1 june 2015 astrogrid-d wp 5: resource management for grid jobs report by: rainer spurzem (zah-ari)...

39
June 18, 2022 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) [email protected] and T. Brüsemeister, J. Steinacker

Post on 18-Dec-2015

221 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

April 18, 2023

AstroGrid-DWP 5: Resource Management for Grid Jobs

AstroGrid-DWP 5: Resource Management for Grid Jobs

Report by:

Rainer Spurzem

(ZAH-ARI)[email protected]

and T. Brüsemeister, J. Steinacker

Report by:

Rainer Spurzem

(ZAH-ARI)[email protected]

and T. Brüsemeister, J. Steinacker

Page 2: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

2AstroGrid-D Meeting April 18, 2023

Meeting 13:10 – 14:30 WG5Meeting 13:10 – 14:30 WG5

Meeting WG5 and friends GridWay Discussion (together with Ignacio Llorente) Expected List of Topics:

The Present Gridway Installation in Heidelberg - Solutions and Problems. Which use cases work? How? Demos or screenshots if available.

how about more than one gridway installation in Astrogrid-D simultaneously at different sites?

cooperation of information system and job submission (in general or in the special cases of our Astrogrid-D information system and Gridway?

miscellaneous (data staging postponed to next session)

Meeting WG5 and friends GridWay Discussion (together with Ignacio Llorente) Expected List of Topics:

The Present Gridway Installation in Heidelberg - Solutions and Problems. Which use cases work? How? Demos or screenshots if available.

how about more than one gridway installation in Astrogrid-D simultaneously at different sites?

cooperation of information system and job submission (in general or in the special cases of our Astrogrid-D information system and Gridway?

miscellaneous (data staging postponed to next session)

Page 3: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

3AstroGrid-D Meeting April 18, 2023

GridWay Leightweight Metascheduler on top of GT2.4/GT4

Central Server Architecture

Support of GGF DRMAA standard API for job submission and management

Simple round robin/flooding scheduling algorithm, but extensible

Meeting 13:10 – 14:30 WG5Meeting 13:10 – 14:30 WG5

Page 4: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

4AstroGrid-D Meeting April 18, 2023

GT4 Resources

hydra.ari.uni-heidelberg.de

Scheduler / Broker

Gridway

Information System

Matchmaking

Job Status: “gwps”

Meeting 13:10 – 14:30 WG5Meeting 13:10 – 14:30 WG5

A practical example with screenshots:A practical example with screenshots:

Page 5: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

5AstroGrid-D Meeting April 18, 2023

Meeting 13:10 – 14:30 WG5Meeting 13:10 – 14:30 WG5

Our View

(Thanks:Hans-Martin)

Our View

(Thanks:Hans-Martin)

Page 6: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

6AstroGrid-D Meeting April 18, 2023

Meeting 13:10 – 14:30 WG5Meeting 13:10 – 14:30 WG5

• D5.1: central resource broker with queue• Present: use GridWay, throughway, round-robin• More Installations useful?

Questions:

• Parameters needed Gridway – Information System (queue status, module availability, data availabilty, hardware)• When is it feasible to have a real brokerage? How?

• D5.1: central resource broker with queue• Present: use GridWay, throughway, round-robin• More Installations useful?

Questions:

• Parameters needed Gridway – Information System (queue status, module availability, data availabilty, hardware)• When is it feasible to have a real brokerage? How?

Page 7: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

7AstroGrid-D Meeting April 18, 2023

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

Porting Use Cases onto the Grid NBODY6++ : Astrophysical Case for direct N-body: Star Clusters, Galactic Nuclei, Black Holes, Gravitational Wave Generation

Special Hardware GRAPE, MPRACE (FPGA), future technologies (HT, Xtoll, GRAPE-DR)

GRAPE in the Grid, Astrogrid-D, International DEISA

Porting Use Cases onto the Grid NBODY6++ : Astrophysical Case for direct N-body: Star Clusters, Galactic Nuclei, Black Holes, Gravitational Wave Generation

Special Hardware GRAPE, MPRACE (FPGA), future technologies (HT, Xtoll, GRAPE-DR)

