01 general plan - winnipeg.ca...7.install reinforced concrete corbel beam and abutment seats....

1
150 GAS 150 GAS 300 DI WM (ABAND) 300 DI WM (ABAND) 300 AC FRM 300 AC FRM 300 PVC WM 300 PVC WM HYDRO DUCTS HYDRO DUCT 12D 150 PVC WM 375 CONC CS WM (ABAND) WM (ABAND) 300 AC FRM 300 DI WM (ABAND) 300 PVC WM 200 DI WM 200 PVC WM 1050 CONC LDS 375 CONC CS 300 LDS HYDRO UG HYDRO DUCT 12D 300 AC FRM 2.700 300 PVC WM 5.000 HYDRO DUCTS 375 CONC CS 6.060 300 AC FRM 2.000 5.800 3.803 3.765 4.005 6.074 11.110 1.500 4.035 300 AC WM 3.480 1.500 1.500 1.000 1.000 250 CS 7.634 300 FRM 300 LDS 150 WM 900 x 1350 CS 300 AC WM 300 LDS 5.548 6.110 2.951 2.152 2.300 20.117 20.117 16.764 20.117 20.117 20.117 150 GAS 150 WM 900 x 1350 CS 20.117 RUE MASSON CATHEDRALE AVENUE RUE DESPINS TACHE AVENUE RED RIVER 531 TREETOP LOOKOUT SHEET PILE WALL AND SIDEWALK WIDENING UPPER BANK PATHWAY SLOPE STABILIZATION PROPOSED RIPRAP 157 161 163 164 165 166 167 171 170 173 174 151 494 151 130 134 138 142 146 156 160 133 135 130 140 150 154 139 141 145 147 149 151 153 136 138 142 146 150 154 500 622 126 106 448 450 452 456 465 455 145 464 458 164 166 ST. BONIFACE HERITAGE GARDENS ST. BONIFACE MUSEUM PIER ICE SCOUR BERM (CLASS 450 RIPRAP) SHORELINE DESIGNED DRAWN CHECKED APPROVED RELEASED FOR CONSTRUCTION BM ELEV HOR SCALE VERT SCALE DATE DATE PROFESSIONAL'S SEAL DRAWING No. SHEET OF CONSULTANT FILE NAME BY BY BY BY LOCATION OF UNDERGROUND STRUCTURES AS SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE BUT NO GUARANTEE IS GIVEN THAT ALL EXISTING UTILITIES ARE SHOWN OR THAT THE GIVEN LOCATIONS ARE EXACT. CONFIRMATION OF EXISTENCE AND EXACT LOCATION OF ALL SERVICES MUST BE OBTAINED FROM THE INDIVIDUAL UTILITIES BEFORE PROCEEDING WITH CONSTRUCTION. NOTE: SUPR. U/G STRUCTURES COMMITTEE LOCATION APPROVED UNDERGROUND STRUCTURES DATE BY REVISIONS YY/MM/DD No. BID OPPORTUNITY No. 754-2017 TACHE PROMENADE THE CITY OF WINNIPEG PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION CITY DRAWING NUMBER REV 70 5170563-Tache-GP-01.dwg 01 02 JGK ISSUED FOR TENDER 0 17/10/13 0 O:\Winnipeg\Proj\5170563\09. Drawing\05. Design\06. Sheets\Detailed Design\General\5170563-Tache-GP-01.dwg Last Saved: 10/13/2017 9:19 AM by kberard Plotted: 10/13/2017 9:30 AM by Kevin Berard ISO A1 - 594mm x 841mm B250-17-02 PLAN WHOLE NUMBERS INDICATE MILLIMETRES DECIMALIZED NUMBERS INDICATE METRES METRIC DAN KMB JGK BWB 17/10/13 Certificate of Authorization MORRISON HERSHFIELD No. 1736 ENGINEERS GEOSCIENTISTS MANITOBA E G E N G P R E D I S T E A L S S R E F O O N I I N O B A A O F M E C N P R E I O V R N T I R E Member KENNEDY J.G. 22326 LEGEND - PLAN EXISTING NEW LEGEND - PLAN EXISTING NEW LEGEND - PLAN EXISTING NEW WATERMAIN LAND DRAINAGE SEWER SANITARY/COMBINED SEWER MANHOLE CATCH BASIN/CATCH PIT CURB INLET WITH BOX HYDRO HANDWELL/CABINET MTS HANDWELL/PEDESTAL GAS SURVEY BAR FENCE TREE CATV/FIBRE OPTIC TRAFFIC SIGNALS/PIT CB LEAD/SSP/DCP SUBDRAIN DITCH PROPERTY LINE BOC/EDGE OF PAVEMENT TEST HOLE TH-12 ELEVATION TRAFFIC SIGN 33.000 