08 jay behnke

90
Hey Buddy, What’ll you have?

Upload: california-asphalt-pavement-association

Post on 07-May-2015

239 views

Category:

Business


0 download

DESCRIPTION

Presenation by Jay Behnke of STATE Testing on RAP and RAS at the California Asphalt Pavement Association Spring Conference April 25, 2013 in Ontario, CA.

TRANSCRIPT

Page 1: 08 jay behnke

Hey Buddy,What’ll you

have?

Page 2: 08 jay behnke

Jay Behnke, P.E.President

S.T.A.T.E. Testing, LLC

Dundee and Chicago, IL

Behnke Materials Engineering

Beloit, WI

2

An HMA Perspective from the Land of Gangsters and Cheese

Page 3: 08 jay behnke

3

Our Sand Box

Page 4: 08 jay behnke

4

Pick a Good Team

Page 5: 08 jay behnke

5

Our Team:

Page 6: 08 jay behnke

6

Our Team:The photogenic ones…

Page 7: 08 jay behnke

Agencies we work for:

7

1. Interest2. Initiative3.Courage 4.Available Projects5.Short Decision Tree6.Funding

Page 8: 08 jay behnke

Class Outline

Mix Design Basics Sustainable Technologies Performance Testing Project Examples

8

Page 9: 08 jay behnke

9

Gyratory Compactor

6 in.

Page 10: 08 jay behnke

10

% Density

Gyrations90NDESIGN

96%

(4% voids)

Gyratory Compaction

Page 11: 08 jay behnke

11

How to Change NDESIGN

1. Aggregate Structure• More Coarse Aggregate• More Manufactured Sand• Less Natural Sand• Less dust

2. Asphalt Binder Content.

Page 12: 08 jay behnke

12

VMA – Voids in Mineral Aggregate

“Space between the Rocks filled with Asphalt Binder and Air Voids”

Excludes Binder Absorbed into the Aggregate

Sets Minimum Binder Content for Durability

Varies with Aggregate Size.

Page 13: 08 jay behnke

13

VMAVoids in Mineral Aggregate

11%

4%15% VMA

Page 14: 08 jay behnke

14

Aggregate Surface Area

One inch dia. rock makes 64 - ¼ in. rocks

Sum of the ¼ in. rocks have 4X surface area.

Page 15: 08 jay behnke

15

VMA Spec by Aggregate Size

Nom. Max.Agg. Size

Minimum VMA

AirVoids

Effective Binder

9.5 mm 15 % - 4% = 11%

12.5 mm 14 % - 4% = 10%

19.0 mm 13 % - 4% = 9%

25.0 mm 12 % - 4% = 8%

Page 16: 08 jay behnke

16

Field VMA

Gmb Dust to AC ratio Contractor is

allowed to remove dust during production

Page 17: 08 jay behnke

17

Field VMA: (f) % AC and Voids

Just a calculation – Uses existing values = 100 – (GMB * PS / GSB)

GMB: “d” from plant test

PS: % Stone = 100- %AC

GSB: Stone Specific Gravity from Design

e.g. = 100 – (2.415 * 0.94 / 2.687) = 15.5Watch: If AC & Voids drop below mix design

values.

Page 18: 08 jay behnke

18

Dust Silos

IDOT requires “Positive Dust Control”

Page 19: 08 jay behnke

19

Mel Pod – Positive Dust COntrol

Weighs Dust In and Out

Page 20: 08 jay behnke

Start-ups Illustrated

Test strip required for all new mixes.

20

Page 21: 08 jay behnke

21

Performance Graded Binder

“PG Binder”(Asphalt Cement)

NOT “Polymer Graded”

Page 22: 08 jay behnke

22

PG Binder Nomenclature

PG64-22Performance Grade

Average 7-day max pavement design temp C

Min pavement design temp C

Page 23: 08 jay behnke

23

….without binder grade jumping.

2010

2012

Page 24: 08 jay behnke

24

When to Modify?

