1 industrial training institute late i.c. desai i.t.i. pardi part: 1 coe iti details
TRANSCRIPT
![Page 1: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/1.jpg)
1
INDUSTRIAL TRAINING INSTITUTE
LATE I.C. DESAI I.T.I. PARDI
PART: 1
CoE ITI Details
![Page 2: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/2.jpg)
UPGRADATION DETAILS (wherever only upgradation is taken up)
Sr. No. YEAR Sanctioned Seats Filled SeatsAdmission
rate %
1 Aug-06 62 81 130%
2 Aug-07 64 84 131%
3 Aug-08 80 84 105%
4 Aug-09 68 90 132%
TOTAL 274 339 124%
Admission Rate % = Filled Seats/Sanctioned Seats * 100 2
![Page 3: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/3.jpg)
BBBT DETAILS
Sr. No.
YEAR Sanctioned Seats Filled SeatsAdmission rate
%
1 Aug-06 96 114 119%
2 Aug-07 96 120 125%
3 Aug-08 96 144 150%
4 Aug-09 96 132 137%
TOTAL 384 510 139%
Admission Rate % = Filled Seats/Sanctioned Seats * 100 3
![Page 4: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/4.jpg)
ADVANCE MODULE DETAILS
Sr. No.
YEARSanctioned
Seats
Filled Seats Admission rate %
August February August February
1 Aug-07 / Feb-08 96 65 20 67% 21%
2 Aug-08 / Feb-09 96 73 15 76% 15%
3 Aug-09 / Feb-10 96 94 31 98% 32%
TOTAL 288 232 66 81% 23%
Admission Rate % = Filled Seats/Sanctioned Seats * 100 4
![Page 5: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/5.jpg)
INDUSTRY SPECIFIC MODULE DETAILS
Sr. No. YEAR Filled Seats No. of IndustriesAdmission rate
%
1 Aug-07 / Feb-08 0 0 0
2 Aug-08 / Feb-09 0 0 0
3 Aug-09 / Feb-10 0 0 0
TOTAL 0 0 0
Admission Rate % = Filled Seats/Sanctioned Seats * 100 5
![Page 6: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/6.jpg)
APPRENTISE TRAINING
Sr. No. YEARDESIGNATED
TRADENO. OF TRAINEES
ENGAGED
1 2007-08 NA NA
2 2008-09 NA NA
3 2009-10 NA
NA
4
TOTAL
6
![Page 7: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/7.jpg)
TRANSITION RATE
Sr. No. YEAR BBBT to ADVANCE (X) Transition rate
1 Aug-07 / Feb-08 65/20 46%
2 Aug-08 / Feb-09 73/15 40%
3 Aug-09 / Feb-10 94/31 48%
TOTAL 232/66 45%
Note: How Many Students joined Advance Module from the lot of X ( X = BBBT Passed Out - Students who got the Job )
Transition Rate = 100 * No. of Students Admited in Advance Module / X
7
![Page 8: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/8.jpg)
TRANSITION RATE
Sr. No. YEARADVANCE to
INDUSTRY SPECIFIC (X)
Transition rate
1 Aug-07 / Feb-08 0 0
2 Aug-08 / Feb-09 0 0
3 Aug-09 / Feb-10 0 0
TOTAL 0 0
Note: How Many Students joined Specific Module from the lot of X ( X = Advance Module Passed Out - Students who got the Job )
Transition Rate = 100 * No. of Students Admitted in Specific Module / X
8
![Page 9: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/9.jpg)
PASSOUT RATE - BBBT (NCVT Pattern)
Sr. No. YEAR Total Appeared Total Passout
1 Jul-07 85 77
2 Jul-08 97 95
3 Jul-09 108 106
TOTAL 290 278
PASSOUT RATE - ADVANCE MODULE
Sr. No. YEAR Total Appeared Total Passout
1 Feb-08 55 50
2 Feb-09 73 68
3 Feb-10 88 59
TOTAL 21 6 177
PASSOUT RATE - For ITI taken up for upgradation (NCVT Pattern)
Sr. No. YEAR Total Appeared Total Passout
1 Jul-07 59 59
2 Jul-08 61 59
3 Jul-09 35 35
TOTAL 134 133 9
![Page 10: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/10.jpg)
PLACEMENT
EMPLOYMENT
Sr. No.
YEAR
TOTAL
PASSED
EMPLOYMENT IN INDUSTRY
SELF EMPLOY
MENT
NO. OF REGISTRATION
WITH EMPLOYMENT
EXCHG.
