1.1 ABOUT PROJECT PROPONENT
SURYADEV ALLOYS & POWER PVT. LTD. [here in after referred as SAPPL] i s s teel plant,
the fi rst of its kind in India, i s located in New Gummidipoondi , Gummidipoondi Ta luk,
Ti ruvallur District, Tamilnadu, with a production capacity of 1,40,000 TPA of Sponge Iron,
1,40,000 TPA of Bi llets & 1,40,000 TPA of Rol led products. The Company was promoted
by a young entrepreneur Mr. Mukesh Agarwal with his brother Mr. Pankaj Agarwal . The
promoters are in iron and s teel businesses and having good reputation in the market,
which was gained with good business practices . Seeing the huge gap in demand and
supply of Steel; SAPPL proposed to set up a new unit by installing Sponge Iron, Induction
furnace, Rolling mill, Oxygen plant and Power plant (WHRB and Pulverized Coal Fi re
boi ler) at Sirupuzhalpet and New Gummidipoondi Vi l lage, Gummidipoondi Ta luk,
Ti ruvol lur Dis trict, Tami l Nadu.
The fol lowing i s the plant configuration & production capaci ty:
S.No Products Production Capacity as per EC issued on 20
th May 2011
Present Proposal After the Present proposal
(Total Capacities) 1 Bi l lets 12,50,000 TPA 7,00,000 TPA
(4 x 40 MT) 19,50,000 TPA
2 Rol led products 12,00,000 TPA 6,50,000 TPA 18,50,000 TPA 3 Sponge Iron 2,31,000 TPA
(4 x 175 TPD) (This i s yet to be
implemented and same is now proposed to be replaced with 1 X 500
TPD in present proposal )
4,95,000 TPA (3 x 500 TPD)
4,95,000 TPA (3 x 500 TPD)
4 Power Plant WHRB
18 MW 45 MW (3 x 15 MW)
45 MW (3 x 15 MW)
Pre-feasibility Report
2
[Instead of exis ting 18 MW]
5 Power Plant CFBC 2 x 80 MW 180 MW (PCF based)
340 MW
6 Ferro Manganese 12000 TPA --- 12000 TPA 7 Si l ico Manganese 24000 TPA --- 24000 TPA 8 Oxygen plant --- 250 MT 250MT
1.2 Total available land with the management i s 164.01 acres , i .e. 119.01 acres i s exis ting
plant and 45 acres of land is adjoining the exis ting land.
1.3 Water i s required for process of manufacturing, cooling and domestic purpose, which will
be met from Ground water source.
1.4 The project cost estimated for the proposed s teel plant i s Rs . 1350 Crores . This i s
inclusive of equipment cost as erected including Civil and structural works, taxes & duties
and contingencies .
As mentioned above the promoters & key personal are experienced, energetic and resourceful
men with good reputation and business links. The promoters are also financially s table & will be
able to execute the project successfully & in specified time & run it profi tabi l i ty & smoothly in
future too.
Pre-feasibility Report
3
Chapter - 2 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION
2.1 Identification of project
M/s. Suryadev Alloys & Power Pvt. Ltd. has proposed to go for expans ion of exis ting
s teel plant by setting up DRI Kiln with WHRB power plant, Induction Furnace unit, Rolling
Mi l l uni t, Power plant (PCF based) and Oxygen plant unit at Si rupuzhalpet & New
Gummidipoondi Vi l lage, Gummidipoondi Ta l uk, Ti ruvol lur Dis trict, Tami l Nadu.
2.2 Brief description of nature of the project
SAPPL Unit # 1, i s an existing steel plant and has obtained Environmental Clearance vide
letter F. No. J-11011/11/2010-IA-II (I) dated 20th
May, 2011 with the below mentioned
capaci ty:
S.No. Products Existing EC obtained 1. Sponge Iron ---- 231000 TPA 2. Bi l lets 140000 TPA 1250000 TPA 3. Rol led Products
(Wire Rods & Bars) 140000 TPA 1200000 TPA
4. Power Plant (WHRB) ---- 18 MW 5. Power Plant (CFBC) ---- 2 x 80 MW 6. Ferro Manganese ---- 12000 TPA 7. Si l ico Manganese ---- 24000 TPA
8. Oxygen plant ---- 50 TPD
Now due the huge gap in demand and supply of Steel; SAPPL proposed to set up a new
unit by installing Sponge Iron, Induction furnace, Rolling mi l l , Oxygen plant and Power
plant (WHRB and Pulverized Coal Fire boiler) at Sirupuzhalpet and New Gummidipoondi
Vi l lage, Gummidipoondi Taluk, Tiruvollur District, Tamil Nadu and naming i t as Suryadev
Alloys & Power Pvt. Ltd.
