01.4ib.30000 powell gis (gas insulated switchgear) · pdf fileinstallations and has received...

53
01.4IB.30000 Powell GIS™ (Gas Insulated Switchgear) G81 - 36kV / 1250A, 2000A, 2500A, & 3150A / 40kA G82 - 38kV / 1200A, 2000A, 2500A / 40kA Powered by Safety ®

Upload: dinhminh

Post on 08-Feb-2018

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

01.4IB.30000Powell GIS™ (Gas Insulated Switchgear)

G81 - 36kV / 1250A, 2000A, 2500A, & 3150A / 40kAG82 - 38kV / 1200A, 2000A, 2500A / 40kA

Powered by Safety®

Page 2: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®

Powell GIS™38kV Gas Insulated Switchgear

01.4IB.30000

Contact Information

Powell Electrical Systems, Inc. powellind.com

[email protected]

Service Division PO Box 12818

Houston, Texas 77217-2818

Tel: 713.944.6900 Fax: 713.948.4569

Page 3: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®

01.4IB.30000

Signal Words

As stated in ANSI Z535.4-2007, the signal word is a word that calls attention to the safety sign and designates a degree or level of hazard seriousness. The signal words for product safety signs are “Danger”, “Warning”, “Caution” and “Notice”. These words are defined as:

DANGER indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury.

! DANGER

! WARNINGWARNING indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.

! CAUTIONCAUTION, used with the safety alert symbol, indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.

CAUTION, used without the safety alert symbol, is used to address practices not related to personal injury.

CAUTION

NOTICENOTICE is used to address practices not related to personal injury.

Qualified Person

For the purposes of this manual, a qualified person, as stated in NFPA 70E®, is one who has skills and knowledge related to the construction and operation of the electrical equipment and installations and has received safety training to recognize and avoid the hazards involved. In addition to the above qualifications, one must also be:

1. trained and authorized to energize, deenergize, clear, ground, and tag circuits and equipment in accordance with established safety practices.

2. trained in the proper care and use of personal protective equipment (PPE) such as rubber gloves, hard hat, safety glasses or face shields, flash clothing, etc., in accordance with established safety practices.

3. trained in rendering first aid if necessary.

Page 4: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®

Powell GIS™38kV Gas Insulated Switchgear

01.4IB.30000

This page left blank intentionally.

Page 5: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® i

01.4IB.30000

Contents

Ch 1 General Information ................................................................................................1A. Scope ...............................................................................................................................................................2B. purpoSe ............................................................................................................................................................2c. InStructIon BulletInS AvAIlABle electronIcAlly ....................................................................................................2

Ch 2 Safety .......................................................................................................................3A. SAfe Work condItIon .........................................................................................................................................3B. SAfety GuIdelIneS ...............................................................................................................................................3c. GenerAl ............................................................................................................................................................4d. SpecIfIc .............................................................................................................................................................4e. X-rAyS .............................................................................................................................................................5f. SAfety lABelS ....................................................................................................................................................5

Ch 3 General Powell GIS™ ................................................................................................6A. deScrIptIon .......................................................................................................................................................6

1) Safety and Maintenance ...................................................................................................................................... 62) Four Completely Segregated Areas .................................................................................................................... 6

Ch 4 General Specification ...............................................................................................7A. ApplIed StAndArd ..............................................................................................................................................7B. ServIce condItIon ..............................................................................................................................................7c. Structure .........................................................................................................................................................7

1) General ....................................................................................................................................................................................... 72) Circuit Breaker .......................................................................................................................................................................... 73) 3-Position Switch ..................................................................................................................................................................... 74) Bus ............................................................................................................................................................................................... 75) Current Transformer ............................................................................................................................................................... 86) Potential Transformer ............................................................................................................................................................ 87) Lightning Arrester .................................................................................................................................................................... 88) Painting ..................................................................................................................................................................................... 8

Ch 5 Technical Specification ............................................................................................9A. rAtInGS .............................................................................................................................................................9B. 3-poSItIon SWItch ........................................................................................................................................... 10

Page 6: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®ii

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Contents

Ch 6 Structure ................................................................................................................11A. GenerAl ......................................................................................................................................................... 11B. cIrcuIt BreAker ............................................................................................................................................... 11c. MechAnISMS ................................................................................................................................................... 12

1) Circuit Breaker Mechanism .................................................................................................................................................122) 3-Position Switch Mechanism ............................................................................................................................................12

d. BuS coMpArtMent ........................................................................................................................................... 13e. cABle coMpArtMent ........................................................................................................................................ 13

Ch 7 Operation ...............................................................................................................14A. conStructIon of eAch feeder ........................................................................................................................... 14B. operAtIon cIrcuIt BreAker .............................................................................................................................. 16c. operAtIon of 3-poSItIon SWItch ....................................................................................................................... 19

1) Electric Operation ..................................................................................................................................................................202) Manual Operation .................................................................................................................................................................20

Ch 8 Components ...........................................................................................................22A. cIrcuIt BreAker (hhf) .................................................................................................................................... 22B. vAcuuM Interrupter conStructIon ................................................................................................................... 22c. 3-poSItIon SWItch (3pS) ................................................................................................................................. 23d. BuS BAr connector (SInGle phASe) ................................................................................................................... 23e. 3-poSItIon SWItch BuShInG (connectS BuS BAr coMpArtMent And cIrcuIt BreAker coMpArtMent) ......................... 23f. cABle Socket .................................................................................................................................................. 23G. rupture dISc .................................................................................................................................................. 24

Ch 9 Assembly & Carry ...................................................................................................25

Ch 10 Installation ...........................................................................................................26A. InStAllAtIon ................................................................................................................................................... 26B. erectIon of poWell GIS™ ................................................................................................................................ 27

1) End Panel .................................................................................................................................................................................272) Next Panel ...............................................................................................................................................................................273) Installation of End Panel ......................................................................................................................................................324) Connecting Primary and Secondary Cables ...................................................................................................................325) Pressure Relief Arc Gas Ducts ..............................................................................................................................................326) Special Accessories for G81 & G82 Installation ...............................................................................................................32

c. eXtenSIon of pAnelS on SIte ............................................................................................................................. 33d. hv cABle connectIon ..................................................................................................................................... 35e. fInAl equIpMent check .................................................................................................................................... 35f. InSulAtIon GAS ............................................................................................................................................... 35

Page 7: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® iii

01.4IB.30000

Ch 11 Maintenance & Test Procedure ............................................................................36A. MAIntenAnce .................................................................................................................................................. 36

1) Safety ........................................................................................................................................................................................362) Maintenance Terms ..............................................................................................................................................................363) Check of Insulation Gas .......................................................................................................................................................364) Instruction for Lubrication Use ...........................................................................................................................................36

