Mt Eden Community Liaison Group Carol Greensmith, Communications Manager 19 th November 2015

Upload: others

Post on 13-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

1Mt EdenCommunity Liaison GroupCarol Greensmith, Communications Manager19th November 2015

Page 2: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

2WelcomeSpeaking tonight are:

• Carol Greensmith, Communications Manager, CRL• Richard Jenkins, Principal Planner

Also here is Holly Claeys, Communications and Stakeholder Advisor

2

Page 3: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

3

Overview• Strategic context

• Early works

• Mount Eden Works

• Planning- Effects assessment- Managing effects- Purpose & expectations of CLG

3

Page 4: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

4

• CRL is required to set up all CLGs by 10th February 2016

• Earliest start for Mt Eden work is 2018

• We will want input into various documents that guide the delivery of the work

• A Community Liaison Group, representing those affected by the work is a key tool for this

• In addition, we will continue to keep in touch via the project website, e-updates, etc.

Why are we here?

Page 5: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

5

Strategic context5

Page 6: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

6Auckland in 2041Auckland is pivotal to the social, economic and cultural development of New Zealand

• More than 700,000 new residents

• An extra 400,000 dwellings

• Twice as many city centre and city fringe residents and employees

• City Centre student numbers up by 30%

• City centre producing 25% of Auckland’s GDP - currently 17%

729,000

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

Auckland Christchurch Wellington Waikato Bay of Plenty Otago Growth inAuckland to

2041

Growth to2041

2011Population

Page 7: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

7

City Rail Link videohttps://youtu.be/SmB8oQv9DdM

Page 8: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

8CRL route and catchment area

Page 9: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

9Vertical Alignment

Page 10: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

10Rail network with the CRL

Page 11: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

11The CRL has multiple roles

The case for the CRL has multiple dimensions

• Economic

• Transport for Auckland’s growth

• Integrated land-use

• Environmental imperatives

Page 12: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

12Auckland’s economy• Auckland employment composition

• Auckland accounts for 34% of jobs in NZ and most are in the urban areas• Auckland region generates 37% of NZ’s GDP• Wellington, Hamilton and Tauranga combined, account for 13% of jobs• Transport is critical to shape urban form and lead economic development in cities

24%

23%18%

23%

12%

Advanced business services,finance and insuranceGovernment, health andeducationWholesaling and retailing

Other

Manufacturing

Page 13: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

13City Access

• The number of people entering the city centre is increasing

• Since 2001, more people take PT to the city centre during the morning peak and fewer take cars

Page 14: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

14Municipal Transport Station

Page 15: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

15Transport leads development

• Leading growth with transport infrastructure is vital to shaping the city

• Contributed $1.3 billion per year to Auckland economy

• Transport infrastructure played a vital role in shaping the city

• Britomart has the lowest vacancy rate in Auckland CBD at 1.3% (2014) and some of the highest rental rates

• Britomart precinct development is ongoing with significant value yet to be unlocked

Page 16: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

16Mt Eden – Potential development

Page 17: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

17Sustainability

The CRL• Sets a benchmark in designing, building and

operating sustainable infrastructure

• Supports the development of a quality compact Auckland through sustainable transport choices

• Aligns with and supports the Council’s low carbon action plan

• Adopts the Infrastructure Sustainability Council of Australia’s (ISCA) Infrastructure Sustainability (IS) rating framework

Transport is Auckland’s largest source of greenhouse gas emissions

Page 18: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

18CRL Programme

Page 19: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

19

Early construction works

19

Page 20: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

20Early works construction dates2015 2016 2017

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Con

tract

1

Queen Street

Britomart TempAccom

CPO (CivilWorks)

Downtown DSC

Con

tract

2

Pipe jack

Albert Stcut and cover

Demolition & rebuild begins

- Tyler & Galway St (access change, buses removed & reversing Tyler)- Interim bus plan operational- Lower Queen Street buses removed

Victoria St (east/west constraint)

Lower Albert St (partially closed to through traffic)Albert St (Victoria to Custom) service lanes only)

- Lower Queen Street Works begin

- Underpinning of CPO begins

Page 21: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

21CRL Enabling Works - construction footprint

Page 22: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

22

Mt Eden Works

22

Page 23: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

23

Page 24: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

24Mt Eden Station concept designs

Page 25: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

25

Planning

25

Page 26: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

26

Innovation: Integrated Station Planning

Managing effects

Page 27: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

27

CLG consultation

Page 28: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

28

Community Liaison Groups (CLGs)

28

Page 29: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

29CLG requirementsCondition 7.5 of the Notice of Requirement requires AT to consult with those directly and in proximity affected by the CRL construction works. This happens through the CLG by:

• regular updates provided by AT on construction progress

• providing feedback on the development of the Delivery Work Plans (DWPs) and Construction Environmental Management Plans (CEMPs), and the Communication and Consultation Plan

• input into a regular forum monitoring the effects on the community

• reporting concerns and issues to AT that it will respond to

• possibly proposing potential initiatives to the Property Management Strategy on the interim use of properties acquired by the CRL

Page 30: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

30

• Construction Environmental Management Plan(s)

CEMP

• This is the “how document” and is the umbrella under which the Delivery Work Plans sit

• Provides the structure for environmental management of the project

Page 31: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

31

• Delivery Work Plans contain specific objectives and methods for avoiding, remedying or mitigating effects for: (a) Transport, access and parking(b) Construction noise and vibration (c) Historic character (d) Urban design (e) Trees and vegetation

DWPS

• Technical documents for which it is useful to have a degree of knowledge within each topic – AT will assist the CLG

Page 32: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

32

• CLG can provide feedback on the development of the CEMP and DWPs

• AT will require feedback within 5-10 working days on the content of the CEMP and the specific DWP

Time and Feedback

Page 33: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

33

• The Mt Eden CLG will meet once a year before main construction begins

• During construction, CLG will be at least every 3 months

• AT will provide administration assistance and ensure the CLG is working effectively

• You may contact CRL project via email: [email protected] or find us on Facebook: Facebook.com/cityraillink

CLG next steps

Page 34: 1 Community Liaison Group - Auckland Transport · • The Mt Eden CLG will meet once a year before main construction begins • During construction, CLG will be at least every 3 months

34Transport - Conclusions

• There is an established way of approach transport appraisal based on straight line growth forecasts and values of time with fixed population and employment patterns, but it is not clear that it reflects what actually happens

• In reality transport drives land use patterns just as much as land use drives transport demand