GRAPE in the Grid, Astrogrid-D, International DEISA

Page 8: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

8AstroGrid-D Meeting April 18, 2023

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

Page 9: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

9AstroGrid-D Meeting April 18, 2023

Jun Makino and colleagues in Tokyo… …support, cooperation, over many years…

N-Body + Grav. Waves @ ARI: Peter Berczik, Ingo Berentzen,Jonathan Downing, Miguel Preto,Gabor Kupi, Christoph EichhornDavid Merritt (RIT, USA)…

in VESF/LSC collaboration:on gravitational wave modelling from dense star clusters:Pau Amaro-Seoane (AEI, Potsdam, D)G. Schäfer, A. Gopakumar (Univ. Jena, D)M. Benacquista (UT Brownsville, USA)

Further collaborations:Sverre Aarseth (IoA Cambridge UK)Seppo Mikkola (U Turku, FIN)

Page 10: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

10AstroGrid-D Meeting April 18, 2023

Globular Cluster ω Centauri(Central Region)

Ground Based View

Page 11: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

11AstroGrid-D Meeting April 18, 2023

Detection of Gravitational Waves? Was Einstein right?

Page 12: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

12AstroGrid-D Meeting April 18, 2023

Example: VIRGO Detector in Cascina near Pisa, Italy

Page 13: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

13AstroGrid-D Meeting April 18, 2023

ijij

jij r

r

mGf

)(

2/322

~N~N ~N^2~N^2

N

ijjiji fa

;1

Basic idea of any GRAPE N-body code:Basic idea of any GRAPE N-body code:

Page 14: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

14AstroGrid-D Meeting April 18, 2023

GRAPE6a, -BL - PCI Board for PC-ClustersPROGRAPE-4, FPGA based board from RIKEN (Hamada)GRAPE7 – new FPGA based board from Tokyo Univ. (Fukushige)GRAPE-DR – new board from Makino et al. NAOJMPRACE1,2 – FPGA boards from Univ. Mannheim/GRACE (Kugel et al.)

GRAPE6a, -BL - PCI Board for PC-ClustersPROGRAPE-4, FPGA based board from RIKEN (Hamada)GRAPE7 – new FPGA based board from Tokyo Univ. (Fukushige)GRAPE-DR – new board from Makino et al. NAOJMPRACE1,2 – FPGA boards from Univ. Mannheim/GRACE (Kugel et al.)

~128 Gflops for a price ~5K USD; Memory for up to 128K particles~128 Gflops for a price ~5K USD; Memory for up to 128K particles

GRAPE6a PCI boardGRAPE6a PCI board

Hardware - GRAPEHardware - GRAPE

Page 15: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

15AstroGrid-D Meeting April 18, 2023

Page 16: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

16AstroGrid-D Meeting April 18, 2023

•32 dual-Xeon 3.0 GHz nodes•32 GRAPE6a•14 TB RAID•Infiniband link (10 Gb/s)•Speed: ~4 Tflops•N up to 4M•Cost: ~500K USD•Funding: NSF/NASA/RIT

ARI 32 node GRAPE6a clustersARI 32 node GRAPE6a clusters

•32 dual-Xeon 3.2 GHz nodes•32 GRAPE6a•32 FPGA•7 TB RAID•Dual port Infiniband link (20 Gb/s)•Speed: ~4 Tflops•N up to 4M•Cost: ~380K EUR•Funding: Volkswagen/Baden-Württemberg

Infiniband Dual 20Gb/s

Page 17: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

17AstroGrid-D Meeting April 18, 2023

ARI-ZAH + RIT GRAPE6a clustersARI-ZAH + RIT GRAPE6a clusters

Performance Analysis (3.2 Tflop/s): Harfst et al. 2007, New Astron.

Page 18: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

19AstroGrid-D Meeting April 18, 2023

HardwareHardware

Page 19: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

20AstroGrid-D Meeting April 18, 2023

Page 20: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

21AstroGrid-D Meeting April 18, 2023

Page 21: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

22AstroGrid-D Meeting April 18, 2023

Page 22: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

23AstroGrid-D Meeting April 18, 2023

Page 23: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

24AstroGrid-D Meeting April 18, 2023

Page 24: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

25AstroGrid-D Meeting April 18, 2023

S.J.Aarseth, S. Mikkola (ca. 20.000 lines):•Hierarchical Block Time Steps•Ahmad-Cohen Neighbour Scheme•Kustaanheimo-Stiefel and Chain-Regular. for bound subsystems of N<6 (Quaternions!)•4th order Hermite scheme (pred/corr)• Bulirsch-Stoer (for KS)