B. teSt procedure .............................................................................................................................................. 371) Visual Check ............................................................................................................................................................................372) Functional Test .......................................................................................................................................................................373) Cleaning ..................................................................................................................................................................................374) Check the Control Circuit Wiring .......................................................................................................................................375) SF₆ Gas Leakage Test .............................................................................................................................................................376) Control Circuit Wiring Test ..................................................................................................................................................387) Timing ......................................................................................................................................................................................388) 3-Position Switch (disconnector or earth) Operating Test ...........................................................................................389) Manual Close/Open Test ......................................................................................................................................................3810) Potential Transformer Test ..................................................................................................................................................38

Ch 12 Others ...................................................................................................................39A. poSt proceSSInG of Bolt And torque vAlve ...................................................................................................... 39B. proceSSInG of contAct SurfAce ....................................................................................................................... 39

1) Cleaning ..................................................................................................................................................................................39c. GAS MonItorInG SySteM (hMd3) .................................................................................................................... 39

1) Channel Scan .........................................................................................................................................................................392) Automatic Scan Mode ..........................................................................................................................................................393) Manual Scan Mode ...............................................................................................................................................................404) Change the Parameter .........................................................................................................................................................40

Contents

Page 8: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®iv

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Figures

Figure 1 Drawing of G81 ............................................................................................11Figure 2 Circuit Breaker Mechanism ..........................................................................12Figure 3 3-Position Switch Mechanism ......................................................................12Figure 4 G81 Single Bus System .................................................................................14Figure 5 G82 Transfer Bus System ..............................................................................15Figure 6 Circuit Breaker Schematic ............................................................................16Figure 7 Flowchart for Circuit Breakers .....................................................................17Figure 8 Available position for 3-Position Switch and Circuit Breaker .....................18Figure 9 3-Position Switch Schematic ........................................................................19Figure 10 Operation Device & Switch Position ............................................................21Figure 11 Circuit Breaker and Mechanism ..................................................................22Figure 12 Vacuum Interrupter for HVS-03644 .............................................................22Figure 13 Structure of 3-Position Switch .....................................................................23Figure 14 Structure of Bus bar Connector ...................................................................23Figure 15 Structure of 3PS Bushing .............................................................................23Figure 16 Structure of Cable Socket .............................................................................23Figure 17 Rupture Disc .................................................................................................24Figure 18 Equipment Lifting ........................................................................................25Figure 19 Installation ...................................................................................................26Figure 20 End Panel Installation ..................................................................................27Figure 21 Bolting of Guide Pin .....................................................................................28Figure 22 Installing Bolts and Guide Pins ....................................................................29Figure 23 Connecting to Bus Bar Socket ......................................................................29Figure 24 Panel and Bus Bar Connection .....................................................................30Figure 25 Figure of Installation Site .............................................................................31Figure 26 Bus Bar Closing Caps ....................................................................................32Figure 27 Future of Extension Site ...............................................................................34Figure 28 Connection of the HV Cable Plug ................................................................35Figure 29 Lubrication of Circuit Breaker Mechanism ..................................................36Figure 30 Lubrication of 3-Position Switch Mechanism ..............................................37Figure 31 HMD3 ............................................................................................................41Figure 32 Wiring Connection Diagram ........................................................................42

Page 9: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® v

01.4IB.30000

Tables

Table A Cubicle Type Gas Insulated Switchgear Ratings ..................................................9Table B 3-Position Switch ................................................................................................10Table C Installation Steps ................................................................................................26Table D Erection of Powell GIS™ Steps ............................................................................27Table E Next Panel Installation .......................................................................................27Table F Installation of End Plate Steps ............................................................................32Table G Special Accessory for G81 & G82 Installation ....................................................32Table H Extension of Panels on Site Steps ......................................................................33Table I Maintenance Terms .............................................................................................36Table J Inspection ............................................................................................................36Table K Timing .................................................................................................................38Table L Insulation Resistance ..........................................................................................38Table M Class 8.8 or 9.8 Bolt and Nut ..............................................................................39Table N Class 10.9 Bolt and Nut ......................................................................................39Table O Change the Parameter .......................................................................................40

Page 10: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®vi

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

This page left blank intentionally.

Page 11: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 1General Information

01.4IB.30000

Ch 1 General Information

! WARNINGThe equipment described in this document may contain high voltages and currents which can cause death or serious injury.

The equipment is designed for use, installation, and maintenance by knowledgeable users of such equipment having experience and training in the field of high voltage electricity. This document and all other documentation shall be fully read, understood, and all warnings and cautions shall be abided by. If there are any discrepancies or questions, the user shall contact Powell immediately at 1.800.480.7273.

! WARNINGPrior to adjustments, servicing, maintenance, or any act requiring the operator to make physical contact with the equipment, the power source must be disconnected and the equipment grounded. Failure to do so may result in death or serious injury.

NOTICEThe information in this instruction bulletin is not intended to explain all details or variations of the Powell equipment, nor to provide for every possible contingency or hazard to be met in connection with installation, testing, operation, and maintenance of the equipment. For additional information and instructions for particular problems, which are not presented sufficiently for the user’s purposes, contact Powell at 1.800.480.7273.

Powell reserves the right to discontinue and to change specifications at any time without incurring any obligation to incorporate new features in products previously sold.

NOTICE

Page 12: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®2 General Information

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

A. Scope

The information in this instruction bulletin covers the technical data in respect to the 36kV/38kV, 40kA SF₆ Powell GIS™ (Gas Insulated Switchgear).

B. purpoSe

The information in this instruction bulletin is intended to provide information required to properly operate and maintain the Gas Insulated Switchgear described in Ch 1 General Information, A. Scope.

This instruction bulletin provides:

1. Safety guidelines

2. General descriptions of the operation and maintenance of the gas insulated switchgear

3. Instructions for installation and placing the switchgear into service

4. Instructions for part replacement

5. Information for ordering renewal parts

6. Procedure for critical adjustments

7. Illustrations, photographs, and description of the switchgear

The illustrations contained in this document may not represent the exact construction details of each particular type of gas insulated switchgear. The illustrations in this document are provided as general information to aid in showing component locations only.

All illustrations and photos are shown using deenergized equipment.

Be sure to follow the appropriate safety precaution while handling any of the equipment. Failure to do so may result in serious injury or death.

! WARNING

To the extent required, the products described herein meet the applicable ANSI, IEEE, NEMA, and IEC Standards; however, no such assurance is given with respect to local codes and ordinances which may vary greatly.

c. InStructIon BulletInS AvAIlABle electronIcAlly

Changes to the instruction bulletin may be implemented at any time and without notice. Go to powellind.com to ensure use of the current instruction bulletin for the Powell equipment.

