Gassi Touil – Rhourde Nouss QH LNG Integrated Project
The Challenges of the Gassi Touil
Integrated Project
Algiers, April 04, 2006
NOT AN OFFICIAL UNCTAD RECORD
![Page 2: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/2.jpg)
2060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated Project
First Integrated Project (Exploration, Development, Production, Liquefaction & Commercialization of Gas) in Algeria
Launched initially by Sonatrach in 2002
Scope increased by Sonatrach in 2004 as initial reserves were perceived as insufficient to pay for development & risks
Very tight schedule (start-up end of 2009), with penalties if dates not met
Awarded to Repsol YPF and Gas Natural in December 2004
Effective Date May 2nd, 2005
![Page 3: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/3.jpg)
3060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated Project
Repsol YPF’s Assets in AlgeriaRepsol YPF’s Assets in Algeria
![Page 4: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/4.jpg)
4060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectContract AreasContract Areas
![Page 5: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/5.jpg)
5060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Partners:
• Association: Repsol YPF (60% Operator) + Gas Natural (40%)
• Upstream: Sonatrach (35%) + Repsol YPF / Gas Natural (65%)
• Transport: Sonatrach (100%)
• LNG Plant: Sonatrach (20%) + Repsol YPF / Gas Natural (80%)
• Commercialization: Sonatrach (51%) + Repsol YPF / Gas Natural (49%)
Contract:
• Production Sharing: 30 years (2005 - 2035)
Production:
• Start Up: End of 2009
• Sales 100% (plateau): 4 MTA LNG + Associated Liquids
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectContract & Expected Production Data Contract & Expected Production Data
![Page 6: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/6.jpg)
6060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
One of the 10 most Large & Complex E&P Projects in the World. Initial CAPEX (100%) estimate 3 B$
The present extremely Tight Oil & Gas Market makes it very difficult to control Schedules and Costs, and to find the adequate Resources
Expect to have a peak of some 5 - 6,000 Persons (mainly Algerians) working during the Construction Phase
Some 500 - 600 Direct Employees once on Production, plus a similar number in indirects
Cooperation among the partners, particularly with Sonatrach, and with qualified service companies, is critical to success
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectMain Challenges Main Challenges
![Page 7: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/7.jpg)
7060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Very Aggressive Exploration Campaign, with a cost of 105 MM$ (Contractual 35 MM$) in 5 years
The largest 3D Seismic Campaign ever launched in Algeria (3,500 km2)
A total of at least 19 Identified Accumulations in a surface of 3000 km2 to be Explored / Appraised or Developed
Up to Three Different Reservoirs per Accumulation. The most important one being the Hamra Quarzites, never economically produced before
Production of Hamra Quartzites advanced to 2009 (Contract 2012) to obtain real drilling and production data as soon as possible
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectMain Challenges Main Challenges
![Page 8: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/8.jpg)
8060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
85 existing wells to be inspected, tested, secured, possible workovers, etc. Some will be abandoned, others as producers
Additionally, some 40 – 50 new wells will be drilled for production start up
Hamra Quartzite drilling (estimate 100 days per well) and fracturing extremely challenging. HQ productivity critical to the success of the project.
Up to 7 Drilling and Workover Rigs working simultaneously
Gas Treatment Facilities (22 – 23 MMNm3/d) at three locations, including Separation and Injection of CO2 and some 600 km of in-field flowlines and pipelines
A 4 Million Tons per Year LNG Plant to be located at Arzew. Possible second LNG Train to be decided by 2008
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectMain Challenges Main Challenges
![Page 9: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/9.jpg)
9060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated Project
ReservoirsReservoirs
![Page 10: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/10.jpg)
10060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectMain Progress MilestonesMain Progress Milestones
Contract Award December 1st
Effective Date May 2nd
Seismic Acquisition
Well Inspection & Testing
Drilling & Workovers
UPSTREAM FACILITIESInternal FEED
Open Book Estimate Upstr.
EPC Upstream
LNG PLANT AT ARZEWFEED + Open Book Estim.