CONCRETE PAVEMENT CONC SIDEWALK/MEDIAN ASPHALT PAVEMENT PAVING STONE GRAVEL PLANING/REMOVAL RAMP CURB 33.333 H M TACHE AVENUE GENERAL SCOPE OF WORK PLAN THE FOLLOWING SCOPE OF WORK IS PRESENTED IN THE CONSTRUCTION SEQUENCE ASSUMED AS THE BASIS OF DESIGN. THE CONTRACTOR SHALL SUBMIT HIS PROPOSED CONSTRUCTION SEQUENCE AND HIS SCHEDULE FOR CONTRACT ADMINISTRATOR'S REVIEW AND ACCEPTANCE PRIOR TO PROCEEDING WITH THE WORK. SCOPE OF WORK UTILITY RELOCATION IN ADVANCE OF TACHE PROMENADE WORKS (BY OTHERS) 1. RELOCATE HYDRO POLES ALONG THE LENGTH OF THE PROPOSED SHEET PILE WALL AND SIDEWALK WIDENING TO THE EAST SIDE OF TACHE AVE. (BY OTHERS) SLOPE STABILIZATION NOTES 2017/18 (WINTER) 1. IMPLEMENT TRAFFIC CONTROL MEASURES FOR SHEET PILE WALL AND SIDEWALK WIDENING. 2. MOBILIZE FOR SLOPE STABILIZATION WORKS. 3. IMPLEMENT TREE PROTECTION. 4. PERFORM ACCEPTED TREE REMOVALS. 5. IMPLEMENT SEDIMENT AND EROSION CONTROL MEASURES AS REQUIRED TO PREVENT SEDIMENT ENTRY INTO THE WATERCOURSE. 6. CONSTRUCT ACCEPTED TEMPORARY ACCESS AND WORK PLATFORMS. 7. FACILITATE INSTALLATION OF RIVERBANK MONITORING INSTRUMENTATION (BY OTHERS). 8. INSTALL ROCKFILL COLUMNS. 9. INSTALL RIPRAP. 10. RESTORE LOWER BANK PLATFORMS AND ANY RAMPS NOT REQUIRED FOR LOOKOUT STRUCTURE CONSTRUCTION. 11. IMPLEMENT TEMPORARY EROSION CONTROL MEASURES FOR SPRING FLOOD. SHEET PILE WALL AND SIDEWALK WIDENING (SUMMER) 1. IMPLEMENT TRAFFIC CONTROL MEASURES FOR SHEET PILE WALL AND SIDEWALK WIDENING. 2. IMPLEMENT EROSION CONTROL MEASURES FOR SHEET PILE WALL CONSTRUCTION AS REQUIRED. 3. PERFORM REMOVALS. 4. INSTALL SHEET PILING. 5. INSTALL SUBDRAIN SYSTEM. 6. INSTALL CELLULAR CONCRETE FILL. 7. INSTALL REINFORCED CONCRETE CORBEL BEAM AND ABUTMENT SEATS. 8. INSTALL CONCRETE PAVEMENT AND SAFETY CURB. 9. INSTALL LIMESTONE BACKFILL AND SIDEWALK PAVEMENT STRUCTURE. 10. INSTALL BICYCLE RAIL. TREETOP LOOKOUT (SUMMER) 1. INSTALL CAST-IN-PLACE CONCRETE PIER FOUNDATIONS C/W PERMANENT PIER SLEEVE. 2. INSTALL PIER ICE SCOUR PROTECTION. 3. INSTALL BEARINGS WHERE REQUIRED. 4. INSTALL STEEL FRAMING. 5. INSTALL STAY-IN-PLACE STEEL DECKING C/W STUD ANCHORS AND PERIMETER ANGLES. 6. INSTALL DECK DRAINS. 7. INSTALL REINFORCING STEEL. 8. INSTALL ELECTRICAL CONDUIT DUCT RUNS. 9. INSTALL CAST-IN-PLACE CONCRETE DECK AND CURBS. 10. INSTALL DECK EXPANSION JOINTS. 11. INSTALL WATERPROOFING MEMBRANE. 12. INSTALL AND COMPACT BEDDING SAND. 13. INSTALL PRECAST CONCRETE PAVERS. 14. INSTALL STEEL RAILING C/W EXPANDED WIRE MESH AND INTEGRAL LIGHTING. 15. INSTALL TIMBER BENCH AT LOOKOUT PLATFORM AND TIMBER RAILING AT JUMP SLABS. 16. FACILITATE INSTALLATION OF PUBLIC ART PIECE AT THE LOOKOUT PLATFORM. 17. INSTALL AND CONNECT ALL ELECTRICAL SERVICES. UPPER BANK PATH (SUMMER) 1. REMOVE EXISTING CURBS AND HANDRAIL. 2. EXCAVATION AND PLACEMENT OF FILL AND PAVEMENT STRUCTURE. 3. INSTALLATION OF LIMESTONE BLOCK WALL. 4. PLACEMENT OF SEPARATION GEOTEXTILE FABRIC, SUB-BASE MATERIAL AND BASE COURSE. 5. PLACEMENT OF ASPHALT PAVEMENT. 6. LANDSCAPING. SCALE: 1:750 0 45m 30 15 1:750