NOTICE

For more information visit powellind.com. To contact the Powell Service Division call 1.800.480.7273 or 713.944.6900, or email [email protected].

For specific questions or comments pertaining to this instruction bulletin email [email protected] with the IB number in the subject line.

Page 13: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 3Safety

01.4IB.30000

Ch 2 Safety

A. SAfe Work condItIon

The information in Section A is quoted from NFPA 70E 2012 - Article 120, 120.1 Establishing an Electrically Safe Work Condition.

120.1 Process of Achieving an Electrically Safe Work Condition

1. Determine all possible sources of electrical supply to the specific equipment. Check applicable up-to-date drawings, diagrams, and identification tags.

2. After properly interrupting the load current, OPEN the disconnecting device(s) for each source.

3. Wherever possible, visually verify that all blades of the disconnecting devices are fully OPEN or that drawout type circuit breakers are withdrawn to the fully disconnected position.

4. Apply lockout/tagout devices in accordance with a documented and established policy.

5. Use an adequately rated voltage detector to test each phase conductor or circuit part to verify they are deenergized. Test each phase conductor or circuit part both phase-to-phase, and phase-to-ground. Before and after each test, determine that the voltage detector is operating satisfactorily.

Informational Note: See ANSI/ISA-61010-1 (82.02.01)/UL 61010-1, Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use - Part 1: General Requirements, for rating and design requirements for voltage measurement and test instruments intended for use on electrical systems 1000 V and below.

6. Where the possibility of induced voltages or stored electrical energy exists, ground the phase conductors or circuit parts before touching them. Where it could be reasonably anticipated that the conductors or circuit parts being deenergized could contact other exposed energized conductors or circuit parts, apply ground connecting devices rated for the available fault duty.

B. SAfety GuIdelIneS

Study this instruction bulletin and all other associated documentation before uncrating the switchgear.

Each user has the responsibility to instruct and supervise all personnel associated with usage, installation, operation, and maintenance of this equipment on all safety procedures. Furthermore, each user has the responsibility of establishing a safety program for each type of equipment encountered.

The switchgear described in this instruction bulletin are operated by a high-energy, high-speed mechanism that is interlocked to provide specific operating sequences. It is mandatory that the following rules be observed to ensure the safety of personnel associated with usage, installation, operation, and maintenance of these circuit breakers.

The safety rules in this instruction bulletin are not intended to be a complete safety program. The rules are intended to cover only some of the important aspects of personnel safety related to gas insulated switchgear.

Page 14: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®4 Safety

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

c. GenerAl

1. Only supervised and qualified personnel trained in the usage, installation, operation, and maintenance of gas insulated switchgear shall be allowed to work on this equipment. It is mandatory that this instruction bulletin, any supplements, and service advisories be studied, understood, and followed.

2. Maintenance programs must be consistent with both customer experience and manufacturer’s recommendations, including service advisories and instruction bulletin(s). A well planned and executed routine maintenance program is essential for circuit breaker’s reliability and safety.

3. Service conditions and circuit breaker applications shall also be considered in the development of safety programs. Variables include ambient temperature; humidity; actual continuous current; thermal cycling; number of operations; interrupting duty; and any adverse local conditions including excessive dust, ash, corrosive atmosphere, vermin and insect infestations.

d. SpecIfIc

1. Do not work on an energized circuit breaker.

2. Do not work on a circuit breaker with the control circuit energized.

3. Extreme care must be exercised to keep all personnel, tools, and other objects clear of mechanisms which are to be operated, discharged, or released. These circuit breakers utilize stored energy mechanisms. These mechanisms must be serviced only by skilled and knowledgeable personnel capable of releasing each spring load in a controlled manner. Detailed information regarding these mechanisms is found in this instruction bulletin.

4. Do not attempt to close the circuit breaker manually on an energized circuit.

5. Do not use an open circuit breaker as the sole means of isolating a high voltage circuit. For complete isolation, the circuit breaker shall be in the open position and disconnector open, and circuit earthed.

6. All components shall be disconnected by means of a visible break and securely grounded for safety of personnel performing maintenance operations on the circuit breakers.

7. Interlocks are provided to ensure the proper operating sequences of the circuit breakers and for the safety of the user. If for any reason an interlock does not function as described, do not make any adjustments, modification, or deform the parts. Do not force the parts into position. Contact Powell for instructions.

Page 15: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 5Safety

01.4IB.30000

e. X-rAyS

When high voltage is applied across the contacts of a vacuum interrupter, there is the possibility of generation of X-rays. The intensity of the X-radiation is dependent on the peak voltage and the contact gap. At the normal operating voltage for this type of equipment, the radiation levels are negligible. At the voltages specified for testing, test personnel shall be in front of the circuit breaker such that the two layers of steel used in the frame and front cover construction are between the test personnel and the vacuum interrupters, and that the test personnel be no closer than one meter (3’) from the front of the circuit breaker. The circuit breaker shall be either fully open, or fully closed when making high potential tests. Do not test with contacts partially open.

f. SAfety lABelS

The equipment described in this document has DANGER, WARNING, CAUTION, and instruction labels attached to various locations. All equipment DANGER, WARNING, CAUTION, and instruction labels shall be observed when the circuit breaker is handled, operated, or maintained.

Warning and Caution labels are located in various places in and on the switchgear and on the circuit breaker removable element. Always observe these warnings and caution labels. Do NOT remove or deface any of these warning/caution labels.

NOTICE

Page 16: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®6 General PGIS

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Ch 3 General Powell GIS™

A. deScrIptIon

Powell’s cubical type gas-insulated switchgear is an integrated assembly of a vacuum circuit breaker, the 3-position switch/disconnector, bus connecting system and control devices coordinated electrically and mechanically for a medium voltage power system.

1) Safety and Maintenance

• The 3-position switch is interlocked with circuit breaker mechanically

• Circuit breaker function accompanied by earthing function in combination with the 3-position switch

• Operating mechanism is accessed from outside of enclosure

2) Four Completely Segregated Areas

• Bus compartment(s)• Circuit breaker compartment• Cable compartment• Low voltage compartment

Page 17: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 7General Specifications

01.4IB.30000

Ch 4 General Specification

A. ApplIed StAndArd

1. Powell GIS™ if manufactured in accordance with the IEC standards.• IEC 62271-100: High-Voltage

alternating current circuit breakers• IEC 62271-200: AC Metal-Enclosed

Switchgear and control gear for rated voltages above 1kV and up to and including 52kV.

• IEC 62271-102: High-Voltage alternating current disconnector and earthing.

• IEC 60376: Specification of technical grade sulfur hexafluoride (SF₆) for use in electrical equipment.

• IEC 60480: Diagnosis guide of SF₆ gas for electric device.

