Issue 46: 7 th August – 1 st October 2004 Catalogue of Company Standards Page 1 Catalogue of Company Standards RT/LS/CAT001 ISSUE 46 7 th August – 1 st October 2004 This document is the property of Network Rail Infrastructure Ltd. It shall not be reproduced in whole or in part, nor disclosed to a third party, without the written permission of the standard owner. Copyright ©2004 Network Rail Infrastructure Ltd. Network Rail Infrastructure Ltd. is part of the Network Rail Group of Companies.

Upload: michael-batley

Post on 28-Sep-2015

330 views

Category:

Documents


1 download

DESCRIPTION

001 Catalogue of Company Standards

TRANSCRIPT

  • Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 1

    Catalogue of Company Standards

    RT/LS/CAT001

    ISSUE 46 7th August 1st October 2004

    This document is the property of Network Rail Infrastructure Ltd. It shall not be reproduced in whole or in part, nor disclosed to a third party, without the written permission of the standard owner. Copyright 2004 Network Rail Infrastructure Ltd.

    Network Rail Infrastructure Ltd. is part of the Network Rail Group of Companies.

  • Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 2

    Whos Who & Support Contacts

    Network Rail Standards Development Process Team

    Technical Problems and Search Support Contacts (Please note it will help save time if you have available your System Number, Company Name and the Product Code. For CD, the Product Code is written on the right hand side of the disc eg RTL1, RTL5. For Online the code is RTI. For Online Historic the code is RTIH)

    Paul McAleer Head of Standards Development Process

    020 7557 8715 (085 78715)

    Technical Support Installation and technical matters Phone: 01344 404428 or email [email protected]

    Keith Hope Standards Change Co-ordinator Steve Smith Standards Change Co-ordinator John Winnifrith Standards Change Co-ordinator Richard Geldart Standards Change Co-ordinator

    020 7557 8691 (085 78691) 020 7557 8695 (085 78695) 020 7557 8462 (085 78462) 020 7557 8768 (085 78768)

    Customer Support For search queries and all other enquiries Phone: 01344 404429 or email [email protected]

    Caroline Peach Standards Publication Co-ordinator Sheriff Olujide Standards Publication Assistant

    020 7557 8679 (085 78679) 020 7557 8832 (085 78832)

    Other Information Network Rail Company Standards Subscriptions IHS Technical Indexes Ltd Phone: 01344 404409

    Chris Folwell Database Co-ordinator Johanna Grant Database Assistant

    020 7557 8714 (085 78714) 020 7557 8677 (085 78677)

    Network Rail Company Standards Hard Copy Document Centre Rapidoc Phone: 01344 861666 or email: [email protected]

    Kim Yarger Team Secretary

    020 7557 9635 (085 79635)

    Railway Group Standards Rail Safety & Standards Board Enquiry Desk Phone: 020 7904 7518 (085 77518)

    Network Rail Technical Drawings National Records Group Phone: 01904 524674 (03 74674)

    Email: [email protected] For all queries about the content of the Company Standards please, in the first instance, contact the Publication Team

    Hard Copy Purchase of Rule Books; Handbooks & Forms Willsons Printers Limited Phone: 01636 702334 (03 79510)

    Updated 2nd July 2004

    On 3rd February 2003 Railtrack officially changed its name to Network Rail. Railtrack Company Standards will now be officially known as Network Rail Company Standards. Newly published standards from April 2003 will reflect this name change. All existing standards are still valid and will be changed as and when the standards are reviewed

  • Contents

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 3

    Contents 1. About this catalogue ....................................................................................................................6

    1.1. How to use this catalogue.................................................................................................................................... 7 1.1.1. Example of Typical Entry ............................................................................................................................................................. 7 1.1.2. The Numbering System................................................................................................................................................................ 7 1.1.3. Quick Find Using the Index..................................................................................................................................................... 8 1.1.4. Referenced Documents................................................................................................................................................................ 8 1.1.5. Coloured Pages.............................................................................................................................................................................. 8 1.1.6. Compliance and Implementation ............................................................................................................................................... 9 1.1.7. Technical Standards for Inter-operability. ................................................................................................................................ 9 1.1.8. Notified National Standards........................................................................................................................................................ 9 1.1.9. Direct Maintenance Supplementary Instructions.................................................................................................................... 9 1.1.10. Ordering and Price List............................................................................................................................................................10

    2. Category Index of Network Rail Company Standards............................................................11 2A. General Information.............................................................................................................................................11

    2A1. Changes from previous issue......................................................................................................................................................11 2A1.1. New or Re-issued Standards .................................................................................................................................................................11 2A1.2. Deleted or Withdrawn Standards ........................................................................................................................................................13 2A1.3. Restricted Documents ............................................................................................................................................................................15 2A1.4. Network Rail Catalogues........................................................................................................................................................................15

    2B. Contracts & Procurement Directorate............................................................................................................17 2B1. Contracts & Procurement...........................................................................................................................................................17

    2B1.1. Procedures..................................................................................................................................................................................................17 2B2. Supplier Accreditation..................................................................................................................................................................18

    2B2.1. Procedures..................................................................................................................................................................................................18 2B2.2. Guidance Notes.........................................................................................................................................................................................18

    2C. Engineering Directorate ......................................................................................................................................19 2C1. Electrification .................................................................................................................................................................................19

    2C1.1. Specifications .............................................................................................................................................................................................19 2C1.2. Procedures.................................................................................................................................................................................................35 2C1.3. Codes of Practice .....................................................................................................................................................................................37 2C1.4. Guidance Notes........................................................................................................................................................................................39 2C1.5. Work Instructions....................................................................................................................................................................................40

    2C2. Business Engineering ....................................................................................................................................................................41 2C2.1. Specifications .............................................................................................................................................................................................41 2C2.2. Procedures.................................................................................................................................................................................................41

    2C3. Ergonomics.....................................................................................................................................................................................42 2C3.1. Specifications .............................................................................................................................................................................................42 2C3.2. Procedures.................................................................................................................................................................................................42 2C3.3. Guidance Notes........................................................................................................................................................................................42

    2C4. Plant .................................................................................................................................................................................................43 2C4.1. Specifications .............................................................................................................................................................................................43 2C4.2. Procedures.................................................................................................................................................................................................49 2C4.3. Codes of Practice .....................................................................................................................................................................................50

    2C5. Signal Engineering..........................................................................................................................................................................51 2C5.1. Specifications .............................................................................................................................................................................................51 2C5.2. Procedures.................................................................................................................................................................................................59 2C5.3. Codes of Practice .....................................................................................................................................................................................62 2C5.4. Guidance Notes........................................................................................................................................................................................76 2C5.5. Special Inspection Notices......................................................................................................................................................................78 2C5.6. Work Instructions....................................................................................................................................................................................82

    2C6. Civil Engineering............................................................................................................................................................................83 2C6.1. Specifications .............................................................................................................................................................................................83 2C6.2. Procedures.................................................................................................................................................................................................87 2C6.3. Codes of Practice ..................................................................................................................................................................................... 88

  • Contents

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 4

    2C7. Telecommunications.................................................................................................................................................................... 91

    2C7.1. Specifications ............................................................................................................................................................................................. 91 2C7.2. Procedures................................................................................................................................................................................................. 93 2C7.3. Codes of Practice..................................................................................................................................................................................... 94 2C7.4. Guidance Notes........................................................................................................................................................................................ 95 2C7.5. Special Inspection Notices ..................................................................................................................................................................... 95

    2C8. Track Engineering......................................................................................................................................................................... 96 2C8.1. Specifications ............................................................................................................................................................................................. 96 2C8.2. Procedures............................................................................................................................................................................................... 102 2C8.3. Codes of Practice................................................................................................................................................................................... 103 2C8.4. Permanent Way Special Instructions................................................................................................................................................. 105

    2C9. Rail Vehicle Engineering ............................................................................................................................................................106 2C9.1. Specifications ........................................................................................................................................................................................... 106 2C9.2. Codes of Practice................................................................................................................................................................................... 106

    2D. Information Management Directorate .......................................................................................................... 107 2D1. Information Management..........................................................................................................................................................107

    2D1.1. Procedures .............................................................................................................................................................................................. 107 2D1.2. Specifications........................................................................................................................................................................................... 107

    2E. Major Projects and Investments ...................................................................................................................... 108 2E1. Major Projects and Investments...............................................................................................................................................108

    2E1.1. Procedures................................................................................................................................................................................................ 108 2E1.2. Guidance Notes ...................................................................................................................................................................................... 108

    2F. Maintenance Directorate................................................................................................................................... 109 2F1. Maintenance..................................................................................................................................................................................109

