2005 2006 39630
Why We’re Here: Critical Issues Facing U.S.
High Oil Price Environment1High Oil Price Environment1
$147.00
Drive Towards Alternative Fuel2(Billions of Gallons)
Drive Towards Alternative Fuel2(Billions of Gallons)
$66.09$56.59
Note:1 Average price for period 2 2006 Vehicle fuel consumption in Gasoline Gallon Equivalents (Sources: U.S. DOE, EIA, Gas Vehicle Report, American Coalition for Ethanol)
Ethanol/Biodiesel
17B
Gap18B
Gasoline175B
Clean Air Regulation/GHGClean Air Regulation/GHG Energy SecurityEnergy Security
3
Why We’re Here: GM – April 2008
Dr. Larry Burns, VP R&D & Strategic Planning, GM:• “After spending well over $1 billion on FC system R&D,
GM remains convinced FCVs have potential to be real”• “Not discovered anything to suggest mass volume can’t
ultimately be attained”• “Toyota, Daimler, Honda have echoed our sentiments”• “GM reached stage where cannot continue progress solely on
our own”• “To reach market tipping point, customers must have
safe/convenient access to affordable hydrogen”• “Means energy industry and governments must join auto
industry to sell FCVs in mass volume”
4
Why We’re Here: Daimler/UNEP – July 2008
Dr. Dieter Zetsche, Chairman, Board of Management, Daimler AG, + head of Mercedes-Benz• “Have developed the technologies and are now
in position to introduce them to the market”• “By introducing electric and fuel cell vehicles on
the market in 2010, demonstrating our intention to fulfill responsibility for sustainable mobility”
• “Greatest challenge at present is to establish necessary infrastructure”
• “Now time for energy providers and petroleum companies to show proof of their commitment as well”
• “We have been approaching possible partners and taking the initiative”
5
Why We’re Here: G8 – July 2008
Japanese automakers providing eco-ride for G8 leaders• Toyota FCHV-adv• Mazda gas/hydrogen hybrid RX8• Honda FCX Clarity
Reuters:• Fuel cell carmakers face reality of
only about 60* hydrogen stations in entire U.S. compared to 180,000 gas stations
• “Even at green conscious Tokyo summit, closest hydrogen is about 13 miles away because of safety concerns”
*Nearly all are private and/or restricted use
6
Why We’re Here: ITS, UC Davis – May 2008
ITS Study, UC Davis, 4 scenarios 2005-2050, LD vehicles• Ca: -80% GHGs from 1990 levels
• H2 Success (major role 2025 and beyond)• Efficiency - ICEVs• Biofuels – ethanol and biodiesel• Portfolio
Conclusions• H2 FCVs break even w/in 10 years (2023)• Infrastructure to break-even year costs $8 billion; cumulative
vehicle “first cost difference” $40 billion• H2 leads to deeper cuts long-term• No single pathway meets goals; portfolio approach is attractive
7
Why We’re Here: GM/Shell
GM/Shell Hydrogen Study:• 56+ billion kg/H2/yr produced globally
• 180+ million FCVs• 11 billion kg/H2/yr produced N Am
• 21+ million FCVs• Primarily from natural gas• Costs well understood• $2-3/gge producing/dispensing
• U.S. natural gas: +2% consumption supports 10 million FCVs• 50% CO2 reduction W2W
• Economic viability leveraging existing asset base• H2 production plants near almost all major US metro
markets
8
Why We’re Here: GM/Shell
GM/Shell Hydrogen Study / U.S. Infrastructure:• 100 top urban areas (70% of US pop)
• 130,000 miles of highway• $10-15 billion investment enables 11,700 stations
• Supports first million FCVs• Urban station every 2 miles• Highway station every 25 miles
9
40 Stations in LA Basin: GM/Shell
30 700* bar stations in LA metro area 10 in heavily traveled corridors (OC, SB, LV, SD)
• Supports 40,000+ FCEVS• Puts H2 station w/in approx. 3.6 miles of 15M consumers• 10 miles worst case
*All OEMS developing 700 bar, per GM, also need 350 bar availability for Honda etc.
CaFCP: 40 200 kg/day stations meet needs through 2014
10
40 Stations in LA Basin: GM/Shell
Needed to take learning to next level Early capitalization risk managed by
concentrating initial sales in specific geographic regions • LA, NY, Shanghai
New ZEV mandate, 6 LVMs:• 2009-2011 : 250-2,500 FCVs
2012-2014 : 2,500 - 25,000 FCVs• Infrastructure will dictate
vehicle placement• 2010 around the corner! Must act
now to meet Phase 1 timeline
11
40 Stations in LA Basin: GM/Shell
Gap analysis• 1 public access 700 bar station
• NFCRC/UC Irvine• Infrastructure providers/suitable land• Partnerships complex, time consuming • CA renewable requirements
complex, costly• ARB RFPs require partnerships w/state, not grants• 50% cost share a killer; load doesn’t justify expense
CaFCP: Limited number qualified design, engineering,construction firms capable of building out infrastructure
12
Compressed Natural Gas (CNG)
