Page 1: 1 Metro Green Line to LAX

1

March 2012

Metro Green Line to LAX Alternatives Analysis

Page 2: 1 Metro Green Line to LAX

2

March 2012 The Crenshaw/LAX Project…

• 8.5 mile extension

• Metro Exposition Line (Crenshaw Exposition) to Metro Green Line (Aviation/LAX Station)

• 6 new stations (+2 stations as construction bid options)

• New maintenance facility

• Builds first mile of Metro Green Line Extension to Aviation/Century Station

• Forecasted opening: 2018

B

A

A

B

Foundation for Metro Green Line to LAX

Page 3: 1 Metro Green Line to LAX

3

March 2012 Metro Green Line to LAX Project Overview

• Goal: Connect the regional transit network to LAX

• Connection can take many forms • Long Range Transportation Plan

• Metro funding: $200 M (Measure R) • Opening year 2028 (could be as soon

as 2018-2020 with funding from America Fast Forward, the airport and/or other sources)

• Additional non-Metro funding will need to be secured

Airport

FutureMetro Rail

Page 4: 1 Metro Green Line to LAX

4

March 2012 Additional funding is required

• Measure R funded project: $200M ($2008) All rail alternatives (including light rail and automated people mover) require much more than this

• Project is contingent upon additional contributions from Los Angeles World Airports (LAWA) and/or other sources

• This planning process identifies feasible alternatives and develops preliminary cost estimates to determine funding needs

• Until funding is secured, no project can be adopted for construction

• Less expensive projects may have a higher likelihood of implementation

$200M

Total Cost of Alternative

Measure R Additional Funding Required

Page 5: 1 Metro Green Line to LAX

5

March 2012

Minneapolis (MSP) 32.0 million*

Metro Transit

Miami (MIA) 35.7 million*

Metro Rail MIA

Mover (APM)

New York (JFK) 46.5 million*

AirTrain (APM)

Funding U.S. Airport Transit Systems

59.1 million annual passengers passed through LAX in 2010

*Annual Airport Passengers (2010)

San Francisco (SFO) 39.3 million*

BART AirTrain(APM)

Airport System Funding Contributions ($M)

(indexed to 2010$)

Total Capital Cost ($M)

(indexed to 2010$)

$2,347

$2,338

$1,014

$724

$509 Airport $770 Local $180 State $888 State

$2,338 Airport

$262 Airport $557 Local $195

State

$88 Airport

$85 Local

$122 State $429 Federal

Page 6: 1 Metro Green Line to LAX

6

March 2012 Types of Connections

Direct Light Rail Transit (LRT) Branch • Metro goes to the airport • Metro Green Line direct connection

Circulator • Airport (Circulator) goes to Metro • New transit system tailored to address the airport’s

unique travel demands/operating environment

Intermediate LRT and Circulator • Metro (LRT) and Airport (Circulator) meet in the middle

Modified LRT Trunk • Metro goes through the airport • Direct connection for Metro Green & Crenshaw/LAX lines • Parallels an alignment to be constructed as part of the

Crenshaw/LAX line

Page 7: 1 Metro Green Line to LAX

7

March 2012 Modes

Light Rail Transit (LRT)

Automated People Mover (APM)

Bus Rapid Transit (BRT) (Elevated Busway)

Page 8: 1 Metro Green Line to LAX

8

March 2012 Alignments

On-Airport (in Terminal area)

Off-Airport

Page 9: 1 Metro Green Line to LAX

9

March 2012 Two-Stage Screening Process

Direct LRT Branch

Circulator

Intermediate LRT & Circulator

Modified LRT Trunk

Initial Connection Concepts

(27)

Screened Alternatives

Alternative

Alternative

Alternative

Alternative

Alternative

Alternative

Stage II Screening

Alternatives Carried into EIS/EIR

Additional Funding needs to be Identified

Build Alternative

Build Alternative

Mode + Alignments

Mode + Alignments

Mode + Alignments

Mode + Alignments

Stage I Screening

Page 10: 1 Metro Green Line to LAX

10

March 2012

We Screen Alternatives Using Common Evaluation Criteria

Stage I – Emphasizes Feasibility

Stage II – Emphasizes Performance and Cost > Travel Time > Reliability > Convenience > Construction Cost

• (Metro only has $200M available, all rail alternatives cost much more than this)

> Potential Environmental Impacts (e.g., visual, traffic)

> Operating Characteristics > Constructability > Compatibility with airport and

transportation system plans

> Mode • Appropriate for Connection

Type > Off-Airport

• Physical fit and constructability • Avoid encroachment into

Runway Protection Zone (RPZ) > On-Airport

• Walking distance from station to terminal

• Average total travel time (transit ride + walk)

• Construction cost

Page 11: 1 Metro Green Line to LAX

11

March 2012

Stage I Screening

Stage I Stage II

Page 12: 1 Metro Green Line to LAX

12

March 2012

Off-Airport Options – Direct LRT Branch

Stage I Stage II

Station and Route Options*

* Exact route and station location dependent on future LAX plans in area

98th North

Century Blvd

Pedestrian Bridge

Page 13: 1 Metro Green Line to LAX

13

March 2012

Stage I Stage II

Century Blvd

98th St

Off-Airport Options – Circulator

Page 14: 1 Metro Green Line to LAX

14

March 2012

Off-Airport Options – Intermediate LRT & Circulator

Stage I Stage II

* Exact route and station location dependent on future LAX plans in area

98th North

1994 SEIR

Station and Route Options*

Pedestrian Bridge

Page 15: 1 Metro Green Line to LAX

15

March 2012

Off-Airport Options Modified LRT Trunk

Stage I Stage II

Through LAX

Airport Blvd

Airport Blvd with Circulator Through LAX

Connection to Existing Metro Green Line Aerial

Structure near Douglas St

Page 16: 1 Metro Green Line to LAX

16

March 2012 On-Airport Options* Rail & BRT Alignments and Station Options

Aerial Or

Tunnel

Stage I Stage II

Aerial

At- grade

Rail Alignment Bus Alignment Potential Station

* Apply to Direct LRT Branch, Circulator and Intermediate Connection Types

Tom Bradley International Terminal TBIT

Page 17: 1 Metro Green Line to LAX

17

March 2012

On-Airport Options – Balancing Cost and Travel Time

Capital Cost

2 3 4 5 8

2.5x

2x

1.5x

1x

0x

Number of Stations

Cos

t

Average Travel Time (Min)