    2F1.1. Specifications ............................................................................................................................................................................................ 109 2F1.2. Procedures................................................................................................................................................................................................ 109 2F1.3. Codes of Practice.................................................................................................................................................................................... 111 2F1.4. Guidance Notes....................................................................................................................................................................................... 111

    2G. Railway Estates Directorate ............................................................................................................................ 112 2G1. Railway Estates Policy and Planning........................................................................................................................................112

    2G1.1. Guidance Notes ..................................................................................................................................................................................... 112 2H. Safety & Compliance Directorates ............................................................................................................... 113

    2H1. Interoperability & Acceptance.................................................................................................................................................113 2H1.1. Procedures .............................................................................................................................................................................................. 113

    2H2. Assurance.....................................................................................................................................................................................114 2H2.1. Specifications........................................................................................................................................................................................... 114 2H2.2. Procedures .............................................................................................................................................................................................. 114 2H2.3. Codes of Practice................................................................................................................................................................................... 114

    2H3. Standards Development Process ............................................................................................................................................115 2H3.1. Procedures .............................................................................................................................................................................................. 115

    2H4. Environment Policy ....................................................................................................................................................................116 2H4.1. Specifications........................................................................................................................................................................................... 116 2H4.2. Procedures .............................................................................................................................................................................................. 116 2H4.3. Guidance Notes ..................................................................................................................................................................................... 117

    2H5. Fire Safety Policy ........................................................................................................................................................................118 2H5.1. Procedures .............................................................................................................................................................................................. 118 2H5.2. Codes of Practice................................................................................................................................................................................... 118

    2H6. Operational Safety Policy .........................................................................................................................................................119 2H6.1. Specifications........................................................................................................................................................................................... 119 2H6.2. Procedures .............................................................................................................................................................................................. 120 2H6.3. Codes of Practice................................................................................................................................................................................... 122 2H6.4. Guidance Notes ..................................................................................................................................................................................... 122

    2H7. Safety Case Management ..........................................................................................................................................................123 2H7.1. Procedures .............................................................................................................................................................................................. 123

    2H8. Accident Investigation ...............................................................................................................................................................124 2H8.1. Procedures .............................................................................................................................................................................................. 124 2H8.2. Guidance Notes ..................................................................................................................................................................................... 124

    2H9. Occupational Health & Safety Policy......................................................................................................................................125 2H9.1. Specifications........................................................................................................................................................................................... 125 2H9.2. Procedures .............................................................................................................................................................................................. 126

  • Contents

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 5

    2H10. Security Specialist .................................................................................................................................................................... 128 2H10.1. Procedures.............................................................................................................................................................................................128 2H10.2. Codes of Practice.................................................................................................................................................................................128 2H10.3. Guidance Notes ...................................................................................................................................................................................128

    2H11. Risk ............................................................................................................................................................................................. 128 2H11.1. Guidance Notes ...................................................................................................................................................................................128

    2J. Product Specifications..........................................................................................................................................129 2J1. Electrification & Plant.................................................................................................................................................................. 129 2J2. Railway Systems ........................................................................................................................................................................... 131 2J3. Signal Engineering......................................................................................................................................................................... 132 2J4. Civil Engineering........................................................................................................................................................................... 136 2J5. Railway Estates Policy and Planning ......................................................................................................................................... 136 2J6. Telecommunications ................................................................................................................................................................... 137 2J7. Track .............................................................................................................................................................................................. 138

    2L. Documents Archived in the Last 14 Months.................................................................................................142 2L1. Historic 06/03.............................................................................................................................................................................. 142 2L2. Historic 08/03.............................................................................................................................................................................. 142 2L3. Historic 10/03.............................................................................................................................................................................. 142 2L4. Historic 12/03.............................................................................................................................................................................. 143 2L5. Historic 02/04.............................................................................................................................................................................. 143 2L6. Historic 04/04.............................................................................................................................................................................. 144 2L7. Historic 06/04.............................................................................................................................................................................. 148 2L8. Historic 08/04.............................................................................................................................................................................. 148

    3. Reference Guide to Group Standards.....................................................................................150 4. Railway Group Standards and Catalogue Index ....................................................................161

    4.1. Railway Group Standards retained by Network Rail .................................................................................161 4.2. Catalogue Index ..................................................................................................................................................162

  • 1. About this Catalogue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 6

    1. About this catalogue Welcome to the Network Rail Catalogue of Company Standards, it is divided into 4 sections:

    Section 1: This introduction, including a How to use this catalogue gives the user information on the Company Standards numbering system and the process for ordering documents.

    As a result of customer concerns over numbering change, and the suspension of the Project Release project, we will revert to the numbering system as at June 2000. Standards given the new numbers from June to October 2000 will not be renumbered. If you have any queries please contact the Business Standards Team on 020 7830 5687 (085 75687).

    Section 2 is the Category Index of Network Rail Company Standards which lists all the

    o Specifications, o Product Specifications, o Procedures, o Codes of Practice, o Work Instructions, o Guidance Notes, o Special Inspection Notices

    by Directorate, Discipline and then by number, title, issue and authorisation. There is also a list of changes from the previous issue, and all standards that have been deleted in the last 14 months.

    The Category Index of Network Rail Company Standards is divided into the following Directorates:

    o Contracts & Procurement o Engineering o Information Management o Maintenance o Major Projects and Investments o Railway Estates o Safety & Compliance

    Product Specifications are grouped separately, in numeric order, for ease of reference. Each Directorate is divided into recognisable sections (e.g. Civil Engineering; Operational Safety Policy, etc.) with a summary of each document to assist the user in identifying standards applicable to their business. In addition, you will find information on the mandatory requirements for each Company Standard as well as information relating to compliance, where applicable.

    Section 3: A Reference Guide to Group Standards is a quick reference for users, which shows an up-to-date listing of Railway Group Standards at present in force. For further information contact the Rail Safety & Standards Board Enquiry Desk on 020 7557 8774 (internal 085 78774).

    Section 4: Railway Group Standards and Catalogue Index. This section contains a listing of the Railway Group Standards retained by Network Rail, and finally an Index to this catalogue.

  • 1. About this Catalogue

    Issue 46: 7th August 1st O

    1.1. How to use this catalogue

    1.1.1. Example of Typical Entry

    RT/CE/S/054 Inspection of Cast Crossings and Cast Vees in the Track Issue Date Status Price Colour Compliance Implementation * E X A M P L E 2 (1) Aug 03 (Aug 96) Up-Issued D 02/08/03 02/08/03

    1.1.2. The Numbering System

    RT / x follows:

    Six types of docume

    TERM Network Rail Comp

    Network Rail Comp

    Network Rail Comp

    n

    o

    Issue Number and Issue Date See note.

    * Indicates a new or up-issued document (For the current catalogue issue only)

    New or Up-issued.Blank = no change

    Price bandSee 1.1.9.

    Yes = colour pages available separately

    Compliance & Implementation dates, used for new and up-issued standards. See note.

    Note: See section 1.1.6 for more details on Compliance & Implementation, including Issue Number and Issue Date / y / z The general format of a typical Standard Reference Number is as

    q ctober 2004 Catalogue of Company Standards Page 7

    nt are published as Network Rail Company Standards. The purpose of each is as follows:

    DEFINITION any Specifications These set mandatory requirements upon Network Rail s employees, and also, when

    designated in an agreed contract or lease, upon contractors or tenants. They may contain procedural requirements. They require a formal remit, a Business case and Stakeholder Review.

    any Product Specifications These have a special status in that applicants for product acceptance shall: demonstrate compliance with the Product Specification; or

    demonstrate that their product has equivalent performance to that required by the Product Specification and is thus acceptable.

    They do not require a Business Case, but require a formal remit & Stakeholder Review.

    any Procedures These set mandatory requirements upon Network Rail employees only. They are not always procedural in nature. These procedures may be incorporated in contracts under the authority of a Network Rail Designated Employer s Representative. They require a Formal Remit, a Business Case and Stakeholder Review.

    3 to 5 digit identifying number

    1 or 2 character reference for the six types of Standard C Code of Practice, G Guidance P Procedure PS Product Specification S Specification WI Work Instruction

    1 or 2 character reference for the Standard Ownership: CE Track/Structures, Operations/Control Management E Electrification & Plant, Railfleet, Telecommunications, SignallingK Procurement LS Line Safety

    RT Denotes a Network Rail Standard.

    This is the general format used for the majority of entries in the catalogue. Please note however, that there are a few exceptions, not shown here.

    p

  • 1. About this Catalogue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 8

    Network Rail Company Codes of Practice These Non-Mandatory Documents communicate good practice for use by Network Rail s employees and contractors. An alternative practice that achieves the same goals may be adopted provided that adequate records are kept, although prior acceptance by Network Rail may be required. Further advice is available from the Standard Owner. They require a formal remit & Stakeholder Reviewed only.