Pre-feasibility Report
4
2.3 Need for the project and its importance to the country and or region.
The demand for steel in India is expected to ri se 7 percent in the next f inancia l year
beginning April 1 as compared to the sluggish 5.5 percent projected growth in 2012-13.
The overall outlook for the s teel sector is positive and the demand was likely to pick up in
the next financial year on the back of revival in economic growth and the government's
measures to ease infrastructure investment rules. In fiscal 2012-13, growth in domestic
s teel demand is expected to be around 5.5 percent. Total demand is e xpected to be
around 75 mi llion tonnes, up from 71 mi llion tonnes in 2011-12. In 2013-14, demand is
expected to be higher at around seven percent.
India is currently the world's fourth largest producer of crude s teel after China, Japan and
the US. Major public as well as private sector fi rms including Tata Steel , SAIL and JSW
Steel are expanding production capacity. The s teel production is expected to reach 200
mi l lion tonnes by 2020 as compared to 71 mi ll ion tonnes recorded last year. In s teel
production, India i s expected to leave behind USA and Japan in a couple of years .
However, it will substantially lag behind China that produces almost 700 mi llion tonnes of
s teel per year.
2.4 Employment Generation (Direct and Indirect) due to the project.
The local areas will be benefited by way of generation of employment opportunities ,
increased demand for local products and services. There will be an overall improvement
in the income level of the loca l people.
The project creates employment to about 150 persons once the plant comes to the
operational s tage and for 300 persons during construction s tage. Top priori ty wi l l be
given to locals for Semi-Skilled and Unskilled jobs. With the development of this Plant
there will be lot of scope for more ancillary development, which in turn wi l l benefi t the
nation.
Pre-feasibility Report
5
There will be a certain enhancement of educational and medical standards of people in
the s tudy area. There wi l l be genera l ly pos i tive and beneficia l impacts by way of
economic improvements , transportation, aesthetic environment and bus iness
generation. There will be an overall upliftment of socio-economic s tatus of people in the
area with the implementation of the project.
*****
Pre-feasibility Report
6
Chapter - 3
PROJECT DESCRIPTION
3.1. Type of Project:
M/s. Suryadev Alloys & Power Pvt. Ltd. as a part of expansion of the proposed project,
they have decided to produce the following product through different routes:
Unit : Description
Sponge i ron : Us ing Iron Ore, Coal and Dolomite as raw materia ls
Ingots / Bi l lets : By us ing DRI, MS scrap as raw materia ls in Induction Furnace
Wire rods / TMT bars : By us ing Ingots/ Billets as raw materials in Rol l ing mi l l
Power generation : By uti lizing hot waste flue gases from DRI kilns in WHRB.
By uti l i zing coal fines in Pulvervised coal boi ler.
Oxygen gas : By a i r separation process based on low pressure cryogenic cycle and double column rectification system for puri ty of various gases in order to meet the requirement of Oxygen, Nitrogen and Argon.
3.2 General Location:
Proposed project will be establishment in the existing plant premises and land adjacent
to the existing plant. Total land envisaged for the entire project is 164.01 acres (Exis ting
plant – 119.01 acres + adjacent land – 45.0 acres). The proposed s teel plant wi l l be
installed at Sirupuzhalpet and New Gummidipoondi Vi l lage, Gummidipoondi Ta luk,
Ti ruvol lur Dis trict, Tami l Nadu.
Exis ting Plant (119.01 acres) UNIT # 1
Survey no.s 281 to 290, 293-296, 297/2, 297/1A to 297/1D, 298 of New Gummidipoondi Vi l lage and 78,80 to 111 of Si rupuzhalpetta i Vi l lage
Proposed land (45 acres) UNIT # 2
Survey no.s 287/1A, 287/2, 287/3, 290/1, 291/1A, 291/1B, 291/4, 291/5 of New Gummidipoondi Vi l lage and 78/1, 78/2A1, 78/2A2, 78/2C, 78/2D, 78/2E, 81/1B, 81/2A, 81/2B, 81/2C of Si rupuzhalpetta i Vi l lage
The location map is shown below:
Pre-feasibility Report
7
Pre-feasibility Report
8
3.3 Details of alternate sites considered:
No a l ternative site have been examined, as proposed expans ion wi l l be carried in the
exis ting plant premises and partly in the land adjacent to the exis ting plant.
