03 gbi assessment method for construction (ir looi hip peu)
TRANSCRIPT
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
1/51
Kota Kinabalu16 November [email protected]
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
2/51
CONTENT 2
1 The Construction Process
4 Check List Templates
3 Affordable Green Builing
2 The GBI Rating Tool
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
3/51
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
4/51
THE C ONSTRUCTION P ROCEDURE 4
16 th November 2013
Client / Design Team Construction Team Authorities
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
5/51
THE C ONSTRUCTION F LOW P ROCESS 5
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
6/51
THE C ONSTRUCTION P ROCEDURE 6
16 th November 2013
Public Interest
Clients Interest
Code of Conduct
Expert Knowledge
4 U n i v e r s a l C o n c e p t s o fP r o f e s s i o n a l i s m
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
7/51
THE P ROFESSIONAL IN C ONSTRUCTION 7
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
8/51
THE P ROFESSIONAL IN C ONSTRUCTION 8
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
9/5116 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
10/5116 th November 2013
THE B UILDING IMPACT ON THE E NVIRONMENT 10
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
11/5116 th November 2013
THE LIFE C YCLE 11
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
12/5116 th November 2013
T YPICAL LCA B OUNDARIES FOR UPVC PIPES 12
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
13/5116 th November 2013
THE B UILDING IMPACT ON THE E NVIRONMENT 13
Energywaste
Water
Sewage
http://www.animationlibrary.com/animation/29835/Fire_sun/ -
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
14/5116 th November 2013
THE B UILDING IMPACT ON THE E NVIRONMENT 14
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
15/5116 th November 2013
THE B UILDING IMPACT ON THE E NVIRONMENT 15
The Building sector consumes approx 10% -15% of total energynationally.
Approx10%-15%BuildingSector
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
16/51
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
17/5116 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
18/51
GBI A SSESSMENT TOOLS 18
1. NRNC (Non Residential New Construction)2. RNC (Residential New Construction) 2009
3. NREB (Non Residential Existing Building)4. RNC V2 (Residential New Construction, Version 2)
2010
5. GBI Township (Township Development)6. IEB (Industrial Existing Building)7. INC (Industrial New Construction)
2011
8. NRNC Data Centre 2012
10. NRNC Retail 2013
11. Under Development(a) Health Care(b) Interior
(c) Resort / Hotel
2013 - 2014
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
19/51
THE RNC T OOL 19
16 th November 2013
RESIDENTIAL NEW C O N S T R U C T I O N V E R S I O N 3 . 0
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
20/51
THE NRNC T OOL 20
16 th November 2013
NON-RESIDENTIAL NEW C O N S T R U C T I O N V E R S I O N 1 . 0
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
21/51
GBI G REEN G OALS IN C ONSTRUCTION 21
16 th November 2013
Measures can be Broken Down into the following
Compliance to Minimum Legal Standards Noadditional Cost.
Good Practice Measures No additional Cost.Best Practice Standard Some Additional Cost
Best Available Technology Additional Cost
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
22/51
CRITERIA R ELATING TO C ONSTRUCTOR 22
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
23/51
CRITERIA R ELATING TO C ONSTRUCTOR 23
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
24/51
CRITERIA R ELATING TO C ONSTRUCTOR 24
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
25/51
CRITERIA R ELATING TO C ONSTRUCTOR 25
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
26/51
CRITERIA R ELATING TO C ONSTRUCTOR 26
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
27/51
CONSTRUCTOR C RITERIA 27
16 th November 2013
Minimum Legal & Safety Standards No Additional Cost
1. EE1 - Minimum Energy Efficiency Standards
OTTV
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
28/51
16 th November 2013
CONSTRUCTOR C RITERIA 28
Minimum Legal & Safety Standards No Additional Cost
5. SM4 Earthworks Construction Activity Pollution Control
Mandatory under law. Protect site from pollution and
6. SM6 Workers Site Amenities
Provide proper facilities and housing to construction workers on site
7. SM10 Storm Water DesignScore 1 out of 3 available points. Design storm water runoff to complywith technical Manual MSMA (Manual Natural Storm Water)
1
1
1
Total Score Minimum Legal & Safety Standards
11 POINTS
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
29/51
16 th November 2013
CONSTRUCTOR C RITERIA 29GOOD PRACTICE Standards No Additional Cost
1. EE6 Sustainable Maintenance & Building User Manual
Provide space for maintenance officeEnsure maintenance staff (50%) appointed earlyProvide documented proof of maintenance plan
2. EQ6 Sound InsulationPartitions between units and rooms with sound insulation quality(STC>45)
3. EQ7 Post Occupancy SurveyImplement post occupany survey
4. SM1 Sustainable SiteSelect sites not environmentally sensitive
5. SM3 Community ConnectivityLocate site where at least 10 public amenities are available (e.g.Library, grocery, supermarket, police station etc.