    Network Rail Company Work Instructions These are Network Rail s equivalent of Specified Operations Publications. They are mandatory and specify actions to be undertaken by employees of Network Rail and others to ensure safety while working on Network Rail Controlled Infrastructure. They differ from Company Specifications in that they are task-based. These require a formal remit, stakeholder review and a business case.

    Network Rail Company Guidance Notes These are intended to provide information for Network Rail and others on the basis of past experience and knowledge. They are advisory documents and do not necessarily represent best practice. They do not require a Business Case or Stakeholder Review.

    Rapid Response The Rapid Response Procedure shall enable Network Rail to authorise Standards Change which are required more urgently than the usual procedures would permit.

    The Rapid Response Procedure may only be used where both the following criteria are met:

    either there is:

    o an immediate threat to safety, where safety would be prejudiced through delay arising from the usual procedures; or

    o a time critical non-safety issue which cannot readily be dealt with via the usual procedures or a non-compliance; and

    the solution which constitutes the Standards Change is readily apparent.

    Standards Change issued under the Rapid Response Procedure shall have an

    applicability of one calendar year from Implementation Date.

    Within 2 months of the Implementation Date, the Sponsor shall regularise the

    Standards Change issued under the Rapid Response Procedure through the usual procedures.

    1.1.3. Quick Find Using the Index

    If you have a document you want to find the status of, the quickest way to find your document is to look in the Index at the end of the catalogue. All current standards are listed, along with the page number where you will find more information on that document.

    1.1.4. Referenced Documents

    Some Network Rail Company Standards grant mandatory or advisory status to other documents produced by Network Rail or other organisations. Referenced Documents include a wide range of documents inherited from the former British Rail Board (BRB) or developed by Network Rail, e.g. Signalling Special Inspection Notices (SINs), Railway Executive Permanent Way (REPW) drawings, and the Overhead Line Equipment Master Index (OLEMI).

    Referenced Documents derive their authority from Network Rail Company Standards and therefore shall only be applied in the circumstances and to the extent shown in any relevant Network Rail Company Standard.

    1.1.5. Coloured Pages

    Some documents contain coloured pages, and these are marked where relevant. These colour pages may be purchased separately from the Rapidoc Document Centre. Please see the section on ordering documents for contact details.

  • 1. About this Catalogue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 9

    1.1.6. Compliance and Implementation

    Each Mandatory Network Rail Company Standard remains in force and has to be complied with until replaced or withdrawn.

    The issue of a replacement standard does not necessarily cancel a previous issue until the Implementation period has been completed and the Compliance date reached. This is normally at least two months from the issue date of a Network Rail Company Standard. This applies to re-issues of existing standards as well as replacements and deletions.

    To assist users, the catalogue entry for a superseded standard will henceforth show the standard that replaces it, and vice versa. Users will thus be able to see not only the standard to which they presently work, but also which standard they will need to follow in future. An example is shown below:

    RT/E/S/10661 Signalling Maintenance Task Intervals Issue Date Status Price Colour Compliance Implementation * EXAMPLE 4 (3) Feb 04 (Apr 03) Up-issued C 01/04/04 01/04/04

    The current standard is shown in (grey), indicating that the new edition, shown in black, will supersede it.

    For reasons of clarity, this approach has been confined to the catalogue (paper and electronic versions), and does not appear in the menu pages of the CD-ROM.

    1.1.7. Technical Standards for Inter-operability.

    Technical Standards for Inter-operability (TSIs) are derived from the following two pieces of European Union legislation:

    z Directive 2001/16/EC on the Interoperability of the Trans-European Conventional Rail System; and

    z Directive 96/48/EC on the Interoperability of the Trans-European High Speed Rail System.

    There is currently a major piece of work in hand by Rail Safety and Standards Board to identify any issues or conflicts between TSIs for High speed and RGSs (Railway Group Standards). The objective is to resolve or remove any conflicts where possible by amending the RGS. It is anticipated that this work will generate a significant amount of work on RGSs.

    Where this work identifies such issues, it is the Rail Safety and Standards Board intention to publish the identified conflicts in a Railway Group Guidance Note (GN/GE8550) in order to provide guidance to the industry pending the resolution of the conflict and amendment of the RGSs.

    RGSs are classified as being subordinate.

    1.1.8. Notified National Standards

    All notified standards in this catalogue are marked as in the left hand column.

    1.1.9. Direct Maintenance Supplementary Instructions

    Following Network Rail s decision to bring certain track maintenance jobs in-house a number of standards are being incorporated into a new catalogue (RT/LS/CAT007), marked thus: , containing supplementary information. It is essential that you first read and understand the supplement pertaining to the standard before proceeding to the standard. You must then apply the requirements of the supplement to the standard.

    With regard to Direct Maintenance Transition, a new catalogue, RT/LS/CAT007 'Direct Maintenance Supplementary Instruction Catalogue' has been introduced. This catalogue contains a suite of Direct Maintenance Instructions, which necessarily modify existing Company Standards where they do not currently cover maintenance undertaken directly by Network Rail employees. The changes required are minor and there is no material change to the technical requirements of the Company Standard. A Direct Maintenance Supplementary Instruction holds the same status as the Company Standard it modifies.

    The Supplementary Instructions will be superseded after the modifications have been made to the relevant standards.

  • 1. About this Catalogue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 10

    1.1.10. Ordering and Price List

    Complete suite of Standards in electronic format. Subscription only, from:

    Paper copies available individually or on subscription from:

    IHS Technical Indexes Willoughby Road Bracknell RG12 8DW Tel: 01344 404409 Fax: 01344 404421

    Network Rail Document Centre IHS Rapidoc IHS Technical Indexes Willoughby Road Bracknell RG12 8DW Tel: 01344 861666 Fax: 01344 714440 Email: mailto:[email protected]

    Most Network Rail Company Standards are priced according to the number of pages in them and are divided into 6 main price bands; these price bands are:

    Price Band A B C D E F Price 8 11 21 32 42 63

    Price list correct at date of publishing.

    Please note that certain publications are not within the above price bands, please contact Rapidoc (details above) for the prices of these documents.

    Orders received will be dispatched within five working days.

    When placing an order for Standards, please have the following details to hand:

    Contact and delivery details, Standard No., Title, Price, Quantity.

    Please also have your credit card/payment details to hand

    Please note: Company Standards for Network Rail Employees only are available from Connect under Business Standards.

  • 2. Company Standards A. General Information Changes from previous Issue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 11

    2. Category Index of Network Rail Company Standards 2A. General Information

    2A1. Changes from previous issue

    2A1.1. New or Re-issued Standards

    The following standards are New or Re-issued.

    Standard No Title Issue Issue Date Compliance Implementation

    RT/CE/C/041

    Structures Condition Marking Index Handbook for Bridges

    Issue 3

    7-Aug-04 07-Aug-04 07-Aug-04

    RT/CE/C/045

    Code of Practice for Terms and Definitions for Use in Civil Engineering Standards

    Issue 1

    7-Aug-04 01-Sep-04 01-Sep-04

    RT/CE/S/044 Design & Construction of Undertrack Crossings Issue 2 7-Aug-04 01-Nov-04 07-Aug-04

    RT/CE/S/048 Standards of Competence for Examination of a Bridge Following a Bridge Strike

    Issue 4 7-Aug-04 02-Oct-04 02-Oct-04

    RT/CE/S/049 Track Design Handbook Issue 8 7-Aug-04 07-Aug-04 07-Aug-04

    RT/CE/S/071 Design of Earthworks, Earthwork Remediations and Geotechnical aspects of Foundations for Structures

    Issue 2 7-Aug-04 01-Nov-04 01-Nov-04

    RT/CE/S/142 Management of Abnormal Road Loads Issue 1 7-Aug-04 07-Feb-05 07-Feb-05

    RT/D/P/095 Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas

    Issue 1 7-Aug-04 07-Aug-04 07-Aug-04

    RT/D/P/096 Determining High Risk Sites for Low Rail Adhesion Issue 1 7-Aug-04 07-Aug-04 07-Aug-04

    RT/D/S/002 Driving Cab Passes Issue 3 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/C/11115 Correlation of Signalling Records Issue 3 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/C/17904 Risk Analysis of Signalling Relays Issue 1 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/C/19020 Signalling Equipment Technical Advice Notice (SIGTAN020) Signalling Relays

    Issue 3 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/C/19272 Signalling Equipment Workshop Engineering Notice (SIGWEN021) Signalling Relays

    Issue 1 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/P/10024 Signaller's Operating Guide for the Use of the IECC Signalling Workstation