3.4 Size or magnitude of operation.
The plant configuration & production capacity of proposed expans ion of s teel pl ant i s
given as below:
S.No Products Production Capacity as per EC issued on 20th May 2011
Present Proposal After the Present proposal
(Total Capacities)
1 Bi l lets 12,50,000 TPA 7,00,000 TPA (4 x 40 MT)
19,50,000 TPA
2 Rol led products 12,00,000 TPA 6,50,000 TPA 18,50,000 TPA 3 Sponge Iron 2,31,000 TPA
(4 x 175 TPD) (This i s yet to be
implemented and same is now proposed to be replaced with 1 X 500
TPD in present proposal )
4,95,000 TPA (3 x 500 TPD)
4,95,000 TPA (3 x 500 TPD)
4 Power Plant WHRB
18 MW 45 MW (3 x 15 MW)
[Instead of exis ting 18 MW]
45 MW (3 x 15 MW)
5 Power Plant CFBC 2 x 80 MW 180 MW (PCF based)
340 MW
6 Ferro Manganese 12000 TPA --- 12000 TPA 7 Si l ico Manganese 24000 TPA --- 24000 TPA
8 Oxygen plant --- 250 MT 250MT
3.5 Manufacturing Process and Flow Diagram:
3.5.1 Manufacturing Process Sponge Iron
For the direct reduction of iron ore, the main furnace used is Rotary Ki ln. The rotary ki ln
i s a refractory l ines vessel on which several blowers are mounted. From the blowers , a i r
pipes go through the shell and refractory. Vertically and delivers the required amount of
a i r required for process, axially. The kiln has conical outlet and inlet holds the material in
the ki ln. Ki ln i s placed in a s lope from feed end s ide at a s lope of 2 ½ degrees .
Pre-feasibility Report
9
Iron ore, Coal, Dolomite/ Limestone is fed in the weighed quantity and the kiln is rotated
at the speed of about 0.5 rpm. A temperature between 1000OC to 1050 OC is maintained
in about 70% of the ki ln length towards discharge and s ide for required reaction.
After the reaction, the product is taken into an indirect cooling drum cooler. The product
i s cooled to 100OC and taken for product separation. The product screened into lumps
and fines i s separated from the coal ash and coal char and th en taken for fina l use.
The waste gas from the kiln contain lot of combustible l ike coal volati les , unused CO,
about 10 to 12% carbon particles and lot of other dust. The gas i s taken to an after
burner chamber and after the combustibles are burnt, the gas is cooled to about 160OC
ei ther passing through a gas cool ing tower or through a waste heat recovery boi ler
before going to Stack via ESP and ID fans .
The construction of Kiln and Cooler i s made in such a way that no outside air i s a l lowed
to go into the system. The outs ide a i r i f goes to the ki ln, re -oxidizes the product
ul timately upsetting the temperature profile. To avoid this, ID fan damper is throttled to
maintained positive pressure in the Ki ln. The pressure of about +5mm water column is
mainta ined at Ki ln fi ring hood.
The rotational speed of the ki ln i s adjusted as per the feed rate and percentage of
metallization. The % of inclination, rotational speed, the length of time the materia l i s
exposed to atmosphere, the kiln temperature, are all to be taken into consideration. So
the ki ln has three functions :
1. It i s heat exchanger.
2. It i s a vessel for Chemical reaction.
3. It i s a conveyor of sol ids .
Pre-feasibility Report
10
Figure of manufacturing process is shown below:
Pre-feasibility Report
11
3.6 Raw material requirement
3.6.1 Raw Material and its consumption:
Raw Material Consumption
(TPA)
For manufacturing of Sponge Iron
Iron Ore 5,28,000
Coal Indian 6,43,500
Imported 3,96,000
Dolomite 16,500
For manufacturing of Ingots/ billets
Sponge Iron 7,00,000
Scrap 1,00,000
Ferro Al loys 10,500
For manufacturing of TMT bars / Structural steel / Wire rod &
Bars
Steel billets / Ingots 6,82,500
For Generation of Power through Pulverized Coal Fired boiler
[180 MW]
Coal Indian 9,50,400
Imported 5,82,120
For Oxygen plant
Air 250 MT
3.6.2 Mode of Transport for Raw materials and finished products:
The aforesaid raw materials are transported through ra i l up to the nearest avai lable
s iding and thereafter the same will be transported to the s ite through tarpaulin covered
trucks .
