The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE (Page 1 of 13) PERSONAL DETAILS Name : Dinh Quang Nham Date of Birth : Dec 2, 1981 Age : 35 Gender : Male Identification No. : 273480747 Passport No. : B3074541 Marital Status : Married Citizen of : Vietnam Hand Phone : +84906674787 or +8487852617 Email : [email protected] ; [email protected] Position Applied : Welding Engineer & Piping/Structure, QA/QC Supervisor/Expediter EDUCATION 2006: Bachelor Degree of Mechanical Engineering University of Technical Education of Ho Chi Minh City - Vietnam, License, License 519173 2006: Teacher Training Certificate Level 2, University of Technical Education of Ho Chi Minh City - Vietnam, License 11408 PROFESSIONAL QUALIFICATIONS CSWIP 3.1 Welding Inspector - CSWIP 3.1 - (Issued by TWI Certification Ltd, Granta Park Great Abington Cambridge, CB21 6AL United Kingdom) (CSWIP 3.1 Certificate No 80569) RADIOGRAPHIC INTERPRETATION - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/245-13/RI (Expire on 21 Oct 2018) ULTRASONIC TESTING - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/037-14/UT (Expire on 03 Apr 2019) MAGNETIC PARTICLE TESTING - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/037-14/MT (Expire on 03 Apr 2019) LIQUID PENETRANT TESTING - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/037-14/PT (Expire on 03 Apr 2019) Tropical Basic Offshore Safety Induction & Emergency Training (T-BOSIET). License 1145550180114012 (Expire on 07 Jan 2018) Tropical Further Offshore Safety & Emergency Training (T-FOSET) License S1010808201202 (Expire on 08 Aug 2015)

Upload: dinh-quang-nham

Post on 09-Jan-2017

134 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 1 of 13)

PERSONAL DETAILS

Name : Dinh Quang Nham

Date of Birth : Dec 2, 1981

Age : 35

Gender : Male

Identification No. : 273480747

Passport No. : B3074541

Marital Status : Married

Citizen of : Vietnam

Hand Phone : +84906674787 or +8487852617

Email : [email protected]; [email protected]

Position Applied : Welding Engineer & Piping/Structure, QA/QC Supervisor/Expediter

EDUCATION

2006: Bachelor Degree of Mechanical Engineering University of Technical Education of Ho Chi Minh City - Vietnam, License, License 519173

2006: Teacher Training Certificate Level 2, University of Technical Education of Ho Chi Minh City - Vietnam, License 11408

PROFESSIONAL QUALIFICATIONS

CSWIP 3.1 Welding Inspector - CSWIP 3.1 - (Issued by TWI Certification Ltd, Granta Park Great Abington Cambridge, CB21 6AL United Kingdom) (CSWIP 3.1 Certificate No 80569)

RADIOGRAPHIC INTERPRETATION - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/245-13/RI (Expire on 21 Oct 2018)

ULTRASONIC TESTING - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/037-14/UT (Expire on 03 Apr 2019)

MAGNETIC PARTICLE TESTING - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/037-14/MT (Expire on 03 Apr 2019)

LIQUID PENETRANT TESTING - Level II - ASNT SNT-TC-1A NDE - Center for Non-Destructive Evaluation, License NDE/037-14/PT (Expire on 03 Apr 2019)

Tropical Basic Offshore Safety Induction & Emergency Training (T-BOSIET). License 1145550180114012 (Expire on 07 Jan 2018)

Tropical Further Offshore Safety & Emergency Training (T-FOSET) License S1010808201202 (Expire on 08 Aug 2015)

Page 2: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 2 of 13)

Successfully completed the training course Welding inspector level II. License GSH/07-01 402/TDTNLDK

Successfully completed the training course WPS application, and establishment, welder qualification. License 06/001.334/TDTNLDK

Successfully completed training course NDT Magnetic testing level II & Radiograph testing level I

MANAGEMENT PRODUCTION COSTS, SAM Institute of Management Skills, License 764 SAM 2011

Successfully completed the training course AutoCAD at College Occupation Engineer HCMC

Successfully completed the training English level B at HCMC technical and economic college

Can read and understand ASME section IX, Section VIII Div 1, ASME section II , ASME Section I, API 1104, ASME B31.3 piping process , B31.1 Power Ping, API 5CT , AWS D1.1, DNV-OS-F101…& EN standard. Work well under high pressure, Ability to work independently. Language: English fluently. Computer: Word, Excel, AutoCAD, Ms Project. Note: For CSWIP 3.1 Welding Inspector Certificates can be verified online directly.