1

0.5x

3x

2 3 4 5

10

8

6

4

0

Number of Stations

Trav

el T

ime

1

2

12

Aerial Alignment (Rail)

Stage I Stage II

8

With More Stations… • Capital Costs increase • Walk distance and walk time

decrease • Total travel times (transit ride +

walk) • decrease from 1 to 3

stations • but then increase with 4 or

more stations

Page 18: 1 Metro Green Line to LAX

18

March 2012

Tunnel (Rail)

Aerial (Rail)

On-Airport Options – 4 Alignments Carried Forward All rail options require additional funding

Stage I Stage II

Aerial (Rail) Lowest Rail Cost Best Average Travel Time

Balances Cost and Travel Time At-Grade (BRT)

Lowest Cost and Walk Time

Page 19: 1 Metro Green Line to LAX

19

March 2012 Stage I Screening Results

Direct LRT Branch 6 Alternatives

Circulator 8 Alternatives

Intermediate LRT & Circulator 8 Alternatives

Modified LRT Trunk 5 Alternatives

27 Alternatives Carried into Stage II Screening

Stage II Stage I

Page 20: 1 Metro Green Line to LAX

20

March 2012

Stage II Screening

Page 21: 1 Metro Green Line to LAX

21

March 2012

Trade-offs Passenger Convenience

Stage II Stage I

1-2

1

5,300-5,400

4,700-4,900

4,700-6,100 16

2-4

4-6

11

9

7

4,900-5,400

4,600-5,100

3,600-4,300

Intermediate LRT & Circulator

Modified LRT Trunk

0-1

Average Travel Time Saved (min)

Number of Transfers

Capital Cost ($M) ($200M is available)

Direct LRT Branch

Circulator (APM/BRT)

Airport Transit Riders per Day**

1-4

$540 - $1,160

$624-$1,250 (APM)

0-1 2-4

$680-$1,370 (APM)

$940-$1,460

$120-140 (BRT)

Average travel time saved/added dependent on station location

Alternative Connection

Types Vertical Level

Changes

**Depending on future airport plans, alternatives have 5,000-10,000 additional riders who drive to the LAX area and ride to terminals.

Page 22: 1 Metro Green Line to LAX

22

March 2012

T T T T

T T T

T

5,300-5,400

6,100 25

29-30 5,300-5,400 $540-$1,160

$940-$1,130

Trade-offs Direct LRT Branch vs. Through LAX

Stage II Stage I

Average Travel Time* (minutes)

Ridership** (Transit Riders per Day) Constructability Issues Capital Cost ($M)

($200M is available)

Direct LRT Branch

Through LAX

Alternative

T T T T

T T T

T

*Average from Norwalk, Expo, and South Bay

*Average from Norwalk, Expo, and South Bay

**Add 5,000 to 10,000 for airport area park and ride passengers

**Add 5,000 to 10,000 for airport area park and ride passengers

Page 23: 1 Metro Green Line to LAX

23

March 2012

$110-$130

820

820

600

200

32.2

31.5

31.2

34.3

Aerial (Rail)

Trade-offs Alignments in the Airport Terminal Area

Stage II Stage I

On-Airport Options

Average Total Travel Time to Terminal (min)

Capital Cost ($M) ($200M is available)

Average Walk Dist. to Terminal (feet)

Potential Visual Impacts to Theme Building

Tunnel (Rail)

Aerial (Rail)

At-Grade (BRT)

$1,060-$1,270

$1,040-$1,250

$620-$740

Add 5-10 minutes under severe traffic congestion

Page 24: 1 Metro Green Line to LAX

24

March 2012

T T T T

T T T T

T T T T

T T T T

T T T T

T T T T

2 29-30

3.3

4

4

31-32

31-32

29-30

540-1,160

470-1,080

620-1,270

600-1,240

Trade-offs Century Boulevard vs. 98th Street

Stage II Stage I

Alternative

Average Travel Time (minutes)

Potential Impacts Visual, Traffic/Access

98th St Century Blvd Average Number of

Vertical Level Changes Capital Cost (millions)

PRELIMINARY

T T T T

T T T T

Direct LRT Branch

Circulator

Average from Norwalk, Expo, and South Bay

Page 25: 1 Metro Green Line to LAX

25

March 2012 Breakout Sessions

Stage II Stage I

#1 Passenger

Convenience

#2 Direct LRT Branch vs.

Through LAX

#3 On-Airport Alignments

#4 Century Blvd.

vs. 98th Street

•Ten minutes per station •Bell will ring when it is time to move to the next station •Rotate clockwise through the tables •Return to seats for a recap

Page 26: 1 Metro Green Line to LAX

26

March 2012 Upcoming Activities

Community Workshops

(February-March)

Metro Board Meeting

(April)

Environmental Scoping Meetings

(Late Spring)

Environmental Document

Preparation (2012-2013)

Stakeholder Outreach and Coordination with LAWA