B. ServIce condItIon

1. Location: Indoor2. Ambient Temperature: -5 ~ +40˚C3. Altitude: Not exceeding 1,000m above sea

level4. Atmospheric Condition: Not notably

polluted

c. Structure

1) General

The gas tank has been designed for its entire life. It is made of stainless-steel (SUS 304L), contains a 3-position switch/disconnector switch, bus bar and vacuum interrupter.

The tank is permanently sealed. No maintenance or refilling of the tank required. In the event of an internal arc, each tank has a rupture disc which direct gases to an arc duct assembly.

2) Circuit Breaker

The circuit breaker is rated up to 36kV/38kV, 40kA. The circuit breaker consists of a vacuum interrupter, insulator frame and operating mechanism. The circuit breaker poles are installed horizontally in the circuit breaker compartment. The vacuum interrupter is supported by the insulator frame located in the circuit breaker compartment. The circuit breaker is operated by a stored energy mechanism normally charged by a small universal motor, but it can be also charged by a manual handle for emergency manual to close and open. The circuit breaker has three independent vacuum interrupters.

3) 3-Position Switch

The 3-positon switch is rated up to 36kV/38kV, 40kA and is a motor operating rod-type switch. Live switch components (bus bar, insulated spindle with moving contact) are in the gas compartment and the operating mechanism components (drive motor, position indicator and emergency manual operation) outside of the gas compartment.

4) Bus

• Single and double bus system• Transfer Bus System

Page 18: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®8 General Specifications

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

5) Current Transformer

• The current transformer is an individual cast-resin insulated product available to be installed inside a SF₆ gas compartment.

6) Potential Transformer

• The potential transformer is a plug-in and epoxy molding type.

7) Lightning Arrester

• The lightning arrester is a plug-in type.

8) Painting

• The gas tanks are stainless steel and do not require painting. All other external metal surfaces are cleaned, rust proofed and painted in accordance with Powell’s paint thickness.

Page 19: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 9Technical Specification

01.4IB.30000

Ch 5 Technical Specification

A. rAtInGS

Table A Cubicle Type Gas Insulated Switchgear RatingsSwitchgear Type HMGS-G81 HMGS-G82

Rated Voltage (kV) 36 [40.5]1 38

Power Frequency Withstand Voltage (kV) 70 [95]1 80

Lightning Impulse Withstand Voltage (kV) 170 [190]1 150 [200]1

Rated Frequency (Hz) 50 / 60 50 / 60

Normal Current (Amperes)Main Bus ≤ 3150 ≤ 2500

Feeder 1250 / 2000 / 2500 / 3150 1200 / 2000 / 2500

Rated Short Time Withstand Current, 3s (kA) 40 40

Rated Peak Withstand Current (kA, peak) 104 104

Rated Short Circuit Breaking Current (kA) 40 40

Rated Short Circuit Making Current (kA) 104 104

Rated Operating Sequence O-0.3s-CO--15s-CO O-0.3s-CO--15s-CO

Closing Time (ms) ≤ 70 ≤ 70

Opening Time (ms) ≤ 50 ≤ 40

Breaking Time (cycle) 5 3

Auxiliary Voltage (V) DC110 / 1252 DC110 / 1252

Insulation Gas SF6 SF6

Rated Pressure at 20°C (bar) 0.3 [0.4]1 0.4

Minimum Operating Pressure at 20°C 0.2 [0.3]1 0.3

Arc Classification (62271-200) B FLR, 40kA / 1s B FLR, 40kA / 1s

Bus Bar System Single / Double Single / Double / Transfer

Size (mm)3

Width (W)≤ 1250A 600 [800]4 800

≥ 2000A 800 800

Depth (D) [optional extra depth] 1760 [1960]5 1960

Height (H) 2400 2400

Notes:

1 The value in “[ ]” is for the system according to the GOST 1516.3, GB 3906 or relevant standard on request.

2 The auxiliary voltage can be changed on request.3 The size of actual panel can be different according to the rating, quantity and arrangement of

components.4 Width of the panel in [ ] is when voltage transformer is installed.5 Depth of the panel can increase according to the numbers and size of components in low voltage compartment.

Page 20: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®10 Technical Specification

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

B. 3-poSItIon SWItch

Table B 3-Position SwitchType 3PS

Rated Voltage 36(38)kV

Frequency 50/60Hz

Rated Current 1200A/1250A/2000A/2500A/3150A

Power Frequency withstand

Voltage

Phase to earth and between phases 70(80)kV

Across the isolating distance 80(88)kV

Lightning impulse

withstand voltage (1.2/50)

Phase to earth and between phases 170kV

Across the isolating distance 195kV

Short-time withstand

current frequency

40kA

Peak withstand

current104kA

Duration of

short-circuit

3s

Disconnector class of

mechanical endurance

M1

Operation method Motor & Handle

Control Voltage DC110 / 125VDC

Control Voltage change range 85 ~ 110%

Page 21: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 11Structure

01.4IB.30000

Ch 6 Structure

A. GenerAl

Powell GIS™ is a metal enclosure 3-phase conductor that is symmetrically arranged with a compact structure.

B. cIrcuIt BreAker

The circuit breaker compartment contains a vacuum interrupter assembly that is connected to a mechanism for open and close operation. The 3-position switch can connect and disconnect the main bus. The switch can also ground the circuit breaker and connected line or load terminals.

Figure 1 Drawing of G81

a. Main Busb. 3-Position Switch Mechanismc. 3-Position Switchd. Main 3-Pole Bushing (Contact Conductor)e. Vacuum Interrupterf. Rupture Discg. Vacuum Interrupter Housingh. Circuit Breaker Mechanismi. Arc Gas Ductj. Current Transformer (Block Type)k. Cable Socket (Structure)l. Instrument Compartment

a

b

d

eg

h

k

c

f

ij

l

i

f

Page 22: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®12 Structure

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

c. MechAnISMS

1) Circuit Breaker Mechanism

• Motor : ~ 125 VDC, for close spring charging

• Auxiliary switch : 5 Poles or 10 poles• Close coil : 86 Ohm• Trip coil : 86 Ohm for 5 cycles or (42

Ohm for 3 cycles)

Figure 2 Circuit Breaker Mechanism

a. Close/Open Indicatorb. Breaker Shaftc. Dash Potd. Operating Countere. Opening Buttonf. Closing Mechanismg. Open Solenoidh. Close Springi. Closing Buttonj. Manual Charging Operating Holek. Trip Springl. Closing Solenoidm. Spring Charge Indicatorn. Motoro. Auxiliary Switch

b

fh

k

m

acd

e

g

ijl

n

o

2) 3-Position Switch Mechanism

• Motor : ~125 VDC• Auxiliary switch (DS,Open,ES) : Up-to 10

Poles• Motor & hand operation

Figure 3 3-Position Switch Mechanism

a. Indicatorb. Handle Insert Holec. Motord. Interlock Rode. Limit Switch for Motor Controlf. Auxiliary Switchg. Drive Gearh. Clutch for Motor Control

a

bc

d

e

f

g

h

Page 23: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 13Structure

01.4IB.30000

d. BuS coMpArtMent

Bus bar compartment contains a main bus bar, feeder bus bar including the 3-position switch (3PS), filled with SF₆ gas with safety rupture discs activated by overpressure.

e. cABle coMpArtMent

Cable compartments contain the incoming or outgoing cable supports and earthing bus. The cable compartment is sealed by metal walls.

