1Construction Code Analysis
Joe MoralesCertifications
ICC – UBC,IBC,IRCIECC – Plans Examiner, Inspector
TDLR – RAS10 years with City of Houston
Plan Examiner
2Construction Code Analysis
3 Step process
• Site Development• Plan Review• Construction and Inspections
3Construction Code Analysis
Water Waste/Water Department
• When is Water Waste/Water Approval Required?
4Construction Code Analysis
Water Waste/Water Department
Projects requiring Water Waste/Water Approvals
• All New Construction and/or Additions
•All Site Work and Utilities
•Change in Occupancy or Change in Use
5Construction Code Analysis
Water Waste/Water Department
• Projects that do not require Water Waste/Water Approval
6Construction Code Analysis
Water Waste/Water DepartmentProjects that do not require Water Waste/Water Approvals
• Driveways• Electronic Locks• Fire Alarms• Remodeling of existing spaces that
do not involve a change in occupancy, change in Use, change in size or change in number of occupants
7Construction Code Analysis
Water Waste/Water Department
Also: be aware that to open a vacant restaurant again, new availability letters and payment of impact fees may be required
Two reasons for this is that the property owner may have transferred water and sewer capacities to another developer or the restaurant may never have been approved by Public Utilities.
8Construction Code Analysis
Water Waste/Water Department
• Utility Analysis Sectiona. Manages Waste Water flows
through WCR (waster water capacity reservations) and manages water demands through water/storm drainage commitment letters
9Construction Code Analysis
Water Waste/Water Department
WCR Long Form – may take from 3 to 4 weeks to processWCR Short From – Can not exceed 6 services units, must
front on a 8 inch or larger sanitary sewer line and/or a 6 inch or larger water line. Can be submitted and impact fees paid immediately
www.publicworks.cityofhouston.gov/planning/development/index.htmDischarge Criteria
Attach copies of the WCR letters and copies of receipts to each set of plans
10Construction Code Analysis
Planning and Development
When is Planning and Development approval required?
11Construction Code Analysis
Planning and DevelopmentWhen is Planning and Development approval required?
1. Construction of new buildings2. Alterations of existing structures
where that alteration results in an increase in;
a. The gross floor area of a building; orb. The intensity of use of a site; or c. The seating capacity of a building;
and
12Construction Code Analysis
Planning and DevelopmentWhen is Planning and Development approval required?
3. The changes of land use, i.e.. Residential to Commercial
4. New Parking lots and/or expansion of existing parking lots
5. Shopping Center – Tennant finish, change of use
13Construction Code Analysis
Planning and Development
• Construction projects that do not require Planning and Development approval
14Construction Code Analysis
Planning and Development Construction projects that do not require Planning and
Development approval
1. Interior remodeling that does not change the use of the building, excluding shopping centers
2. Residential carports that do not encroach into the building setback line, provided the applicant submit verification of setback lines
15Construction Code Analysis
Planning and Development Construction projects that do not require Planning and
Development approval
3. Fences more than 8 feet in height not adjacent to a public street or within a building line and any fences less than 8 feet in height
4. Swimming pools without above ground improvements, i.e.. Pool houses, shower and locker rooms. Swimming pools located exclusively at a single family residence, including pool houses.
16Construction Code Analysis
Planning and Development Construction projects that do not require Planning and
Development approval
5. Mechanical equipment and storage tanks – both above and below grade
6. Under ground improvements, such as parking garages, tunnels, basements
7. Canvas awnings wholly supported from a building wall that comply with building setback lines
17Construction Code Analysis
Planning and Development Construction projects that do not require Planning and
Development approval
8. Façade attached to the exterior of a building, not exceeding 18 inches in thickness. However, the façade may not be permitted where it extends into the setback line
9. The resurfacing and repairs of parking lots
18Construction Code Analysis
Planning and Development Construction projects that do not require Planning and
Development approval
10.Mechanical equipment on the exterior of a building of a building premise
11.Driveways and sidewalks
19Construction Code Analysis
Planning and Development
• Generally, Ordinances which effect Planning and Development requirements are;
• Chapter 42; Development (Platting)
• Chapter 33; Landscaping• Chapter 26; Off Street Parking
20Construction Code Analysis
Planning and Development How to determine if project requires a development plat
• In new construction a copy of the recorded plat can be obtained from 611 Walker St. in the Basement level. If the recorded plat reveals that the property has been subdivided since recordation then a replat is necessary.
• If the plat is for use other than what is being proposed, a replat would be necessary
21Construction Code Analysis
Planning and Development How to determine if project requires a development plat
• If the property is in a Reserve Tract, determine what the Reserve is platted for. If the use does not match the intended use, a Replat is required.