•NBODY6 (Aarseth 1999)•NBODY6++ (Spurzem 1999) using MPI/shmem, copy algorithm•Parallel Binary Integration in Progress•Parallel GRAPE Use (Harfst, Gualandris, Merritt, Spurzem, Berczik, Portegies Zwart, 2007)

Software:High Accuracy Integrators for Systems with long-range force + relaxation (gravothermal)Software:High Accuracy Integrators for Systems with long-range force + relaxation (gravothermal)

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

Page 25: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

26AstroGrid-D Meeting April 18, 2023

by D.C. Heggie

Via www.maths.ed.ac.uk

Larger N needed!

●Baumgardt, Heggie, Hut Baumgardt, Makino

●Harfst, Gualandris, Merritt, Spurzem, Berczik

High Accuracy Integrators: Record with GRAPE cluster at 2 million particles!High Accuracy Integrators: Record with GRAPE cluster at 2 million particles!

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

Page 26: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

27AstroGrid-D Meeting April 18, 2023

Parallel PP on GRAPE6a cluster

Parallel PP on GRAPE6a cluster

ARI Cluster:

~3.2 Tlop/ssustained

ARI Cluster:

~3.2 Tlop/ssustained

Harfst, Gualandris,Merritt, Spurzem,Portegies Zwart, Berczik, New Astron. 2007.

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

Page 27: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

28AstroGrid-D Meeting April 18, 2023

VisualisationVisualisation

WithS. DominiczakW. Frings

John-von-NeumannInstitute forComputing(NIC)FZ Jülich

google for

xnbody

Page 28: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

29AstroGrid-D Meeting April 18, 2023

Xnbody Visualization with FZ Jülich (Unicore) NBODY6++ UseCase in Astrogrid-D (Globus GT4.0)

Simple JSDL Job ok

Parallel Job + GRAPE/MPRACE request

in progress Astrogrid-D Participation in international networks, like MODEST,

AGENA (EGEE) Goal: share and load-balance GRAPE/MPRACE

resources in international grid-based frame

Xnbody Visualization with FZ Jülich (Unicore) NBODY6++ UseCase in Astrogrid-D (Globus GT4.0)

Simple JSDL Job ok

Parallel Job + GRAPE/MPRACE request

in progress Astrogrid-D Participation in international networks, like MODEST,

AGENA (EGEE) Goal: share and load-balance GRAPE/MPRACE

resources in international grid-based frame

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

Page 29: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

30AstroGrid-D Meeting April 18, 2023

International GRAPE-Grid CollaborationInternational GRAPE-Grid Collaboration Members of Astrogrid-D:

ARI-ZAH Univ. Heidelberg, DMain Astron. Obs. Kiev, UA

Candidates:Univ. Amsterdam, NL

Obs. Astroph. Marseille, FFessenkov Obs., Almaty, KZ

Members of Astrogrid-D:ARI-ZAH Univ. Heidelberg, DMain Astron. Obs. Kiev, UA

Candidates:Univ. Amsterdam, NL

Obs. Astroph. Marseille, FFessenkov Obs., Almaty, KZ

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

Page 30: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

31AstroGrid-D Meeting April 18, 2023

NBODY6++ RequirementsNBODY6++ Requirements

Meeting 15:15 – 17:00 Use CasesMeeting 15:15 – 17:00 Use Cases

•Fortran 77 with cpp Preprocessor and make•Data Access for Job Chain•Staging of binary and ASCII input/output

Optional:• Parallel Runs (PBS, mpich-mpif77, mpirun, others)• GRAPE hardware• xnbody direct visualization and interaction interface

Future:• GridMPI, Runs across sites

•Fortran 77 with cpp Preprocessor and make•Data Access for Job Chain•Staging of binary and ASCII input/output

Optional:• Parallel Runs (PBS, mpich-mpif77, mpirun, others)• GRAPE hardware• xnbody direct visualization and interaction interface

Future:• GridMPI, Runs across sites

Page 31: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

32AstroGrid-D Meeting April 18, 2023

Common Workgroup Meeting of WG3 (Distributed Data Management) with WG5 (Resource Management for Grid Jobs) Expected List of Topics:

How can we improve data staging together? Which steps, what is needed, action items, people?