Upload: others

Post on 06-Dec-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 01 General Plan - winnipeg.ca...7.install reinforced concrete corbel beam and abutment seats. 8.install concrete pavement and safety curb. 9.install limestone backfill and sidewalk

150 G

AS

150 GAS

300 DI WM (ABAND)

3

0

0

D

I W

M

(A

B

A

N

D

)

3

0

0

A

C

F

R

M

300 AC FRM

300 PVC WM

3

0

0

P

V

C

W

M

H

Y

D

R

O

D

U

C

T

S

HYDRO DUCT 12D

150 P

VC

W

M

375 C

ON

C C

S

WM

(A

BA

ND

)

WM

(A

BA

ND

)

3

0

0

A

C

F

R

M

3

0

0

D

I W

M

(A

B

A

N

D

)

3

0

0

P

V

C

W

M

200 D

I W

M

200 P

VC

WM

1050 C

ON

C LD

S

375 C

ON

C C

S

300 LDS

H

Y

D

R

O

U

G

HYDRO DUCT 12D

300 AC FRM

2

.7

0

0

3

0

0

P

V

C

W

M

5

.0

0

0

H

Y

D

R

O

D

U

C

T

S

3

7

5

C

O

N

C

C

S

6

.0

6

0

3

0

0

A

C

F

R

M

2

.0

0

0

5

.8

0

0

3

.8

0

3

3

.7

6

5

4.005

6.074

11.110

1.500

4.035

300 AC WM

3.480

1.500

1.500

1

.0

0

0

1.000

250 CS

7.634

300 FRM

300 LDS

150 W

M

900 x 1350 C

S

300 AC WM

300 LDS

5.548

6.110

2.951

2.152

2

.3

0

0

20.117

20.117

16.764

20.117

20.117

2

0

.1

1

7

150 G

AS

150 W

M

900 x 1350 C

S

20.117

RU

E M

AS

SO

N

CA

TH

ED

RA

LE

AV

EN

UE

RU

E D

ES

PIN

S

TACHE AVENUE

RED RIVER

NoteNote

5

3

1

TREETOP LOOKOUT

SHEET PILE WALL AND

SIDEWALK WIDENING

UPPER BANK PATHWAY

SLOPE STABILIZATION

PROPOSED RIPRAP

1

5

7

1

6

1

1

6

3

1

6

4

1

6

5

1

6

6

1

6

7

1

7

1

1

7

0

1

7

3

1

7

4

151

494

151

130

134

138

142

146

1

5

6

1

6

0

133

135

1

3

0

1

4

0

150

154

139

141

145

147

149

151

153

1

3

6

1

3

8

1

4

2

1

4

6

1

5

0

1

5

4

500

6

2

2

126

1

0

6

448 450 452 456

465455

145

464458

164

166

S

T

. B

O

N

IF

A

C

E

H

E

R

IT

A

G

E

G

A

R

D

E

N

S

ST. BONIFACE MUSEUM

PIER ICE SCOUR BERM

(CLASS 450 RIPRAP)

SHORELINE

DESIGNED

DRAWN

CHECKED

APPROVED

RELEASED FOR CONSTRUCTION

BM

ELEV

HOR SCALE

VERT SCALE

DATE DATE

PROFESSIONAL'S SEAL

DRAWING No.