• If the property is in an Unrestricted Reserve, development may proceed as long as the Title Report does not have restrictions that would prohibit construction
22Construction Code Analysis
Planning and Development How to determine if project requires a development plat
• If the property is part of an Abstract Tract where no platting has been done and there are no restrictions in the Title Report, a plat would not be required.
23Construction Code Analysis
Planning and DevelopmentProjects that require Planning and Development approval
without plat requirements
• Development Site Plan Review• Depending on the Project Scope
the following may be required in the Development Site Plan Review;
1. Parking requirements2. Landscaping requirements
24Construction Code Analysis
Planning and Development Projects the require Planning and Development approval
without plat requirements
• Applications for Development Site Plan Review can be picked up at 3300 Main St.
25Construction Code Analysis
Article II Division 1
Sec. 42-22 Development plat requiredDevelopment of property through the new
construction or enlargement of any exterior dimension of any building, structure, or improvement within the City or its ETJ shall require a development plat, except that the following types of development shall be exempt from this requirement:
26Construction Code Analysis
Article II Division 1
Sec. 42-22 Development plat required - Exceptions1) Buildings, structures, or improvements within the central
business district;2) Alterations to any building or improvement, including enclosing
an existing canopy or porte-cochre, that do not increase the exterior square footage by more than 100 square feet and that do not result in an encroachment into the building line requirement;
3) Construction of a detached single-family residential unit (or enlargement thereto) that meets the requirements of article III of this chapter on a lot that is part of, and in manner that complies with, a recorded subdivision plat or an unrecorded subdivision plat that is recognized as a plat for the purposes of property conveyance;
4) A parking lot or expansion thereof;5) A retaining wall, masonry wall or fence under eight feet high; or6) Placement of a temporary classroom building at a public school
facility.
27Construction Code Analysis
Code EnforcementPlan Review
Goal is 11 Days in the System
and 2 submittalsTotal Time is dependant on how long the designer holds the
plans for plan corrections.
28Construction Code Analysis
Making it into the system
• City has implemented a Prerequisites Checklist for allowing drawings to be submitted for plan review
a. Provides for the minimal information required for a complete plan review.
b. Eliminated reviewing plans that had no chance for approval
c. Rejections for Prerequisites do not count as a submittal
29Construction Code Analysis
Pay Attention to Detail
• Critical to maximizing chance for approvala. Permit applicationb. Read correction comments carefully, if they
are not clear call the plan checker to gain more clear understanding
c. Plan Checkers want information on the plans!d. If a comment correction is made to the
Architectural Drawings it most probably will effect the MEP drawings, coordinate with the MEP engineers
30Construction Code Analysis
Prerequisites
• Please read all prerequisite requirements
• Someone should be responsible for reviewing the completed Plan Set to see if all Prerequisites are met. There are 18 prerequisites that may or may not effect your project.
31Construction Code Analysis
Code Analysis
• Lead the Plan Checker through the plans
• Provide a good exiting plan and provide exit width calculations
• Exiting plan is good place to show the square footage of all rooms and/or spaces along with the Occupant Load Factors and Occupant Loads as per Table 1004.1.1 (amended)
32Construction Code Analysis
Code AnalysisOccupancy Groups
•Determine the Occupancy Group from Chapter 3
•Call Plan Review for Help when in doubt
•Occupancy Group is critical in determining code requirements
33Construction Code Analysis
New Express RulesDesigner’s Review by Appointment
•The Designer/Architect may schedule a meeting with the Plan Checker to discuss the manner in which the rejection comments have been addressed
•By appointment only
•Limited to 30 minutes
•Plan Designer/Architect must be in attendance
•Project must have at least one full review & comments should not be excessive (determined by Plan Checker)
34Construction Code Analysis
Quick Start I
35Construction Code Analysis
Quick Start I
36Construction Code Analysis
Quick Start I
37Construction Code Analysis
Quick Start I
38Construction Code Analysis
Quick Start I
39Construction Code Analysis
Quick Start I
40Construction Code Analysis
Phased Permitting • UNDERGROUND UTILITIES
• PLUMBING: • 1. Complete set of pipes (Storm/Sanitary/Water)• 2. Utility Letters
• ELECTRICAL: • 1. Electrical Underground (Conduit)
• STRUCTURAL: • 1. Any Structural components (i.e. Light Pole Base)• 2. Paving Plans if applicable• 3. Civil Plans
41Construction Code Analysis
Phased Permitting• FOUNDATION/SITEWORK
• PLUMBING: • 1. Waste & Vent below Foundation• 2. Roof Drainage • 3. Utility Letters• 4. (COPY) of approved piping plan for ref. • 5. Site-Drainage & Detention• 6. Flood Approval if required
• ELECTRICAL: • 1. (COPY) of approved Underground Conduit for ref.• • STRUCTURAL: • 1. Geotechnical Report• 2. Civil Drawings• 3. Site-Plan (Architectural) • 4. Engineered (Foundation & Detail) Drawings
42Construction Code Analysis
Phased Permitting• BUILDING PHASE• • PLUMBING: • 1. Riser Diagram• 2. Piping Legend• 3. Equipment with plumbing connection (water/gas)• 4. (COPY) of the approved “Foundation” for ref.• 5. Roof drainage calculation• 6. Utility Letters• 7. (COPY) of the approved (Site-Utility) for ref.