3.6.3 Market of Final Products:
It i s proposed to install s teel plant with specia l rol led products faci l i ty. As the s teel/
power sector had huge demand and supply gap. Hence marketing of the product has no
problem.
Pre-feasibility Report
12
3.8 Availability of water its source, Energy / power requirement and source:
3.8.1 Water Requirement and its sources:
Water required for the expansion project will be 1950 KLD. The desired quantity of water
wi l l be drawn met from Ground water resource. Water drawl permission CGWA wi l l be
obtained.
3.8.2 Sources of Energy/ Power and its sources:
The type of Energy/ power sources for proposed s teel plant i s given as below:
S.No Units
Sources Energy/ Power
Its origin
1. Sponge Iron Electric Power TNEB grids/CPP
3.9 Generation and disposal of Wastes [Waste Water and Solid Wastes]:
3.9.1 Waste Water Generation:
There will be no effluent generation in the DRI as closed ci rcui t cool ing system wi l l be
adopted.
Effluent from power plant such as boiler blowdown, DM Plant regeneration. Initia l ly the
acidic and alkaline effluent s treams coming from cation and anion units of DM plant wi l l
be neutralized in a neutrali zation tank. Service water wi l l then pass through an Oi l
Separator to remove the oil content in the effluent. The pH of Boiler blowdown wi l l be
between 9.5 and 10.5. Hence this effluent s tream shall be neutralized in a neutralization
tank before mixing with other effluent streams. Al l these effluent streams will be mixed
in a Central Monitoring Basin along with cooling tower blowdown. Treated effluent wi l l
be used for ash conditioning, dust suppress ion and for greenbelt development.
The sanitary wastewater will be treated in septic tank followed by soak pit. Hence there
wi l l not be any chance of contamination of water bodies due to proposed project.
Pre-feasibility Report
13
3.9.2 Solid Waste Generation and its disposal
Dolochar generated from the Sponge i ron will be uti l i zed in the Power plant, Fly Ash
generated will be given to Asbestos Cement sheet units . Bottom ash wi l l be given to
Cement / Brick manufacturers etc. are the solid wastes to be generate due to operation
of proposed s teel plant. The following table depicts the expected quanti ties of various
sol id wastes :
The fol lowing table depicts the expected quanti ties of various sol id wa stes :
S.No Solid wastes Quantity 1. Dolochar Uti l i zed in exis ting FBC boi ler 2. Accretion slag Wi l l be Used in Road construction 3. Wet scraper s ludge Wi l l be given to brick manufacturers
4. Ash & Dust from DRI Wi l l be given to Cement plant
Pre-feasibility Report
14
Chapter - 4
SITE ANALYSIS
4.1 Connectivity.
The proposed site i s well connected with Rail and Road connectivi ty. The nearest railway
s tation is Gummdipundi RS. The following table gives brief regarding connectivi ty of the
proposed s i te:
Component Description Road : NH – 5 at dis tance of 2.5 Kms. Rai l : Nearest s tation – 2.7 km is Gummdipundi RS Air : Chennai – 45 km
Sea Port : Chennai – 45 km
4.2 Land Form, Land use and Land ownership.
4.2.1 Land Form
Present land use i s a l ready converted for industria l purpose.
4.2.2 Land Use of the Project Site
Present land use i s a l ready converted for industria l purpose.
4.3 Topography
Topography of land is more or less flat terra in without much undulation.
4.4 Existing land use pattern:
4.4.1 Land use pattern of the Project site:
Total land in possession of management is 164.01 acres i.e. 119.01 acres of existing plant
and 45 acres of land adjoining land.
4.4.2 Environmental Setting of the Project Site:
The following is the environmental setting within the 10 Km. radius of the project site:
The proposed project area does not fall under the industrial areas / cluster, w hich
are l i s ted in MoEF office memorandum dated 13th January 2010 and i ts
subsequent amedments .
Tandalacheri is the nearest habitation at a dis tance of 1.0 Km. from the project
s i te.
Pre-feasibility Report
15
There are no National Parks, Wild life Sanctuaries and Bird Sanctuaries within 10
Km. radius of the project s i te.
No forest land is involved in the proposed s i te.
Arani river flows at dis tance of 3.4 Kms. from the project s i te.
Gumadipoondi Railway Station is at a distance of 3.0 Kms. from the project s i te.
Palavakkam RF exis ts within 10 Km. radius of the project s i te.