Extreme Temperatures• Hot or Cold

Heavy Traffic• Especially Slow or Stopped

Rutting or Shoving Problem Areas Concern re: Reflective Cracking Improve Film Thickness.

Page 25: 08 jay behnke

25

Permeability Factors Increased Density Lower Permeability Smaller NMAS aggregate Lower

Permeability (fewer interconnected voids)

Page 26: 08 jay behnke

26

Permeability can be measured

Page 27: 08 jay behnke

27

Permeability vs.Density and Nom. Max. Agg. Size

(NCAT)

Page 28: 08 jay behnke

Sustainable Options for HMA

28

RAP FRAP GTR WMA RAS

Page 29: 08 jay behnke

29

Recycled Asphalt Pavement(RAP)

Page 30: 08 jay behnke

30

RAP Can Be Our Friend

Quality Green Economical.

Page 31: 08 jay behnke

31

RAP Works Processed Reasonable

Proportions Designed into the

mix < 20% - Acts as

“Black Rock.”

- Superpave Research

Page 32: 08 jay behnke

32

Binder Grade for RAP Mixes

RAP% Binder Grade≤ 20% Use Same PG Grade> 20% Use Softer Grade

e.g. PG 58-28 for PG 64-22.

Page 33: 08 jay behnke

FRAP - Fractionated RAP

Old – RAP was bad Then – RAP is OK Now – FRAP is great

33

Page 34: 08 jay behnke

IL FRAP Sizes (typical)

34

< #4 (0.2 in.)

#4 to 1/2 in.

> 1/2 in.

Page 35: 08 jay behnke

Observations - FRAP

High Quality Grindings Higher RAP % does not affect production P#4 Material useful in SMA

• Angular• Higher AC Content

Bids reflect overall savings Less segregation

35

Page 37: 08 jay behnke

GTR - Ground Tire Rubber Modified Asphalt

37

Page 38: 08 jay behnke

GTR-Modified Asphalt

AC modified with recycled Ground Tire Rubber (12-15%)

Substitute for polymer-modified AC

38

Vestenamer Stabilizer

Page 39: 08 jay behnke

Why GTR?

Improved performance• Rutting• Resistance to oxidation

Green - 2,000 tires per lane mile (2 in.) $$ ≈ Polymer-modified AC Replaces anti-draindown fibers

39

Page 40: 08 jay behnke

No Draindown

Replacement for Fibers. Open Graded Pervious SMA

40

Page 41: 08 jay behnke

GTR is Versatile

Since 2006: Green Alleys City Streets (low

ESAL) County Roads

(medium ESAL) Tollway mainline

(high ESAL) Bridge Decks Michigan Avenue

41

Page 42: 08 jay behnke

WMA - Warm Mix Asphalt

Lowered emissions Less fuel consumption Worker health benefits Lower temps = Reduced

oxidation Extended paving season

• Haul time• Compaction time

42

Page 43: 08 jay behnke

Warm Mix Technologies

Chemical additives, e.g. Evotherm

Organic additives “wax”, e.g. Sasobit

Foaming –Astec Double Barrel® Green

43

Page 44: 08 jay behnke

CDOT Warm Mix Asphalt

6000+/- tons Produced @ 230˚ F Placed down to 180˚ F Same rolling pattern No difference in

workability Reduced odor, fumes

Page 45: 08 jay behnke

WMA Warm Mix Asphalt + RASon the Interstate

45

Page 46: 08 jay behnke

RASRecycled Asphalt Shingles

46

Page 47: 08 jay behnke

2012 - RAS is the Law in Illinois

47

Page 48: 08 jay behnke

RAS = Quality HMA Ingredient

Consistent gradation:• 100% < 3/8 in.• 93% < #4

30+% High Quality Fine Aggregate 26.4% High Quality AC 27.8% Mineral Filler

• Shoot for 1:1 ratio (dust to AC) Mineral/Organic Fibers

48

Page 49: 08 jay behnke

High ESAL RAS

49

Page 50: 08 jay behnke

Field Performance

No time for TRB WMA GTR High ABR FRAP RAS

50

Page 51: 08 jay behnke

Illinois’ Performance TestHamburg Wheel

Torture Test for Stability Moisture

Resistance

51

Page 52: 08 jay behnke

Chicagoland Hamburg Criteria

All WMA, RAS, & High-ABR mixes

52

Binder # Repetitions (Chicago)

