

    Vs (m/s)

    Density*)(Ton/m3)

    Poisson Ratio

    Dynamic Shear

    Modulus (Mpa)

    Dynamic Young

    Modulus (Mpa)

    Dynamic Bulk Modulus

    (Mpa)

    0 326.1 164.8 1.72 0.328 46.7 124.2 120.6

    1 347.5 163.8 1.72 0.357 46.2 125.3 146.1

    2 438.4 151.5 1.72 0.432 39.5 113.1 277.9

    3 428.0 153.1 1.72 0.427 40.3 115.1 261.3

    4 1504.5 165.4 1.72 0.494 47.0 140.6 3,830.6

    5 1487.7 232.4 1.72 0.487 92.9 276.3 3,683.0

    6 1787.9 317.2 1.72 0.484 173.1 513.6 5,267.5

    7 1868.2 352.7 1.53 0.482 190.4 564.1 5,086.0

    8 2143.7 354.8 1.53 0.486 192.6 572.3 6,774.1

    9 2371.2 336.3 1.53 0.490 173.1 515.7 8,371.4

    10 2051.9 346.1 1.53 0.485 183.3 544.6 6,197.1

    11 2137.8 341.8 1.53 0.487 178.8 531.7 6,754.1

    12 2204.2 325.1 1.63 0.489 172.2 512.8 7,689.8

    13 1849.4 308.6 1.63 0.486 155.2 461.2 5,367.8

    14 1874.1 310.7 1.63 0.486 157.4 467.6 5,515.2

    15 1893.7 278.3 1.63 0.489 126.3 376.0 5,676.8

    16 1909.3 264.7 1.63 0.490 114.2 340.4 5,789.9

    17 1922.0 258.6 1.63 0.491 109.0 325.0 5,875.9

    18 1932.3 259.1 1.63 0.491 109.4 326.3 5,940.3

    19 1940.8 259.5 1.63 0.491 109.8 327.4 5,993.7

    20 1948.0 259.9 1.63 0.491 110.1 328.3 6,038.3

    21 1953.9 253.7 1.63 0.491 104.9 312.8 6,083.1

    22 1959.0 290.4 1.70 0.489 143.4 427.0 6,332.6

    23 1963.3 290.8 1.70 0.489 143.7 428.0 6,360.8

    24 2444.0 340.2 1.70 0.490 196.8 586.4 9,891.6

    25 2449.6 340.6 1.70 0.490 197.3 587.9 9,937.8

    26 2454.5 341.0 1.70 0.490 197.7 589.2 9,977.9

    27 1975.9 291.8 1.75 0.489 149.0 443.8 6,633.4

    28 1977.9 248.7 1.75 0.492 108.2 322.9 6,702.1

    29 1979.8 242.8 1.75 0.492 103.1 307.8 6,721.5

    30 1981.4 242.8 1.75 0.492 103.2 308.0 6,732.6

    Table 4a

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    13

    Depth (m)

    Vp (m/s)

    Vs (m/s)

    Density*)(Ton/m3)

    Poisson Ratio

    Dynamic Shear

    Modulus (Mpa)

    Dynamic Young

    Modulus (Mpa)

    Dynamic Bulk

    Modulus (Mpa)

