1 amwtp employee safety video contest. 2 james gouldthorpe bio site project manager designee for...

15
1 AMWTP Employee Safety Video Contest

Upload: josephine-davidson

Post on 03-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

1

AMWTP Employee Safety Video Contest

Page 2: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

2

James Gouldthorpe Bio

• Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment Project

• Worked in reactor operations• Former technical writer• B.A. History • Video hobbyist• Lives in Idaho, but originally from Virginia

Page 3: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

3

Safety Video Contest

• Bechtel BWXT Idaho announced safety video contest in February 2009

• Judging occurred in May

• First prize was $400, a catered lunch and a trip to the ISMS conference in Knoxville

Page 4: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

4

Employee Involvement and Actively Caring

• The following is an excerpt from the video that won third place in the competition.

• It is was entertaining and informative.

• This excerpt, from the end of the video contains a genuine expression of the value of employee involvement.

Page 5: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

5

Employee Involvement and Actively Caring Video

Page 6: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

6

Safe and Compliant Spill Cleanup

• The following excerpt is from the second place video

• This technical video follows workers through a pre-job brief and the actual job

• To make this video, every person involved had to perform every task correctly

Page 7: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

7

Safe and Compliant Spill Cleanup Video

Page 8: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

8

Timeline For First Place Video

• Videotaping occurred throughout April

• Each minute of the final video required 2-5 hours of time setting-up, working with actors and videotaping

• Additionally, video editing required about 2-5 hours per minute of final video

• Music was developed simultaneously

Page 9: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

9

Production Notes

• Safety on the set was vital

• One of my goals is for people to enjoy themselves on the set

• Motivated actors are one of the video’s best assets

Page 10: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

10

Value Added

• Contests like this encourage workers to feel appreciated for their talents, thereby improving their investment in the safety culture

Page 11: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

11

Value Added

Because employees will take a closer look at something a co-worker created, the message of safety and compliance is spread more readily

Page 12: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

12

Lessons Applied

• The goal is to encourage people to pay attention

• Any presentation can include one or more of the following:– Seamless formatting– Compelling subject matter– Comedy– Art

Page 13: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

The Main

Attraction

Page 14: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

14

Distractions And Horseplay Video

Page 15: 1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment

15

?

Questions