03/000 first geodetic results from the auscope vlbi network oleg titov australian government...

57
03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Upload: jaylen-postlewait

Post on 31-Mar-2015

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

03/000

First geodetic results from the AuScope VLBI network

Oleg Titov

Australian Government

Geoscience Australia

UTAS, Hobart,

20 June 2012

Page 2: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Geoscience Australia

20 June 2012

Page 3: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Geoscience Australia

20 June 2012

Page 4: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

The concept

;cos12 c

BTT

1T

Geoscience Australia

18 October 2010

B

B = 10000 km,

= 0.03cos sec

2T

Page 5: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Correlation

Geoscience Australia

20 June 2012

Disk 1

Disk 2

Output values:

- Time delay and its error

- Amplitude and phase

- Cross-correlation

- etc.

Time delay:

= T’ - T

Page 6: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Local tie

Geoscience Australia

20 June 2012

Page 7: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Reference Frames :

co-location• At sites where the technique are co-located (<300

metres apart) a millimetre level connection is measured using classical geodetic techniques

• This provides the link between the measurement techniques

• In Australia GA routinely undertakes these surveys at Tidbinbilla, Yarragadee, Hobart, Mount Stromlo

VLBISLR

GPSDORIS

Page 8: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Geoscience Australia

20 June 2012

ITRF2005 Velocity field

Page 9: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

AuScope project densificationAuScope project densification

Page 10: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Australian – New Zealand network

Geoscience Australia

20 June 2012

Page 11: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

12m Antenna at Patriot12m Antenna at Patriot

Page 12: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

The “dish” at workThe “dish” at work

Page 13: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

12m Antenna at Patriot12m Antenna at Patriot5 deg/sec in azimuth, 1.5 deg/sec in elevation

Page 14: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

AuScope network

• Hobart12 – started operation in tag along mode

in October 2010; in full mode – January, 2011

• Yarragadee – since 26 May, 2011

• Katherine – since 16 June, 2011;

• Astrometric problems are likely to contribute to

the total geodetic error budget

20 June 2012

Page 15: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12

Geoscience Australia

20 June 2012

Mostly for IVS-R1, R4 sessions (EOP)AstrometryRegional geodesy

In total we have 78 ‘good’ session From 50 to 635 observations per session

Page 16: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 – X component

Geoscience Australia

20 June 2012

X - component

Year

2011.0 2011.2 2011.4 2011.6 2011.8 2012.0 2012.2 2012.4

met

er

-0.90

-0.85

-0.80

-0.75

-0.70

-0.65

Page 17: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 – Y component

Geoscience Australia

20 June 2012

Y-component

Year

2011.0 2011.2 2011.4 2011.6 2011.8 2012.0 2012.2 2012.4

met

er

1.12

1.14

1.16

1.18

1.20

1.22

1.24

Page 18: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 – Z component

Geoscience Australia

20 June 2012

Z-component

Year

2011.0 2011.2 2011.4 2011.6 2011.8 2012.0 2012.2 2012.4

met

er

-8.20

-8.15

-8.10

-8.05

Page 19: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 (ITRF2005)

Geoscience Australia

20 June 2012

Component VLBIGPS + local tie

(26-Nov-09)VLBI - GPS

X (meter)-3949990.683 +/-

0.014-3949990.675 +/-

0.004-0.008 +/- 0.014

Y (meter)2522421.181 +/-

0.0082522421.199 +/-

0.003-0.018 +/- 0.009

Z (meter)-4311708.161 +/-

0.013-4311708.170 +/-

0.0030.009 +/- 0.013

Reference epoch T = 2009.904

Page 20: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 (ITRF2005)

Geoscience Australia

20 June 2012

ComponentHobart26

(ITRF2005)Hobart12

Hobart26-Hobart12

VX (cm/y) -3.95 -4.1 +/- 0.8 0.2 +/- 0.8

VY (cm/y) 0.91 0.4 +/- 0.50.5 +/- 0.5

VZ (cm/y) 4.15 4.5 +/- 0.8 0.4 +/- 0.8

Tectonic velocities

Page 21: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 (ITRF2005)

Geoscience Australia

20 June 2012

Component X Y Z

σ (cm) 1.4 0.8 1.3

Weighted rms (cm)

2.4 1.3 2.2

Error budget?

Page 22: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Kath12M

Geoscience Australia

20 June 2012

In total we have 24 ‘good’ session

From 104 to 700 observations per

session

Not properly tied to ITRF2005

Page 23: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Kath12M – X component

Geoscience Australia

20 June 2012

Year

2011.4 2011.6 2011.8 2012.0 2012.2

met

er

-4.70

-4.65

-4.60

-4.55

-4.50

Page 24: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Kath12M – Y component

Geoscience Australia

20 June 2012

Year

2011.4 2011.6 2011.8 2012.0 2012.2

met

er

2.30

2.35

2.40

2.45

2.50

Page 25: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Kath12M – Z component

Geoscience Australia

20 June 2012

Year

2011.4 2011.6 2011.8 2012.0 2012.2

met

er

-3.34

-3.32

-3.30

-3.28

-3.26

-3.24

-3.22

-3.20

Page 26: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Yarra12M

Geoscience Australia

20 June 2012

In total we have 12 ‘good’ session From 28 to 452 observations per session

Not properly tied to ITRF2005

Page 27: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Yarra12M – X component

Geoscience Australia

20 June 2012

Year

2011.2 2011.4 2011.6 2011.8 2012.0 2012.2

met

er

-6.20

-6.18

-6.16

-6.14

-6.12

-6.10

-6.08

-6.06

-6.04

-6.02

-6.00

Page 28: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Yarra12M – Y component

Geoscience Australia

20 June 2012

Year

2011.2 2011.4 2011.6 2011.8 2012.0 2012.2

me

ter

9.85

9.90

9.95

10.00

10.05

Page 29: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Yarra12M – Z component

Geoscience Australia

20 June 2012

Year

2011.2 2011.4 2011.6 2011.8 2012.0 2012.2

met

er

-1.00

-0.98

-0.96

-0.94

-0.92

-0.90

-0.88

-0.86

-0.84

Page 30: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Baseline Hobart12 - Kath12M (ICRF2 reference radio

sources)

Geoscience Australia

20 June 2012

Year

2011.4 2011.6 2011.8 2012.0 2012.2

3431

870

+..