NO. OF CAMPUS
INTERVIEW HELD
1
2006 – 072007 – 082008 - 09
463522517
210240225
NIl 398475435
152023
10
![Page 11: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/11.jpg)
EARNINGS PER MONTH
Sr. No. YEAR AVERAGE MONTHLY SALARY
1 2006-07 Nil
2 2007-08 3350
3 2008-09 3600
Total Average 3475
11
![Page 12: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/12.jpg)
PROCUREMENT OF GOODSITI's (FOR 6 BBBT + 3 ADVANCE + 6 UPGRADED TRADES)
NAME
Total No. of Unit
Total Required Qty.
Total Available Qty.
% Availability
BBBT
Fundamentals of elect. & comp.
1 172 161 94 %
Basic fitting 1 668 633 95 %Basic mechanical process
1 818 778 95 %
Fundamentals of general chemistry
1 769 763 99 %
Basic Instrumentation
1 818 785 96 %
Basic unit operation
1 342 329 96 %
AMAdvance aocp 1 510 489 96 %Advance Im 1 595 486 82 %Advance lacp 1 250 141 57 %
TRADE (Trade
taken for Upgradati
on)
FT 2 1041 943 91 %WD 1 678 648 95 %IT 1 171 141 83 %AOCP 1 1379 1329 96 %LACP 1 4609 4539 98 %IMCP 1 970 940 97 %
12
![Page 13: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/13.jpg)
COUNSTRUCTION OF CIVIL WORKS
Sr. No. ADDITION AND ALTERATION / NEW WORK
1 Total Progressive Expenditure incurred Rs. 68.63 lacs.
2 Expected Date of Completion : work completed
SET UP OF ADVANCE MODULE WORKSHOP
1 Expected Date of Completion : Work completed
CONSTRUCTION PHOTOGRAPHS REQUIRED
13
![Page 14: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/14.jpg)
STAFF VACANCY (To be filled by November-2009)
Sr. No. ITEMNo. of
SanctionedNo. of Filled No. of Vacant
1 Principal 01 0 01
2 Teaching Staff 54 44 11
3 Other 20 15 05
Total 75 59 17
14
![Page 15: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/15.jpg)
Training of Trainers
Sr. No.
Total Instructors
No of Instructor Completed training
No. of
Instructor
CTI Training 1 Year
CTI Training POT Training 3 Months
CTI Engineering Technology
3 Month
CTI Trade Technology
6 MonthBBBT AM
Other Training
more than 7 Days
1 55 12 02 - -
01 02 03
15
![Page 16: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/16.jpg)
REVENUE GENERATION
Sr. No. ACTIVITYRevenue
Generated (Rs.)
1
Budget I ncome of institute 0230Labour & employment
4.60
(Please attach detail sheet of Revenue Generation)
16
![Page 17: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/17.jpg)
PLACEMENT BEREAU ACTIVATION
Sr. No.
YEARTotal
Trainee Pass out
Bio Data Placed on Website
Registered With
Employment Exchange
No. of Campus
Interview Held
No. of Trainee got Job
Avg. Salary / Month
123
2006-072007-0820008-09Total
77169191437
77169191437
35117162314
-100919
---
17
![Page 18: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/18.jpg)
BUDGET - EXPENDITURE DETAILS (Year2009-2010)
Sr. No.
Component
Budget Provision Expenditure Remaining Expenditure
PlanNon Plan
Total PlanNon Plan
Total PlanNon Plan
Total
1Miscellaneous
- 19.20 19.20 - 19.20 19.20 - - -
2
Machinery & Equipment
- 6.00 6.00 - 5.98 5.98 - - -
3 Civil 32.42 - 32.42 - - - 32.42 - 32.42
TOTAL
18
![Page 19: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/19.jpg)
WOMAN PARTICIPATION
Sr. No.STEPS TAKEN TO INCREASE
PARTICIPATIONRESULTS
11. Jagruti abhiyan .
2. Seminar in school.3. Advertisement
Will be seen in Aug. 2010
ACTION TAKEN FOR ALLUMNI ASSOCIATION
Sr. No.STEPS TAKEN TO
ASSOCIATE THE ALLUMNIRESULTS
1 Nil
Nil
19
![Page 20: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/20.jpg)
ACTIVITY FOR DISADVANTAGE GROUP
Sr. No. STEPS TAKEN RESULTS
1
1. Jagruti abhiyan .2. Seminar in school.
3. Advertisement
Will be seen in Aug. 2010
ORIENTATION PROGRAM FOR IMC
Sr. No. STEPS TAKEN RESULTS
1MeetingContacts
IMC formed & Expenditure for COE to develop COE sector.