Under the Arc Fault condition, the rupture disc may rupture and should be checked visually by opening the arc gas duct panel.

Page 24: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®14 Operation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Ch 7 Operation

A. conStructIon of eAch feeder

Figure 4 G81 Single Bus System

Arc Way Outgoing Feeder Incoming Feeder Bus - VT Bus - Coupler Arc Way

3PS3PS

CB

CT

VT

PF

3PS

CB

3PS

CB2500A1250A

VTCTCT

SA

VD

ZCT

250 600 800 800 800 250

Circuit Diagram for Typical Unit

a. Main Busb. 3-Position Switchc. 3-Position Switch Mechanismd. Bushinge. Vacuum Interrupter

f. Rupture Discg. Circuit Breaker Mechanismh. Current Transformer (Block Type)i. Inner Cone Socketj. Surge Arrestork. Zero Sequence Current Transformer

f

CB Panel/Outgoing Feeder

b

a

cd

g

j

e

h

i

k

Note: 1. Width of panel can be increasing according to the specification or quantity of current transformers.2. An arc way is needed at each side of the end panel

Page 25: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 15Operation

01.4IB.30000

Figure 5 G82 Transfer Bus System

Arc Way Incoming Feeder Outgoing Feeder Bus PT Bus-Coupler Arc Way

250 800 800 800 800 250

3PS

CB

3PS

3PS

CB

3PS DS

CT CT

DS

PF PF

PT PT

3PS 3PS

CB

CT

Circuit Diagram for Typical Unit

a. Main Busb. 3-Position Switchc. 3-Position Switch

Mechanismd. Bushinge. Vacuum Interrupterf. Circuit Breaker Mechanism

g. Rupture Disch. 3-Position Switchi. 3-Position Switch Mechanismj. Current Transformerk. Inner Cone Socketl. Arc Gas Duct

CB Panel/Outgoing Feeder with Plug-in Circuit

a

bc

d

f

h

i

e

g

k

j

l

l

Note: 1. An arc way is needed at each side of the end panel

Page 26: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®16 Operation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

B. operAtIon cIrcuIt BreAker

Figure 6 Circuit Breaker Schematic

CloseCommand

OpenCommand

1

21

22S21

21

22S22

M

13

14

61

62

1

5

A2

A1Y9

6 4

K1

Y1

63

64A1

A2

A1

A2

2 7 5

11

12

6

4K1

S3

K1

ASO

8

7

R

ASOS3

P

N

S21 & S22

S3

ASO

K1

M

Y1

Y9

: Limit Switch for Driving Springs

: Limit Switch Close

: Auxiliary Switch

: Anti Pumping Relay

: Motor for Spring Charging

: Trip Coil

: Closing Coil

Page 27: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 17Operation

01.4IB.30000

Figure 7 Flowchart for Circuit Breakers

Motor Motion

Closing SpringCharging

Limit SwitchS21, S22 Open

Limit SwitchS3 Close

Motor StopCB Closing Signal Input

Energizing Trip Coil

CB Close CB Close by Manual(by button)

Charging ClosingSpring by Handle

Limit SwitchS21, S22 CloseRelease Closing Spring

CB Open Signal(Protection Relay

CS S/W)Energizing Trip Coil CB Open

CB Open by Manual(by button)

Electric OperationManual Operation

Page 28: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®18 Operation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Figure 8 Available position for 3-Position Switch and Circuit Breaker

DISCONNECT / OPEN CONNECT / CLOSE READY FOR EARTHING

3PS 3PS 3PS

CB CB CB

CABLE SIDE EARTHING

3PS

CB

Page 29: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 19Operation

01.4IB.30000

c. operAtIon of 3-poSItIon SWItch

Figure 9 3-Position Switch Schematic

13 13 13 13

14 14 14 14

23 23 23 23

24 24 24 24

E1CX D1OX E1OX D1CX D1CXE1OXD1OXE1CX

23 25025

024

023

24

33 33 33 33

34 34 34 34D1CXE1OXD1OXE1CX

119 XA1XA13PS1

10 12

++

--

D1CX : Disconnector Close Command Contact

D1OX : Disconnector Open Command Contact

E1CX : Earthed Close Command Contact

E1OX : Earthed Open Command Contact

M : Motor

CH : Motor Clutch

M CH

Page 30: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®20 Operation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

1) Electric Operation

Refer to Figure 9 during electric operation.

A clutched motor is used for the electrical operation of the 3-Position disconnector. The motor can be operated forward or reversed direction and the motor clutch makes the operation of the motor stop to prohibit over operating of the disconnector as follows:

a. Disconnector : Off → On When the command contact “D1CX” is

closed, the motor is rotated clockwise so that the position of the disconnector is connected.

b. Disconnector : On → Off If the command contact “D1OX”

is closed, the motor is rotated counterclockwise so that the position of this disconnector is disconnected.

c. Earthing : Off → On If the command contact “E1CX”

is closed, the motor is rotated counterclockwise so that the position of this disconnector is placed “earth”.

d. Earthing : On → Off When command contact “E1OX” is

closed, the motor is rotated clockwise so that the position of this disconnector is placed “disconnected”.

2) Manual Operation

Refer to Figure 10 during manual operation.

Carefully follow the instructions on the face of the selector switch mechanism.

The 3-position switch can only be operated when the circuit breaker is in the open position. If the circuit breaker is closed, the 3-position switch cannot be operated mechanically as the circuit breaker interlock prohibits insertion of the manual handle into the access port.

The circuit breaker can only be operated when the 3-position switch is fully in the connected, disconnected, or earthed position. The manual handle can not be removed until switching operation has been completed.

The 3-position switch contains a moving contact that moves in a longitudinal direction by an internal trapezoid threaded screw among fixed and earthing contacts. The alternating movement provides for the switching of the disconnecting switch contact, open position or switching of the earthing contact of the 3-position switch.

As the switch is rotated clockwise from the “OFF”position, it is placed in the “connected” (service on) position. From the “connected” position, counter-clockwise rotation returns the switch to the “open” position.

