INTEGRATING INTEGRATING CONSTRUCTABLITY CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT
[email protected]://www.construction-productivity.
![Page 2: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/2.jpg)
INTEGRATING CONSTRUCTABLITY INTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT
![Page 3: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/3.jpg)
IMPLEMENTING PROJECT IMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITYConstructability is the integration of
expertise into all phases of the project. For Improving factors such as:Cost Schedule QualityProfitabilitySafetyCustomer satisfaction and overall objectives.
![Page 4: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/4.jpg)
IMPLEMENTING PROJECT IMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITYThe proper use of the knowledge
gained by participants such as:Managers Designers/Production Managers Site shop floor and on site workersOther contributors Learning from their past
experience increases the level of productivity and overall success.
![Page 5: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/5.jpg)
IMPLEMENTING PROJECT IMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITYConstructability must be used at
key points in the project life cycle. This includes:
in the planning phase;early in the design phase; prior to the procurement phase;prior to the mobilization phase
for construction.
![Page 6: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/6.jpg)
IMPLEMENTING PROJECT IMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITYConstructability process
considers a detailed review of: Design drawings; Models; Specifications; and construction processes.
![Page 7: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/7.jpg)
IMPLEMENTING PROJECT IMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY
The purpose of the constructability review
is to identify the following items:• Design errors (both material
selection or dimensions)• Un clear specifications• Unnecessary work• Complexity that does not serve
the project objectives
![Page 8: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/8.jpg)
IMPLEMENTING PROJECT IMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY• Project features-difficult and
very costly to construct.• Project complexity- that
exceed the capability of industry to properly build.
• Project features that are difficult to interpret and will be hard to accurately bid.
![Page 9: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/9.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS)Steps to take: Identify the processes needed for
the Quality Management System Its application in the organization Its customers Determine the sequence and
interaction of these processes Determine the criteria and
methods required to ensure that the operation runs well
![Page 10: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/10.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS)Determine the criteria and methods
required to ensure that controls of these processes are effective.
Ensure that the necessary resources, information necessary to support the operation are in place.
Make sure monitoring of these processes will be provided.
Set up systems to monitor measure and analyse the processes.
![Page 11: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/11.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS)Total Quality Management
TotalQuality
Management
processManagement
Planningprocess
Supply ChainParticipation
CustomerFocus
ProcessImprovement
![Page 12: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/12.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS)The construction industry has
embraced the ISO 9000 standard since its inception.
The QMS has become the benchmark for successful construction companies.
The QMS has also become the benchmarking for successful construction companies worldwide.
![Page 13: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/13.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS)QMS has helped many companies to structure their management and processes to consistently meet the client’s requirements.
![Page 14: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/14.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS)The eight Quality Management
Principles stated in ISO 9000:2000 and ISO 9004:2000 provide the basis for the performance improvement.
Focusing on the Customer to increase revenue and market share.
Choose Effective Leaders to motivate the organization towards achieving organisational goals.
![Page 15: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/15.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS) Involving People to become:1.Innovative2.Creative3.Accountable Understanding Processes. This will
help to define activities necessary to obtain a desirable result.
Valuing a Systems Approach-Structuring a system to achieve the organisation's objectives in the most effective and efficient way.
![Page 16: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/16.jpg)
Wheel of QMSWheel of QMS
wheel ofQMS
Step1
Step2
Step3
Step4
Step5
Defineareas
ofImprovement
Analyzeexistingpractices
Developmentof
QualitySystem
Integrationand
supervisionofQS
Define QualityProgramme
![Page 17: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/17.jpg)
QUALITY MANAGEMENT QUALITY MANAGEMENT SYSTEM(QMS)SYSTEM(QMS)
QualityManagement
System
EffectiveLeadership
PeopleInvolvement
UnderstandingProcesses
StructuringSystem
Approach
ContinuousImprovement
InformedDecision
CommonCause
CustomerFocus
![Page 18: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/18.jpg)
JIT & Quality Management JIT & Quality Management SystemsSystemsThe existing quality management
systems -ISO 9000 should include JIT.
It is practical to integrate ISO 9000 (20 clauses) with the 7 JIT concepts
Successful firms are using 7 concepts of JIT with ISO 9000 quality management systems in order to improve their productivity.
