ME 442 Senior Project Week 8
Dr. Joseph VignolaPangborn G43, Phone 202-319-6132, [email protected]
Tuesdays & Thursdays, 9:40-12:20 AM, Pangborn G43
Office Hours: Tuesdays, 1:00-2:00 PM
2
DocumentationEach member of the group should be sure that you bring ALL electronic files everydaySolidWorks drawings
3
DocumentationEach member of the group should be sure that you bring all electronic files everydaySolidWorks drawingsExcel budget and receipts
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
4
DocumentationEach member of the group should be sure that you bring all electronic files everydaySolidWorks drawingsExcel budget, must be this version or have this information
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
5
DocumentationEach member of the group should be sure that you bring all electronic files everydaySolidWorks drawingsExcel budget, must be this version or have this information
Item(s)Date of purchaseSupplierDate receivedTotal cost (items + shipping and anything else)Who’s credit was used Name of the receipt pdf file
One line per transaction
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
6
DocumentationPlease bring all your electronic files everyday
SolidWorks drawingsExcel budget
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
It’s best to use the document that I started
7
DocumentationPlease bring all your electronic files everyday
SolidWorks drawingsExcel budget
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
It’s best to use the document that I startedIt’s on the class web page
8
Design Support Documents
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
1) Gantt chart A timeline with milestones, component delivery dates, estimated dates of the
completions of sub-tasks. This can be a separate Excel document.
2) Weight and drag budget A document that lists target, design and as-build weight and location for all components
on the plane. Specifically state what are estimates and what was calculated in SolidWorks and what was measured as-built. Include the coordinates of the CGs for all subsystem. The coordinates must be in a defined, single coordinate system and include a figure that shows the plane, coordinate system and centers. This should be in the main MS Word document.
9
Design Support Documents
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
3) Cost budget & parts inventoryA list of all component parts you will include in your plane. You should have links to data sheets. The budget should include all planed expenditures and all money spent by your group related to the project. This is can be a summary of a separate Excel spread sheet. You must save all receipts.
4) Toolbox inventoryA specific list of all tools, bolts and any other hardware with sized. Do not include this in the Excel document. This should be in the main MS Word document.
5) Safety protocolsRead the new School of Engineering Safety document and write a statement that indicates that you have read and will comply with all points of the School of Engineering Safety. This document must be signed by all team members.
10
Design Support Documents
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
3) Cost budget & parts inventoryA list of all component parts you will include in your plane. You should have links to data sheets. The budget should include all planed expenditures and all money spent by your group related to the project. This is can be a summary of a separate Excel spread sheet. You must save all receipts.
4) Toolbox inventoryA specific list of all tools, bolts and any other hardware with sized. Do not include this in the Excel document. This should be in the main MS Word document.
5) Safety protocolsRead the new School of Engineering Safety document and write a statement that indicates that you have read and will comply with all points of the School of Engineering Safety. This document must be signed by all team members.
Plus send Ken your SolidWorks
11
Group Purchases
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
We need to purchase:
chargerCharge level indicator
12
SAE Reports
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
Please don’t resubmit last semesters reports
13
PurchasesI need to see the Excel budgets today and everyday
I want to be sure we are keeping careful track of all expenses.
14
Materials and PurchasingIt is very import that we straighten the budget today
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
15
Materials and PurchasingIt is very import that we straighten the budget today
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
19
ExpediencyBe sure you are making design decisions based on engineering principles.
Please don’t
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
20
MaterialsAsk Ken to bring specific material you need
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
Ken
21
Materials and PurchasingIt is very import that we straighten the budget today There are problems with the credit card
MNEY
22
Materials and PurchasingIt is very import that we straighten the budget today There are problems with the credit card
The card problems include the lost receipts from this class
MNEY
23
Materials and Purchasinge-mail Hong right away to schedule time
She is nicer that I am and will help you
24
Flight Testing
Jim and Ed want to test Tuesday, Feb 25
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
That’s 7 days off
25
Flight TestingI’m hoping that Ken will schedule and do the technical inspection and taxi tests with you
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
…and you have to do the taxi test and technical inspection before the flight test
S M T W Th F S
6 7 8
9 10 11 12 13 14 15
16 17 18 Today 19 20 21 22
23 24 25 Flight Test
26 27 28SAE Deadline
May 1
I’m still working on this but the big issues is
26
Machine ShopPlease work with Don, Hong or anyone that has built things
Show them sketches of ideas and be open to new ideas
This will make it easier for you
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
27
Machine ShopPlease work with Don, Hong or anyone that has built things
Show them sketches of ideas and be open to new ideas Simplify your design
Settle on the details
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
28
Assignment 2Fix assignment 1
A number of groups did not submit assignment 2 or didn’t really update anything
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
29
Assignment 2Fix assignment 1
Toolbox Please just list what you need to carry to the airfield.