    Issue 4 7-Aug-04 01-Oct-04 01-Oct-04

    RT/E/P/11120 Process for Management of Signal Engineering Technical Instructions and Notice Boards

    Issue 6 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/P/19607 Management of Overlapping and Parallel Signalling Design

    Issue 1 7-Aug-04 02-Oct-04 02-Oct-04

    RT/E/S/10040 IECC Applications Manual Contents Issue 6 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/S/10662 Process for Introduction of New or Revised Maintenance Regimes for Signalling Assets

    Issue 2 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/S/11129 Life Management of Signalling Relays, Searchlight and Banner Signals

    Issue 3

    7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/S/11630 BR930 Series Pin Code Allocations and Contact Arrangements

    Issue 7 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/S/17002 SSI Applications Manual Contents Issue 13 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/WI/00102 TI21 Track Circuit Risk Based Maintenance Issue 3 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/WI/00103 HW Risk Based Maintenance Issue 1 7-Aug-04 07-Aug-04 07-Aug-04

  • 2. Company Standards A. General Information Changes from previous Issue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 12

    Standard No Title Issue Issue Date Compliance Implementation

    RT/E/WI/00104 TPWS Track Subsystem Risk Based Maintenance Issue 2 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/WI/00105 AzLM Axle Counter System Risk-Based Maintenance Issue 2 7-Aug-04 07-Aug-04 07-Aug-04

    RT/E/WI/00110 Maintenance of Electrification, Plant, Signalling and Telecommunications Equipment, Incorporating Asbestos Materials or Components

    Issue 1

    1-May-04 21-May-04 21-May-04

    RT/LS/C/101 Managed Stations Fire Safety Issue 4 7-Aug-04 07-Aug-04

    RT/LS/C/102 Operational Estate Fire Safety Issue 4 7-Aug-04 07-Aug-04

    RT/LS/CAT001 Catalogue of Company Standards 46 07-Aug-04

    RT/LS/CAT005 Index of Network Rail Documents Relating to Signalling & communications Equipment - Part 3 Typical Circuits

    22 7-Aug-04 07-Aug-04

    RT/LS/CAT006 Index of Network Rail Documents Relating to Signalling & Communications Equipment - Part 4 Equipment and Systems Specifications

    10 7-Aug-04 07-Aug-04

    RT/LS/CAT007 Direct Maintenance Supplementary Instruction Catalogue

    2 7-Aug-04 07-Aug-04

    RT/LS/G/00014

    Contractor Assurance System Issue 2 7-Aug-04 07-Aug-04 07-Aug-04

    RT/LS/P/200

    Network Rail Security Manual Issue E1 7-Aug-04 07-Aug-04 07-Aug-04

    RT/LS/P/250

    Incident Response - Planning & Management Manual Issue E1 7-Aug-04 07-Aug-04 07-Aug-04

    ff

  • 2. Company Standards A. General Information Changes from previous Issue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 13

    2A1.2. Deleted or Withdrawn Standards

    Standard No Title Issue

    Deleted Date

    Deleted Change Made

    RT/CE/C/041 Structures Condition Marking Index Handbook Issue 2 Aug 04 Superseded by Issue 3

    RT/CE/S/044 Undertrack Crossings Issue 1 Aug 04 Superseded by Issue 2

    RT/CE/S/048 Standards of Competence for Examination of a Bridge following a Bridge Strike

    Issue 3 Aug 04 Superseded by Issue 4

    RT/CE/S/049 Track Design Handbook Issue 7 Aug 04 Superseded by Issue 8

    RT/CE/S/071 Design of Earthworks and Earthworks Remediations Issue 1 Aug 04 Superseded by Issue 2

    RT/D/P/021 Acceptance- Audit & Review of the Contractor's Safety Case

    Issue 2 Aug 04 Superseded by RT/LS/P/052

    RT/D/P/022 Management of the Monitoring of Contracts and Corrective Actions

    Issue 7 Aug 04 Withdrawn

    RT/D/S/002 Driving Cab Passes Issue 2 Aug 04 Superseded by Issue 3

    RT/D/S/004 Railtrack Specification for Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas

    Issue 2 Aug 04 Superseded by RT/D/P/095

    RT/D/S/005 Railtrack Specification for Determining High Risk Sites for Low Rail Adhesion as Defined in Group Standard GO/RT3356

    Issue 2 Aug 04 Superseded by RT/D/P/096

    RT/E/C/10048 Signalling Relay and Searchlight Mechanism Servicing Issue 1 Aug 04 Superseded by RT/E/S/11129 Issue 3

    RT/E/C/10094 Signal Light Beam Alignment (SG21) Issue 2 Aug 04 Superseded by RT/E/S/10660

    RT/E/C/10095 Signal Lamp Maintenance Addendum to Signal Maintenance Specification (SMS) SG31

    Issue 2 Aug 04 Superseded by RT/E/S/10660

    RT/E/C/11115 Correlation of Signalling Records Issue 2 Aug 04 Superseded by Issue 3

    RT/E/C/19004 SIGTAN 004 Replacing relays - type sj 8211 relay units gec geographical units

    Issue 1 Aug 04 Superseded by RT/E/C/19020 Issue 3

    RT/E/C/19011 SIGTAN 001 Silver to Silver Contacts - DC Polarised Moving Iron Relays

    Issue 1 Aug 04 Superseded by RT/E/C/19020 Issue 3

    RT/E/C/19020 Signalling Equipment Technical Advice Notice (SIGTAN020) AEI - GRS Type M

    Issue 2 Aug 04 Superseded by Issue 3

    RT/E/C/19031 Signalling Equipment Technical Advice Notice (SIGTAN031) Full-Size Plug-In Relays

    Issue 1 Aug 04 Superseded by RT/E/C/19020 Issue 3

    RT/E/C/19034 (SIGTAN034) Thermal Timer Relays Issue 1 Aug 04 Superseded by RT/E/C/19020 Issue 3

    RT/E/C/19255 Signalling Equipment Workshop Engineering Notice (SIGWEN004) GEC - GS Geographical Units

    Issue 1 Aug 04 Superseded by RT/E/C/19272

    RT/E/C/19256 SIGWEN 005 - Westinghouse Signals style 'P' relays Issue 2 Aug 04 Superseded by RT/E/C/19272

    RT/E/C/19260 SIGWEN 009 - Westinghouse Signals style 'B' relays Issue 2 Aug 04 Superseded by RT/E/C/19272

    RT/E/C/19261 SIGWEN 009 - Westinghouse Signals style 'B' relays Issue 1 Aug 04 Superseded by RT/E/C/19272

    RT/E/C/19264 Signalling Equipment Workshop Engineering Notice (SIGWEN013) GEC-GS Style Z Relays

    Issue 1 Aug 04 Superseded by RT/E/C/19272

    RT/E/C/19267 Signalling Equipment Workshop Engineering Notice (SIGWEN016) Setting Thermal Timer Relays

    Issue 1 Aug 04 Superseded by RT/E/C/19272

    RT/E/P/10024 Signallers Operating Guide for the use of IECC Signalling Workstation

    Issue 3 Aug 04 Superseded by Issue 4

    RT/E/P/11120 Process for Management of Signal Engineering Technical Instructions and Notice Boards

    Issue 5 Aug 04 Superseded by Issue 6

    RT/E/S/10040 IECC Applications Manual Contents Issue 5 Aug 04 Superseded by Issue 6

    RT/E/S/10662 Process for the Introduction of New or Revised Maintenance Regimes for Signalling Assets

    Issue 1 Aug 04 Superseded by Issue 2

    RT/E/S/11129 Life Management of Signalling Relays Issue 2 Aug 04 Superseded by Issue 3

    RT/E/S/11630 BR930 Series Pin Code Allocations December 2003 and Contact Arrangements

    Issue 6 Aug 04 Superseded by Issue 7

    RT/E/S/17002 SSI Applications Manual Contents Issue 12 Aug 04 Superseded by Issue 13

  • 2. Company Standards A. General Information Changes from previous Issue

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 14

    Standard No Title Issue

    Deleted Date

    Deleted Change Made

    RT/E/WI/00102 TI21 Track Circuit Risk Based Maintenance Issue 2 Aug 04 Superseded by Issue 3

    RT/E/WI/00104 Network Rail Company Work Instruction TPWS Risk Based Maintenance

    Issue 1 Aug 04 Superseded by Issue 2

    RT/E/WI/00105 AzLM Axle Counter System Risk Based Maintenance Issue 1 Aug 04 Superseded by Issue 2

