1 brookhaven science associates ring building overview marty fallier, conventional facilities...
TRANSCRIPT
1 BROOKHAVEN SCIENCE ASSOCIATES
Ring Building Overview
Marty Fallier, Conventional Facilities DirectorASAC Meeting July 18, 2008
2 BROOKHAVEN SCIENCE ASSOCIATES
Outline
• Design & Construction Approach• Site Plan • Ring Building Design
• Overall Floor Plan• Architectural Program• Building Section• Injection Building• RF Building• Accommodating Long Beamlines
• Utilities
3 BROOKHAVEN SCIENCE ASSOCIATES
Design & Construction Approach
• Design is by HDR Architects & Engineers• Vibration and Acoustic Consultant – Colin Gordon Associates• Cost Estimating Consultant – VJ Associates• Geotechnical Consultants – GEI Associates• Fire Protection Consultant – NIKA Technologies
• Design Phase Construction Management - LiRo/Gilbane• Construction Management will be by NSLS-II Team• Construction will be competitive Lump-sum contracts to general
contractors (see construction package list)• Main Ring Building Contract out for bid – 9/26/08• Start Construction – Spring 09• Turnover Ring Bldg to ASD – 2/11 thru 4/12
4 BROOKHAVEN SCIENCE ASSOCIATES
Construction Packages & InterfacesConstruction Package Purpose Interface
Site Preparation
Prepares site for Ring Building contractor, isolates & reroutes utilities, clears trees, closes monitoring wells, verifies no environmental liabilities
Will be done prior to start of Ring Building Contract
Ring Building Main contract, provides all buildings and on-site utilities
Interfaces to all packages except CHW Plant
Electrical Substation & PowerIncreases capacity of BNL substation for NSLS II, brings 20 MW at 13.8 kV to site
Connect to power 13.8kV at construction site boundary
Chilled Water PipingBrings Central Chilled Water piping to construction site boundary
Connect to chilled water at construction site boundary
Chilled Water Plant ExpansionExpands capacity of Central Chilled Water Plant
No interface with Ring Building Contract
Future Lab Office BuildingsProvides lab and office space for research teams and staff
Added to exterior of Ring Building at each Pentant after Pentant is accepted from Ring Building contractor FY 2012-13
5 BROOKHAVEN SCIENCE ASSOCIATES
NSLS II Siteplan
Vehicle Access Tunnel
Possible JPSI Locations
NSLS
CFN
Injection Bldg
NSLS II
Service Bldgs (1 of 5)
CHW Plant
Bldg 603 Substation
Future LOB’s & Parking
RF Bldg
HDR Preparing new graphicPaving in Base Scope
Future Paving (w/LOB’s)
LOB’s in Base Scope (2nd pkg)
6 BROOKHAVEN SCIENCE ASSOCIATES
Ring Building Overview
7 BROOKHAVEN SCIENCE ASSOCIATES
View of Entry Lobby
8 BROOKHAVEN SCIENCE ASSOCIATES
Key Performance Parameters
• Designed to achieve key CF-Accelerator Parameters• Storage Ring Tunnel vibration• Storage Ring Tunnel temperature stability• Primary Process DI Water load and temperature stability• Process Chilled Water load and temperature stability• Provide supporting utilities & required capacities
– Electrical– Chilled water– LN2 & GN2– Potable Water & Fire Protection– Data and Communication
• Assure overall beam availability >95%
9 BROOKHAVEN SCIENCE ASSOCIATES
Overall Floor Plan
Storage Ring & Booster Tunnel
Experimental Floor
Access Corridor
Service Buildings
LOB’s 1, 5, & 4 Base Scope
Future LOB’s
Earth Berm
RF
Injection
Lobby
LOB 1
Vehicle Tunnel
LOB
5
LOB 4LOB 3
LOB 2
Process Cooling Water Bldg
10 BROOKHAVEN SCIENCE ASSOCIATES
Ring Building Section
11 BROOKHAVEN SCIENCE ASSOCIATES
Injection Building
12 BROOKHAVEN SCIENCE ASSOCIATES
RF Building
13 BROOKHAVEN SCIENCE ASSOCIATES
By-pass Corridor
By-pass Corridor
Extended Experimental Floor
Std Access Corridor
Stair, ADA Lift and Material Lift
Ramp
14 BROOKHAVEN SCIENCE ASSOCIATES
Section Through Access Corridor at Beamline
Section Through Corridor At Beamline
2’-6”
7’-1”
Beam Tube
15 BROOKHAVEN SCIENCE ASSOCIATES
Overall Utilities Plan
16 BROOKHAVEN SCIENCE ASSOCIATES
Central Process DI Water Plant
Tower Water Treatment Area
Process DI Water Treatment Area
Process DI Water Supply & Return
Process DI Water Pumps
Cooling Tower Pumps
Chilled Water Supply & Return
17 BROOKHAVEN SCIENCE ASSOCIATES
Summary
• CF & ASD effectively coordinating requirements to assure design meets performance goals• Regular & frequent coordination meetings• Active ASD interaction with CF A/E (HDR)
• CF design on track for completion in late August to support bid and award for Spring 09 construction start
• Development of detailed commissioning plan for CF facilities to enable hand-off for ASD installation & commissioning is underway (CFAC Recommendation)