    31 1982.8 237.2 1.75 0.493 98.4 293.9 6,748.9

    32 1984.1 231.7 1.75 0.493 94.0 280.6 6,763.7

    33 1985.2 243.0 1.75 0.492 103.3 308.4 6,759.2

    34 1986.3 255.4 1.75 0.492 114.2 340.6 6,751.9

    35 1987.2 262.1 1.75 0.491 120.3 358.6 6,750.2

    36 2479.2 331.5 1.75 0.491 192.3 573.4 10,499.8

    37 2480.6 342.9 1.51 0.490 177.6 529.3 9,054.9

    38 2481.9 343.1 1.51 0.490 177.7 529.7 9,064.3

    39 2483.1 355.3 1.51 0.490 190.6 567.9 9,055.8

    40 2484.1 355.4 1.51 0.490 190.8 568.3 9,063.6

    41 1991.5 343.4 1.51 0.485 178.0 528.6 5,751.4

    42 1992.0 332.1 1.60 0.486 176.4 524.2 6,113.5

    43 1992.4 321.5 1.60 0.487 165.4 491.6 6,131.0

    44 1992.8 321.5 1.60 0.487 165.4 491.8 6,133.5

    45 1993.2 321.6 1.60 0.487 165.5 492.0 6,135.7

    46 1993.5 355.9 1.60 0.484 202.7 601.3 6,088.3

    47 1993.8 356.0 1.70 0.484 215.4 639.1 6,470.9

    48 1994.1 356.0 1.70 0.484 215.5 639.3 6,472.8

    49 1994.4 343.9 1.70 0.485 201.0 596.8 6,494.0

    50 1994.7 332.5 1.70 0.486 187.9 558.4 6,513.2

    51 1994.9 302.4 1.70 0.488 155.5 462.7 6,558.1

    52 1995.1 293.6 1.70 0.489 146.5 436.3 6,571.5

    53 1995.3 277.3 1.70 0.490 130.8 389.7 6,594.0

    54 2492.1 277.3 1.70 0.494 130.8 390.7 10,383.3

    55 2492.4 369.5 1.70 0.489 232.0 690.9 10,251.3

    56 2492.8 369.5 1.70 0.489 232.1 691.1 10,254.1

    57 2493.1 369.5 1.70 0.489 232.1 691.2 10,256.7

    58 2493.4 369.6 1.70 0.489 232.2 691.3 10,259.1

    59 2493.6 369.6 1.70 0.489 232.2 691.4 10,261.4

    60 2493.9 369.6 1.70 0.489 232.3 691.6 10,263.6

    *) From laboratory test samples

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    14

    MECHANICAL PARAMETER S FROM DOWNHOLE SEISMIC TEST AT T BOREHOLE: BR-15

    Depth (m)

    Vp (m/s)

    Vs (m/s)

    Density*)(Ton/m3)

    Poisson Ratio

    Dynamic Shear

    Modulus (Mpa)

    Dynamic Young

    Modulus (Mpa)

    Dynamic Bulk

    Modulus (Mpa)

    0 294.1 136.4 1.50 0.363 27.9 76.0 92.6

    1 310.0 143.7 1.50 0.363 31.0 84.5 102.9

    2 393.2 134.0 1.50 0.434 26.9 77.2 196.0

    3 767.9 186.0 1.50 0.469 51.9 152.4 815.4

    4 855.5 172.4 1.50 0.479 44.6 131.8 1,038.3

    5 979.5 120.9 1.50 0.492 21.9 65.4 1,409.9

    6 897.3 141.0 1.50 0.487 29.8 88.7 1,168.0

    7 897.7 140.7 1.50 0.487 29.7 88.4 1,169.2

    8 945.6 141.3 1.53 0.489 30.5 90.9 1,327.4

    9 1834.8 176.7 1.53 0.495 47.7 142.8 5,087.1

    10 1963.5 212.6 1.53 0.494 69.1 206.6 5,806.3

    11 2064.3 259.7 1.53 0.492 103.2 307.8 6,382.5

    12 2143.2 368.3 1.53 0.485 207.6 616.3 6,751.2

    13 2205.1 376.8 1.64 0.485 232.8 691.4 7,664.3

    14 1846.9 369.5 1.64 0.479 223.9 662.5 5,295.8

    15 1871.0 374.3 1.64 0.479 229.8 679.8 5,434.9

    16 1890.3 378.2 1.64 0.479 234.5 693.8 5,547.4

    17 1905.9 321.0 1.64 0.485 169.0 502.0 5,731.7

    18 1918.6 322.6 1.64 0.485 170.7 507.1 5,809.2

    19 1929.1 324.0 1.64 0.485 172.1 511.4 5,873.4

    20 1937.8 325.1 1.64 0.486 173.3 514.9 5,927.0

    21 1945.1 326.0 1.64 0.486 174.3 517.9 5,972.1

    22 1951.2 230.0 1.64 0.493 86.8 259.0 6,128.2

    23 1956.5 230.2 1.64 0.493 86.9 259.6 6,161.6

    24 1641.5 247.4 1.64 0.488 100.4 298.8 4,285.4

    25 1643.9 241.7 1.64 0.489 95.8 285.2 4,304.3

    Continue to next page

    Table 4b

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    15

    Depth (m)