As the switch is rotated counterclockwise from the “open” position, the switch is now in the “earthed” position. From the “earthed” position, clockwise rotation returns the switch to the “open” position.

Page 31: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 21Operation

01.4IB.30000

Figure 10 Operation Device & Switch Position

! DANGER

! CAUTION

DISCONNECTING

EARTHING

OFF

OFF

ON

ON

Connected Position

Disconnected Position

Earthed Position

Page 32: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®22 Operation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Ch 8 Components

A. cIrcuIt BreAker (hhf)

Figure 11 Circuit Breaker and Mechanism

a. Contact Springb. Circuit Breaker Mechanismc. Pole with VI

c

a

b

B. vAcuuM Interrupter conStructIon

Figure 12 Vacuum Interrupter for HVS-03644

d

ab

c

f

e

a. Contact Tipb. Contact Basec. Bellowsd. Fixed Steme. Arc Chamberf. Movable Stem

Page 33: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 23Operation

01.4IB.30000

c. 3-poSItIon SWItch (3pS)

Figure 13 Structure of 3-Position Switch

a

b

c

a. Manual Handle Insert holeb. Operating Screw Rodc. 3PS Pole

d. BuS BAr connector (SInGle phASe)

Figure 14 Structure of Bus bar Connector

a. Bus Bar Connector for 1250A

b. Bus Bar Connector for 2500A

e. 3-poSItIon SWItch BuShInG (connectS BuS BAr coMpArtMent And cIrcuIt BreAker coMpArtMent)

Figure 15 Structure of 3PS Bushing

f. cABle Socket

Figure 16 Structure of Cable Socket

Page 34: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®24 Operation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

G. rupture dISc

Figure 17 Rupture Disc

Normal

Ruptured

Page 35: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 25Assembly & Carry

01.4IB.30000

Ch 9 Assembly & Carry

It is recommended that the equipment be moved by crane but if one is not available a forklift or hand push vehicle is sufficient.

When using a crane to lift, make sure to keep the same angles of the chain on both sides of the equipment. Always keep the equipment in an upright, horizontal position during movement.

Figure 18 Equipment Lifting

Page 36: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®26 Installation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Ch 10 Installation

A. InStAllAtIon

Table C Installation Steps

Step #1Bolt the individual base frames together. Set the distances according to the installation plan. Keep them in one plane.

Step #2Position the whole base frame on the floor. Check distances to wall and to cable openings.

Step #3

In the case of concrete floor, drill holes for plugs. Place in the fastening bolts. (First do it in the two traverse corners, then in all other points). Continuously check the right position.

Step #4 Insert steel shims below the height adjusting points and insert adjusting screws.

Step #5

Adjust the whole base frame structure into horizontal plane by adjusting the base frame height adjusting screws. Check the position again.

Step #6 Fasten the base frame firmly to the floor.

Step #7

When reaching a final position and horizontal plane checking weld base frame height adjusting screws to prevent any change in settings.

Step #8 Earth the base frame connecting it properly to the local earthing system.

Step #9

(Optional) Insert auxiliary bolts into the base frame to avoid penetration of screed into the nuts. Complete the preparation of the floor. Fill the foundation by screening it carefully. The Surface of the base frame shall be +/-0.5 mm above the final floor level.

Figure 19 Installation

1

2 3

4 5

67

Foundation 2

Foundation 1

1 ...

3 m

m

No. Description1

2

3

4

5

6

7

Base Frame

Bottom frame of the panel

Panel height adjusting screw

Shim

Base Frame �xing bolt

Panel �xing bolt

Base Frame height adjusting screw (option)

Page 37: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 27Installation

01.4IB.30000

B. erectIon of poWell GIS™

1) End Panel

Table D Erection of Powell GIS™ Steps

Step #1 Grease the upper surface of base frame where the panel will be intended to slide.

Step #2 Put the end-panel to the base frame as close to the final position as possible

Step #3 Position the panel by slightly sliding it on the greased base frame

Step #4 Insert fixing bolts into the nuts

Step #5 Align and position the panel precisely. Fix height-adjusting screws by counter nuts.

Step #6 Fasten the panel firmly to the base frame after a final checking.

Figure 20 End Panel Installation

2) Next Panel

Table E Next Panel Installation

Step #1 Bolt the guide pins into the neighboring panel.

Step #2 Bolt the special connecting bolts into the neighboring panel.

Step #3Grease the upper surface of the base frame where the next panel will be intended to slide.

Step #4

Put the next panel to the base frame near the neighboring panel leaving enough room to carry out preparatory work described in Steps #5 through #8.

Step #5 Remove the protective caps from the adjacent bus bar sockets of both panels.

Step #6

Carefully check the bus bar sockets, conductor and insulating parts of the bus bar connecting elements (“BB connector”). Clean all surfaces if necessary.

Step #7Prepare connecting surfaces of conductor and insulating parts of the bus bar connecting elements applying grease.

Step #8Insert conductor and insulating part of the bus bar connecting element into the bus bar socket of the neighboring panel.

Step #9

Slide the panel toward the neighboring panel and help to penetrate guiding pin into the next panel. Adjust the height of the next panel by height-adjusting screws if necessary.

Step #10

As soon as the next panel is close enough to neighboring panel, insert-connecting screws. From now approach the next panel by tightening these screws step by step evenly.

Step #11Make a final check (and adjustment if necessary). The gap between main bus compartments shall be 10(+0/-1)mm.

Step #12 Fasten the next panel to the base frame.

Step #13

Connect the main earthing bar of the Two panels

Earthing Bar Connection

Page 38: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®28 Installation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Figure 21 Bolting of Guide Pin

a

b

c

a. Guide Pinb. Guide Nutc. Connecting Piece

Page 39: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 29Installation

01.4IB.30000

Figure 22 Installing Bolts and Guide Pins

The connecting bolts of the BB compartment

Installing the guide pins

Install the connecting bolts

The connecting bolts of the CB compartment

Figure 23 Connecting to Bus Bar Socket

Epoxy Mold Connecting Conductor& Silicone Tube

Page 40: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®30 Installation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Figure 24 Panel and Bus Bar Connection

Page 41: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 31Installation

01.4IB.30000

Figure 25 Figure of Installation Site

Put the �rst panel

Place new panel and install busbar connector

Place in busbar closing caps and �x gas duct closing plate

Connect all panels

Page 42: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®32 Installation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

3) Installation of End Panel

Table F Installation of End Plate Steps

Step #1 Place in and fix bus bar closing caps on the first and last panels

Step #2 Place in and fix arc gas duct closing plates on the first and last panels

Step #3 Place in and fix lateral side covers on the first and last

Step #4 Place in bus bar closing caps and fix arc gas duct closing plate

Figure 26 Bus Bar Closing Caps

4) Connecting Primary and Secondary Cables

Primary cables shall be connected to the switchgear before assembling the rear arc gas ducts. Connect secondary wiring system to the panels.