    RT/LS/C/101 Managed Stations Fire Safety Issue 3 Aug 04 Superseded by Issue 4

    RT/LS/C/102 Operational Estate Fire Safety Issue 3 Aug 04 Superseded by Issue 4

    RT/LS/CAT005 Index of Network Rail Documents Relating to Signalling & communications Equipment - Part 3 Typical Circuits

    Issue 21 Aug 04 Superseded by Issue 22

    RT/LS/CAT006 Index of Railtrack Documents Relating to Signalling and Communications Equipment: Part 1 - Equipments and Systems Specifications

    Issue 9 Aug 04 Superseded by Issue 10

    RT/LS/CAT007 Direct Maintenance Supplementary Instruction Catalogue

    Issue 1 Aug 04 Superseded by Issue 2

    RT/LS/G/00014 Contractor Assurance System Issue 1 Aug 04 Superseded by Issue 2

    Note regarding Standards superseded or deleted in April 2004

    In the last 2 issues of the catalogue (44 and 45), it has been noted that the listing for Standards superseded or replaced in April 2004 was incomplete. A full listing may now be found on page 151

  • 2. Company Standards A. General Information

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 15

    2A1.3. Restricted Documents

    The following Standards are for Network Rail Use Only and are not Available outside the Company. There are currently 8 procedures listed in the Catalogue but unavailable on the CD-ROM or on the Company Standards Website. Reference Title Issue Issue Date HQ Owner

    RT/D/P/020 Management of RT1A Asset Change Proposals 6 Aug-00 Business Engineering

    RT/D/P/027 Infrastructure Maintenance Contracts Changes to Contract Lump Sums, Prices, Targets and Fees

    5 Apr-00 Supply Chain

    RT/D/P/030 RTIA; IMC2 & IMC2000 Payment Cost Control and Reporting 8 Dec-02 Supply Chain

    RT/D/P/034 Delegation and Use of Contractual Powers RT1A and IMC2 4 Apr-00 Supply Chain

    RT/D/P/036 Monitoring of Contractor s Stewardship, Progress and Financial Reports

    5 Apr-00 Supply Chain

    RT/D/P/047 Management of Infrastructure Maintenance Contract Regimes 6 Apr-00 Supply Chain

    RT/E/P/02009 Engineering Management Projects 2 Oct-01 Business Engineering

    RT/LS/P/052 Accreditation and Development of Suppliers 1 Apr-04 Supplier Accreditation

    2A1.4. Network Rail Catalogues

    RT/LS/CAT001 Catalogue of Company Standards Issue Date Status Price Colour Compliance Implementation * 46 Aug 04 Up-Issued

    The Company Standards Catalogue, formerly known as The Line Standards Catalogue, lists Standards issued by Engineering, Safety & Environment, and Contract & Supply.

    Index of Network Rail Documents Relating to Signalling and Communications Equipment: RT/LS/CAT003 Part 1: Mechanical & Electrical Drawings Issue Date Status Price Colour Compliance Implementation 4 Oct 00

    This catalogue lists documents (drawings) relating to signalling equipment Mechanical and Electrical Drawings.

    RT/LS/CAT004 Part 2: Signalling Structure Drawings Issue Date Status Price Colour Compliance Implementation 4 Feb 00

    This catalogue lists documents (drawings) relating to signalling equipment Signalling Structure Drawings.

    RT/LS/CAT005 Part 3: Typical Circuits Issue Date Status Price Colour Compliance Implementation * 22 (21) Aug 04 (Feb 04) Up-Issued Yes 07/08/04

    This catalogue lists documents (drawings) relating to signalling equipment Typical Circuits.

  • 2. Company Standards A. General Information

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 16

    RT/LS/CAT006 Part 4: Equipment & Systems Specifications Issue Date Status Price Colour Compliance Implementation * 10 (9) Aug 04 (Aug 01) Up-Issued 07/08/04

    This catalogue lists documents (drawings) relating to signalling equipment Equipment and Systems Specifications. The standards shown in catalogue 6 are for reference purposes only, they may not reflect today s requirements nor Network Rail s future asset strategy.

    RT/LS/CAT007 Direct Maintenance Supplementary Instruction Catalogue Issue Date Status Price Colour Compliance Implementation

    * 2 (1) Aug 04 (Apr 04) Up-Issued Phone 07/08/04

    This catalogue contains Supplementary Instructions when maintenance is directly managed internally within Network Rail the existing Company Standard to which it pertains will not be wholly appropriate. The changes required are minor and there is no material change to the technical requirements of the Company Standard. The changes are to be considered made to the existing Company Standard published by Business Standards only where maintenance is undertaken directly by Network Rail employees.

    RT/ETE/INDEX DC Electric Traction Equipment Drawing Index Issue Date Status Price Colour Compliance Implementation 2 Aug 00

    This document lists current electrical track equipment (ETE) drawings, together with the equivalent superseded drawings.

  • 2. Company Standards B. Contracts & Procurement Contracts & Procurement

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 17

    2B. Contracts & Procurement Directorate

    2B1. Contracts & Procurement

    2B1.1. Procedures

    RT/D/P/026 Reporting Trends in Infrastructure Maintenance Contractors Accidents and Incidents Issue Date Status Price Colour Compliance Implementation 5 Apr 00 C

    This procedure details the rles and responsibilities of Network Rail staff in considering trends in Contractors accidents and incidents and assisting in the setting up of Action Plans to reduce the likelihood of similar occurrences.

    Mandatory upon: Network Rail Standards Ownership: Contracts & Procurement

    RT/D/P/045 Change During the Course of Track Renewals Work Issue Date Status Price Colour Compliance Implementation 1 Nov 96 B

    It is essential that the Track Renewals Contractor has either a Contingency Plan in place for problems encountered in complying with Specifications/Standards during Track Renewals Works or is aware of the Procedure within Network Rail for resolution of the problem. This procedure sets out the roles and responsibilities in relation to dealing with problems encountered during Track Renewals Works.

    Mandatory upon: Network Rail Standards Ownership: Contracts & Procurement

    RT/D/P/064 Monitoring of the Track Litter Clearance Contract (Station Areas) Issue Date Status Price Colour Compliance Implementation 2 Apr 00 B

    This procedure lays down the principles for monitoring contracts for clearance of litter from the track in station areas both where this activity is carried out under the Infrastructure Maintenance Contract and under separate bespoke contracts.

    Mandatory upon: Network Rail Standards Ownership: Contracts & Procurement

    RT/K/P/013 Engagement of Management Consultants Issue Date Status Price Colour Compliance Implementation 1 Jul 97 C

    The purpose of this procedure is to support the Corporate Manual's requirement, by defining the steps that must be followed by all parties in the various stages of engagement of management consultants. It also emphasises the Corporate Manual's requirement to obtain prior approval of the Chairman or Chief Executive for the engagement of all Management Consultants.

    Mandatory upon: Network Rail Standards Ownership: Contracts & Procurement

  • 2. Company Standards B. Contracts & Procurement Supplier Accreditation

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 18

    2B2. Supplier Accreditation

    2B2.1. Procedures

    RT/LS/P/052 Accreditation and Development of Suppliers Issue Date Status Compliance Implementation 1 Apr 04

    The purpose of this procedure is to mandate the requirements for: The effective accreditation and development of suppliers directly engaged by Network Rail The Supplier Accreditation Department's contribution to the maintenance and development of an

    adequate and continually improving base of service suppliers to support the delivery of Network Rail's business objectives

    The use of pre-contract approval and accreditation information to ensure that appropriate suppliers are selected to meet Network Rail contract requirements

    Mandatory upon: Network Rail Standards Ownership: Supplier Accreditation

    This Standard is for Network Rail Use Only Not Available outside the Company

    2B2.2. Guidance Notes

    RT/LS/G/00014 Contractor Assurance System Issue Date Status Price Colour Compliance Implementation * 2 (1) Aug 04 (Apr 02) Up-Issued D 07/08/04 07/08/04

    Describes the Contractor Assurance System, i.e. Network Rail s contract & contractor assurance processes, in order to clarify the purpose and interdependence of these processes.

    Mandatory upon: Advisory only Additional Information: This Guidance Note replaces RT/LS/C/003 Standards Ownership: Supplier Accreditation

  • 2. Company Standards C. Engineering Electrification

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 19

    2C. Engineering Directorate

    2C1. Electrification

    2C1.1. Specifications

    RT/E/S/20000 Index of Railtrack Documents Relating to Electrical Distribution & Electro-Mechanical Plant Engineering Activities

    Issue Date Status Price Colour Compliance Implementation 11 Aug 02 D

    To specify the application of documents relating to Electrical Distribution & Electromechanical Plant issued prior to April 1994 and as listed in this Specification.