    Vp (m/s)

    Vs (m/s)

    Density*)(Ton/m3)

    Poisson Ratio

    Dynamic Shear

    Modulus (Mpa)

    Dynamic Young

    Modulus (Mpa)

    Dynamic Bulk

    Modulus (Mpa)

    26 1646.0 241.9 1.75 0.489 102.4 304.8 4,604.7

    27 1647.8 225.7 1.75 0.490 89.2 265.8 4,632.8

    28 1649.4 231.0 1.75 0.490 93.4 278.3 4,636.3

    29 1650.8 225.9 1.75 0.490 89.3 266.3 4,649.8

    30 1652.0 226.0 1.75 0.490 89.4 266.5 4,657.0

    31 1653.2 254.8 1.75 0.488 113.6 338.0 4,631.1

    32 1654.1 254.9 1.75 0.488 113.7 338.3 4,636.7

    33 1655.0 255.0 1.75 0.488 113.8 338.6 4,641.8

    34 1655.8 261.7 1.75 0.487 119.9 356.6 4,638.3

    35 1656.6 261.8 1.60 0.487 109.7 326.3 4,244.4

    36 1657.2 255.2 1.60 0.488 104.2 310.2 4,255.2

    37 1657.8 262.0 1.60 0.487 109.8 326.6 4,250.9

    38 1658.4 292.6 1.60 0.484 137.0 406.6 4,217.5

    39 2478.8 301.5 1.60 0.492 145.5 434.2 9,637.3

    40 2480.2 355.0 1.60 0.490 201.6 600.7 9,573.3

    41 2481.4 355.1 1.60 0.490 201.8 601.1 9,583.0

    42 2482.6 355.2 1.60 0.490 201.9 601.5 9,591.9

    43 2483.6 355.4 1.60 0.490 202.0 601.9 9,600.0

    44 2484.6 343.3 1.60 0.490 188.5 562.0 9,625.6

    45 2485.5 332.0 1.70 0.491 187.4 558.7 10,251.9

    46 2486.3 321.4 1.70 0.492 175.6 523.9 10,274.4

    47 1992.5 311.5 1.70 0.487 164.9 490.7 6,529.1

    48 1992.9 311.5 1.70 0.487 165.0 490.8 6,531.6

    49 1993.2 302.2 1.70 0.488 155.2 462.0 6,547.0

    50 1993.5 293.4 1.70 0.489 146.3 435.7 6,561.1

    *) From laboratory test samples

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    16

    MECHANICAL PARAMETER S FROM DOWNHOLE SEISMIC TEST AT T BOREHOLE: BR-21

    Depth (m)

    Vp (m/s)

    Vs (m/s)

    Density*)(Ton/m3)

    Poisson Ratio

    Dynamic Shear

    Modulus (Mpa)

    Dynamic Young

    Modulus (Mpa)

    Dynamic Bulk

    Modulus (Mpa)