. (m

eter

)

8.96

8.98

9.00

9.02

9.04

Page 31: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 - Katherine (distant reference radio

sources, z>1.7)

Geoscience Australia

20 June 2012

Year

2011.4 2011.6 2011.8 2012.0 2012.2

3431

870

+ .

.. (

met

er)

8.92

8.94

8.96

8.98

9.00

9.02

9.04

Page 32: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Hobart12 - Katherine

Geoscience Australia

20 June 2012

Reference sources

Baseline rate (cm/year)

295 ICRF2 -3.8 +/- 1.3

4810 z>1.7 -1.6 +/- 1.9

GPS

(2010-2012) -0.3 +/- 0.7

Baseline evolution

Page 33: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Internal vs external accuracy

Geoscience Australia

20 June 2012

Baseline lengths are sensitive to selection of reference radio sources

For X, Y, Z components – external accuracy looks more then internal

Page 34: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Internal vs external accuracy

Geoscience Australia

20 June 2012

Rotation of the whole Australian subnetwork due to astrometric instability of the reference sources, or just poor astrometric positions

May be caused by uncertainty of the reference radio sources in the southern hemisphere

Page 35: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF1 catalogue (1998)

Geoscience Australia

20 June 2012

1.212 defining sources with the floor positional accuracy ~0.25 mas

2.294 candidate sources

3.102 other sources

608 sources separated into 3 groups

Page 36: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF2 catalogue (1998)

Geoscience Australia

20 June 2012

1.295 defining sources with the positional accuracy ~0.04 mas

2.922 “non-defining” sources

3.1217 VCS sources

3414 sources separated into 3 groups

Page 37: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

First catalogue (Ma et al., 1990)

Page 38: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF1 defining sources

Geoscience Australia

20 June 2012

Page 39: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF2 sources

Page 40: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF2 defining sources (295)

Geoscience Australia

20 June 2012

degrees

-80 -60 -40 -20 0 20 40 60 80

as

40

60

80

100

120

140

160

180

cos

Page 41: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF2 non-defining sources (922)

Geoscience Australia

20 June 2012

degrees

-80 -60 -40 -20 0 20 40 60 80

as

200

400

600

800

1000

1200

1400

1600

1800

2000

cos

Page 42: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

2145+067

1994 1996 1998 2000 2002 2004

as

-2000

-1000

0

1000

2000

20 June 2012

Page 43: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF source instability(quasar 2201+315)

Variations of the 2201+315, RA

Year

2000 2001 2002 2003 2004 2005 2006

as

-2000

-1500

-1000

-500

0

500

1000

1500

Geoscience Australia

20 June 2012

Variations of the 2201+315, DEC

Year

2000 2001 2002 2003 2004 2005 2006

as

-2000

-1500

-1000

-500

0

500

1000

1500

Page 44: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

ICRF source instability(quasar 2201+315, in plane, 2001-2004)

Geoscience Australia

20 June 2012

Shift

~1.2 mas

( ~3.5 cm )

other

stable

# 3

as

-1000-50005001000

as

-1000

-500

0

500

1000

Daily dataApproximation

Page 45: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Systematic proper motion (555 sources)

20 June 2012

Page 46: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Systematic proper motion (40 best sources)

20 June 2012

Page 47: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Systematic proper motion(555 sources)

20 June 2012

Page 48: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Systematic proper motion

20 June 2012

Dipole component – 6.4 +/- 1.5 μas/year

Titov, Lambert, Gontier A&A 529, A91 (2011) Theory 46 μas/year

Total displacement is up to

~130 μas for 22 years since 1990

Page 49: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Systematic proper motion

20 June 2012

Quadrupole component ??

Page 50: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Conclusion

• Geodesy

• Astrometry

20 June 2012

Page 51: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Geodesy

• AuScope network operates successfully in spite of some

technical problems;

• Geodetic positions for Hobart12 were calculated

(ITRF2005) with accuracy ~ 1 cm;

• A good consistency with independent (GPS + local tie)

results;

• Astrometric problems are likely to contribute to the total

error budget

20 June 2012

Page 52: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Astrometry

• Number of the ICRF2 reference radio sources in

the southern hemisphere in sufficient;

• Positional accuracy needs to improved;

• We should keep an eye on the observational

schedules and, particularly, on the source

selection

20 June 2012

Page 53: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Proposal

• Do we need a special project (UTAS and GA) to

select more stable reference radio sources?

20 June 2012

Page 54: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Practical steps

• To check out existing time series of the reference radio

source positions;

• To run more sessions (AuScope + Parkes + Warkworth +

Hartrao) to get more observations of the reference radio

sources and extend the list;

• To revise the existing list of reference radio sources (in

cooperation with IVS-IERS-IAU);

20 June 2012

Page 55: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Thank you!

20 June 2012

Page 56: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Earthquake in Chile – 27-Feb-2010

20 October 2010

Page 57: 03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012

Earthquake in Japan – 11 March 2011

20 October 2010