1 Mitigation Program Summary • Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to meet municipal demand on the Monterey Peninsula • Includes both direct and indirect measures to protect and manage natural Monterey Peninsula Water Management District

Upload: hunter-schmitt

Post on 27-Mar-2015

228 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

1

Mitigation Program Summary

• Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to meet municipal demand on the Monterey Peninsula

• Includes both direct and indirect measures to protect and manage natural resources

Monterey Peninsula

Water Management District

Page 2: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

2

Prior Programs Incorporated into the Mitigation Program in 1991

• Carmel River Management Program• Irrigation Program• Interim Relief Program• Emergency Irrigation Program• Hydrologic monitoring and reporting

(stream gaging, groundwater levels and quality, water use by water distribution systems and private wells)

• Carmel River lagoon habitat monitoring

Page 3: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

3

Direct Measures

• Fish rescue, rearing, habitat improvement

• Streambank and channel restoration

• Irrigation of Carmel River riparian corridor

• Vegetation management/modification and augmentation

• Seaside basin injection/recovery

Page 4: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

4

Indirect Measures

• Conservation - e.g. property inspection/retrofits, studies for Pebble Beach reclamation project

• Enforcement of Ordinances/Rules and Regulations for water use and activities along the Carmel River

•Management of limited water supplies

•Monitoring programs (fishery, wildlife, vegetation, water quality and quantity)

Page 5: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

5

Total = $5,677,400

Capital Projects Fund$2,882,300(51%)

Mitigation Fund

$2,068,800(36%)

Conservation Fund $726,300(13%)

FY 2003-04 Budget - Revenues by Fund

Page 6: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

6

Mitigation Program Revenues 1992-2004

Page 7: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

7

Mitigation Program Expenditures 1992 to 2004

Page 8: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

8

Mitigation Program Revenues and Expenditures 1992-2004

Page 9: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

9

Comparison of Planned and Actual Mitigation Program Expenditures 1992-2004

Page 10: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

10

SUMMER/FALL PUMPING in the CARMEL VALLEY ALLUVIAL AQUIFER

Above Robinson Canyon Bridge

Sept. 1984

Dec. 1989

Page 11: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

11

FISHERIES PROJECTS

Approximately $1.55 million between 1993 and 2003

Page 12: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

12

EROSION PREVENTION

Approximately $1.04 million between 1993 and 2003

Page 13: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

13

Degradation in Perennial Areas Appears to be Halted for Now

Above Robinson Canyon Bridge

May 2002

Page 14: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

14

Degradation in theLower Carmel River Continues

March 2003

See Next Slide

Page 15: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to

15

2004 Bank ErosionLower Carmel River

April 12, 2004