5) Pressure Relief Arc Gas Ducts

After erecting all panels top pressure relief ducts, rear arc gas ducts and side arc gas ducts shall be assembled onto the panels and joining to each other according to the installation plan.

6) Special Accessories for G81 & G82 Installation

Table G Special Accessory for G81 & G82 Installation

No. Name Figure Quantity per Bus Compartment

1 Guide Pin 4

2 Guide Nut 4

3 Connecting Piece 2

4 Connecting Bolt for BB Compartment 2

5 Connecting Bolt for CB Compartment 2

6 Insulation (Silicone) Tube 3

7 Connecting Conduct with Special Contact 3

8 Insulation Grease Silicone Grease 1

9 Conducting Grease B8 Grease 1

Page 43: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 33Installation

01.4IB.30000

c. eXtenSIon of pAnelS on SIte

Powell Powell GIS™ can be extended on site either on the left side or the right size after commissioning. The factory assembled and SF₆ gas filled panels don’t need any gas handling on installation site.

If future extension is expected the necessary space requirement shall be considered in foundation layout.

CAUTION

Do not work on energized equipment. Working on energized equipment may cause personal injury or even death.

CAUTION

Table H Extension of Panels on Site Steps

Step #1Make the necessary measurements according to valid regulation in order to provide safe and effective work

Step #2 Remove the lateral side covers of the extended panel

Step #3 Remove the closing plate of arc gas duct

Step #4 Remove the closing caps of all bus bars

Step #5 Place new panel near to the existing panel series

Step #6 Place in all bus bar connection assemblies (contacts and insulator tubes)

Step #7 Place in arc gas duct connecting elements

Step #8 Insert positioning tools (pins)

Step #9 Move the new panel toward the existing panel series

Step #10 Check correct position by positioning tools

Step #11 Set correct panel height position by adjusting tools

Step #12

Repeat steps 10 and 11 as many times as it is necessary. When the new panel is in the correct position remove positioning tool and join the new panel to the existing panel series

Step #13 Fix new panel to the basement frame

Step #14 Fix arc gas duct connecting elements

Step #15Connect earthing bar of the new panel to the earthing bar system of the existing panel series

Step #16 Place in and fix bus bar closing caps on the new panel

Step #17 Fix arc gas duct connecting elements

Step #18 Place in and fix arc gas duct closing panel on the new panel.

Step #19 Place in and fix end panel on the new panel

Step #20 Connect primary cables to the new panel

Step #21 Connect secondary wiring system to the new panel

Step #22

Make the necessary inspection, checking and other measures according to valid regulation in order to ensure suitable condition of the extended panel series

Page 44: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®34 Installation

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Figure 27 Future of Extension Site

The existing panels Remove lateral side covers and closing caps

Place new panel and install busbar connector Place in busbar closing caps and �x gas duct closingplate on the new panel

Extenstion of panels

Page 45: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 35Installation

01.4IB.30000

d. hv cABle connectIon

Cables are connected to Powell GIS™ utilizing a plug in “inner sealing cone” assembly.

1. When connecting the HV cable, it is recommended to treat ending part with termination kit in accordance with cable plug manufacturer’s recommendations.

2. Access the cable compartment, and then pull the cable plug up to the cable socket.

3. Fix the cable to the cable support by clamp.

Figure 28 Connection of the HV Cable Plug

Enclosure Surface

M8(15±3Nm)

e. fInAl equIpMent check

1. Tightening between Powell GIS and foundation

2. Main bus cover compartment bolts3. Earth bus bar bolts4. Control cable bolts5. Check Auxiliary Circuit and Control Circuit6. Check Current Transformer Circuit7. Aux Circuit and Control Circuit Check8. Check CT Circuit by CT Circuit Drawing

f. InSulAtIon GAS

Check input pressure by pressure meter.

Page 46: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®36 Maintenance & Test Procedure

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Ch 11 Maintenance & Test Procedure

A. MAIntenAnce

1) Safety

Extreme care must be exercised to keep all personnel, tools, and other objects clear of mechanisms which are to be operated, discharged, or released. These circuit breakers utilize stored energy mechanisms. These mechanisms must be serviced only by skilled and knowledgeable personnel capable of releasing each spring load in a controlled manner.

2) Maintenance Terms

Table I Maintenance TermsMaintenance

Terms Description

Every 4 years - Check SF₆ gas pressure, if need refilling

Every 12 years- Check SF₆ gas pressure- Grease driving device- Test solenoid coil

After CB mechanism

operation is 2,000 times

- CB mechanism operating test and grease driving device- Test solenoid coil

After 3PS mechanism

operation is 1,000 times

- 3PS mechanism operating test and grease driving device

3) Check of Insulation Gas

Table J InspectionCheck of SF₆ Gas Description

Range of gas sensor is in 1.2~1.5 bar

(abs)

- Fill to recommended pressure range- Relieve pressure if above range

4) Instruction for Lubrication Use

In general, the operating mechanism requires only moderate lubrication at regular intervals and all excess must be removed with a clean cloth to prevent any accumulation of dust or dirt. Avoid any lubricant on insulation or other electrical parts.

Lubricate the mechanism with Alvania #2 or equivalent. Moving parts should then be moved slightly to let the grease penetrate and become properly distributed. After lubrication, operate the breaker several times manually.

The points to be lubricated is shown in Figure 29.

Figure 29 Lubrication of Circuit Breaker Mechanism

• Outer surface of spring guide• Outer surface of shaft and pin• Latch for closing/opening• Cam for closing

Page 47: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 37Maintenance & Test Procedure

01.4IB.30000

Figure 30 Lubrication of 3-Position Switch Mechanism

• Shaft and saw-tooth of all gears• Guide pin and Driving shaft

B. teSt procedure

1) Visual Check

a. General condition of cabinets and compartments

b. All operating mechanisms (especially that of the circuit breaker, 3-position switch/disconnector switch, and mechanical interlocks.

2) Functional Test

After performing the visual check, the circuit breaker or 3-position switch mechanical test should be performed on all related devices, including mechanical interlocks. During this test the device shall be operated with no (electrical) load. If the “visual check” raises doubts about the proper characteristics of a component, consult with Powell on what tests are to be performed.

3) Cleaning

According to the result of the visual check cleaning may be necessary.

Note: Only isolated, earthed and/or securely isolated parts of Powell GIS™ should be subjected to cleaning. Keep in mind all safety regulation of relevant standards.