Further Interaction with other WG's e.g. WG7 user interfaces, WG6 Data Streaming, WG1 system integration

Next deliverables 5.4-5.8, others... Open Discussion on sustainability, internationality, EGEE,

followup project, breakout ideas, guided by Goals Last Year

Common Workgroup Meeting of WG3 (Distributed Data Management) with WG5 (Resource Management for Grid Jobs) Expected List of Topics:

How can we improve data staging together? Which steps, what is needed, action items, people?

Further Interaction with other WG's e.g. WG7 user interfaces, WG6 Data Streaming, WG1 system integration

Next deliverables 5.4-5.8, others... Open Discussion on sustainability, internationality, EGEE,

followup project, breakout ideas, guided by Goals Last Year

Meeting 17:30 – 18:30 WG5 with WG3Meeting 17:30 – 18:30 WG5 with WG3

Page 32: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

33AstroGrid-D Meeting April 18, 2023

How can we improve data staging together? Which steps, what is needed, action items, people?

Use Astrogrid-D file management system?

How can we improve data staging together? Which steps, what is needed, action items, people?

Use Astrogrid-D file management system?

Meeting 17:30 – 18:30 WG5 with WG3Meeting 17:30 – 18:30 WG5 with WG3

Page 33: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

34AstroGrid-D Meeting April 18, 2023

WP5: Resource Management for Grid Jobs Tasks

WP5: Resource Management for Grid Jobs Tasks

Task V-1: Specification of Requirements and Architecture

AIP (8), ARI-ZAH (6), ZIB (6), AEI (2), MPE (2), MPA (1)

Start Sep. 05, Deliverable D5.1 Oct. 2006 COMPLETED Task V-2: Development of Grid-Job Management (Feb. 07)

ZIB (24), ARI-ZAH (12), MPA (5)

Start June 06, Deliverable D5.2 Feb. 2007, D5.6 June 2008

5.2 COMPLETED Task V-4 Adaptation of User- and Programmer Interfaces (May 07)

AIP (18), ARI-ZAH (12), AEI (5), MPE (4), MPA (1)

Start Dec. 06 Deliverable D5.4 May 2007, D5.7 Sep. 2008 PENDING

Task V-3 Development Link to Robotic Telescopes, Requests (Feb 07) AIP (17), ZIB (6) , Start Sep. 06 Deliverable D5.3 Feb. 2007, D5.5 Oct. 2007, D5.8 Sep. 2008 IN PROGRESS

Task V-1: Specification of Requirements and Architecture

AIP (8), ARI-ZAH (6), ZIB (6), AEI (2), MPE (2), MPA (1)

Start Sep. 05, Deliverable D5.1 Oct. 2006 COMPLETED Task V-2: Development of Grid-Job Management (Feb. 07)

ZIB (24), ARI-ZAH (12), MPA (5)

Start June 06, Deliverable D5.2 Feb. 2007, D5.6 June 2008

5.2 COMPLETED Task V-4 Adaptation of User- and Programmer Interfaces (May 07)

AIP (18), ARI-ZAH (12), AEI (5), MPE (4), MPA (1)

Start Dec. 06 Deliverable D5.4 May 2007, D5.7 Sep. 2008 PENDING

Task V-3 Development Link to Robotic Telescopes, Requests (Feb 07) AIP (17), ZIB (6) , Start Sep. 06 Deliverable D5.3 Feb. 2007, D5.5 Oct. 2007, D5.8 Sep. 2008 IN PROGRESS

Page 34: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

35AstroGrid-D Meeting April 18, 2023

Meeting 17:30 – 18:30 WG5 with WG3Meeting 17:30 – 18:30 WG5 with WG3

Short Term:•Improve the deployment by pushing the implementation of modules for at least 2-5 pioneer usecases (this year) [D5.4, 5.7]. • Demonstrate the ability to deploy and run these use case on more than one resource using Gridway (this year) [D5.4, 5.7]. • Use first primitive data staging (handing data through). Note: Useful Document GridGateWay 2007-10-05 by HMA et al.Middle Term:• Enable GridWay as AstroGrid-D job manager (May 08) [D5.6] • Solve the problem how to handle data management together with Gridway (Aug 08) [TA II-5] • increase number of use cases and prospective users [D5.4]• Improve international impact / compatibility issues e.g. with EGEE