Gumadipoondi Industrial area is present within 10 Km. radius of the project s i te.
There are no habitations in the land earmarked for the project. Hence no
rehabi l i tation and resettlement i s involved.
4.5 Existing Infrastructure
Al l required infrastructure i s prevai l ing in the s i te.
4.6 Soil classification
The soils in the area are generally of clayey loam types with sandy loam soi l in some
areas .
4.7 Climatic data from secondary sources
The cl imatic condition of this area is semi-arid. The maximum temperature goes upto
48ºC during summer in the month of May and the minimum temperature goes down to
10.0ºC during winter in the month of January-February. The winds in the area are light to
moderate during summer and winter. The rainfall of the district i s 1000 mm. General ly
l ight to moderate winds prevails throughout the year. Winds were l ight and moderate
particularly during the morning hours. While during the afternoon hours the winds were
s tronger.
Pre-feasibility Report
16
Chapter - 5
PLANNING BRIEF
5.1 Planning Concept:
M/s. Suryadev Alloys & Power Pvt. Ltd. has proposed to go for expansion of existing s teel
plant by setting up DRI Kiln with WHRB power plant, Induction Furnace unit, Rolling Mi l l
uni t, Power plant (PCF based) and Oxygen plant unit at Si rupuzhalpet & New
Gummidipoondi Vi l lage, Gummidipoondi Ta luk, Ti ruvol lur Dis trict, Tami l Nadu.
5.2 Population Projection:
There are no major human settlements in the vicinity of the project s ite. The manpower
requirement will be sourced from the local areas to the extent possible; hence not much
of settlement of outside people in the area. However population concentration may
increase around the project s i te due to increase in anci l lary activi ties .
5.3 Land use planning:
Proposed project will be establishment in the existing plant premises and land adjacent
to the existing plant. Total land envisaged for the entire project is 164.01 acres (Exis ting
plant – 119.01 acres + adjacent land – 45.0 acres). The proposed s teel plant wi l l be
installed at Sirupuzhalpet and New Gummidipoondi Vi l lage, Gummidipoondi Ta luk,
Ti ruvol lur Dis trict, Tami l Nadu.
Exis ting Plant (119.01 acres) UNIT # 1
Survey no.s 281 to 290, 293-296, 297/2, 297/1A to 297/1D, 298 of New Gummidipoondi Vi l lage and 78,80 to 111 of Si rupuzhalpetta i Vi l lage
Proposed land (45 acres) UNIT # 2
Survey no.s 287/1A, 287/2, 287/3, 290/1, 291/1A, 291/1B, 291/4, 291/5 of New Gummidipoondi Vi l lage and 78/1, 78/2A1, 78/2A2, 78/2C, 78/2D, 78/2E, 81/1B, 81/2A, 81/2B, 81/2C of Si rupuzhalpetta i Vi l lage
5.4 Amenities/Facilities.
Faci lities like canteen, rest room and indoor games faci l i ties wi l l be provided in the
proposed plant as basic facilities to workers. No other additional facilities are proposed.
Pre-feasibility Report
17
Chapter - 6
PROPOSED INFRASTRUCTURE
6.0 Proposed Infrastructure
As mentioned earlier that the tentative land area s tatement of proposed 164.01 Acres of
project s i te i s given as below:
Item Area in Acres Bui lt up area 70.00 Internal roads 12.00
Other Anci llary Area 8.00 Storage yard 11.00 Greenbelt 47.00 Open area 16.01 Total land 164.01
6.1 Industrial Area (Processing Area).
The main plant area comprises of Furnace sheds, Rolling mill area, raw materia l s torage
and product s torage etc.
6.2 Residential Area (Non Processing Area).
No colonization is proposed; however facilities like canteen, rest room and indoor games
faci lities will be provided in the proposed plant and one Admin building is also proposed.
6.3 Green Belt.
About 1/3rd of tota l land avai labi l i ty i s reserved for pl antation.
6.4 Social Infrastructure.
Social infrastructure will be developed as per need based in the Villages of the vicini ty of
the project.
6.5 Connectivity:
The proposed site i s well connected with Rail and Road connectivi ty. The nearest railway
s tation is Gummdipundi RS. The following table gives brief regarding connectivi ty of the
proposed s i te:
Pre-feasibility Report
18
Component Description Road : NH – 5 at dis tance of 2.5 Kms. Rai l : Nearest s tation – 2.7 km is Gummdipundi RS Air : Chennai – 45 km Sea Port : Chennai – 45 km
6.6 Drinking Water Management
Drinking water supply wi l l be mainta ined at the proposed project s i te.