20
![Page 21: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/21.jpg)
RAISING AWARENESS AMONG POTENTIAL STUDENTS & INDUSTRY
Sr. No. STEPS TAKEN RESULTS
1 Industrial visit - About 200 students visited several Industry.
2 Campus Interview
-06 Companies have arranged campus Interview.
- 187 Students attended & 89 students selected.
3 On Job Training - 40 trainees will go for on job training
during April – 2010. 21
![Page 22: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/22.jpg)
22
PART: 2
Best Practices Presentation
![Page 23: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/23.jpg)
ENTRANCE GATE OF ITI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
![Page 24: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/24.jpg)
SIGN BOARD NEAR GATE OF ITI
I.T.I. PARDI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
![Page 25: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/25.jpg)
ENTRANCE ROAD TO ITI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 26: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/26.jpg)
COE BUILDING
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
![Page 27: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/27.jpg)
LANDSCAPING & FRONTAGE
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
![Page 28: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/28.jpg)
ENTRANCE OF BUILDING
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
![Page 29: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/29.jpg)
ENTRANCE OF BUILDINGBLOCK B
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 30: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/30.jpg)
BUILDING & WORKSHOP CORRIDORS
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 31: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/31.jpg)
THEORY & AUDIO VISUAL ROOM
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 32: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/32.jpg)
CONFERENCE ROOM
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 33: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/33.jpg)
Existing workshop for CHBT
• Mod.1 - Fundamental of Electronics & Computers• Mod.2 - Basic Fittings and Measurements• Mod.3 - Basic Mechanical Processes• Mod.4 - Fundamental of General Chemistry & Physics• Mod.5 - Basic Instrumentation• Mod.6 - Basic unit Operations and Processes
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 34: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/34.jpg)
CHBT-1 Electronics & ComputersCHBT-1 Electronics & Computers
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 35: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/35.jpg)
CHBT- 2 Basic Fitting LabCHBT- 2 Basic Fitting Lab..
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 36: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/36.jpg)
CHBT- 3 Mech.Process Lab.CHBT- 3 Mech.Process Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
After
Before
![Page 37: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/37.jpg)
CHBT- 4 Chemistry Lab.CHBT- 4 Chemistry Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 38: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/38.jpg)
CHBT – 5 Instrumentation Lab.CHBT – 5 Instrumentation Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 39: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/39.jpg)
CHBT – 6 Unit Operation Lab.CHBT – 6 Unit Operation Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 40: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/40.jpg)
CHAT 01 ADV. AOCHAT 01 ADV. AO
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 41: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/41.jpg)
CHAT 03 ADV. IMCHAT 03 ADV. IM
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 42: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/42.jpg)
Instrument Mechanic Lab.Instrument Mechanic Lab.AfterBefore
![Page 43: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/43.jpg)
ELECTRONICS LABELECTRONICS LAB
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 44: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/44.jpg)
IT LABIT LAB
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 45: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/45.jpg)
Plastic Processing OperatorPlastic Processing Operator
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 46: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/46.jpg)
WiremanWireman
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 47: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/47.jpg)
Mechanic DieselMechanic Diesel
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 48: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/48.jpg)
COPA Lab.COPA Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
![Page 49: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/49.jpg)
APPAREL PARK
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 50: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/50.jpg)
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
COE STAFF DRESS CODECOE STAFF DRESS CODE
AfterBefore
![Page 51: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/51.jpg)
PLACEMENT ADVISORY PLACEMENT ADVISORY BUREAUBUREAU AfterBefore
![Page 52: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/52.jpg)
PLACEMENT ADVISORY BUREAUPLACEMENT ADVISORY BUREAUBefore After
![Page 53: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/53.jpg)
Website of ITI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 54: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/54.jpg)
Training Materials for each COE Module M-1 Fundamental of Electronics & Computer
Lesson No.. Lesson Name
1 Atomic theory
2 Active & Passive components
3 Integrated circuits
4 Logic Gates
5 MS- Word
6 MS- Excel
7 MS - powerpoint
8 AutoCAD
![Page 55: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/55.jpg)
Training Materials for each COE Module
M- 2Basic Fittings and Measurements
Lesson No. Lesson Name
1 Vernier Caliper
2 Micrometer
3 Dial Gauge
4 Hand Tools
5 Drilling Machine
6 Limit- Fit
7 Taps & Die
8 File, Hackshaw, Bench vice
![Page 56: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/56.jpg)
Training Materials for each COE ModuleM - 3 Basic Mechanical Processes
Lesson No. Lesson Name
1 Lathe machine
2 Cutting tool material
3 Tapper turning
4 Welding
5 Metal joining process
6 Thread cutting
7 Safety precaution
![Page 57: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/57.jpg)
Training Materials for each COE Module
M -4Fundamental of General Chemistry & Physics
Lesson No. Lesson Name
1 Units & Measurement
2 Viscocity & Density
3 Acid , baise solution
4 Metal & Non metal
5 Transformers
6 Volumetric Analysis
7 Physical dimension
![Page 58: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/58.jpg)
Training Materials for each COE Module
M -5Basic Instrumentation
Lesson No. Lesson Name
1 Pressure measurement equipments
2 Temperature measurement equipments
3 Level Indicators
4 Purge systems
5 Flow meters
6 PH meter
7 Hygro meter, Hydro meter
8 Anemometer
![Page 59: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/59.jpg)
