Best Management Best Management PracticesPractices
Planning, Leasing, PermittingPlanning, Leasing, Permitting
Jamie ConnellJamie ConnellBLM Northwest ColoradoBLM Northwest Colorado
District ManagerDistrict Manager
BLM – PlanningBLM – PlanningBLM – PlanningBLM – Planning
• National Environmental Policy Act (NEPA)National Environmental Policy Act (NEPA)
• Federal Land Policy and Management Act (FLPMA) Federal Land Policy and Management Act (FLPMA)
• Foundation for sustainable resource decisionsFoundation for sustainable resource decisions
• Balances competing useBalances competing use
• Basis for legally-defensible resource management decisionsBasis for legally-defensible resource management decisions
• Timely implementation decisionsTimely implementation decisions
• National Environmental Policy Act (NEPA)National Environmental Policy Act (NEPA)
• Federal Land Policy and Management Act (FLPMA) Federal Land Policy and Management Act (FLPMA)
• Foundation for sustainable resource decisionsFoundation for sustainable resource decisions
• Balances competing useBalances competing use
• Basis for legally-defensible resource management decisionsBasis for legally-defensible resource management decisions
• Timely implementation decisionsTimely implementation decisions
Decision TypesDecision Types Decision TypesDecision Types
1. Resource Management Plan (RMP)1. Resource Management Plan (RMP)
- Designate Special Management Areas- Designate Special Management Areas
- Set resource goals & objective- Set resource goals & objective
- Availability for Oil & gas, coal leasing- Availability for Oil & gas, coal leasing with appropriate stipulationswith appropriate stipulations
- Travel management- Travel management
- Land tenure adjustments- Land tenure adjustments
- Wild & Scenic River Suitability- Wild & Scenic River Suitability
1. Resource Management Plan (RMP)1. Resource Management Plan (RMP)
- Designate Special Management Areas- Designate Special Management Areas
- Set resource goals & objective- Set resource goals & objective
- Availability for Oil & gas, coal leasing- Availability for Oil & gas, coal leasing with appropriate stipulationswith appropriate stipulations
- Travel management- Travel management
- Land tenure adjustments- Land tenure adjustments
- Wild & Scenic River Suitability- Wild & Scenic River Suitability
2. 2. Activity/Implementation Plans Activity/Implementation Plans
- site specific detailed management plans- site specific detailed management plans
- allotment management plans- allotment management plans
- oil and gas permitting with conditions of - oil and gas permitting with conditions of approvalapproval
- recreation management plans- recreation management plans
2. 2. Activity/Implementation Plans Activity/Implementation Plans
- site specific detailed management plans- site specific detailed management plans
- allotment management plans- allotment management plans
- oil and gas permitting with conditions of - oil and gas permitting with conditions of approvalapproval
- recreation management plans- recreation management plans
55
Glenwood Springs Field OfficeGlenwood Springs Field OfficeBLM Surface: 567,395 acres
Federal Mineral Estate: 748,228 acres, plus 1.5 million acres of FS
Master Development Master Development PlansPlans
• Plan for wells, production Plan for wells, production facilities, roads, and pipelines and facilities, roads, and pipelines and mitigation mitigation • One NEPA analysis vs. multiple One NEPA analysis vs. multiple redundant processes and redundant processes and documentsdocuments• Proposed wells approved without Proposed wells approved without additional NEPA additional NEPA • Additional wells approved using Additional wells approved using Statutory CX Statutory CX
66
77
Directional DrillingDirectional DrillingMulti-well locationsMulti-well locations
Reduced well pad Reduced well pad densitydensity
Reduced road Reduced road densitydensity
Dual rig operationsDual rig operations
Efficiency Efficiency Drilling Drilling Rigs Rigs
• Smaller footprintSmaller footprint• 22 wells per pad22 wells per pad• 75 % reduction in 75 % reduction in surface disturbancesurface disturbance• Reduced habitat Reduced habitat fragmentationfragmentation• Expanded gas Expanded gas recovery in extreme recovery in extreme topographytopography
88
99
Remote Frac/Centralized Remote Frac/Centralized Production TanksProduction Tanks
Fracing new wells from up to four miles awayFracing new wells from up to four miles awayUse of temporary surface linesUse of temporary surface linesCentralized tanks serving 87 wellsCentralized tanks serving 87 wells
1010
Water Delivery SystemsWater Delivery Systems
Temporary, poly water pipelinesTemporary, poly water pipelines
Delivers water for drilling and completionsDelivers water for drilling and completions
Eliminates water truck traffic and impactsEliminates water truck traffic and impacts
1111
Clustered DevelopmentClustered Development
Compressor facilityCompressor facility
Two well locationsTwo well locations
10 wells10 wells
1212
Hydro ax/chippingHydro ax/chipping
Clearing heavy Clearing heavy woodland corridorswoodland corridors
Fuel reduction, mgtFuel reduction, mgt
Enhanced rehab Enhanced rehab
Big game habitat Big game habitat mitigationmitigation
Pipeline BoringPipeline Boring
1313
• Avoids steep slope construction•Eliminates visual impacts
1414
Off-site Production FacilitiesOff-site Production Facilities
Production facilities Production facilities located off well located off well locationlocation
Provide immediate Provide immediate production while other production while other wells drilledwells drilled
Minimize well pad foot Minimize well pad foot print print
1515
Camo Facility PaintCamo Facility Paint
Custom color patternsCustom color patterns
Minimize color Minimize color contrastcontrast
Maximize visual Maximize visual mitigationmitigation
1616
ColorantColorantFired clay colorant Fired clay colorant
Turf reinforcement Turf reinforcement matmat
Growth mediumGrowth medium
Water infiltration Water infiltration enhancerenhancer
1717
Exhaust Stack ScreensExhaust Stack Screens
Migratory bird mitigationMigratory bird mitigation
Prevents entry by birdsPrevents entry by birds
Flat screens vs. conesFlat screens vs. cones
Remote telemetry Remote telemetry
1818
Pit NettingPit Netting
Migratory bird mitigationMigratory bird mitigation
Prevents bird entryPrevents bird entry
More effective than More effective than flaggingflagging
1919
CMP Containment “Berms”CMP Containment “Berms”
Metal containment areasMetal containment areasSynthetic linersSynthetic linersLeak proof/fail proofLeak proof/fail proofLoad lines insideLoad lines inside
Phased DevelopmentPhased DevelopmentRoan PlateauRoan Plateau
• Development Development limited to one limited to one geographic area at a geographic area at a timetime• Phasing to new Phasing to new area after fully area after fully developed and developed and interim reclamationinterim reclamation• Total surface Total surface disturbance limited disturbance limited to 1 percent acres to 1 percent acres availableavailable
2020
2121
Temporary ReclamationTemporary Reclamation
Quick cover speciesQuick cover species
Use of sterile hybridsUse of sterile hybrids
MulchingMulching
Areas not subject to interim Areas not subject to interim reclamation first yrreclamation first yr
Areas to be redisturbedAreas to be redisturbed
2222
Interim ReclamationInterim Reclamation
Grading, shaping cuts Grading, shaping cuts and fillsand fills
TopsoilingTopsoiling
Revegetating areas Revegetating areas not needed for not needed for production operationsproduction operations
Wrap-upWrap-up
Questions, discussion, debate… Questions, discussion, debate…