Glue that take overnight to dry is probably not appropriate for that list but cyanoacrylate glue (Superglue) is
You should know what each screw is for
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
30
Assignment 2Fix assignment 1
Toolbox Please just list what you need to carry to the airfield.
Glue that take overnight to dry is probably not appropriate for that list but cyanoacrylate glue (Superglue) is
You should know what each screw is forPlease don’t list random items
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
31
Assignment 2Fix assignment 1
Toolbox Please just list what you need to carry to the airfield.
Glue that take overnight to dry is probably not appropriate for that list but cyanoacrylate glue (Superglue) is
You should know what each screw is forPlease don’t list random items ¼” screws
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
32
Assignment 2Fix assignment 1
Toolbox Please just list what you need to carry to the airfield.
Glue that take overnight to dry is probably not appropriate for that list but cyanoacrylate glue (Superglue) is
You should know what each screw is forPlease don’t list random items ¼” screws, a hammer
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
33
Assignment 2Fix assignment 1
Toolbox Please just list what you need to carry to the airfield.
Glue that take overnight to dry is probably not appropriate for that list but cyanoacrylate glue (Superglue) is
You should know what each screw is forPlease don’t list random items ¼” screws, a hammer, weed wacker
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
34
Assignment 2Fix assignment 1
Toolbox Please just list what you need to carry to the airfield.
Ask Jason, Hong, Ken or me what you really need
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
35
Money
Lets start with the group that has the most people here
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
36
Money
Thanks for the help resolving the credit card issues
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
37
Flight Testing
Jim and Ed want to test Monday, Feb 24
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
38
Flight Testing
Jim and Ed want to test Monday, Feb 24
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
S M T W Th F S
6 Today 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 Flight Test
25 26 27 28 29
I’m still working on this but the big issues is
39
Flight Testing
Jim and Ed want to test Monday, Feb 24
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
…and you have to do the taxi test and technical inspection before the flight test
I’m still working on this but the big issues is
S M T W Th F S
6 Today 7 8
9 10 11 12 13 14 15
16 17 18 tech insp taxi test
19 20 21 22
23 24 25 Flight Test
26 27 28 1
40
So Given the Calendar
Work with Ken, Hong, Don, and Me
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
41
Flight Test
I would like you to make all the arrangements regarding getting up to the airfield Tuesday.
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
42
Money
Thanks for the help resolving the credit card issues
Today we can start with group ?
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
43
Myths and TruthsMyths Gorilla Glue is no stronger than ordinary carpenters glue
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
44
Myths and TruthsMyths Gorilla Glue is no stronger than ordinary carpenters glue You can make a part bigger then the travel range of the CNC machine
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
45
Myths and TruthsMyths Gorilla Glue is no stronger than ordinary carpenters glue You can make a part bigger then the travel range of the CNC machine
Ken brought enough wood for everyone
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
Ken
46
Myths and TruthsMyths Gorilla Glue is no stronger than ordinary carpenters glue You can make a part bigger then the travel range of the CNC machine
Ken brought enough wood for everyone
Purchase always come through as hoped
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
47
Myths and TruthsTruthsRound holes are easier to make then not round holes
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
48
Myths and TruthsTruthsRound holes are easier to make then not round holes
Hong needs some sleep
Taken from http://patheoldminer.rootsweb.ancestry.com/faybuffington.html