Short Term:•Improve the deployment by pushing the implementation of modules for at least 2-5 pioneer usecases (this year) [D5.4, 5.7]. • Demonstrate the ability to deploy and run these use case on more than one resource using Gridway (this year) [D5.4, 5.7]. • Use first primitive data staging (handing data through). Note: Useful Document GridGateWay 2007-10-05 by HMA et al.Middle Term:• Enable GridWay as AstroGrid-D job manager (May 08) [D5.6] • Solve the problem how to handle data management together with Gridway (Aug 08) [TA II-5] • increase number of use cases and prospective users [D5.4]• Improve international impact / compatibility issues e.g. with EGEE

Next Steps in WG-5 / WG-3Next Steps in WG-5 / WG-3

Page 35: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

36AstroGrid-D Meeting April 18, 2023

GUI jsdlproc

GT4.0

JSDL RSL/XML

(GT4.2 wird gerade entwickelt und wird JSDL direkt unterstützen)

Entscheidung für dieJob Submission Data Language (JSDL)

wird vom open grid forum (OGF) unterstützt

WG5: Current status,Job Management

Page 36: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

37AstroGrid-D Meeting April 18, 2023

GridWay Leightweight Metascheduler on top of GT2.4/GT4

Central Server Architecture

Support of GGF DRMAA standard API for job submission and management

Simple round robin/flooding scheduling algorithm, but extensible

WG5: Current status,Scheduler/Broker

Page 37: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

38AstroGrid-D Meeting April 18, 2023

GT4 Resources

hydra.ari.uni-heidelberg.de

Scheduler / Broker

Gridway

Information System

Matchmaking

Job Status: “gwps”

WG5: Current status,Scheduler/Broker

Page 38: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

39AstroGrid-D Meeting April 18, 2023

First Steps accomplished toward the integration into AstroGrid Adopted the REMOTE TELESCOPE MARKUP LANGUAGE (RTML)

and developed a first description of STELLA-I This description can contain dynamic information e.g. about weather Developed a generic transformation from RTML to RDF which we can

upload to the AstroGrid information service

(Therefore we modified the program OwlMap from the FRESCO project) The user can use SPARQL queries to find appropriate telescopes. Also SPARQL queries can be implemented in tools like the Grid-

Resource Map.

First Steps accomplished toward the integration into AstroGrid Adopted the REMOTE TELESCOPE MARKUP LANGUAGE (RTML)

and developed a first description of STELLA-I This description can contain dynamic information e.g. about weather Developed a generic transformation from RTML to RDF which we can

upload to the AstroGrid information service

(Therefore we modified the program OwlMap from the FRESCO project) The user can use SPARQL queries to find appropriate telescopes. Also SPARQL queries can be implemented in tools like the Grid-

Resource Map.

STELLA-I

Robotic Telescopes STELLA-I & II

in Tenerife(Canary Islands)

WG5: Current status,Robotic Telescopes

Page 39: 1 June 2015 AstroGrid-D WP 5: Resource Management for Grid Jobs Report by: Rainer Spurzem (ZAH-ARI) spurzem@ari.uni-heidelberg.de and T. Brüsemeister,

40AstroGrid-D Meeting April 18, 2023

Next steps RTML description of STELLA-II, RoboTel and other robotic telescopes Develop a system that adds dynamic weather information Develop transformation from RTML to telescope specific language for

AIP operated telescopes to be able to send observation requests in RTML

Provide access through the AstroGrid by applying Grid security mechanisms VO management

Development of a scheduler for a network of robotic telescopes A lot of testing

The AIP has a simulator for STELLA and RoboTel

Next steps RTML description of STELLA-II, RoboTel and other robotic telescopes Develop a system that adds dynamic weather information Develop transformation from RTML to telescope specific language for

AIP operated telescopes to be able to send observation requests in RTML

Provide access through the AstroGrid by applying Grid security mechanisms VO management

Development of a scheduler for a network of robotic telescopes A lot of testing

The AIP has a simulator for STELLA and RoboTel

WG5: Next Steps,Robotic Telescopes