4) Check the Control Circuit Wiring

Check the connecting condition of wiring according to the drawing.

5) SF₆ Gas Leakage Test

If pressure is below recommended level, perform this test to confirm that leakage of SF₆ gas sealed in the Powell GIS has not occurred.

a. Leak Test Methodi. Test all the compartments, o-ring

and bolting connections for leaks using the SF₆ gas detector.

ii. The SF₆ gas detector detects Freon gas. So, where a leak is detected smear the spot with soapy water to confirm the leakage. Wipe away the soapy water after confirmation.

iii. Standard of judgment: No detection of gas leakages.

Page 48: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®38 Maintenance & Test Procedure

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

6) Control Circuit Wiring Test

a. Test Method Confirm electrical operations with an

approved drawing. Validate proper operation of all functional electrical components and interlocks.

7) Timing

At normal control voltage, operate the test source to the “close” position to close the circuit breaker and record the closing time. The closing time from energizing the closing coil to vacuum interrupter contact touch should not exceed the values in Table K Timing. Again, at normal control voltage, operate the test source to the “open” position to open the circuit breaker and record the opening time. The opening time from energizing the shunt trip coil to vacuum interrupter contact part should not exceed the values in Table K Timing.

Table K TimingClosing Time Tripping Time

3 Cycle ≤80 ms <35 ms

5 Cycle ≤80 ms <50 ms

8) 3-Position Switch (disconnector or earth) Operating Test

a. Test MethodPurpose of this test is to check characteristics of ES and DS. Measuring open and close time

b. Control Voltage: 80 - 110%c. Standard of judgement:

Fully changes positions in 10 seconds

9) Manual Close/Open Test

a. Test Method Repeat open & close operation by manual handle. Purpose of this test is checking DS and ES operation status.

10) Potential Transformer Test

a. Test Method Use a 1000V megger for validating the main bus insulation. Use a 500V megger for validating control wire insulation.

Table L Insulation ResistanceMain circuit and earthBetween main circuit

terminal

Control circuit and between control circuit

and earthAbove 500 MΩ

(DC 1000V Megger)Above 2MΩ

(DC 500V Megger)

Page 49: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 39Others

01.4IB.30000

Ch 12 Others

A. poSt proceSSInG of Bolt And torque vAlve

If the torque value of the gas compartment is above 8.8 and uses a whisker coated bolt, install using Loctite 222 or an anti reveling device. For outside installation a normal bolt is used. Torque values are represented in Table M Class 8.8 or 9.8 Bolt and Nut and Table N Class 10.9 Bolt and Nut.

Table M Class 8.8 or 9.8 Bolt and NutTorque (Nm)

Min Max

M6 7 9

M8 18 22

M10 36 44

M12 63 77

M16 153 187

M20 297 363

Table N Class 10.9 Bolt and NutTorque (Nm)

Min Max

M6 13 15

M8 32 40

M10 65 80

M12 90 110

M16 243 297

B. proceSSInG of contAct SurfAce

Before fixing bolt, following operations are required:

• Surface must be cleaned• Exposed surface bus must be grinded

(without rust resistant part)• Spread rust resistant grease

1) Cleaning

a. Use liquid detergent to clean a foreign substance on the surface

b. If the degree of pollution is high, use grinder to clean the foreign substance.

c. GAS MonItorInG SySteM (hMd3)

Do not connect anything to the terminal marked “NC”.

! CAUTION

1) Channel Scan

Channel Skip

The selected channel is skipped when “CHn” is OFF. Then the skipped channel LED and the relay operations all become “OFF” status.

2) Automatic Scan Mode

At the operating display, pressing the “SET” key for more than 1 second turns to the “Auto Scan” mode. While in the “Auto Scan” mode, it scans the channels that are “Chn = ON” and displays for approximately 2 seconds each. However, if a channel has a certain problem, the “Auto scan” is stopped and the problem status is displayed with the channel locked.

Page 50: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®40 Others

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

3) Manual Scan Mode

At the operating display, pressing the “SET” key turns to the “Manual Scan” mode. While in the manual scan mode, every time the “SET” is pressed once, the channels that has “CHn=ON” is scanned and displayed. * n = 1~3 (Channel Number)

4) Change the Parameter

Table O Change the Parameter

Parameter Name <--> Parameter Value

When the “parameter

name” and the “parameter

value”Are displayed

on the indicator panel in alternately

Parameter Value

Then only the “parameter

value” is displayed, and

at this time,by using keys to change the

value, after which the “SET” key is pressed

Parameter Name <--> Changed Parameter Value

The changed parameter values are

registered, and the “parameter name” and the

“parameter value” are displayed alternate.

Page 51: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety® 41Others

01.4IB.30000

Figure 31 HMD3

<< <<

<<

< <<

POWELL

<<

<<

123.4HDM3

P1

P2

P3

bar

SET

No. Description1

2

3

4

5

6

OPERATING ZONE lamp of each P1, 2, & 3 (Green)

LOW ZONE Lamp of each P1, 2, & 3 (Yellow)

Low-Zone Lamp of each P1, 2, & 3 (Red)

Channel indicating Lamp of each P1, 2, & 3 (Green)

PV Indicator

DOT Indicator

SET: SET KEY <<

Direction setting shift key

Setting level reduction key

Setting level increasing key

1 2 3 4 5 6

Page 52: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®42 Others

01.4IB.30000Powell GIS™38kV Gas Insulated Switchgear

Figure 32 Wiring Connection Diagram

P1 P1

P1 P2 P3

P2 P2 P3 P3

L. LOWZONE

L. LOWZONE

L. LOWZONE

LOWZONE

LOWZONE

LOWZONE

4 - 20 mA 4 - 20 mA 4 - 20 mA

COM

COM

COM

NC

FG

NC

11 12 13 14 15 16 17 18 19 20

1 2 3 4 5 6 7 8 9 10

E

~Power

100-240VDC/AC

50/60 Hz* Caution: Do not connect anything to “NC”

!

+ - + - + -

+ -

Page 53: 01.4IB.30000 Powell GIS (Gas Insulated Switchgear) · PDF fileinstallations and has received safety training to ... SF₆ Gas Leakage Test ... Table A Cubicle Type Gas Insulated Switchgear

Powered by Safety®Powell Electrical Systems, Inc.Service Division - HoustonPO Box 12818 • Houston, TX • 77217

Tel: 713.944.6900 • Fax: 713.948.4569powellind.com

[email protected]©2006 Powell Industries, Inc. • All rights reserved.

G81 - 36kV / 1250A, 2000A, 2500A, & 3150A / 40kAG82 - 38kV / 1200A, 2000A, & 2500A / 40kA

01.4IB.30000Powell GIS™ (Gas Insulated Switchgear)

June 2015