6.7 Sewerage System
Domestic effluent collected through toilet blocks will be collected through well designed
sewer network and send to Septic tanks fol lowed by soak pi ts .
6.8 Industrial Waste Management
There will be no effluent generation in the DRI as closed ci rcui t cool ing system wi l l be
adopted.
Effluent from power plant such as boiler blowdown, DM Plant regeneration. Initia l ly the
acidic and alkaline effluent s treams coming from cation and anion units of DM plant wi l l
be neutralized in a neutrali zation tank. Service water wi l l then pass through an Oi l
Separator to remove the oil content in the effluent. The pH of Boiler blowdown wi l l be
between 9.5 and 10.5. Hence this effluent s tream shall be neutralized in a neutralization
tank before mixing with other effluent streams. Al l these effluent streams will be mixed
in a Central Monitoring Basin along with cooling tower blowdown. Treated effluent wi l l
be used for ash conditioning, dust suppress ion and for greenbelt development.
The sanitary wastewater will be treated in septic tank followed by soak pit. Hence there
wi l l not be any chance of contamination of water bodies due to proposed project.
6.9 Solid Waste Management.
Dolochar generated from the Sponge i ron will be uti l i zed in the Power plant, Fly Ash
generated will be given to Asbestos Cement sheet units . Bottom ash wi l l be given to
Pre-feasibility Report
19
Cement / Brick manufacturers etc. are the solid wastes to be generate due to operation
of proposed s teel plant. The following table depicts the expected quanti ties of various
sol id wastes :
The fol lowing table depicts the expected quanti ties of various sol id wastes :
Sr. No Solid wastes Quantity 1. Dolochar Uti l i zed in exis ting FBC boi ler 2. Accretion slag Wi l l be Used in Road construction 3. Wet scraper s ludge Wi l l be given to brick manufacturers 4. Ash & Dust from DRI Wi l l be given to Cement plant
6.10 Power requirement & its source.
Power required for proposed steel plant will be sourced from nearby grid ini tia l ly, later
from CPP.
Pre-feasibility Report
20
Chapter - 7
REHABILITATION & RESETTLEMENT (R & R) PLAN
7.0 Rehabilitation and Resettlement Scheme:
No rehabilitation and resettlement is required as there are no habitations in the in the
Project s i te.
Pre-feasibility Report
21
Chapter - 8
PROJECT SCHEDULE & COST ESTIMATES
8.1 Likely date of start of construction:
Construction activity pertaining to installation of proposed Steel Plant wi l l be s tarted
within 24 months from the date of Environment Clearance.
8.2 Estimated project cost:
The estimated project cost for the proposed is about Rs . 1350/- crores , i ts breakup is
given as below:
Sr. No. Particulars Amount
(Rs. in Crores) 1. Land & Si te Dev. Charges. 80 2. Bui lding (Factory + Office) 50 3. Plant and Machinery 900
4. Electrical Installation 105 5. Pol lution Control Equipments 105 6. Other Fixed Assets 95 7. Other activities 15
Total 1350
Pre-feasibility Report
22
Chapter - 9
ANALYSIS OF PROPOSAL
9.1 Financial and social benefits:
With the implementation of the proposed project, the socio-economic s tatus of the local
people will improve substantially. The land rates in the area will improve in the nearby
areas due to the proposed activity. This will help in upliftment of the social status of the
people in the area. Educational insti tutions wi l l a lso come -up and wi l l lead to
improvement of educational s tatus of the people in the area. Primary health centre wi l l
a lso be developed by us and the medica l faci l i ties wi l l certa inly improve due to the
proposed project.
9.2 Socio-Economic Developmental Activities
The management i s committed to upl i ft the s tandards of l iving of the vi l lagers by
undertaking fol lowing activi ties / respons ibi l i ties as the part of Corporate Socia l
Respons ibi l i ty.
Health & hygiene
Drinking water
Education for poor
Vi l lage roads
Lighting
HEALTH & HYGINE
Personal and domestic hygiene,
Maintaining clean neighborhood,
Weekly health camps offering free -check up & medicines
Ambulance services
Education & drug de -addiction, a ids .
DRINKING WATER
Making drinking water avai lable at centra l i zed locations in the vi l lage,
SUPPORTING EDUCATION
Providing books to a l l poor chi ldren,
Conducting annual sports festiva l in the vi l lage schools ,