    Mandatory upon: Network Rail & Contractors Standards Ownership: Electrification & Plant

    Document No Title Issue Date Status

    Des

    ign

    Inst

    alla

    tio

    n

    Mai

    nten

    ance

    Ope

    rati

    ons

    882C1 Insulating Shroud for Foot of Conductor Rail 3 1997 Specification AC2/3 50 HZ, 25 kV Overhead Line Equipment (OHLE) 1 1968 Specification AC 8 Specification for 25 kV Isolators 1 1976 Specification AC 129 Specification for the Installation of Switching Station Slab Foundation Bases 1983 Specification AC 174 General Specification for Fused Isolators 1984 Specification AC 199 Specification for Silicone Rubber Covered Primary Insulated Poles 1986 Specification AC 239 General Specification for Ancillary Equipment Enclosures for 25 kV Structure

    Mounted Switchgear 1991 Specification

    AC/DC 242 General Specification for Installation of Cable Routes, Cable Laying, Testing and Jointing on Cable Routes forming part of the Traction Distribution System

    1990 Specification

    ECP 229 Conductor Running Out Pulley Servicing Requirements 1989 Specification EHQ/SP/C/501 Specification for the Design and Installation of Negative Bonding and Associated

    Equipment on the High Current D.C. Electrified Lines of Network South East 1 1994 Specification

    EHQ/SP/D/007 Specification for Earthing and Bonding at Dolland's Moor International Freight Yard

    2 1992 Specification

    EHQ/SP/D/025 General Specification for 25 kV Power Transformers and Solid State Voltage Regulators for Signalling Supplies - CAUTION: Protective treatments - RT/CE/S/039 & RT/CE/C/002 apply now

    1 1993 Specification

    EHQ/SP/D/102 Specification for Earthing and Bonding at North Pole Depot 1 1991 Specification EHQ/SP/D/134 Procurement Specification for the Supply, Delivery & Installation of Outdoor

    Ancillary Cubicles for 25 kV Isolation Transformers 1 1992 Specification

    EHQ/SP/O/004 Specification for the Supply and Installation of OHL Equipment for 50Hz A.C. Electrification

    1 1991 Specification

    EHQ/SP/O/006 Specification for Identification of Bonds on Electrified Lines Except Southern Divisions of NOS.

    2 1993 Specification

    EHQ/SP/O/012 Specification for Test of Cross Spanwire Clamps on 19/2.1 Cad Cu Spanwire 1 1991 Specification EHQ/SP/O/026 Specification for Track Datum Markers on all overhead electrified lines. 1 1990 Specification EHQ/SP/O/049 Protective Coatings of Structure Bases & Foundation Caps of Overhead Line

    Structures - CAUTION: Protective treatments - RT/CE/S/039 & RT/CE/C/002 apply now

    3 1993 Specification

    EHQ/SP/O/105 Specification for Concrete for OHLE Structure Foundations 1 1992 Specification EHQ/SP/S/001 Specification for the Provision of Isolation, Earthing and Indication Facilities

    where Local Isolations are Permitted on AC Electrified Lines 2 1993 Specification

    EHQ/SP/S/002 Specification for the screening of signals 2 1991 Specification EHQ/SP/S/004 Specification for the Installation & Operation of Buffer Sections & Permanently

    Earthed Sections in A.C. OHLE 2 1992 Specification

    EHQ/SP/S/030 Specification for the Preparation of Isolation Diagrams and Instructions for AC Electrified Lines.

    1 1992 Specification

    EHQ/ST/D/615 Standard for Routine Maintenance of Electrical Protection Systems 1 1994 Specification EHQ/ST/D/622 Standard for Routine Maintenance of Buildings 1 1994 Specification EHQ/ST/D/629 Standard for Maintenance of Oil Pressure in Oil Filled Cables 2 1994 Specification

  • 2. Company Standards C. Engineering Electrification

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 20

    Document No Title Issue Date Status

    Des

    ign

    Inst

    alla

    tio

    n

    Mai

    nten

    ance

    Ope

    rati

    ons

    EHQ/ST/D/630 Standard for Routine Maintenance of HV Feeders 1 1994 Specification EHQ/ST/D/631 Standard for Maintenance of SCADA Equipment 1 1994 Specification EHQ/ST/D/632 Standard for Routine Maintenance of Pilot Cables and Systems 1 1994 Specification EHQ/ST/O/001 Maintenance of Mark I OHLE 2 1992 Specification EHQ/ST/O/002 Maintenance of Mark IIIA OHLE 2 1992 Specification EHQ/ST/O/003 Maintenance of Mark IIIB OHLE 2 1991 Specification EHQ/ST/O/009 Design of Overhead Line Structures 1 1992 Specification EHQ/ST/S/001 Safety Requirements for Contractors Undertaking OHLE Contracts 1 1992 Specification EHQ/ST/S/502 Standard for the Emergency Disconnection of Grid Supply Feeders for DC

    Electrification 1 1993 Specification

    EHQ/ST/S/505 Standard for the Preparation or Modification of Comprehensive Track Diagrams for SE, SW & SC Divisions

    1 1993 Specification

    EHQ/ST/S/506 Standard for Site Safety for Non British Railways Personnel Working for the Electrification Group

    1 1994 Specification

    OLEMI Railtrack Index of Accepted Design Drawings. Note: Issue 12 is a two volume publication with a separate revision table that lists changes that have occurred between June 2000 and June 2002

    12 Jun-02 Specification

    SN27-93-002 General Specification for 750 V D.C. Track Voltage Relays Specification SN53-3-24/007/2

    General Technical Specification for Paired Core Compound Filled Supervisory Cables

    1987 Specification

    EHQ/PR/C/501 Procedure for Application of Short Circuiting Straps for Conductor Rail Isolation

    1 1994 Procedure

    EHQ/PR/O/002 Maintenance of Ceramic Bead Neutral Sections 1 1990 Procedure EHQ/PR/O/003 Examination and Maintenance of Steatite and Porcelain Insulators 1 1990 Procedure EHQ/PR/O/004 Maintenance of Overhead Line Isolators 2 1992 Procedure EHQ/PR/O/006 Examination and Adjustment of Balance Weight Termination's of Mark I Design 1 1990 Procedure EHQ/PR/O/008 Fitting and Removal of OHL Connections To/From High/Low Voltage Terminals

    on Transformers 2 1991 Procedure

    EHQ/PR/O/011 Use of Ladders on Permaquip High Capacity Trolley on Overhead Equipment 1 1990 Procedure EHQ/PR/O/012 Jointing of Universal Columns and Broad Flanged Beams for use as Masts for

    OHL Structures - CAUTION: Protective treatments - RT/CE/S/039 & RT/CE/C/002 apply now

    2 1992 Procedure

    EHQ/PR/O/013 Installation of "Preformed" Dead Ends for AL, AWAC & CU-PLY Conductors 2 1991 Procedure EHQ/PR/O/014 Installation of "Preformed" Splices for AL & AWAC Conductors 2 1992 Procedure EHQ/PR/O/016 Use of Permaquip Scissor-Type extending Platform Machine Used for Overhead

    Line Maintenance 2 1993 Procedure

    EHQ/PR/O/017 Installation of 'BICC-BURNDY Compression Splices for AL, AWAC & Copper-Cadmium Conductors

    2 1992 Procedure

    EHQ/PR/O/019 Installation of Compression Lugs for Aluminium, Copper and Copper-Ply Conductors

    2 1992 Procedure

    EHQ/PR/O/020 Application of High Performance Pressure sensitive Plastic Sheet Film Markers to OHL Equipment

    2 1992 Procedure

    EHQ/PR/O/024 Use and Care of B.R. Type Overhead Live Line Testers 2 1992 Procedure EHQ/PR/O/027 Installation of Contact Wire Splices for Hard-Drawn & Cadmium Copper

    Conductors 2 1992 Procedure

    EHQ/PR/O/029 Thermit Welding for Traction Bonding 2 1992 Procedure EHQ/PR/O/032 Installation of Standard Type Neutral Sections 2 1992 Procedure EHQ/PR/O/034 Installation of Brown Boveri 25 kV Section Insulators 2 1992 Procedure EHQ/PR/O/037 Installation and Maintenance of Pneumatic Tensioning Units in OHLE 2 1992 Procedure EHQ/PR/O/040 Installation of Bolts in Masonry, Brickworks or Concrete using Polyester Resin

    Cartridges 2 1991 Procedure

    EHQ/PR/O/042 Installation of Heat Shrink Tubing for Aluminium Conductors 2 1992 Procedure EHQ/PR/O/045 Touch Up Painting of Tubular Pile Foundations - CAUTION: Protective

    treatments - RT/CE/S/039 & RT/CE/C/002 apply now 2 1992 Procedure

    EHQ/PR/O/046 Use of M.E. Mechanical Handling Conductor Drum Carriers Fitted With Caliper Disc Brakes

