I am a retired
Certified Quality Auditor Certified Quality Engineer IATCA Senior Lead Auditor
I was 6’7”
3
Some of the companies I have audited are:
Candy and Gum manufacturers
An Army Tank Plant
The company that makes car trunk openers
A manufacturer of $3000 drill bits
The engineering department for the NYC subways
The largest aerosol valve manufacturer in the world
4
Companies I audited (cont’d):
The company that makes coin exchangers for candy machines
A company that extracted seaweed for a ingredient used in chocolate milk
Electronic component distributors and warehouses
A telephone cable manufacturer
5
A biotech manufacturing company
A toxicology lab An aerosol filler An auto dashboard manufacturer
ETC, ETC, ETC…………..
More Companies (cont’d.)
6
THERE ARE A MILLION STORIES ASSOCIATED WITH ALL OF
THESE AUDITS
I might tell you some of these
and
I might tell you where a good restaurant is
nearby.
7
What do all these have in common?
ALL HAVE QUALITY SYSTEMS THAT MUST CONFORM TO A
SPECIFIC QUALITY STANDARD THAT WAS AUDITED TO
8
The standard might have been: QS 9000 ISO 9000 TL 9000 GMPs for Drugs GMPs for Foods Industry Standards Company SOPs
9
ISO 19011-2011 IS A
GUIDELINE DOCUMENT FOR
QUALITY MANAGEMENT
SYSTEMS AUDITING
ISO 17021 IS A NEW STANDARD
USED FOR
3RD PARTY CERTIFICATION AUDITS
10
11
Audit Purpose The purpose of quality auditing is to examine the effectiveness of management directed control
programs.
The philosophy of quality assurance programs is based on prevention rather than detection of problems.
Audit Scope
To determine the areas of investigation that the audit will encompass.
12
Audit Terms: Appraisal - A form of the quality system audit,
normally conducted to examine the quality program effectiveness and implementation.
Audit - Planned and documented assessment to determine whether requirements are met.
Audit Standard - Description of characteristics that reflects current practice.
Auditee - An organization or person being audited.
Auditor - Individual carrying out the audit Client – Determines the scope and purpose of
the audit and receives the report.
13
Audit objectives can be based on:
Management priorities or system requirements Statutory, regulatory and contractual
requirements A need for supplier evaluation Risks to the organization Whatever the boss dictates
14
Audit program objectives may be designed to:
Evaluate and maintain confidence in a supplier
Verify conformance to contractual requirements
Become certified to a management system
Follow up a corrective action program
15
General Types of Audits
System audit
Process audit
Product audit
16
AUDITORS
WHAT PERSONALITY TYPES ARE AUDITORS?
17
AUDITOR QUALIFICATIONS
For the first time in the USA, a new psychometric test was part of the ISO certification process in 2005. (These same requirements should be applied to all audits.)
18
Must Haves
1. Ethical and Principled Honest, truthful, sincere, discrete
2. Proactive and organized Will take the initiative with issues
3. Systematic Shows balanced affiliation for both tasks and people
4. Logical Makes decisions based on facts and reasoned logic
5. Decisive Will expedite decisions methodically
19
Should Haves1. Observant Shows the ability to identify both patterns and exceptions in complex systems
2. Diplomatic Shows tact in appropriate situations
3. Flexible Shows a balanced global and detail focus
4. Process Preference Demonstrates the ability to follow a predetermined method
20
Should Haves (cont’d.)
5. People Sensitive Distinguish and identify a person’s emotional state and operating style 6. Adaptable and Resourceful Match and work with different types of people in a
range of situations
7. Confident Demonstrates calm and poise in challenging situation
21
Auditors should:
Remain with the audit scope
Collect and analyze evidence
Act in an ethical manner
22
Auditors are responsible for:
Complying with the applicable audit requirements
Documenting and reporting audit results
Maintaining confidentially of the audit
23
THE AUDIT
24
Audit Planning
Establish the audit objectives
Plan resources needed
Select lead auditor and audit team
Develop an audit plan
Notify the auditee & obtain confirmation
Coordinate schedules with management
Determine time requirements
25
Audit Planning (cont’d.)
Determine the critical areas to be audited
Plan resources needed
Determine time requirements
Track progress on action plans
Respond to new emphasis from FDA,
International regulations etc.
26
THE QUESTIONS
27
Interviewing Techniques
Open ended questions
Probing
Silence
Pauses
Paraphrasing
28
Variety of Non Verbal Communication Signals
Facial expressions
Body movements
Vocal intonation and speech pattern
Often dictate the direction of the
conversation.
29
Hidden communication factors: Hostility Contempt Concern Anger Fatigue Boredom Confusion Apathy
30
Communication Barriers
Lateness
Unavailability of key people
Exceptions
Lack of time, resources
Long lunches
Interruptions
Amnesia
Lack of preparedness
31
AUDIT LOGISTICS
32
Communications During Audit
Opening meeting
- Introduce the audit team to the auditee
- Review the scope and objectives of the audit
- Set the time and date for the closing meeting
- Finalize the agenda
33
The audit (cont)
Plant tour
This is a walk through the facility to familiarize the audit team with the site. During this walk through, information concerning the raw material receipts, storage, processing and quality control inspections are reviewed with notes taken concerning items to be reviewed further.
34
Audit (cont)
Evidence is collected through
- Interviews
- Examination of documents
- Observation of activities and conditions
- Records
35
Audit (cont)
All observations should be:
- Documented
- Reviewed
- Reported as nonconformities
- Clear and Concise
- Supported by evidence
- Acknowledged by the auditee
36
Audit (cont)
Daily review
This gives the auditee an opportunity to discuss and findings
Closing meeting
- Present observations to management that will be incorporated into the report.
37
Afterwards The project is not finished until the
paperwork is completed.
For external audits, the expense report is written first.
Audit Report is drafted within two weeks.
38
Follow-up
Corrective Action Plan (CAP) is requested within 30 days from auditee