Max. Rut Depth

PG76-XX, PG70-XX 20,000

0.5 in.PG64-XX, PG58-XX, PG52-XX, PG46-XX 10,000

SMA 20,000 0.25 in

Page 53: 08 jay behnke

Passing the Hamburg Test

GTR RAS Manufactured Sand Harder Rock (not

Limestone) Anti-strip additive

53

Page 54: 08 jay behnke

54

Direct Compact Tester

Page 55: 08 jay behnke

Performance Testing

Field Demonstration Projects

Research Lab Verification

55

Page 56: 08 jay behnke

56

PROJECT EXAMPLES

Tollway - Warm Mix CDOT – N30 LC IL 4.75 – Friction

Course Michigan Ave

Page 57: 08 jay behnke

57

Jane Addams Tollway WMA, HMA, FRAP, RAS

Page 58: 08 jay behnke

58

Tollway Warm Mix Asphalt

In 2012 the Tollway was the first agency in the country to mandate Warm Mix Asphalt!!!

Page 59: 08 jay behnke

Tollway WMA - 2012 762,000+ total tons (Magnificent Green 56

Miles) SMA mainline

• 304,000 tons

N50 Shoulder Binder• 204,000 tons

N70 Shoulder Surface• 210,000 tons

Stabilized Subbase• 8,400 tons

59

Page 60: 08 jay behnke

60

Akzo Nobel• “REDISET LQ”

MeadWestVaco• “EVOTHERM M1”

Astec, Inc.• “ASTEC WARM MIX

SYSTEMS”

AQUABlack Solutions• “MAXAM

AQUABLACK” Stansteel Asphalt

Plant Products• “STANSTEEL ACCU-

SHEAR”

Page 61: 08 jay behnke

CDOT manages a lot of Asphalt Paving…in a variety of locations

61

Page 62: 08 jay behnke

CDOT by the Numbers

$600-800 Million Annual Budget(More than half from state or federal grants)

262 bridges and viaducts4,091 miles of streets (excluding Expressways)26,658 intersections (2,935 signalized)10,646,110 feet of lane striping12,145 bike racks10,997 trees planted/year59 stations and 50 miles of track owned by CDOT but operated by CTA

Page 63: 08 jay behnke

CDOT Typical In-House Program

2 Block increments 4 Paving crews

• 2 street / 2 alley +/- 150,000 tons / year

placed Innovative mixture(s) Purchased from local

plants Rented equipment

63

Page 64: 08 jay behnke

9.5mm N30 LC Surface Mix(Low ESAL)

Evolving over the years Increased % FRAP Added recycled PCC Added GTR Lowered PG grades Added WMA technology Added RAS % ABR Hamburg Tested

64

Page 65: 08 jay behnke

9.5mm N30 LC Surface Mix(Low ESAL)

65

ABR PG Binder

0-22% PG 64-22

23-45% PG 58-28

46-67% PG 46-34

Recycled Material Max%

Crushed PCC &/or Coarse Aggregate

50% Total Aggregate

Fractionated RAP 40%

RAS 7.5%

Page 66: 08 jay behnke

66

4.75mm Friction Surface

Not a “sand mix” Historically a

polymer-modified mix

RAS used as modifier.

Can be laid ¾” thick!!

HMA version of Micro Surfacing

Page 67: 08 jay behnke

Recycled Friction AggregateChicago Expressways: Most

surfaced with slag friction mixes and high quality AC binder.

