    Emergence of a new LNG market

    By: Dr. Anthony Barker, BG Group

    16 April 2013

    17

    th

     INTERNATIONAL CONFERENCE EXHIBITION ON

    LIQUEFIED NATURAL GAS (LNG 17)

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    2/20

    Legal notice

    The following presentation contains forward-looking statements concerning BG Group plc’sstrategy, operations, financial performance or condition, outlook, growth opportunities orcircumstances in the countries, sectors or markets in which BG Group plc operates. By theirnature, forward-looking statements involve uncertainty because they depend on futurecircumstances, and relate to events, not all of which can be controlled or predicted. Althoughthe Company believes that the expectations reflected in such forward-looking statements arereasonable, no assurance can be given that such expectations will prove to have been

    correct. Actual results could differ materially from the guidance given in this presentation for anumber of reasons. For a detailed analysis of the factors that may affect our business,financial performance or results of operations, we urge you to look at the “Principal risks anduncertainties” included in the BG Group plc Annual Report & Accounts 2011. Nothing in thispresentation should be construed as a profit forecast and no part of this presentationconstitutes, or shall be taken to constitute, an invitation or inducement to invest in BG Groupplc or any other entity, and must not be relied upon in any way in connection with anyinvestment decision. BG Group plc undertakes no obligation to update any forward-lookingstatements.

    No representation or warranty, express or implied, is or will be made in relation to theaccuracy or completeness of the information in this presentation and no responsibility orliability is or will be accepted by BG Group plc or any of its respective subsidiaries, affiliatesand associated companies (or by any of their respective officers, employees or agents) inrelation to it.

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    3/20

    Singapore’s challenges 

    Source: Wood Mackenzie, November 2012 & EMA Singapore Energy Statistics Report 2012

    75.7%

    20.3%

    4.0%

    2011 gas demand

    Power

    Industry

    Other

    84.1%

    15.9%

    2011 gas supply

    Indonesia

    Malaysia

    78.0%

    18.4%

    3.6%

    2011 fuel mix forelectricity generation

    Natural Gas

    Petroleum Products

    Others

    Power

    Industry

    Other

    Indonesia

    Malaysia

    Natural gas

    Petroleum products

    Others

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    4/20

    Consolidating demand

    • Marketing multiple gas sales

    contracts

    • Inventory management and

    24/7 commercial operations• Market development

    Sources: BG Group estimates 2012,Schlumberger Business Consulting, 2009

    Singapore LNG demand

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    2013 2014 2015 2016

        m     t    p    a

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    5/20

    Meeting Singapore’s challenges 

    Source: BG Group, 2012

     Aggregator

    (BG Group)

    Terminal owner

    (Singapore LNG)

    Energy Market

     Authority of

    Singapore

    Gas buyersLNG supplier

    (BG Group)

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    6/20

    BG Group’s LNG marketing 

    Henry Hub

      m   t  p  a

    Singapore

    Source: BG Group Strategy Presentation, February 2012

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    7/20

    Global assets, supply and markets

    * Exclusive right to supplyPotential liquefaction

    Existing long term supply source Liquefaction under construction

    Equity position

    Existing import capacity

    Long term customer

    UK

    USA

    Nigeria

    EgyptTrinidad

    & Tobago

    EG

    Chile

    Singapore*

     AustraliaTanzania

    Canada

    China

    Japan

    Brazil

    India 

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    8/20

    • Pipeline gas moratorium

    • Vesting contracts

    • SLNG step-in and

    underwriting

    Policy and regulatory support

    EMA initiatives and policies

    0

    5001,0001,5002,0002,5003,000

    3,5004,000

       Q   2   2   0   1   2

       Q   3   2   0   1   2

       Q   4   2   0   1   2

       Q   1   2   0   1   3

       Q   2   2   0   1   3

       Q   3   2   0   1   3

       Q   4   2   0   1   3

       Q   1   2   0   1   4

       Q   2   2   0   1   4

       Q   3   2   0   1   4

       M   W 

    Incremental gas generationcapacity

    Source: Tri-Zen Consulting, BG Group estimates, May 2012

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    9/20

    Long-term sales

    • 3 mtpa exclusive franchise

    to supply Singapore

    • Approx 2.6 mtpa

    contracted with 10 – 20year supply periods

    • 10 gas buyers and ~15

    GSAs

    Long-term sales projection

    Source: BG Group, November 2012

    1.61.8

    2.0

    2.2

    2.4

    2.6

    2.8

    3.0

    3.2

       Q   1   2   0   1   0

       Q   4   2   0   1   0

       Q   3   2   0   1   1

       Q   2   2   0   1   2

       Q   1   2   0   1   3

       Q   4   2   0   1   3

       Q   3   2   0   1   4

       Q   2   2   0   1   5

      m   t  p  a

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    10/20

    Singapore franchise state of play

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    3.50

       2   0   1   3

       2   0   1   4

       2   0   1   5

       2   0   1   6

       2   0   1   7

       2   0   1   8

       2   0   1   9

       2   0   2   0

       2   0   2   1

       2   0   2   2

       2   0   2   3

       2   0   2   4

       2   0   2   5

       2   0   2   6

       2   0   2   7

       2   0   2   8

       2   0   2   9

       2   0   3   0

       2   0   3   1

       2   0   3   2

       2   0   3   3

    Remaining Sales (3mtpa Franchise Forecast)Contracted Long-term Sales

      m   t  p  a

    Source: BG Group, November 2012

    Contracted long-term sales

    Remaining sales (3 mtpa franchise forecast)