6. SM8 Public Transportation AccessCovered waiting area and public transportation score 4 out of 8
7. SM11 Greenscape & Water Bodies
At least 15% of land area to score 1 out of 5 points.
2
1
1
1
4
4
1
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
30/51
16 th November 2013
CONSTRUCTOR C RITERIA 30
GOOD PRACTICE Standards No Additional Cost 8. SM14 Composting
Plan for composting of landscape and/or organic waste9. MR2 Recycled Content Material
Select concrete, steel, glass with recycled content; target at least 10%of total building material cost to score 1 out of 2 points
10. MR3 Regional Materials
Select building material at least 75% supplied from region (500kmradius from site). Exclude M&E items.
11. MR5 Storage & Collection of Recyclables.During construction provide recycling bins & planFor permanent design provide bins and collection centre
12. MR6 Construction Waste Management
Recover at least 50% of construction waste e.g. Steel, waste concrete,pile cut-off, timber waste etc to score 1 out of 2 points.
12. WE3 Water Efficient Irrigation & LandscapeSelect native plants which do not use water to reduce irrigation needby at least 50% to score 1 out of 2 points.
1
1
2
2
1
Total Score GOOD Practice Standards 22 POINTS
1
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
31/51
16 th November 2013
CONSTRUCTOR C RITERIA 31
BEST PRACTICE Standards Some Additional Cost
1. EE2 Advanced EE Performance
OTTV < 42 and RTTV < 0.5W/mK. Score 2 out of 12 points.Additional cost for roof insulation or insulation embedded in r.c. Flatroof.
2. EE4 External Lighting & Control
High efficiency lighting to external lightings and photo sensors forcontrol. Some cost for LED or high efficiency fluorescent or SON lamps
3. SM8 Public Transportation Access
Dedicated, covered walkway to station score another 2 out of 8points
2
2
2
Minimum Legal & Safety Standards 11 POINTS
GOOD Practice Standards 22 POINTS
TOTAL NO COST MEASURES 33 POINTS
Additional Point for certification 17 POINTS
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
32/51
16 th November 2013
CONSTRUCTOR C RITERIA 32
BEST PRACTICE Standards Some Additional Cost
4. SM9 Dedicated Cycling LaneProvide cycling lanes, bicycle parking baysSome small additional cost.
5. SM11 Heat Island Effect
At least 25% of land area (normal local authority requirements is 15%).
This will score additional 1 out of 5 points6. SM13 Heat Island Effect - Roof
Select roof material with good SRI at least 75% of roof area (may beno cost or some cost)
7. MR1 Materials Reuse and Selection
Select low impact building material at least 2% to score 2nd point.Some cost possibly
8. MR6 Construction Waste Management
Recover at least 75% of construction waste e.g. Steel, waste concrete,pile cut-off, timber waste etc to score the 2nd point.