    0 361.4 100.0 1.53 0.459 15.3 44.6 179.5

    1 340.0 100.4 1.53 0.452 15.4 44.8 156.3

    2 353.6 149.7 1.53 0.391 34.3 95.4 145.6

    3 728.4 161.3 1.53 0.474 39.8 117.4 758.6

    4 794.8 167.8 1.53 0.477 43.1 127.2 909.0

    5 646.4 166.3 1.53 0.465 42.3 123.9 583.0

    6 708.1 187.1 1.53 0.462 53.5 156.6 695.7

    7 754.7 159.8 1.53 0.477 39.1 115.4 819.4

    8 734.9 161.2 1.53 0.475 39.7 117.2 773.3

    9 704.9 129.6 1.53 0.483 25.7 76.2 726.0

    10 903.5 153.4 1.53 0.485 36.0 106.9 1,200.9

    11 921.8 154.7 1.53 0.486 36.6 108.7 1,251.4

    12 1286.1 160.5 1.53 0.492 39.4 117.6 2,478.2

    13 1311.0 273.1 1.63 0.477 121.6 359.3 2,639.2

    14 1330.4 276.6 1.63 0.477 124.7 368.4 2,718.7

    15 1345.7 251.7 1.63 0.482 103.3 306.1 2,814.3

    16 1358.0 273.8 1.63 0.479 122.2 361.4 2,843.2

    17 1368.0 275.4 1.63 0.479 123.7 365.8 2,885.3

    18 1376.1 269.4 1.63 0.480 118.3 350.3 2,928.7

    19 1382.8 270.5 1.63 0.480 119.2 353.0 2,957.6

    20 1388.3 278.8 1.63 0.479 126.7 374.8 2,972.7

    21 1393.0 279.6 1.63 0.479 127.4 376.9 2,992.9

    22 1931.6 288.3 1.70 0.489 141.3 420.6 6,154.7

    23 1939.2 297.4 1.70 0.488 150.4 447.4 6,192.5

    24 1945.7 327.0 1.70 0.485 181.7 539.9 6,193.4

    25 1951.3 350.4 1.70 0.483 208.7 619.2 6,194.3

    26 1956.1 328.1 1.70 0.486 183.1 543.9 6,260.4

    27 1960.2 328.6 1.70 0.486 183.6 545.4 6,287.6

    28 1963.9 260.8 1.60 0.491 108.8 324.5 6,025.9

    29 1967.1 340.5 1.60 0.485 185.5 550.8 5,943.7

    30 1969.9 300.2 1.60 0.488 144.1 429.0 6,016.6

    Table 4c

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    17

    2.7 Laboratory Tests

    The following laboratory tests were conducted for all the undisturbed soil samples and selected SPT samples:

    Index Property Tests Unit weight Specific gravity Natural water content Atterberg limits (liquid and plastic limits) Grain size analysis

    Mechanical Property Tests Unconfined Compression Test Unconsolidated-Undrained (UU) Triaxial Compression Test __ Consolidation Test

    The soil samples that have been recovered from the boreholes, were tested in the laboratory in

    order to obtain their index as well their engineering properties. The results are tabulated as shown

    in the Appendix. A summary of the soil index properties results of each borehole is presented

    below:

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    18

    Table 5.a Summary of Laboratory Test Results at Dukuh Atas Station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    19

    Table 5.b Summary of Laboratory Test Results at Dukuh Atas Station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    20

    Table 5.c Summary of Laboratory Test Results at Dukuh Atas Station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    21

    Table 5.d Summary of Laboratory Test Results at Tunnel Section

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    22

    Table 5.e Summary of Laboratory Test Results at Tunnel Section

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    23

    Table 5.f Summary of Laboratory Test Results at Bunderan HI Station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    24

    Table 5.g Summary of Laboratory Test Results at Bunderan HI Station

  • SOIL INVESTIGATION REPORT CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    25

    Table 5.h Summary of Laboratory Test Results at Bunderan HI Station

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    23

    APPENDIX C

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    24

    APPENDIX C.1 EXPLORATORY DRILLING

    The boreholes were drilled using rotary type drilling rig. Figure B.I.I shows the general set-up of a

    rotary drilling rig. The diameter of the boreholes in the present study was 89mm. Flush-jointed

    casing pipes that suit the desired borehole diameter were installed to prevent the borehole wall from

    collapsing and to maintain a clean hole.

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    25

    Core boring is one of the drilling method to advance the exploratory boreholes. In core boring

    method, a single barrel with a crown bit is lowered to the bottom of the borehole by drill rods. The

    borehole is advanced by rotating the core barrel with gentle thrust actions and, at the same time,

    muddy water is pumped through the drilling bit to flush out the soil cuttings. The mud-water also

    serves as the coolant for the drill bit and helps to stabilize the borehole from collapsing or caving in.

    When the drilling reaches to the anticipated depth for undisturbed sampling or other in-situ tests, the

    core barrel is withdrawn from the borehole and to recover the soil samples that have been retained

    in the barrel.