    2 1992 Procedure

    EHQ/PR/O/050 Installation of FARGO Automatic Splices for AWAC Catenary 2 1992 Procedure

  • 2. Company Standards C. Engineering Electrification

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 21

    Document No Title Issue Date Status

    Des

    ign

    Inst

    alla

    tio

    n

    Mai

    nten

    ance

    Ope

    rati

    ons

    EHQ/PR/O/057 Compression Jointing of End Fittings 2 1992 Procedure EHQ/PR/O/061 Installation of Cone-End fittings for Termination of Overhead Line Conductors 2 1992 Procedure EHQ/PR/S/001 Procedure for Inspection of Bonds Attached to Scaffolding on A.C. Electrified

    Lines 1 1990 Procedure

    EHQ/PR/S/002 Procedure for the disconnection of "yellow" bonds or action to be taken when reported broken or disconnected, on AC electrified Lines

    1 1990 Procedure

    EHQ/PR/S/003 Procedure for the Isolation of Switching Stations at Electrical Control Room Boundaries to Comply with Issue of Permits to Work and Sanctions for Test

    2 1991 Procedure

    EHQ/PR/S/006 Procedure for the special action required for AC electrified lines in those joint less track circuits areas listed in Appendix 1

    1 1990 Procedure

    EHQ/PR/S/031 Procedure for the Issue, Storage, Routine Inspection and Testing of Rubber Gloves

    2 1991 Procedure

    EHQ/PR/S/134 Procedure to be followed when a return Conductor to Rail Connection or other "Red" Bonds are reported broken or disconnected

    2 1991 Procedure

    EHQ/PR/S/602 Procedure for Application of Short Circuiting Bar in an Emergency 1 1994 Procedure EHQ/ST/S/501 Notification to Electrical Control Room of Staff Authorised to take Pre-planned

    Isolations of the Conductor Rail 2 1993 Procedure

    SP-PM-018 Acceptance Of High Mast Winch Mechanisms 2 Mar-92 Procedure SP-PM-027 Design Of Retention Toilet Servicing Installations 1 Mar-84 Procedure SP-PM-039 Exam Codes Used In Standard Maintenance Specs. Procedure SP-PM-048 Setting Axle Loads On 76t. Breakdown Cranes 1 Mar-88 Procedure SP-PM-060 Contract Statutory Examination Of Pressure Vessels 1 Jun. 1988 Procedure SP-PM-063 Cleaning Windscreens And Replacement Of Wiper Blades Under A.C.

    Overhead Lines 2 Feb-90 Procedure

    SP-PM-066 Operation Of Escalators And Escalator Trolleys 1 Nov-87 Procedure SP-PM-111 Minor Works Contract For Electrical Cable And Mechanical Installations 1 May-90 Procedure AC 220 Code of Practice for OLE "As Installed" Data Records 1991 Code of

    Practice

    CP-PM-001 Lineside Equipment For Use With High Capacity Wagons 6 Nov-89 Code of Practice

    CP-PM-011 External Carriage Washing Machines, Guidelines Of Design With Liquid Concentrates

    1 Jun. 1985 Code of Practice

    CP-PM-017 Under floor Wheel Lathe, Design Of Facilities 1 Jul. 1987 Code of Practice

    CP-PM-018 Electricity Supplies To Computers 1 Oct-89 Code of Practice

    CP-PM-019 Design, Specification And Maintenance Of Hydraulic Systems 4 Aug-92 Code of Practice

    CP-PM-023 Depot Protection Equipment List 4 Aug-92 Code of Practice

    CP-PM-033 Electric Cable Installation Associated With P&M In Br Underground Locations 2 Feb-90 Code of Practice

    CP-PM-045 Electrical Installations On Rail Premises 1 Jun-93 Code of Practice

    CP-PM-046 Winches 1 Feb-92 Code of Practice

    ECP 34 Wind Loading on OHLE and Structures 3 1980 Code of Practice

    ECP 44 Passage of High /Long loads over level crossings (BR 12009) 1 1977 Code of Practice

    ECP 227 Code of Practice for Winching Overhead Line Conductors 1989 Code of Practice

    ECP 166 Code of Practice for Location and Design of Designated Earth Points (D.E.P.S.) for Overhead Line Equipment

    1985 Code of Practice

    ECP 236 Code of Practice for Protection Settings and Methods of Calculation for 25 kV Electrified Lines

    Code of Practice

    EHQ/CP/P/039 Code of Practice for the Allocation of Designations for Switching Stations, Auxiliary Supply Points, Electrical Sections, Overhead Line Switches, Circuit Breakers and the Like, for AC Electrified Lines

    5 1993 Code of Practice

  • 2. Company Standards C. Engineering Electrification

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 22

    Document No Title Issue Date Status

    Des

    ign

    Inst

    alla

    tio

    n

    Mai

    nten

    ance

    Ope

    rati

    ons

    EHQ/CP/P/209 Code of Practice for the Preparation of Section Diagrams for AC Electrified Lines

    2 1993 Code of Practice

    EHQ/CP/S/136 Code of Practice for the Application and Removal of Local Earth's and Temporary Continuity Jumpers for A.C. Electrified Lines

    3 1991 Code of Practice

    EHQ/ST/C/502 Reporting and Investigation into the Cause of Displaced Conductor Rails 1 1993 Code of Practice

    EHQ/ST/C/612 Standard for the Maintenance of Positive Conductor Rail 1 1994 Code of Practice

    EHQ/ST/D/645 Code of Practice for Access to Trackside Supervisory Equipment 1 1995 Code of Practice

    TPS/MC/401 Planning, Installation & Maintenance of Cable Routes & Other Works in Cess 1 1987 Code of Practice

    BR 29740 DC Electrified Lines Working Instructions (Merseyrail Only) Instructions BR 29987/9 DC Electrified Lines Working Instructions (Drayton Park - Moorgate Only) Instructions EHQ/IN/D/001 Instruction for the Inspection of 25 kV A.C. Feeder Station Buildings and Other

    Track Sectioning Cabins/ Enclosures 2 1992 Instructions

    EHQ/IN/D/003 Instruction for Documents to be kept in Switching Station Buildings 1 1990 Instructions EHQ/IN/D/008 Instruction for Routine Testing and Maintenance of Transformer and Switchgear

    Oil 1 1993 Instructions

    EHQ/IN/D/009 Instruction for the Inspection and Maintenance of 25 kV Cables and Cable Routes

    1 1993 Instructions

    EHQ/IN/D/010 Instruction for the Routine Inspection and Secondary Injection of F.G.L. Instantaneous Attracted Armature Relays

    1 1993 Instructions

    EHQ/IN/D/011 Instruction for Method of Applying Zone Reach and Timer Settings to DZA and AKE Protection Relays Using BR DZ Test Set

    1 1993 Instructions

    EHQ/IN/D/012 Instruction for Routine Inspection and Secondary Injection Testing of DZA & XFE Protection Relays

    2 1993 Instructions

    EHQ/IN/D/013 Instruction for Routine Inspection and Secondary Injection Testing of T.F.H. Protection Relays

    1 1993 Instructions

    EHQ/IN/D/014 Instruction for Routine Inspection and Secondary Injection Testing of CAG 19 Instantaneous Overcurrent and Earth Fault Relays

    1 1993 Instructions

    EHQ/IN/D/016 Instruction for Routine Inspection and Secondary Injection Testing of YTG 14 Distance Protection Relays

    1 1993 Instructions

    EHQ/IN/D/019 Instruction for Routine Inspection and Secondary Injection Testing of CDG and HO4 Protection Relays

    1 1993 Instructions

    EHQ/IN/D/021 Instruction for Vacuum Interrupter Pressure Testing on 25 kV VCB Equipment (GEC Type XE2, X82S and SWS Type 82XEM)

    1 1993 Instructions

    EHQ/IN/D/030 Inspection and Maintenance of Enclosed Transformer Return Current Isolating Switches

    1 1993 Instructions

    EHQ/IN/D/100 Instruction for Maintenance of 25 kV A.C. Switchgear Type K11 on 25 kV A.C. Electrified Lines

    1 1990 Instructions

    EHQ/IN/D/101 Instruction for the Inspection & Maintenance of South Wales Switchgear Type RD 100 Double Pole Disconnector

    1 1992 Instructions

    EHQ/IN/D/102 Instruction for Maintenance of 25 kV GEC Type OX SF6 Insulated Vacuum Switchgear Incorporating Sequential Isolators and Associated Equipment