SHEET OF

CONSULTANT FILE NAME

BY

BY

BY

BY

LOCATION OF UNDERGROUND STRUCTURES

AS SHOWN ARE BASED ON THE BEST

INFORMATION AVAILABLE BUT NO

GUARANTEE IS GIVEN THAT ALL EXISTING

UTILITIES ARE SHOWN OR THAT THE GIVEN

LOCATIONS ARE EXACT. CONFIRMATION OF

EXISTENCE AND EXACT LOCATION OF ALL

SERVICES MUST BE OBTAINED FROM THE

INDIVIDUAL UTILITIES BEFORE PROCEEDING

WITH CONSTRUCTION.

NOTE:

SUPR. U/G STRUCTURES

COMMITTEE

LOCATION APPROVED

UNDERGROUND STRUCTURES

DATE

BYREVISIONS YY/MM/DDNo.

BID OPPORTUNITY No. 754-2017

TACHE PROMENADE

THE CITY OF WINNIPEG

PUBLIC WORKS DEPARTMENT

ENGINEERING DIVISION

CITY DRAWING NUMBER

REV

70

5170563-Tache-GP-01.dwg

01

02

JGKISSUED FOR TENDER0 17/10/13

0

O:\W

in

nip

eg

\P

ro

j\5

17

05

63

\0

9. D

ra

win

g\0

5. D

esig

n\0

6. S

he

ets\D

eta

ile

d D

esig

n\G

en

era

l\5

17

05

63

-T

ach

e-G

P-0

1.d

wg L

ast S

ave

d: 1

0/1

3/2

01

7 9

:1

9 A

M b

y kb

era

rd

P

lo

tte

d: 1

0/1

3/2

01

7 9

:3

0 A

M b

y K

evin

B

era

rd

IS

O A

1 - 5

94

mm

x 8

41

mm

B250-17-02

PLAN

WHOLE NUMBERS INDICATE MILLIMETRES

DECIMALIZED NUMBERS INDICATE METRES

METRIC

DAN

KMB

JGK

BWB

17/10/13

Certificate of Authorization

MORRISON HERSHFIELD

No. 1736

ENGINEERSGEOSCIENTISTSMANITOBA

E

G

E

N

G

P

R

E

D

IS

T

E

A

L

SS

R

EF

O

O

N

I

I

N

O

B

A

A

OF

M

E

C

N

P

RE

I

O

V

R

N

TI

RE

Member

KENNEDY

J.G.

22326

LEGEND - PLANEXISTING NEW LEGEND - PLANEXISTING NEW LEGEND - PLANEXISTING NEW

WATERMAIN

LAND DRAINAGE SEWER

SANITARY/COMBINED SEWER

MANHOLE

CATCH BASIN/CATCH PIT

CURB INLET WITH BOXHYDRO HANDWELL/CABINET

MTS HANDWELL/PEDESTAL

GAS

SURVEY BAR

FENCE

TREECATV/FIBRE OPTIC

TRAFFIC SIGNALS/PIT

CB LEAD/SSP/DCP

SUBDRAIN

DITCH

PROPERTY LINE

BOC/EDGE OF PAVEMENT

TEST HOLE

TH-12

ELEVATION

TRAFFIC SIGN

33.000

CONCRETE PAVEMENT

CONC SIDEWALK/MEDIAN

ASPHALT PAVEMENT

PAVING STONE

GRAVEL

PLANING/REMOVAL

RAMP CURB

33.333

H

M

TACHE AVENUE

GENERAL SCOPE OF WORK

PLAN

THE FOLLOWING SCOPE OF WORK IS PRESENTED IN THE CONSTRUCTION SEQUENCE ASSUMED AS THEBASIS OF DESIGN. THE CONTRACTOR SHALL SUBMIT HIS PROPOSED CONSTRUCTION SEQUENCE AND HISSCHEDULE FOR CONTRACT ADMINISTRATOR'S REVIEW AND ACCEPTANCE PRIOR TO PROCEEDING WITHTHE WORK.