For (SNT-TC-1A) Level II Certificates can be verified online directly Website: http://www.nde.com.vn

CAREER SUMMARY

I have over 10 years of extensive working performance and experience in quality control and quality assurance procedures and supervised gained whilst working in various engineering environments for major projects, international projects, worked for different foreign Contractors & Owners. Positions held have included Mechanical Engineer, Piping Supervisor, Welding & Piping Inspector, Structural Inspector, QC Team Leader and Surveyor acting on behalf of the Certification Authority as well as Nondestructive Testing Inspector for various onshore and offshore projects. This involved in the shop prefabrication to site construction, quality assurance and quality control for steelworks as material receiving inspection, prefabrication, blast and paint, field assembly, installation, inspection, testing, handover works for steel structures, piping, storage tanks, pressure vessels, equipments in Thermal Power Plant, Onshore Pipeline fabrication skid etc. More other phases of the works in oil & gas industries including onshore fabrication, load out, off shore modification, Huc-up replacement activities, etc. And here are the companies that I have worked through different projects, and the different positions in each company.

PROFESSIONAL EXPERIENCE

Page 3: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 3 of 13)

17 May 2016 to Present Nooter/Eriksen AHAT-III DEMONSTRATION PROJECT QA/QC Inspector

- Verified all materials, including welding consumable come in. Conduct inspection of all ongoing activities for structural fabrication

- Witness inspections for all piping material deliveries. Attend all structural inspection with main contractor/Vendor representatives.

- Identifying and reporting to the QC Manager and/ or Engineer for any non-conformances. Maintain good record keeping of activities carried out and inspection reports, surveillance reports, etc.

- Carry out statistical analysis of the inspection and test result to improve quality control operations on site, to verify testing compliance and to advise the QC Manager and/ or Engineer of the results.

- Verify Use of Accepted Weld Procedures, Sandblast/Paint Thickness, Verify Identification marking and Carry out all inspections/surveillances as required by the relevant ITP

- Check the drawings and documents used at site for approvals and compliance with project requirements. Ensure that all works are carried out as per the approved method statements and drawings.

- Instruction, Reviewed approval vendor do PQRs/WPSs, qualify Welder, issued certificates with respect to ASME or AWS. Final inspection and document review. And issued Inspection Release Certificate for vendor prepare packing

21 Mar to 31 May 2016 CMI Energy. VALLEY ENERGY CENTER PROJECT / CPV CMI ENERGY PROJECT QA/QC Inspector

- Initial visit to this supplier will have a goal to establish validation of their Quality control program, and that they are fully implementing their QA system.

- Verify that all quality records and inspections are documented for collection into an “end of manufacturing book” (MDB)

- Inspections shall be done on the work and testing in process, and document reviews. Verify supplier compliance to CMI specifications, customer specifications, and adherence to welding code rules. Essentially monitoring that Metacor is controlling and monitoring and testing for Quality in all aspects.

- Written reports with photos are to be submitted as the inspection report.

- Inspector is to report all non-conformance issues, and noted schedule deviations immediately.

- The MDB shall be work in progress and reviewed for accuracy by the inspector

- ITP points of Witness or Monitoring shall be noted in the inspection report as monitored or witnessed in process.

21 Dec 2015 to Present ABS Consulting Inc. (Part time)

Welding Engineer & Piping & Structure Supervisor/Expediter & QC inspector

Page 4: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 4 of 13)

- CA Representative for verification of procured primary structural steel, Atmospheric Vessels, Storage Tanks, Fire Water Tank, Sulphuric Acid Tank, Phosphoric Acid Tank ans Stack materials, witnessed inspection and certified pWPSs/PWRs/WPSs, welder qualification test for NPK Plan Project of Dam Phu My-PMFC.

I involved to heat recovery steam generator pengerang power project

- Monitor and manage the progress fabricate by the contractor.