2
1
1
1
1
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
33/51
16 th November 2013
CONSTRUCTOR C RITERIA 33
BEST PRACTICE Standards Some Additional Cost
4. WE1
Rain Water Harvesting (for common areas)RWH to reduce common area water by 30%, score 2 out of 4Some small additional cost.
5. WE2 Waste Water Recycling
Recycle grey water. To keep cost down use grey water only forlandscape irrigation. 10% common water reduction score 1 out of 2points.
6. Innovation Total available 7 Points
Design bioswale 25% of building perimeterExternal shading device for 50% of glazed area (this will also help inEE1 and EE2)
Recycle fire system water (minimal cost)Herb and Food garden
7. IN2 Appoint GBI Facilitator
Some cost. The advantage is the GBIF can advice on the bestmeasures with optimal cost for adoption.
2
1
4
1
Total Score BEST Practice Standards 20 POINTS
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
34/51
16 th November 2013
CONSTRUCTOR C RITERIA 34
Code Description Total Min .Standards
GoodPractice
BestPractice
EE1 Min EE Performance 1 1 0 0
EE2 Advanced EE Performance 12 0 0 2
EE3 Renewable Energy 5 0 0 0
EE4 External Lighting and Control 2 0 0 2
EE5 Internet Connectivity 1 0 0 0
EE6 Sustainable Maintenance & Building User Manual 2 0 2 0
EQ1 Minimum Indoor Air Quality Performance 3 3 0 0
EQ2 Volatile Organic Compounds Minimisation 2 0 0 0
EQ3 Formaldehyde Minimisation 1 0 0 0
EQ4 Daylighting 3 3 0 0
EQ5 External Views 1 1 0 0
EQ6 Sound Insulation 1 0 1 0
EQ7 Post Occupancy Evaluation 1 0 1 0
Sub Total 35 8 4 4
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
35/51
16 th November 2013
CONSTRUCTOR C RITERIA 35Code Description Total Min .
StandardsGood
PracticeBest
Practice
SM1 Site Selection & Planning 1 1 0 0
SM2 Rehabilitation of Brownfield OR redevelopment ofExisting Building
1 0 0 2
SM3 Community Connectivity 4 0 4 0
SM4 Earthworks Construction Activity Pollution Control 1 1 0 0
SM5 QLASSIC Quality Assessment System for BuildingConstruction Works
1 0 0 0
SM6 Workers Site Amenities 1 1 0 0
SM7 IBS Industrialised Building System 2 0 0 0
SM8 Public Transportation Access 8 0 4 2
SM9 Dedicated Cycling Network 2 0 0 2
SM10 Stormwater Design Quantity & Quality Control 3 1 0 0
SM11 Heat Island Effect Greenscape & Water Bodies 5 0 1 1
SM12 Heat Island Effect - Hardscape 2 0 0 1
SM13 Heat Island Effect Roof 1 0 0 1
SM14 Composting 1 0 0 1
Sub Total (cumulative) cumulative 68 12 13 14
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
36/51
16 th November 2013
CONSTRUCTOR C RITERIA 36
Code Description Total Min .Standards
GoodPractice
BestPractice
MR1 Materials Reuse and Selection 2 0 0 1MR2 Recycled Content Materials 2 0 1 0
MR3 Regional Materials 2 0 2 0
MR4 Sustainable Timber 2 0 0 0
MR5 Storage and Collection of Recyclables 2 0 2 0
MR6 Construction Waste Management 2 1 1 1WE1 Rainwater Harvesting 4 0 0 2
WE2 Waste Water Recycling 2 0 0 1
WE3 Water Efficient Irrigation & Landscaping 2 0 1 0
WE4 Waste Efficient Fittings 4 0 0 0
IN1 Innovation 7
Bioswale 25% of perimeter 0 0 1
External shading device for 50% of glazing area 0 0 1
Recycle fire system water 0 0 1
Herb & Food Garden 0 0 1
IN2 GBI Facilitator 1 0 0 1
Sub Total 100 13 20 24
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
37/51
16 th November 2013
CONSTRUCTOR C RITERIA 37
Code Description Total Min .Standards
GoodPractice
BestPractice
EE Energy Efficiency 23 1 2 4EQ Indoor Environmental Quality 12 7 2 0
SM Sustainable Site Planning & Management 33 4 9 10
MR Material & Resources 12 1 6 2
WE Water Efficiency 12 0 1 3
IN Innovation 8 0 0 5Sub Total 100
Up Minimum Safety Standard 13
Up to Good Practice Standards 33
Up to Best Practice Standards 57
Certified at Minimum or NO COST.