Training Materials for each COE Module
M -6Basic unit Operations and Processes
Lesson No. Lesson Name
1 Fluid flow operation
2 Extraction & leaching
3 Absorption & Adsorption
4 Lagging material
5 Distillation
6 Fertilizers
7 Mfg. processes Urea, Soap, Nitric acid etc.
8 Screening
9 Filteration
![Page 60: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/60.jpg)
Training Materials for each COE ModuleAdv. AOCP
Lesson No. Lesson Name
1 Fluid Transportation
2 Valves
3 Pumps
4 Heat transfer
5 Evaporation
6 Distilation & its types
7 Centirifugation
8 Crystalisation
9 Water & Air polution
![Page 61: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/61.jpg)
Energy Saving
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 62: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/62.jpg)
Status of ISO Certification
• ISO Consultant has been selected and order to be given to
Ahmedabad neboulous.
• ISO training has been conducted on dated 5th Jan. 2010, 22nd
Feb. 2010, 19th March. 2010.
• ISO audit will be conducted on 16th April 2010.
![Page 63: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/63.jpg)
Civil Work under CoECivil Work under CoEFor New BuildingFor New Building
• Rs. 32 Lac. Sanctioned for new building.
• T.S. approved tendering process by PWD. Will be
carried out.
• For New Existing BuildingFor New Existing Building
• Electrification compeleted.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 64: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/64.jpg)
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
•Provision for current year 2009- 2010 Rs. 19.20 lacs.
• How many tender issued Nil
• How many order placed Nil
• Amount of Expenditure incurred upto 31st March 2010
Rs. 19.20 lacs.
•How much expenditure is to be incurred up to March - 2010
Rs. 19.20 lacs.
Miscellaneous Expenditure
![Page 65: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/65.jpg)
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
•Provision for current year 2009- 2010 Rs. 6 lacs.
• How many tender issued Nil
• How many order placed Nil
• Amount of Expenditure incurred upto 31st March 2010.
Rs. 5.98 lacs.
•How much expenditure is to be incurred up to March - 2010
Rs. 5.98 lacs.
Machinery Equipment
![Page 66: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/66.jpg)
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
•On Roll BBBT 132
•Advanced AOCP 11
•Advanded IMCP 11
•Advanced LACP•Total
10
164
Status of On roll in BBBT/ Advance Module
![Page 67: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/67.jpg)
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
• Open land available in sq. mt. 86821 sq.mt.
• Perimeter of Boundary wall in meter of compund
1200 mts.
•How many plants planted in July 2009 5000 Nos.
• How many plants survived as on 31st March 2010.
4500 + (984 grown up trees till June 09)
• Which different type of plants planted in ITI in July 2009
Boganvel, Neem, Saptapadi, Asopalav & others.
Plantation
![Page 68: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/68.jpg)
PlantationPlantation
![Page 69: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/69.jpg)
Plantation Survival
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 70: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/70.jpg)
Plantation
![Page 71: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/71.jpg)
Plantation
![Page 72: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/72.jpg)
Plantation
![Page 73: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/73.jpg)
Plantation
![Page 74: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/74.jpg)
Plantation
![Page 75: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/75.jpg)
Plantation
![Page 76: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/76.jpg)
Plantation
![Page 77: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/77.jpg)
Plantation
![Page 78: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/78.jpg)
Seminar on E.M.F.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 79: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/79.jpg)
Staff Meeting
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
![Page 80: 1 INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details](https://reader038.vdocuments.net/reader038/viewer/2022102818/56649cea5503460f949b5d7b/html5/thumbnails/80.jpg)
THANK YOU 80