- Monitor all quality control of the project

- Reviewed approve PQRs/WPSs, Welder certificates with respect to ASME or AWS

- Verified all materials, including welding consumable come in.

- Made weekly reports including expediting report – pictures, manufacturing, report, Video report sent to Siemens’s head offices in Germany.

- Review QA documents such as MDR.

- Reviewed inspection Packing List and inspect finished goods.

Nov, 2014 to Present: VELOSI Group QA/QC Inspector I involved to Project Steam Boiler Burner Package, NSRP Complex Project and Exhaust Stack Project and Oil Removal Package project with clients as below

Nghi Son Refinery and Petrochemical Limited Liability Company

Steam Boiler Burner package project

Exhaust Stack Project

- I worked represent the company, nooter/eriksen, BUMIARMADA verify quality for item Steam Boiler Burner, Subcontractor is John Zink Hamworthy Combustion and Vendor is Vina offshore. SK Engineering verify quality for item Fired Heater, Subcontractor is JNK Heater Co,.Ltd and Vendor is POSCO E&C. and NSRP PPU Project PEB(PRE-ENGINEERED BUILDING) at Vendor KIRBY South East Asia Co., Ltd & Vendor): Peerless Asia Pacific Pte Ltd, PVD Tech.

- I have to checked /inspection/reviewed for piping, structural, insulation, painting material, material test certificate, identification, transfer of material marking of Materials.

- During Fabrication and Inspection: I have to check dimension, fit-up and monitoring welding activities. Verify welder’s certificates, Welding consumable.

- Verified NDT reports, manufacture data record, final inspection, witness function test and issued Inspection Release Certificate for vendor prepare packing.

Page 5: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 5 of 13)

Mar, 2012 to 21, Dec 2015: PTSC OFFSHORE SERVICES JSC Piping Supervisor –Welding Engineer (Working as Project) I involved to Project below and clients as below:

I involve to Project below:

Thai Binh - Ham Rong Gas Distribution And Gathering System Project, Block 102&106, Phase 01 project.

Maharaja Lela South Project

01Jan 2014-HCG-EOR FSS Project – P17 & P18 Infield Pipeline Package – JVPC Client

EPCIC For Flowline And Gaslift Of 15P Well- Client Was Petronas

TOPAZ-EPCIC Low Pressure System Project- Client Was Petronas

EPCIC Flare Tip & Dip modification for pearl platform project- Client Was Petronas

Fabricated /Huc-up RBDP-B Gas Lift Project of client is PC VIETNAM.

Su Tu Nau Field Development–Wellhead Platforms And Pipelines- Client Was CLJOC

Huc-Up SU TU TRANG project of client was CUU LONG JOC

Thang Long – Dong Do Field Block 01/97 – 02/97 Project- client was LSJOC

Zawtika Development Project, Phase 1A oversea in Myanmar.

Spools & Spreaders Transportation Stands and Sea fastening (Subsea Seven) Project

Lan Tay Produced Water Facilities Expansion Client TNK Viet Nam

FPSO-Block 12W Development Modification Project of Client Primier & FPSO LEWEK EMAS.

Huc-Up WPH-HT1 Bien Dong POC Project

Page 6: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 6 of 13)

From 01 Apr 2015 to 21.Dec.2015: To monitor subcontractor issued schedule fabricating piping spools, pipe support, pipe racks, platform, blasting, painting at workshop in the Hai Phong province. Request subcontractor issued plan loading piping spools, pipe support, pipe rack to Thai Binh site.

Have to meeting with client’s supervisor at 18h pm every day; notify my schedule for next day.

To management and administration of all meetings related to the progress, quality control of the project

I have to management, make organizational communication channel between subcontractors, vendors. Contact investors to a meeting to discuss work plans and accept the phased completion.

Management schedule qualified welder.