![Page 19: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/19.jpg)
JIT & Quality Management JIT & Quality Management SystemsSystemsTo have high quality product and high
productivity is a challenging task for project management team.
All large construction companies have already established quality management systems within their organisation to meet ISO 9000 requirements.
Some companies are implementing the concepts of JIT and ISO 9000 separately.
![Page 20: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/20.jpg)
JIT & Quality Management JIT & Quality Management SystemsSystemsBoth ISO 9000 and JIT objectives are: 1) high productivity 2) perfect product each time and
every time.ISO has no any clause related to
project time. It is a tool for productivity
improvement.
![Page 21: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/21.jpg)
JIT & Quality Management JIT & Quality Management Systems-waste reductionSystems-waste reductionQuality and productivity are
inter-related.High quality product will
eliminate repeat work and increases productivity.
OverproductionLong waiting timesPoor transportation schedules
![Page 22: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/22.jpg)
JIT & Quality Management JIT & Quality Management SystemsSystemsProcessing failuresHigh inventoriesExcessive movement of materials on site
Poor workmanshipDefective products
![Page 23: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/23.jpg)
JIT & Quality Management JIT & Quality Management SystemsSystems JIT Concepts
1-Waste elimination2-Kaban System
3-Smooth workflow4-Total Quality Control
5-Employee involvement6-Supplier relationship
7-Continuous improvement
Solution
High productivity
ISO 9000-R equirements
4.1 Management responsibility4.2 Quality system4.3 Contract review4.4 Design control
4.5 Document and data control4.6 Purchasing
4.7 supply chain4.8 Product identification/availability/track record/green
issues/price/etc4.9 Process control
4.10 Inspection/testing4.11 Control of inspection, measuring, test requirement
4.12 Inspection and test status4.13 Control of non-conforming products
4.14 Preventive action and corrective action4.15 Handling of materials, good storage policy, preservation and
delivery policy4.16 Quality control and record keeping
4.17 Internal quality audit4.18 Training4.19 Servicing
4.20 Statistical techniques
INTEGRATING JIT INTOQUALITY MANAGEMENT
SYSTEM
![Page 24: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/24.jpg)
IMPLEMENTINGPROJECT
CONSTRUCTABILITY
planningphase
Knowledge-based
PROJECT-1,2, 3, ....
COMPLETED
Designphase
Procurementphase
prior to themobilization phase
for construction
ConstructionphaseKPIs
Completionphase
Handover
inceptionphase
wheel ofQMS
Step1
Step2
Step3
Step4
Step5
Defineareas
ofImprovement
Analyzeexistingpractices
Developmentof
QualitySystem
Integrationand
supervisionofQS
Define QualityProgramme
HighProductivity JIT
![Page 25: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/25.jpg)
INTEGRATING CONSTRUCTABLITY INTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT
Cost savings derive from:Fewer delays.Fewer disruptions.Shortened duration of activities.Less work at higher elevations.Less material required.Decreased likelihood of labour
conflicts.
![Page 26: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/26.jpg)
INTEGRATING CONSTRUCTABLITY INTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JITOne must initially invest to earn the costsavings from better constructability, suchas:More effort for design and procurement.More communication among builders,
designers, and the client.More communication among supply
chain(including customers)
![Page 27: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/27.jpg)
INTEGRATING CONSTRUCTABLITY INTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JITImprove constructability reducescosts by:Mitigating the effects of adverse
site conditions.Implementing better design,
better buildings.Advance technologies.
![Page 28: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/28.jpg)
INTEGRATING CONSTRUCTABLITY INTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JITOffering assembly-line conditions.Accelerating the schedule by
decoupling sequential workface activities.
Reducing the number of workers and costlier skills.
Better constructability methods can include:
• Prefabrication. • Economies and quality via
manufacturing process.
![Page 29: 039 Integrating Constructability-short](https://reader036.vdocuments.net/reader036/viewer/2022062522/58acc69b1a28abd3048b603f/html5/thumbnails/29.jpg)
INTEGRATING CONSTRUCTABLITY INTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT• Preassembly-Join components
into subunit at the factory.• Under more advance and better-
controlled location.• Modularization-Assembly
operations create the largest unit logistically possible.
• Contains all components of final state.