Or additional cost < 1% of normal construction cost.
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
38/51
16 th November 2013
CONSTRUCTOR C RITERIA 38
Description Total Min .Standards
GoodPractice
BestPractice
EE Energy Efficiency 23 1 3 2EQ Indoor Environmental Quality 11 6 2 2
SM Sustainable Site Planning & Management 39 12 6 2
MR Material & Resources 9 1 6 2
WE Water Efficiency 12 0 0 0
IN Innovation 6 0 0 5Sub Total 100
Min. Safety Standard 20
Good Practice Std. 37
Best Practice Std. 50
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
39/51
S UMMARY OF G OVERNMENT INCENTIVES 39
16 th November 2013
Wa t e r P a s s i v eD e s i g n
????
WaterEfficientFittings
Rain WaterHarvesting
OTTVCompliance(MS1525)
RTTVCompliance(MS1525)
Min openingsfor
ventilation
Min openingsfor daylighting
L a n ds c a p e
25% more
Green Space(over currentrequirements)
E n e r g y
EnergyCalculationsto MS1525
G r e e nB u i l d i n gCertification
GBI Gold orPlatinum
GBI Certified
Already Mandatoryunder UBBLRecently
Mandatory
MakeMandatory
The above areonly beginning for
discussions
Mandatory onlyon sectors orvia incentives
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
40/51
16 th November 2013
GBI Check ListDeliverables byConsultants,Clients,
Contractors,Owner/Developer
ESC Plan CheckList
CoW
Contractors,S.O.
CWM Plan CheckList
Contractors,
S.O.
CxS Plan &Check List
Contractors,EngineerBriefing/Training
Material CheckList
Recycled MaterialReUsed MaterialRegional Material
Quality CheckList
ContractorCIDBQLASSIC
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
41/51
16 th November 2013
CWMP C HECK LIST 41
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
42/51
CHECK LIST 42
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
43/51
CWMP C HECK LIST 43
16 th November 2013
Date: Waste Form No.:
Person In Charge: Container Type:
No. of Trips Source of Waste
Reuse RecycleDisposal Onsite OffsitePercentage of Waste in the Container
Concrete % Insulation %Wood % Glass %Metals % Electrical %Cardboard % %
Gypsum % %Plastic % %Destination of waste Waste Receipt No./Photo
No.Sub-Contractor Signature
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
44/51
MR2 R ECYCLED C ONTENT C HECK LIST 44
16 th November 2013
Recycled Content Materials to be used in this project:-Post Consumer1. Galvanized iron door frame2. Aluminum frame for window3. Mild steel railing to the staircase4. Dry wall partition*5. Carpet *6. Suspended ceiling*7. Reinforcement steel bars
8. Cement with fly-ash mixturePre Consumer1. Waste Concrete2. Pile stump cut-off
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
45/51
ESC C HECK LIST 45
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
46/51
ESC C HECK LIST 46
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
47/51
ESC C HECK LIST 47
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
48/51
ESC C HECK LIST 48
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
49/51
ESC C HECK LIST 49
16 th November 2013
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
50/51
GREEN PAGES MALAYSIA 50
[email protected], 10 th October-2012
www.greenpagesmalaysia.com
-
8/10/2019 03 GBI Assessment Method for Construction (Ir Looi Hip Peu)
51/51
Kota Kinabalu16 November [email protected]