SCOPE OF WORK

UTILITY RELOCATION IN ADVANCE OF TACHE PROMENADE WORKS (BY OTHERS)

1. RELOCATE HYDRO POLES ALONG THE LENGTH OF THE PROPOSED SHEET PILE WALL ANDSIDEWALK WIDENING TO THE EAST SIDE OF TACHE AVE. (BY OTHERS)

SLOPE STABILIZATION NOTES 2017/18 (WINTER)

1. IMPLEMENT TRAFFIC CONTROL MEASURES FOR SHEET PILE WALL AND SIDEWALK WIDENING.

2. MOBILIZE FOR SLOPE STABILIZATION WORKS.

3. IMPLEMENT TREE PROTECTION.

4. PERFORM ACCEPTED TREE REMOVALS.

5. IMPLEMENT SEDIMENT AND EROSION CONTROL MEASURES AS REQUIRED TO PREVENTSEDIMENT ENTRY INTO THE WATERCOURSE.

6. CONSTRUCT ACCEPTED TEMPORARY ACCESS AND WORK PLATFORMS.

7. FACILITATE INSTALLATION OF RIVERBANK MONITORING INSTRUMENTATION (BY OTHERS).

8. INSTALL ROCKFILL COLUMNS.

9. INSTALL RIPRAP.

10. RESTORE LOWER BANK PLATFORMS AND ANY RAMPS NOT REQUIRED FOR LOOKOUT STRUCTURECONSTRUCTION.

11. IMPLEMENT TEMPORARY EROSION CONTROL MEASURES FOR SPRING FLOOD.

SHEET PILE WALL AND SIDEWALK WIDENING (SUMMER)

1. IMPLEMENT TRAFFIC CONTROL MEASURES FOR SHEET PILE WALL AND SIDEWALK WIDENING.

2. IMPLEMENT EROSION CONTROL MEASURES FOR SHEET PILE WALL CONSTRUCTION AS REQUIRED.

3. PERFORM REMOVALS.

4. INSTALL SHEET PILING.

5. INSTALL SUBDRAIN SYSTEM.

6. INSTALL CELLULAR CONCRETE FILL.

7. INSTALL REINFORCED CONCRETE CORBEL BEAM AND ABUTMENT SEATS.

8. INSTALL CONCRETE PAVEMENT AND SAFETY CURB.

9. INSTALL LIMESTONE BACKFILL AND SIDEWALK PAVEMENT STRUCTURE.

10. INSTALL BICYCLE RAIL.

TREETOP LOOKOUT (SUMMER)

1. INSTALL CAST-IN-PLACE CONCRETE PIER FOUNDATIONS C/W PERMANENT PIER SLEEVE.

2. INSTALL PIER ICE SCOUR PROTECTION.

3. INSTALL BEARINGS WHERE REQUIRED.

4. INSTALL STEEL FRAMING.

5. INSTALL STAY-IN-PLACE STEEL DECKING C/W STUD ANCHORS AND PERIMETER ANGLES.

6. INSTALL DECK DRAINS.

7. INSTALL REINFORCING STEEL.

8. INSTALL ELECTRICAL CONDUIT DUCT RUNS.

9. INSTALL CAST-IN-PLACE CONCRETE DECK AND CURBS.

10. INSTALL DECK EXPANSION JOINTS.

11. INSTALL WATERPROOFING MEMBRANE.

12. INSTALL AND COMPACT BEDDING SAND.

13. INSTALL PRECAST CONCRETE PAVERS.

14. INSTALL STEEL RAILING C/W EXPANDED WIRE MESH AND INTEGRAL LIGHTING.

15. INSTALL TIMBER BENCH AT LOOKOUT PLATFORM AND TIMBER RAILING AT JUMP SLABS.

16. FACILITATE INSTALLATION OF PUBLIC ART PIECE AT THE LOOKOUT PLATFORM.

17. INSTALL AND CONNECT ALL ELECTRICAL SERVICES.

UPPER BANK PATH (SUMMER)

1. REMOVE EXISTING CURBS AND HANDRAIL.

2. EXCAVATION AND PLACEMENT OF FILL AND PAVEMENT STRUCTURE.

3. INSTALLATION OF LIMESTONE BLOCK WALL.

4. PLACEMENT OF SEPARATION GEOTEXTILE FABRIC, SUB-BASE MATERIAL AND BASE COURSE.

5. PLACEMENT OF ASPHALT PAVEMENT.

6. LANDSCAPING. SCALE: 1:750

0 45m3015