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    11/20

    Long-term sales

    • BG Group has contracted at

    three long-term price tranches

    • Singapore’s power market

    is now well supplied withlong-term volumes

    • Buying interest seen from

    2018 onwards

     – Replacement of expiring pipelinegas import contracts

     – Demand growth driven byindustry

    0.0

    2.0

    4.06.0

    8.0

    10.0

    12.0

       2   0   1

       3

       2   0   1

       5

       2   0   1

       7

       2   0   1

       9

       2   0   2

       1

       2   0   2

       3

       2   0   2

       5

      m   t  p  a

    Incremental demand

    Sumatra pipeline gas replacement

    Natuna pipeline gas replacement

    Malaysia pipeline gas replacement

    BG Group franchise

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    12/20

    Short-term supply security

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    2013 2014 2015

      m   t  p  a

    Source: BG Group, December 2012

    Available volumes for short-term sales

    BG Group committed volumes

    Potential for short-term sales

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    13/20

    Short-term sales

    79%

    21%

    2013 volumes• Through 2012, BG Group worked

    closely with the regulator (EMA) to

    develop:

     – Standardised master short-term GSAs

     – ‘Stand alone’ short-term GSAs

    • Short-term interest driven by:

     – Ramp up and commissioningrequirements

     – Operational concerns

     – Commercial opportunities to accessspot LNG

     – Pipeline gas displacement

     – Power market opportunities

    Long-term sales

    Short-term sales

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    14/20

    0

    0.020.04

    0.06

    0.08

    0.1

    0.120.14

    0.16

    0.18

    0.2

    GSA1 GSA2 GSA3 GSA4 GSA5 Cargoes

      m   t

    Consolidating demand

    Aggregator's short-term and spot GSAs

       1  c  a  r  g

      o

       2  c  a  r  g  o  e  s

       3  c

      a  r  g  o  e  s

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    15/20

    Market development

    Source: BG Group, November 2012

    Singapore

    LNG

    inventory

    Term

    LNGFuel oil &

    oil products

    Indonesia

    piped gas

    Malaysia

    piped gas

    Spot LNG

    Electricity

    procurement

    100

    150

    200

    250

    300

       2   0   0   5

       2   0   0   6

       2   0   0   7

       2   0   0   8

       2   0   0   9

       2   0   1   0

       2   0   1   1

       2   0   1   2

       2   0   0   5  =   1   0   0

    Relative pricing of

    fuel oil & Brent

    BrentFuel oil

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    16/20

    Singapore market overview

    -

    2

    4

    68

    10

    12

    14

    16

       2   0   1

       0

       2   0   1

       1

       2   0   1

       2

       2   0   1

       3

       2   0   1

       4

       2   0   1

       5

       2   0   1

       6

       2   0   1

       7

       2   0   1

       8

       2   0   1

       9

       2   0   2

       0

       2   0   2

       1

       2   0   2

       2

       2   0   2

       3

       2   0   2

       4

       2   0   2

       5

      m   t  p  a

    Sources: BG Group estimates, November 2012 & EMA procurement framework consultation paper, March 2012

     Aggregator franchise – long-term contracted supply

    Long-term supply opportunities (EMA consultation paper)

     Aggregator franchise – 3 mtpa

    Short-term supply opportunities

    Gas demand (EMA consultation paper)Terminal max throughput – facilities under construction

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    17/20

    Pipeline gas displacement

    • LNG is competitive against

    pipeline gas in Singapore

    • Spot LNG prices regularly

    support short-termdisplacement of pipeline gas

    with LNG

    Pipeline gas prices

       S  p  o   t   L   N   G 

      p  r

       i  c  e  s

    Pipeline gas

    displacement

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    18/20

    Market development LNG reloads

    • Physical reload capability

    enables break bulk

    trans-shipment

    • Demand side interest in LNGreloads for various regional

    markets

    • Early stage assessment of

    LNG bunkering under way

    SLNG full development

    Source: EMA.gov.sg

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    19/20

    Conclusions

    • Close cooperation among

    BG Group, SLNG and EMA

    • Aggregator model tailor made

    to meet Singapore’s gasmarket challenges. It could be

    adapted to introduce LNG to

    new markets

    • BG Group is committed toongoing development of

    Singapore gas market

  • 8/18/2019 01 01 Anthony Barker BG Singapore Presentation

    20/20