“Fix Tube Sheet” Heat ExchangerGeneral Assembly view
Shell side Outlet
Shell side Inlet
Tube side Inlet
Tube side Outlet
Shell
Distributor
Tube Sheet
Gasket
Saddle
End Flange
Tube SheetGasket
Gasket
Cover
2
“Fix Tube Sheet” Heat Exchanger
Cross Sectional View Assembly
Baffle Shell
Distributor
Tube sheet
Tube Cover
Tube Sheet
3
“Fix Tube Sheet” Heat Exchanger
Split view sectioned parts
Cover
Gasket
Shell-Tube sheet-Tubes
Gasket
End Flange
Gasket
Distributor
4
“Fix Tube Sheet” Heat Exchanger
Split View of Parts
GasketGasket
Gasket
Distributor
End Flange
Cover
Tube Sheet
Shell
Saddle
Tube Sheet
5
Do Not Start The Job Without a Safety Plan
6
“Fix Tube Sheet” Heat Exchanger
Maintenance Activity Description
Blind Inlets-Outlets at plant area
Disconnect and remove Distributor with gasket
Remove Cover with gasket
Install Blinds in-Out of shell
Ground level
7
“Fix Tube Sheet” Heat Exchanger
Shell Hydro-test
Connect water pump
Raise the pressure at value indicated by Inspection
Install pressure gauge
Ground level
PG
Water Pump
Eliminate leaks if found
Fill the shell by water
Drain water from shell
Drain
Remove PG & Water pump
Remove blinds, fix gaskets & tight bolts
8
“Fix tube sheet” Heat Exchanger Shell Side Hydro-test …Leak elimination from tubes [Details]
Shell
Tube
Tube sheetTube sheet
Water
Water
Plug
Plug
Leak elimination by Plugs
Leak elimination by Expansion
Leak
Leak
Expander
Blind
PG
PG
9Ground level
“Fix tube sheet” Heat Exchanger Tube Side Hydro-test [Details]
Install distributor with new gasket
Water Pump
PG
Install blinds at inlet-outlet
Install Pressure gauge & water pump
Fill Water tube side
Raise the pressure up to the value indicated by Inspection
Check sealing distributor to shell
Check sealing distributor to end flange
Discharge water remove PG & pump
Remove blinds at distributor in-out
Install cover with gasket Check sealing cover to Shell
10
“Fix Tube Sheet” Heat Exchanger
Handover & Final House Keeping Close Work permit Remove tools and equipment
Clean and wash the area Remove scaffold after unit start-up
By Maintenance
Ground level