67

Page 68: 08 jay behnke

4.75mm Friction Surface New Specification

68

AGGREGATES PERCENTAGE

Natural Sand 40% Maximum

Manufactured Sand 15% Minimum

combinedManufactured Sand from Gravel; or Steel Slag

Passing #4 portion of FRAP from Steel Slag RAP; or Steel Slag 35% Minimum

combinedFine Aggregate from Steel Slag RAP; or Steel SlagRAS 7.5% Maximum

Page 69: 08 jay behnke

4.75mm Friction Surface New Specification

VOLUMETRICS NDES = 50 Voids = 3.5% VMA = 18.5%

69

ABR PG Binder Max. RAS0-22% PG 64-22 2.5%

23-45% PG 58-28 5.0%46-67% PG 46-34 7.5%

High ABR

Page 70: 08 jay behnke

4.75mm High ABR Surface 2011 Demonstration

% MIX

AC Content ABR

FRAP (1) 8% 4.8% 0.4%

FRAP (2) 30% 5.8% 1.7%

RAS 7.0% 26% 1.8%

3.9%

Design AC 8.0%

New AC 4.1%

AC Savings $28 / Ton

70

50% ABR

Page 71: 08 jay behnke

Pulling it TogetherMichigan Avenue SMA

71

Page 72: 08 jay behnke

Environmental Leadership Award2012 NAPA

72

Page 73: 08 jay behnke

Examination

Given: Location Variable

Base/Subbase 300 Structures to

work around Time Constraints Green Objectives

Solve for:

1. Milling Thickness

2. Lift Thickness

3. Binder Mix

4. Surface Mix

5. Tack Coat

6. Paving Width

7. Maximum ABR

73

Page 74: 08 jay behnke

Factors favoring Single SMA Lift

Uncertainty of Base Time Cost SMA Characteristics

74

Page 75: 08 jay behnke

75

Michigan Ave SMA Mix Design

MIXTURE OIL

Quartzite 12.5mm 50%

Quartzite 9.5mm 24%

FA & Mineral Filler 3.5%

RAP < 3/8 in. 15% 0.8%

RAS 7.5% 2.0%

PG 58-28 GTR+12 6.1% 3.3%

6.1%

VOLUMETRICS NDES = 80 Voids = 3.5% VMA = 16.3% VFA = 78.5%

Page 76: 08 jay behnke

Torture Tested (cores)

76

< 4mm rut

Page 77: 08 jay behnke

77

Test Strip at Plant

Page 78: 08 jay behnke

78

Paving

Page 79: 08 jay behnke

79

Logistics & Traffic Control

Page 80: 08 jay behnke

80

Sweeping for Prime was an Art in Itself

Page 81: 08 jay behnke

+ Trackless Tack/Prime Coat

81

Page 82: 08 jay behnke

82

Completed in 6 consecutive nights of Paving

Page 83: 08 jay behnke

83

Daily Temperatures

Oct-201116 17 18 19 20 21 22

High 52°Low  27°

53° 27°

57° 30°

61° 27°

62°40°

54° 31°

60° 36°

Historic Averages54°/30° 53°/29° 52°/29° 52°/28° 51°/28° 50°/27° 50°/27°

Page 84: 08 jay behnke

84

Compaction – 3 static 3-wheeled; Large Tandem Finish

Page 85: 08 jay behnke

85

Street Returns

Page 86: 08 jay behnke

86

Hand Workable

Page 87: 08 jay behnke

87

Quality Control

Std. Dev.

Tolerance

GMM 0.003 +/-.030

GMB 0.006 +/- .026

Voids 0.25 +/- 1.00

VMA 0.150 +/- 0.70

AC 0.16 +/- 0.03

Dust:AC 0.07 +/-1.20

4 Samples 1 set per night > 700 Tons per

night

Page 88: 08 jay behnke

88

Finished Product

Page 89: 08 jay behnke

89

Details

Page 90: 08 jay behnke

90

The End – Thank You