• ELECTRICAL: • 1. (COPY) of the approved underground (conduit)
• STRUCTURAL: • 1. (COPY) of the approved Civil Plans• 2. (COPY) of the approved Site-Plan• 3. Complete Architectural Plans• 4. Complete Structural Package
43Construction Code Analysis
Partial Permits
• Site work only or site work and underground utilities
• This permit is for clearing the land of vegetation and roots which involves excavating a foot or more of the surface dirt from the property. This permit may include excavating for and laying of underground utilities such as drainage pipes, water pipes, fire lines, etc.
• (a) If this permit is for clearing the land, then only structural approval is required. The cost of this permit will be a flat fee of $30 plus a $5 administrative fee regardless of how much the cost of improvements may be.
• (b) If this permit does include underground utilities, it shall have approval from water, sewer, storm, plumbing and structural. The cost of this permit is the same as above in item l(a)
44Construction Code Analysis
Partial PermitsSite work, parking lot & paved areas permit (no foundation)This permit is only for site work and required parking lots, driveways and sidewalks. Required parking lots are associated with the construction of a new building and its' purpose is to provide the required off-street parking for the tenants of the building.This permit is possible, provided all off-street parking and other site work requirements have been met as required for the new building and all departments have approved the paving plans based on the requirements for a new building.If plans are submitted for this permit, plans must be routed to all required departments for approval, e.g., planning, traffic, storm, water, sewer, structural, etc.If this permit is issued, the plans for the building must still be routed to City planning, water and sewer to make sure site, parking lot and/or building configurations or use have not been changed.The fee for this kind of permit is based on 'total area of the parking lot,' 'driveways,' 'side walks,' etc.
45Construction Code Analysis
Partial Permits• Site work and foundation permit
• This permit type has been traditionally submitted to the City and all plan review personnel are familiar with this kind of permit.
• If requested, plans shall be submitted and routed to all required departments/sections for approval; such as planning, traffic, water, sewer, storm, plumbing, electrical and structure.
• The fee for this kind of permit is based on 'total area covered by foundation,' 'total area of parking lot,' 'driveways' and 'sidewalks', etc.
46Construction Code Analysis
Partial Permits• Superstructure
• Follows a Site Work and Foundation Permit
• to construct the structural frame only.
47Construction Code Analysis
Partial Permits• Roof and Exterior Walls• Follow up with a Roof and Exterior
walls permit after the Superstructure.
• Often referred as a Skin Permit
48Construction Code Analysis
Partial Permit• Drilled piers only permit
• This permit has been requested by many applicants and is just to get an early start on construction. This permit does not include full foundation or site work. If requested, plans shall be routed to planning and water waste/water for their approval.
• The fee for this permit is based upon total area covered by the foundation slab.
49Construction Code Analysis
Partial Permit• Shell building only permit
• This permit includes site work if not permitted in a previous phase. Again, this kind of permit is also traditional and every plan examiner is familiar with the process.
• Shell building permit is usually for occupancy groups B, M, S-l and S-2 unless it is specifically categorized for a specific occupancy. A suitable 'type of construction' is assigned based on type of occupancy. Calculate allowable area, and if area separation walls are required, they shall become part of the shell building. Complete details of area separation walls with their locations shall be submitted along with plans for approval.
50Construction Code Analysis
Construction and Inspections
May take up to one year or more depending on the project size.
51Construction Code Analysis
Additional Resources
Code Enforcement Web Site:• www.publicworks.cityofhouston.gov/planning/enforcement/
index.htmPlan Check Inquiry:• http://pdinet.pd.ci.houston.tx.us/cohilms/webs/
Plan_LookUp.aspHFD Standards• www.houstontx.gov/fire/businessinfo/standards.htmlUtilities Planning Applications• www.publicworks.cityofhouston.gov/planning/development/
index.htm2006 City of Houston Fee Schedule• http://www.publicworks.cityofhouston.gov/planning/
enforcement/fees.htmConstruction Code Analysis• www.cca-services.com
52Construction Code Analysis
Thanks