Taxis
Airporttransit
Governmentvehicles
Leading Provider of Natural Gas As a Transportation Fuel
40 Stations in LA Basin: Why Clean Energy?
Liquefied Natural Gas (LNG)
Regionaltrucking
Refusehauling
Publictransit
Largest Alternative Transportation Fuel Provider
275+Fleet
customers
14,000+Natural gas
vehicles
170+Natural gas
fueling stations
13
Clean Energy/GM LAX Hydrogen Station
14
Clean Energy Management
Andrew J. Littlefair, President/CEO/Board Member• Formerly president, Pickens Fuel Corp, predecessor to Clean
Energy• Served in various management positions, Mesa, Inc.• Staff Assistant to the President, Reagan White House
T. Boone Pickens, Board Member • Author, Pickens Plan• Founder, BP Capital• Active management, BP Capital Equity Fund and Commodity
Fund• Founder, Pickens Fuel Corp., predecessor to Clean Energy• Founder, Mesa Petroleum, CEO and chairman for 40 years
15
CORPORATE
HOLDING
OPERATIONAL
Eden Innovations Ltd Energy Assets
HyRadix IncChicago, USA
Hythane Company LLCDenver, USA
Coal Bed/Seam MethaneWales, UK
Natural GasSouth Australia,
AUS
Terratherma
(Geothermal)South Australia,
AUS
Greg Solomon, Executive Chairman
Robert Gray, CEO Andrew Leibovitch, NED
Eden Cryogenics LLC
Columbus, USA
David Cepla,President
Roger Marmaro, President
Steve Hensley, President
40 Stations in LA Basin: Why Eden Energy, Ltd?
16
Eden Energy, Ltd. U.S. Subsidiaries
HyRadix Inc (Chicago, IL), www.hyradix.com • Hydrogen reformer manufacturer• Selected supplier to Praxair, the world’s 3rd largest
industrial gas company
Hythane Co. LLC (Denver, CO). www.hythane.com • Innovator of Hythane®• Patented blending technology to generate required
ratio of hydrogen : methane
Eden Cryogenics LLC (Columbus, OH)• Specialized cryogenic storage vessels for thermo-
pressure compaction of gases• Strategic supplier to NASA and major national
laboratories• www.edencryogenics.com
PRODUCTION
DEPLOYMENT
STORAGE
17
Eden Energy Management
Greg Solomon, Executive Chairman• Solicitor, 30+ years Australian and international experience• Director, Eden Energy, since incorporation• Executive chairman, Tasman Resources NL
Robert Gray, PE, CEO Eden Innovations Ltd.• 30 years experience commercializing technology, new
businesses development• Formerly president/CEO ,HyRadix Inc. • Formerly director of corporate strategy, UOP LLC • Holds an MBA, 5 process patents , Six-Sigma Black Belt
18
GM’s Hoped for LA Cluster, 30 Stations
19
GM’s Hoped for LA Cluster, 30 Stations
20
GM’s Hoped for Cluster & Existing H2 Stations
21
GM’s Hoped for Cluster w/out Private H2 Stations
22
GM’s Hoped for Cluster & Existing CNG Stations
23
GM’s Hoped for Cluster – Phase One
24
GM’s Hoped for Cluster – Phases One & Two
25
Co-location w/NG Stations: Benefits
Central reformation lowest cost H2 production method
On-site reforming proven technology, lowest cost
30+ kg/day 50% GHG reduction compared to gasoline vehicle
W2W• Half the hydrogen comes from water
CAFCP: NG-based stations provide benefit until renewable costs decline• Consumers will only switch if
hydrogen costs less per mile than gasoline
26
Co-location w/NG Stations: Benefits
India adopts policy• Natural gas accepted by gov’t as pathway to H2• Hythane® marketed as premium blend of natural gas
• Renewable Energy Ministry & Society of Indian Automobile Manufacturers establish public-private partnership for Hythane®• Modifying CNG cars, buses, three-wheelers• 1 million H2 vehicles by 2020
• World Bank helping finance; Delhi station to open 2009
27
NG 90-99% methane Renewable methane becoming
available (Biomethane) Landfill gas, sewage treatment
process dairy farms, biomass, etc. Iceland powers 100% NGV bus fleet
with Biomethane CNG stations can be modified
to co-locate hydrogen/Hythane®
Natural Gas: Renewable and Sustainable
28
New Model Required!
Old ones don’t work!• Infrastructure providers size station to load• Not consumer-friendly• Load doesn’t justify investment
Leverage nat’l gas infrastructure Use Hythane® as bridge OEM support required
• Agree to place cars where stations are located
• Open existing stations to other OEMs
Take or pay contracts
29
Partners Required!
In absence of sufficient demand to justify $100-120 million infrastructure investment (40 stations), need:• Funders as partners
• DOT, DOE, EERE, CARB, CEC, SCAQMD• Shared risk, public rewards
• OEMs as partners• GM -100• Honda -100• Nissan – 40• Etc.
30
Preliminary Budget – Phase One (10 Stations)
Add 350 bar and 700 bar hydrogen fueling to 10 existing LA area CE stations• Trucked in hydrogen when load under 30 kg/day
• Cost to install – approx $2 million• On-site reformer when load 30+ kg/day
• Cost to install – approx $3 million• Hydrogen generated on site less than half the cost of
trucked in• 100 kg/day reformer fuels approx. 20 cars per day• Hythane® additional $250,000
Total estimated Phase One budget = $25 million Timeline: Open stations 2009-2011
31
DOT Leadership Key to Success
DOT assigns team to work with Clean Energy/Eden Energy
DOT forms Public Private Partnership….takes lead in answering the call
DOT calls meeting of OEMs• Presents program, budget, timeline• Obtains commitment to participate
DOT calls meeting of potential funders – federal and state• Presents program, budget, timeline• Obtains commitment to participate
DOT and Partnership set program launch date DOT holds regular accountability update meetings with