MGM SPRINGFIELD CONSTRUCTION ACTIVITIES -7/5/17-7/18/17
WORK HOURS: 7:00 AM - 7:00 PM
FOR CONSTRUCTION-RELATED INQUIRES PLEASE CONTACT: [email protected]
FULL CONSTRUCTION BUILD OUT
ZONE LOCATION STATUS
1 95 and 101 State Street 95 State Interior fit out is underway along with interior demolition work/cleanup and floor leveling. Window delivery and installation has begun. Exterior façade work is underway.
2 Hotel The following activities are ongoing: Above ground storm piping, spray on fireproofing, exterior framing, power distribution,and interior framing lay out.
3 Casino The following activities are ongoing: Above ground storm piping, exterior framing, overhead mechanical, electrical and plumbing (MEP) installation, roofing, interior framing, fire protection, power distribution, and casino mock up build out.
4 Da Vinci Park No work anticipated
5 Dave's Furniture No work anticipated
6 Armory No work anticipated
7 Plaza No work anticipated
8 Church No work anticipated
9 Entertainment The following activities are ongoing: spray on fireproofing, temporary power and lighting installation, exterior framing, roofing, and scaffold erection.
10 Parking GarageThe following activities are ongoing: Above ground mechanical, electrical, and plumbing (MEPs) installation, waterproofing and caulking, interior masonry wall erection in electric / IDF rooms, painting and line striping, installation of storefront, and elevator construction.
11 Support Area No work anticipated
12 MGM Way Receiving deliveries and staging of material/equipment.
STREET WORK
State Street No work anticipated
7/7/178:46AM Page2of3
ZONE LOCATION STATUS
Main Street
Reflectorized drums will intermittently be placed in the south bound lane to shift traffic from 6am-6pm Monday through Friday to allow for the unloading of certain materials onto the construction site. The barrels will be moved out of the road at the end of each day to allow parking during non-working hours. Two way traffic will be maintained at all times and two police details will be present. This traffic shift is currently underway.
Road work to adjust a curb box at the corner of Main Street & Stockbridge Street is anticipated to take place within the next two weeks. A police detail will be present for this work and two-way traffic will be maintained.
Union Street
Utility work is taking place at the intersections of Union, Howard West, and Bliss Street with East Columbus Ave. During this work, Union Street will be closed to through traffic from Main Street to East Columbus Avenue. Access to Pride Gas Station, the Colvest Building, and 55 State Street will be maintained at all times. Signage will be in place to direct patrons to business’ on Main Street via State Street and to provide updates and direction for drivers in the area.
East Columbus Ave will be open to through traffic throughout the project. At times, lanes will need to be reduced to accommodate utility crossings at the intersections. Police details will be present throughout the summer to help traffic flow as efficiently as possible.
East Columbus Avenue Work is underway to repair/replace portions of water main piping. A police detail is anticipated.
Bliss Street Work is underway to repair/replace portions of water main piping. A police detail is anticipated.
Howard Street Turn Around No work anticipated
Howard Street Work is underway to repair/replace portions of water main piping. A police detail is anticipated.
UTILITY ACTIVITY
UTILITY PROVIDER WORK TO BE PERFORMED
Eversource No work anticipated
Verizon No work anticipated
Comcast No work anticipated
Columbia Gas No work anticipated
Springfield Water & Sewer No work anticipated
MISCELLANEOUS ACTIVITY
LOCATION WORK TO BE PERFORMED
7/7/178:46AM Page3of3
ZONE LOCATION STATUS
York Street Lot Construction material staging is underway.
Zorzi Lot Established as parking for craft labor foreman and superintendents.
Offsite Parking Lots Craft labor parking has been established at the Mass Mutual Center parking garage and 1870 E. Columbus Ave.
MAIN STREET
EAST COLUMBUS AVENUE
HOW
ARD
TURN
ARO
UND
195/101 STATE
2HOTEL
3CASINO
12MGM WAY
7PLAZA
6ARMORY
8CHURCH
5DAVE’S
FURNITURE
4DA VINCI
PARK
9ENTERTAINMENT
10PARKING GARAGE
11SUPPORT
AREA
BLIS
S ST
REET
HOW
ARD
STRE
ET
TRAFFIC WILL BE INTERMITTENTLY SHIFTED FROM THE SOUTHBOUND LANE BETWEEN 6AM-6PM DURING THE WORK WEEK TO ALLOW FOR MATERIALS LOADING.
TWO WAY TRAFFIC WILL BE MAINTAINED AND A POLICE DETAIL IS ANTICIPATED.
STAT
E ST
REET
ROAD WORK TO ADJUST A CURB BOX AT THE CORNER OF MAIN ST. & STOCKBRIDGE ST. IS ANTICIPATED TO TAKE PLACE WITHIN THE NEXT TWO WEEKS.
A POLICE DETAIL WILL BE PRESENT FOR THIS WORK AND TWO-WAY TRAFFIC WILL BE MAINTAINED.
UNIO
N ST
REET
BEGINNING IN MID JUNE AND CONTINUING THROUGHOUT THE SUMMER, UTILITY WORK WILL BE TAKING PLACE AT THE INTERSECTIONS OF UNION, HOWARD WEST, AND BLISS STREET WITH EAST COLUMBUS AVE. DURING THIS WORK, UNION STREET WILL BE CLOSED TO THROUGH TRAFFIC FROM MAIN STREET TO EAST COLUMBUS AVENUE. ACCESS TO PRIDE GAS STATION, THE COLVEST BUILDING, AND 55 STATE STREET WILL BE MAINTAINED AT ALL TIMES. SIGNAGE WILL BE IN PLACE TO DIRECT PATRONS TO BUSINESSES ON MAIN STREET VIA STATE STREET AND TO PROVIDE UPDATES AND DIRECTION FOR DRIVERS IN THE AREA.
EAST COLUMBUS AVE WILL BE OPEN TO THROUGH TRAFFIC THROUGHOUT THE PROJECT. AT TIMES, LANES WILL NEED TO BE REDUCED TO ACCOMMODATE UTILITY CROSSINGS AT THE INTERSECTIONS. POLICE DETAILS WILL BE PRESENT THROUGHOUT THE SUMMER TO HELP TRAFFIC FLOW AS EFFICIENTLY AS POSSIBLE.