    Hidroenergia 2008, JH 1

    GRP Pipe Solutions in Hydro Power projects.

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    2/20

    Hidroenergia 2008, JH 2

    GRP Pipe Solutions in Hydro Power projects.

    Jarle Hausberg,

    APS Norway AS

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    3/20

    Hidroenergia 2008, JH 3

    History of GRP, (Glass fiber Reinforced Polyester)

    GRP composite was developed in USA

    before the second world war.

    A new material with 70 years history!

    From the beginning GRP was used inpipes for the chemical industry due to

    the very good corrosion resistance.

    Today GRP is used in more and more

    applications also due to the highstrength and low weight.

    Flowtite GRP pipes for more

    than 40 years!

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    4/20

    Hidroenergia 2008, JH 4

    Water Supply

    Sewerage

    Power

    Industrial

    Irrigation

    Desalination

    Applications for GRP Pipe

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    5/20

    Hidroenergia 2008, JH 5

    DN100 - 4000mm

    PN1-6-10-16-25-32bar

    Standard length:

    6 and 12 meter (1-18)

    Full fittings program

    GRP Pipe, product range.

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    6/20

    Hidroenergia 2008, JH 6

    Performance standards for GRP pipes

    ASTM American Society for Testing and MaterialsASTM D3517, ASTM D3754, ASTM D3262

    AWWA American Water Works AssociationAWWA C950 and design manual AWWA M45

    ISO International Organization for Standardization

    ISO 10639, ISO 10467

    CEN Comit Europen de Normalisation EN 1796,EN 14364

    Local, national standards and regulations.

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    7/20Hidroenergia 2008, JH 7

    Water is power power is

    money!

    Don't loose it on the

    way!

    Why GRP Pipes in Penstocks?

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    8/20Hidroenergia 2008, JH 8

    Long service life

    Corrosion-resistant material.

    Low maintenance costs. Low Life Cycle Cost

    Less head loss

    Best hydraulic characteristic

    Low friction coefficient

    Essentially constant over time.

    Why GRP Pipes in Penstocks?

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    9/20Hidroenergia 2008, JH 9

    Economical

    Competitive with other traditionally used materials

    Low installation cost, easy to assemble

    Low operating costs and long service life!

    Why GRP Pipes in Penstocks?

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    10/20Hidroenergia 2008, JH 10

    GRP pipes are easily transported, low weight.

    (1/4 of DIP and 1/10 of concrete)

    Environmental friendly, can be nested.

    For hydro power penstocks different solutionsto terrain vehicle has been used, including

    helicopters.

    Handling and installation

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    11/20Hidroenergia 2008, JH 11

    GRP pipes has a unique

    feature for cold and hot

    climate.

    The mechanical propertiesremain the same from +30 to -

    60.

    It doe's not get brittle when it is

    cold.

    The pipe can be installed

    above ground without any

    special UV protections!

    Why GRP Pipes in Penstocks?

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    12/20Hidroenergia 2008, JH 12

    GRP pipes are often installed on

    steep slopes, either buried or above

    ground.

    The challenges of such installations

    must, however, be respected

    Installation on steep Slopes

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    13/20Hidroenergia 2008, JH 13

    A high number of GRP

    penstocks have been built

    around the whole word.

    Only in Norway more than 270

    Flowtite GRP penstocks.

    DN500-2800mm, PN6-32bar.

    A proven solution for more

    than 40 years!

    GRP Pipes in Penstocks, case studies

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    14/20Hidroenergia 2008, JH 14

    GRP Pipes in Penstocks, case studies

    Vangpollen Hydropower

    Norway

    DN700/800mm.PN6-32bar.

    Slope up to 46 .

    Installed 1989

    (3,3MW, horisontal

    Pelton~14,9GWh)

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    15/20Hidroenergia 2008, JH 15

    Vinkelfallet hydro power station:

    Norway

    DN1600-1800mm L=1,6km

    PN6-16

    Installation in 1982

    (7,1MW on two Francis turbines,

    yearly production 25,6GWh)

    GRP Pipes in Penstocks, case studies

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    16/20

    Hidroenergia 2008, JH 16

    SAFA hydro power station,

    Norway

    DN2400/2200mm L=250m

    PN6/10Installed 2005

    Difficult access downside the

    plant required installation with a

    crane on a barge.

    Pipes painted black after

    installation for the environmental

    reason.

    (2,2MW, 2 Francis turbines, 20GWh)

    GRP Pipes in Penstocks, case studies

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    17/20

    Hidroenergia 2008, JH 17

    LANGFJORDEN

    hydro power station,

    Norway

    DN1200mm L=284m

    PN32 (Static pressure 26bar)

    Installed 2005

    Pipeline on fundaments in

    a tunnel from a pressure

    shaft in the mountain.

    Manhole DN1200/500 PN32

    GRP Pipes in Penstocks, case studies

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    18/20

    Hidroenergia 2008, JH 18

    TWIMBERG hydro power station

    Austria

    DN1800mm

    PN10

    L=4,5km (200m in tunnel)

    GRP Pipes in Penstocks, case studies

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    19/20

    Hidroenergia 2008, JH 19

    Fjardara hydro power stations:

    Iceland

    Station 1:

    DN1000mm, L=3,8km

    PN6-35bar (static pressure 33,5bar)

    (6,4MW)

    Station 2:

    DN1000mm, L=3,4km

    PN6-25bar (static pressure 20bar)

    (3,4MW)

    Installed in 2007/2008

    GRP Pipes in Penstocks, case studies

  • 8/13/2019 1. Jarle Hausberg - GRP Pipe Solutions in Hydro Power Projects

    20/20

    Hidroenergia 2008 JH 20

    Environmental friendly

    solutions for the future!

    For generations!!

    Thank you for your

    attention!

    GRP Pipes in Penstocks