    Flush joint casing pipes that suit the desired borehole diameter were commonly installed to prevent

    the borehole wall from collapsing and to maintain a clean hole. If the borehole is sunk in soil layers

    having high potential of collapsing, casing pipes have to be installed immediately after the advance

    of the borehole to about 0.5m above the bottom of the borehole. In stable soil layers, casing pipes

    are usually installed in upper weak ground only to prevent necking of the borehole and serve as

    guide pipe. Thick bentonite slurry is sometimes used as drilling fluid which can be effectively

    stabilizing the borehole without the use of casing pipes.

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    26

    APPENDIX C.2

    UNDISTURBED SAMPLING

    a. Open-drive Sampling Method

    Open-drive sampling method is normally used to obtain soft to medium stiff cohesive soils. The

    sampler consists of a thin wall tube attached to a sampler head, as shown in Figure A.1

    The sampler head is equipped with a ball valve which allows water or air above the sample to

    freely escape when the tube is driven into the soil. The ball valve closes the air passage and helps

    retaining the sample when the sampler is pulled out from the ground. Figure B.3.2 illustrates the

    sampling mechanism.

    To obtain an undisturbed soil sample, a clean open borehole is drilled to the desire sampling

    depth. Before the sampling operation, the borehole is carefully cleaned to the sampling depth and

    the sampler is then lowered to the bottom of the borehole.

    In sampling operation, the thin wall tube is pushed into the ground by mechanical jacking or driven

    by SPT hammer. After the thin wall tube penetrates to the soil approximately 80% of the tube

    length, it is left for a few minutes for the recovery of the adhesion between the soil sample with the

    tube wall. Finally, the sampler is pulled out of the borehole. Both ends of the thin wall tube are

    sealed with paraffin wax immediately after the tube is separated from the sampler head.

    Figure A.1 Thin Wall Tube sampler

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    27

    APPENDIX C.3

    STANFDARD PENETRATION TEST

    The purpose of performing the tests is to determine relative density or consistency of soils and to obtain

    soil samples for identification A split barrel sampler of 50mm outer diameter as sown in Figure B 2 1 is

    lowered to the bottom of the borehole by drill rods The sampler was then dnven45Qmm in the soil by a

    o"3 5 kg automatic and self tripping free fall drive hammer, as shown in Figure B 2 2, over a height of

    760mm The first 15mm penetration is regarded as the seating drive, hence the number of blows to achieve

    this penetration is not included in the SPT N-value The total cumulative numbers of the blow counts

    required for each 75mm of the last 300mm penetration is recorded as the N-value. The recovered soil

    samples are kept in plastic jars for soil identification.

    Figure A.2 Standard Penetration Sampler

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    28

    Figure A.3. Automatic SPT Trip Hammer

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    29

    APPENDIX C4 PRESSUREMETER TEST

    The Pressuremeter Test is an in-situ apparatus to measure the relationship between ground stress

    and deformation.

    The pressuremeter test was using the LLT (Lateral Load Tester) type M from OYO Corporation-

    Japan.

    The apparatus consists of a probe or sonde of 70mm diameter ruber tube that is inflated at the

    bottom borehole and the soil is pressurized incrementally and laterally until reaching to a maximum

    shear strength where the soil has yielded.

    Figure A.4.1 Typical Pressuremeter Apparatus

  • Soil Investigation Report CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT - UNDERGROUND SECTION - CP106

    30

    APPENDIX C5

    PERMEABILITY TEST The Permeability Test shall be performed by following the Falling Head Permeability Test

    and is in accordance to BS 9530-1981. The procedure of the test is as follows:

    Procedure of Test

    a. Drill a hole of 76mm diameter to designated depth level for permeability test

    b. Install steel casing of 76 diameter into the borehole until designated depth level

    c. Drill to inside casing until 1.0m below casing bottom end

    d. Clean and flush the borehole by clear water

    e. Measure the ground water leveling the borehole

    f. Fill clear water until the top level of casing

    g. Measure the water level at elapsed time until the water level is at constant level .

    h. The measurement is input in the table and based on the following eqution the soil

    permeability is determined