52
Mass and Aerodynamic Centers Weighted averages. Pick an origin, make a table
x
y
component Mass (kg) x-location (cm)
engine 0.45 -3
fuselage 2.1 75
Wing 2.3 27
Front landing gear 0.35 12
Rear landing gear 0.64 34
Fuel tank 0.33 8
Radio reciever 0.25 7
tail 0.75 150
Payload
Total 7.17 319
53
Mass and Aerodynamic Centers Weighted averages. Pick an origin, make a table
x
y
component Mass (kg) x-location (cm)
engine 0.45 -3
fuselage 2.1 75
Wing 2.3 27
Front landing gear 0.35 12
Rear landing gear 0.64 34
Fuel tank 0.33 8
Radio reciever 0.25 7
tail 0.75 150
Payload
Total 7.17 319
51.2 cm
54
Mass and Aerodynamic Centers Each component that is exposed to the exterior flowHas a net drag force that acts on that component
The magnitude of that force is
51.2 cm
These drag forces occur at specific locations
These location must be determined
Once you have them
x
z
55
Mass and Aerodynamic Centers Each component that is exposed to the exterior flowHas a net drag force that acts on that component
The magnitude of that force is x
z
51.2 cm
These drag forces occur at specific locations
These location must be determined
Once you have them
57
Mass and Aerodynamic Centers Once you have them Then sum forces andmoments
mg
thrust
Wing drag
tail drag
fuselage drag
58
Mass and Aerodynamic Centers Once you have them Then sum forces andmoments
mg
thrust
Wing drag
tail drag
fuselage dragx
z
59
Mass and Aerodynamic Centers Once you have them Then sum forces andmoments
mg
thrust
Wing drag
tail drag
fuselage dragx
z
60
Mass and Aerodynamic Centers Once you have them Then sum forces andmoments
mg
thrust
Wing drag
tail drag
fuselage dragx
z
61
Mass and Aerodynamic Centers Once you have them Then sum forces andmoments
mg
thrust
Wing drag
tail drag
fuselage dragx
z
62
Mass and Aerodynamic Centers This summing for moments is precisely the same as the weighted average
x
z
51.2 cm
component Net drag (N) z-location (cm)
x-location (cm
fuselage 2.7 5 44
Wing 15.3 17 45
Front landing gear
3.5 -12 34
Rear landing gear
5.8 -11 76
tail 13.7 21 125
Total 40.7
63
You MUST include this informationThis summing for moments is precisely the same as the weighted average
x
z
51.2 cm
component Net drag (N) z-location (cm)
x-location (cm
fuselage 2.7 5 44
Wing 15.3 17 45
Front landing gear
3.5 -12 34
Rear landing gear
5.8 -11 76
tail 13.7 21 125
Total 40.7
So have a figure with YOUR plane, a coordinate system, and the location of the centers
64
Design to Meet ObjectivesThe objectives are requirements and constraints
Requirements and constraints are separate
Requirements: what you are expecting from the full system or subsystem
Constraints: what you are stuck with
They must be specific
65
Design to Meet ObjectivesThe objectives are requirements and constraints
Requirements and constraints are separate
Requirements: what you are expecting from the full system or subsystem
Constraints: what you are stuck with
They must be specific
Landing gear must be strong enough
66
Design to Meet ObjectivesThe objectives are requirements and constraints
Requirements and constraints are separate
Requirements: what you are expecting from the full system or subsystem
Constraints: what you are stuck with
They must be specific
Landing gear must be strong enough
Must remain elastic for 3 f/s vertical fall will transferring less that a 2 g impulse to the fuselage
Requirements and ConstraintsThere MUST be requirements and constraints for the plane itself Every subsystem MUST have bulletined requirements and constraints listed separately
The should have numbers and be specific
Fuselage RequirementsHold: 4 cell battery (based on 6 minute flight)z57 model radio receiver (with link to data sheet)27 lbs payload at plane’s unloaded CG and wing’s CLRemovable wing mount able to transfer 42 lbs from wing to fuselage. Engine mount within ± ½ in of current estimate of plane’s aerodynamic centerTransfer 2 x planes full weight (84 lbs) to landing gear…
Support 2.5 lb horizontal force generated by tail with rudder at full deployment…
69
ME 442 Senior Project Week 3
Dr. Joseph VignolaPangborn G43, Phone 202-319-6132, [email protected]
Tuesdays & Thursdays, 9:35-12:25 AM, Pangborn G43
Office Hours: Tuesdays, 1:00-2:00 PM
Week 3
Please email your t-shirt size to Ms. Hicks and Nicole Bull
Today I would like to see Excel budgets