Issued pWPSs,PQRs and WPSs for pipeline, applied API 1104. From 03 Mar 2015 to 30 Mar 2015. I involved to control, installation TBHR Jacket and topside project at the offshore. Monitoring subcontractor was Saburakencana. From Feb 2015 - FLET, Top of Riser Breakout, Bottom of Riser Retrofit Support Structure, Bridging Spool, Tie-In Spools and Vertical Riser Pre-Metrology (CRA) of Woodside Energy Limited – Persephone WP2 Development and Echo Yodel Decommissioning Project. Clients are Subsea 7 Australia Contracting Pty Ltd & Woodside Energy Ltd. From 01 Oct 2014 – Maharaja lela south project, project particular Specification for CRA Clad Pipe Field welding. I have to prepared Preliminary Welding Procedure Specification (pWPS) and NDT, Mechanical test matrix and run Procedure Qualification record for material Flange A 694 clad 625 to pipe API X60 Clad 625, Bend API X60 clad 316L to API X60 pipe clad 625, Pipe API X60 Clad 316 to Insert weld olet A/SA 182 F51. .with consumable GTAW: ER NiCrMo-3/ SMAW: E NiCrMo-3. Fabricated pipeline spools and riser spools. 01 Sep 2014-Thai Binh - Ham Rong Gas Distribution And Gathering System Project, Block 102&106, Phase 01. Monitor vendor fabrication and written pWPSs, PQRs/WPSs for Piping & accessories at Gas Distribution Center & Land Fall Station. I have to Raw Material inspection, Head forming inspection, review ITP, WPS/PQR, Weld Overlay, radiographic interpretation of subcontractor and all document, procedures relate to fabricate progress for 06 packages below:

Corrosion inhibitor skid

- Manual Valves for LFS & GDC

- Filter Separator, LP Separator, Fule gas Receiver “U-Stamp”

- HP Separator/ Close Drain Vessel- CDV Pump- Nitrogen Skid/Instrument Air. “U-Stamp”

- Condensate Heater, Fuel gas Supper heater, air cooled heat exchanger-“U-Stamp”

- Flare System (knockout drum -Pressure Vessel with code design ASME VIII Div 1. And piping system.

I’m working for LSJOC as a Welding - QC Engineer, Site Representative (Part time)

Now I’m also working for LSJOC as a Welding - QC Engineer, Site Representative on behalf of THANG LONG – DONG DO FIELD BLOCK 01/97 – 02/97 with responsibilities for monitoring shop fabrication and field assembly of fifteen Flow line including steel structures and piping systems in order to ensure that quality control system is met applicable Codes, Standards and Project requirements for LAMSON JOC, Also responsible for the review and auditing of PVD OFFSHORE

Page 7: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 7 of 13)

Contractor compliance with approved project quality control procedures, for the approval of Welding Procedure Qualification (PQR’s) and Welding Procedure Specification Records (WPS’s), for the review of radiographic films during shop fabrication and the review of final QC documentation packages (Manufacturer’s Data Reports). From 12 Dec 2012 to 23 Dec 2013. I worked at Position Welding Engineer.

I attend to FPSO-Block 12W Development and Spools Project Client was Primier oil, EMAS

Lan Tay Produced Water Facilities Expansion Project. Client was TNK Vietnam

Spools & Spreaders Transportation Stands and Sea fastening Project . Client was Subsea Seven

- I prepared Welding Procedure Specification, Inspection and Test Plan for Piping, Structural, and Blasting & Painting.

- To prepare Project Quality Plan, Welding consumable control procedure, Welding control, Dimension Control Procedure, Leak Test Procedure, Hydrostatic Test Procedure, and all documents relate to Quality Control Procedure.

- Witnessed welder qualification, issued welder certificates following ASME IX, AWS D1.1. API 1104 and issued welder’s card.

- Made data base of Piping and Structural. Prepared for NDT & Welding summary reports. Welding, Material traceability report.

- Prepared Hydrostatic test procedure, hydrostatic test package. And leak test piping system.

- I liaised with the Authorized Inspector, Certification Authorized and client’s QA/QC inspector requested the timely execution of inspections and document reviewed following in ITP. Submitted all supplementary procedures to A.I/CA and client for them review and acceptance.

I involved to HUC-UP WPH-HT1 BIEN DONG POC PROJECT of client was BIEN DONG POC as position QA/QC Engineer Leader done from 15, Sept, to 15 Nov, 2012 at offshore field HT1 Platform and HT-PQP Platform.

From Mar to Jun, 2012 I involved to HUC-UP RBDP-B GAS LIFT PROJECT, client was PC VIETNAM. Modified extend cellar deck platform, fabrication; install equipment, piping spools at offshore.