    1 1990 Instructions

    EHQ/IN/D/104 Instruction for the Routine Maintenance of 25 kV Vacuum Circuit Breakers: GEC Type XE2, X82S, South Wales Switchgear Type 82XEM and Other equipment Within the HV Chamber

    1 1990 Instructions

    EHQ/IN/D/106 Instruction for the Maintenance of ASEA Minimum Oil Circuit Breakers Type HKSJ 600Amp & HKSJB 800Amp Including Associated Busbar and Breaker Circuit Chambers

    1 1993 Instructions

    EHQ/IN/D/108 Instruction for the Maintenance of 25 kV GEC Type OX36 Vacuum Switchgear (Structure Mounted Outdoor Switchgear)

    2 1993 Instructions

    EHQ/IN/D/109 Instruction for the Routine Maintenance of ABB Sace Esaflour SFE 25 Structure Mounted Outdoor Switchgear

    3 1993 Instructions

    EHQ/IN/D/200 Instructions for Maintenance of Oil Filled Transformers Except Booster Transformers

    2 1990 Instructions

    EHQ/IN/D/201 Instruction for Maintenance of Free Breathing and Sealed Booster Transformers 3 1991 Instructions EHQ/IN/D/302 Instruction for Stationary Batteries Nickel Cadmium Type and Associated

    Charger and Changeover Relay-West Coast 25 kV Electrified Line Only 1 1990 Instructions

  • 2. Company Standards C. Engineering Electrification

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 23

    Document No Title Issue Date Status

    Des

    ign

    Inst

    alla

    tio

    n

    Mai

    nten

    ance

    Ope

    rati

    ons

    EHQ/IN/D/402 Instructions for Maintenance of All Voltage Regulators and Regulating Transformers

    1 1990 Instructions

    EHQ/IN/D/405 Instructions for Single to Three Phase Converter Installations 1 1990 Instructions EHQ/IN/D/406 Instruction for Routine Inspection and Maintenance of Diesel and Electrically

    Driven Compressed Air Installations 1 1991 Instructions

    EHQ/IN/D/409 Instruction for Maintenance of MVAC Distribution Boards 1 1990 Instructions EHQ/IN/D/413 Instruction for Maintenance of Motor Wound Spring Mechanism on OHL

    switches Manufactured by Morris Line Equipment 1 1990 Instructions

    EHQ/IN/D/414 Instruction for Installation modification of Interconnecting Wiring 2 1992 Instructions EHQ/IN/D/415 Instruction for the Inspection and Examination of Harmonic Filter Equipment 1 1993 Instructions EHQ/IN/D/616 Instruction for Electrical Testing of Glass Fibre Height & Stagger Gauge 1 1991 Instructions EHQ/IN/D/617 Instruction for Electrical Testing of Glass Fibre Hollow Section Height Stick and

    Glass Fibre System Height Pole used on Live Overhead Equipment 1 1991 Instructions

    EHQ/IN/D/618 Instruction for the Examination and Testing of a Primary Insulator Pole which may Contact Live Overhead Line Equipment

    2 1992 Instructions

    EHQ/IN/D/622 Instructions for Checking Operation and General care of 25 kV L.M.R. Design Live Line Tester (Meter Type)

    1 1991 Instructions

    EHQ/IN/O/003 Instruction for the Preparation, Care and Maintenance of Local Earths 2 1992 Instructions EHQ/IN/O/005 Instruction for the Maintenance of BICC Single Wire Porcelain Section

    Insulators 1 1990 Instructions

    EHQ/IN/O/006 Instruction for the Layout of Overhead Line Equipment. 1 1992 Instructions EHQ/IN/O/012 Instruction for the Retensioning of Fixed Termination OLE 1 1990 Instructions EHQ/IN/O/030 Inspection of OHL Structures and Foundations 2 1992 Instructions EHQ/IN/O/031 Installation of 'CCL-Reliable' Automatic Connectors for HD copper, Copper-

    Cadmium & AWAC Catenary 2 1991 Instructions

    EHQ/IN/O/035 Protective Greasing of OLE Assemblies & Components 2 1991 Instructions EHQ/IN/O/036 Installation of BICC-BURNDY Compression Connections in Overhead Line

    Equipment 2 1992 Instructions

    EHQ/IN/O/037 Instruction for the Installation of Overhead Line Equipment, Planted and Bolted Base Side Bearing Foundations

    1 1992 Instructions

    EHQ/IN/O/042 Instruction for the Attachment of Spanwire to Tube Clamps 1 1993 Instructions EHQ/IN/O/056 Installation of Skidless Neutral Sections 2 1992 Instructions EHQ/IN/P/002 Instruction for the Production of Mean and Peak Currents for 25 kV

    Electrification 1 1992 Instructions

    EHQ/IN/P/004 Control of Major feeding Diagrams 1 1993 Instructions EHQ/IN/S/001 Instructions for Isolation and Earthing of 25 kV A.C. Switchgear Manufactured

    by Messrs. Switchgear and Cowans type K11 and Cable Connections 2 1993 Instructions

    EHQ/IN/S/002 Isolation & Earthing at Hackney Downs No. 2 TSC 1 1990 Instructions EHQ/IN/S/003 Isolation & Earthing 25 kV Switching Stations Incorporating VCB's 2 1992 Instructions EHQ/IN/S/007 Instructions for Isolation and Earthing for Feeder Switch Maintenance for A.C.

    Electrified Lines 1 1990 Instructions

    EHQ/IN/S/008 Instructions for the Installation and Removal of Traction Bonding on all Electrified Lines

    1 1990 Instructions

    EHQ/IN/S/011 Instructions for Isolating and Earthing Structure Mounted Outdoor Switchgear (SMOS) Locations (where the working Instructions for A.C. Electrified Lines BR 29987 apply)

    4 1992 Instructions

    EHQ/IN/S/012 Instructions for Isolation and Earthing at 25 kV A.C. Feeder Stations with Harmonic Filters and Vacuum Circuit Breakers

    4 1993 Instructions

    EHQ/IN/S/014 Isolation & Earthing at York Way TSC 1 1991 Instructions EHQ/IN/S/015 Isolation & Earthing at Incline TSC 2 1992 Instructions EHQ/IN/S/027 Isolation & Earthing for Isolating Transformers at Dolland's Moor 1 1993 Instructions EHQ/IN/S/035 Instruction for the Use of Ladders & Other Equipment on OHLE 1 1992 Instructions EHQ/IN/S/036 Instructions for Isolation & Earthing of SMOS Location not Adjacent to

    Overhead Line equipment, using BR 12011 3 1993 Instructions

    EHQ/IN/S/037 Isolation & Earthing for Isolating Transformers, Associated Cables & equipment at W. London J., Mitre Bridge and Scrubbs Lane

    1 1993 Instructions

    EHQ/IN/S/038 Isolation & Earthing for Old Oak Common Isolation Transformers 3 1993 Instructions

  • 2. Company Standards C. Engineering Electrification

    Issue 46: 7th August 1st October 2004 Catalogue of Company Standards Page 24

    Document No Title Issue Date Status

    Des

    ign

    Inst

    alla

    tio

    n

    Mai

    nten

    ance

    Ope

    rati

    ons

    EHQ/IN/S/039 Instruction for the Urgent Communication of Information of a Serious Safety or Technical Nature Concerning Electrification Fixed Equipment Except the SC, SE & SW Divisions of Network SouthEast

    1 1993 Instructions

    EHQ/IN/S/040 Safety of Staff Using the Roof of Wiring Trains 1 1993 Instructions EHQ/IN/S/212 Instructions for the carrying out of Testing on all Electrified Lines. 2 1991 Instructions EHQ/IN/S/801 Arrangements for Isolation of the Conductor Rail for Pre-planned Possessions

    of the Line 3 1995 Instructions

    EHQ/ST/D/502 Standard for Replacement to be Used on Electrification Equipment 1 1993 Instructions OM.1 Inspection And Cleaning Of Propane Gas Storage Tanks 2 Jun-79 Instructions OM.2 Calibration & Associated Test Of S.L.I.S On Cranes 3 Oct-84 Instructions OM.3 Maintenance In Safe Order, S.L.I.S On Cranes 3 Apr-84 Instructions OM.52 Inspection Of Spring Hanger Bolts (Cranes) 3 Jul-81 Instructions OM.53 Safety Of The Line Brake Test & Special Post Derailment 1 Aug-82 Instructions OM.58 Rail Crane Air Brake System: Exam Of Air Receivers 2 Sep-83 Instructions PMTK 0028 Plant Maintenance Technical Kit For Domestic Equipment May-90 Instructions PMTK 0041 Plant Maintenance Technical Kit For 76t. Converted Breakdown Cranes Jul-90 Instructions PMTK 0042 Plant Maintenance Technical Kit F