EPC
"Sociedad de Licuefacción" March 14th
2005 2006 2007
![Page 11: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/11.jpg)
11060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectExploration – Map & Works
Minimum Phase I (5 Years)3 Exploration Wells500 km 2D Seismic150 km2 3D Seismic1 Long Production Test1 Hydraulic Fracture
35 MM$
Planned Phase I (5 Years)
8 Exploration Wells1430 km 2D Seismic260 km2 3D Seismic1 Long Production Test1 Hydraulic Fracture
> 105 MM$
![Page 12: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/12.jpg)
12060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectThe largest seismic campaign ever in Algeria
![Page 13: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/13.jpg)
13060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Full scale reservoir characterization as a key tool to drill new Full scale reservoir characterization as a key tool to drill new opportunities and predict reservoir behavior opportunities and predict reservoir behavior
Matrix Permebility 0.1 mD
![Page 14: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/14.jpg)
14060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectAdvanced Well Design, Planning & Architecture
High-tech to optimize productivity from the Ordovician fractured reservoirs
![Page 15: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/15.jpg)
15060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectDepleted fields rejuvenation
Existing wells surveillance campaignExisting wells surveillance campaign
![Page 16: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/16.jpg)
16 RESERVOIR: HQ - 4938 – 5016 m - PRES = 10 000 psi - 1.42 s.g. equiv. - Static BHT = 158°C - CO2 < 11%, N2 <1%
BRIDES WELLS TO ORDOVICIAN
CP 30’’ or 42’’ @ +/- 9 m
26” drilling, WBM 1.05 s.g.425 m : 18 5/8” Csg, 87.5#, K55, BTC
16” drilling, OBM 1.25 s.g
2350 m : 13 3/8” Csg, 68#, N80, BTCcement to surface : Light Cement or DV
12 ¼’’ drilling, OBM 2.10 s.g. 3250 : 9 5/8” Csg, 53.5#, special drift, P110,Tenaris BlueCement to surface : DV @ ~2500 m, in Lias Anhydritique
8 ½” drilling, OBM 1.30 to 1.50 s.g.(Possibility of ‘’Flow Drilling’’)
TOL @ 4470 m
4670 m : 7” liner, 32#, P110, Tenaris BlueTOL @ ~ 2250 m, +/-250 m above 9 5/8” DV
6” drilling, OBM 1.45 s.g. 5200 m : 4 ½” liner, 13.5#, P110, Tenaris Blue
WH 15 K Compact
optDV
BRD 4, 5, 6
24” WBM 1.05 – 1.06
18 5/8”: 415 426 440(Sénonien LagunaireAnhydrites & Dolomites)
17 1/2” OBM 1.10 – 1.45
13 3/8”: 2361 2376 2331(Top Lias: Lias argilo-dolomitique)
12 ¼” OBM 2.10 – 2.40
9 5/8”: 3260 3190 3260(Base Lias: Lias argileux)
8 3/8” - 8 1/2” OBM 1.24 – 1.57
7”: 4666 4670 4724(Top Ordov.: DMK)
6” OBM 1.45 -1.49
4 ½”: 5130 5220 5204(Grès d’El Atchane)
DV
225023502500
32502678 - 2721 Hz B
BRIDESBRIDES WELL TO ORDOVICIAN
RIG: 2000HP - ENTP 198
0
1000
2000
3000
4000
5000
0 10 20 30 40 50 60 70 80 90 100 110 120
Days
Dep
th (
mts
)
Budget
Actual
![Page 17: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/17.jpg)
17060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectCO2 Injection
CO2 Injection Project – Defined Workflow
![Page 18: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/18.jpg)
18060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectUpstream FacilitiesUpstream Facilities
Present Market Environment very difficult:
• Large increases in equipment and materials prices,
• Much longer delivery times,
• Most quality contractors are saturated
To accelerate engineering, FEED done mostly in-house
Preliminary Open Book Estimate Contract signed with major international contractor, expect to sign EPC in October 2006
First Gas Planned September 2009
![Page 19: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/19.jpg)
19060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectUpstream FacilitiesUpstream Facilities
The integration of a large number of gas fields of different characteristics (high pressure vs depleted, wet vs dry, high CO2 vs sweet) present significant challenges for an efficient, long term development
To optimize this very complex network, large scale integrated simulations, from the reservoir to the facilities, have been developed.
This allows the Project Team to select the optimum development scenarios (e.g. compression) and to update them easily
![Page 20: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/20.jpg)
20060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectLNG FacilitiesLNG Facilities
The Market Situation is even more difficult than in Upstream Facilities, as only a very small number of contractors are qualified to design & build LNG Plants
The number of LNG projects under development has increased dramatically, giving the international contractors a very large leverage
This is causing significant costs increases in many projects around the world
![Page 21: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/21.jpg)
21060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectLNG FacilitiesLNG Facilities
![Page 22: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/22.jpg)
22060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated ProjectGassi Touil – Rhourde Nouss QH LNG Integrated ProjectLayout of LNG Facilities at ArzewLayout of LNG Facilities at Arzew
![Page 23: 1 060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition Gassi Touil – Rhourde Nouss QH LNG](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4c5503460f94b40f4c/html5/thumbnails/23.jpg)
23060404 The Challenges of the GT Project – UNCTAD – 10th Africa Oil & Gas, Trade & Finance Conference & Exhibition
Gassi Touil – Rhourde Nouss QH LNG Integrated Project Gassi Touil – Rhourde Nouss QH LNG Integrated Project ConclusionsConclusions
Very Complex and Demanding Project, in very Difficult Market Circumstances
Very Tight Schedule, but presently On Target
Productivity of the Hamra Quartzite is the cornerstone of the project
The Project will use Cutting-Edge Technology in several areas to overcome the technical / economical challenges
Close collaboration among the partners, in particular with Sonatrach, is key to the success of the project