HUC-UP, installation piping and structural for SU TU TRANG project of client was CUU LONG JOC.

- I prepared all documents, procedures for these projects and carried out qualify welders, inspected material come in, fit-up, visual, reviewed film and issued welding summary and NDT reports. Prepared test package for hydrostatic test which including: request for flushing & hydro testing, hydrostatic pressure testing record, flushing certificate, weld summary, chart recorder, punch list, P&ID (make-up drawing), isometric drawings(make-up drawing), pipe support drawings(make-up drawing) .

- Prepared N2 Test Package leak test system after assembly piping spools and equipments as such as: Test Pack Amendment Record, Test Pack Information, Primary Isolation Checklist, Secondary Isolation Checklist, Vent Valve Checklist, Inline Valve Checklist,

Page 8: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 8 of 13)

Toolbox Talk Meeting Forms, Pre-Pressurization Safety Checklist, Pressurizations Procedure, Leak Test Procedure, Depressurizations Procedure Checklist, Leak Description Report, Reinstatement Checklist, Highlighted P & ID’s, Result / Closeout Report for pre-commissioning, and commissioning.

- I also was site QC inspector full time for control quality welding progress of welders for welding structural and piping spools. Cross check alignment piping assembly connection, reviewed film radiographic testing, ect.

- Witness, monitor qualification welder, issued welder’s cards, welder’s certificates,

Apr 2009 to Mar 2012: PETROLEUM TRADING AND DRILLING TECHNICAL SERVICES Co., Ltd. QA/QC Deputy Manager

Duties

2012: I was QA/QC Manager position for projects as below.

Dragon Oil Field - RP2 Platform project “Produced Water Treatment- Package including: Package 1: Compact Floatation Unit and Package 3: Caisson Block” of VietSovPetro.

Chemical & Methanol Injection Pumps Skid - Package Hai Su Trang Full Field And Hai Su Den Early Production System Development Project of Thang Long JOC.

- I prepared all documents, procedures for these projects as such: Inspection and test plan, Welder Qualification Certificate & List, Mechanical Completion Procedure, Leak Test Procedure, Hydrostatic test, Flushing & Drying Procedure, Welding Repair and Buttering Procedure, WPSs/ PQRs for Piping, pressure vessel, structural, Welding consumables control Handling, Baking & Issuance Procedure, Material Control Procedure, ASME "U" stamp Fabrication Traveler….

- Witness welders, welding operator qualification, reviewed film and issued, certified welders, welding operator certificates.

- Issues manufacture date record for pressure when completed to fabricated following in FORM U-1A MANUFACTURER'S DATA REPORT FOR PRESSURE VESSELS. (Alternative Form for Single Chamber, Completely Shop or Field Fabricated Vessels Only). As Required by the Provisions of the ASME Code Rules, Section VIII, Division 1.

Jul, 2011-Jan, 2012: I was QA/QC Manager position for Te Giac Trang Field Development Project H04-WHP Compact Manifolds and fabrication CNV TEST SEPARATOR “U-Stamp” for client Hoang Long Hoan Vu.

- Issued plan qualified PVDTech’s Welders for Project; prepared welding procedure specification, Manpower list and submitted to HLJOC for approval, prepared various quality control procedures as field quality control plan (FQCP), welding repair procedure for piping systems, weld map and NDT map for fabrication of storage tanks and piping systems. Checked incoming materials, carried out fitting up, visual inspection, reviewed radiographic films during construction as well as witnessed various testing works as vacuum box test, oil penetrate test, magnetic particle test, ultrasonic test, hydrostatic test, pipe laying-out, etc.

PVD TechPVD Tech

Page 9: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 9 of 13)

- Applicable codes and standards for the Project as AWS D1.1; ASME IX; ASME II; ASME V; ASME B31.3….revised WPSs and submitted to HLJOC and CA reviewed and approval.

Jan-Jul 2011: I was position QA/QC Manager & QC Inspector for Project and clients below:

I built to procedures relation quality control projects such as Chemical Tanks, Atmospheric Tanks of BIEN DONG 1 PROJECT

Fabrication of Bulk Handling Equipments Project, Client is PV SHIPYARD

- These involves in the review, comments on submitted quality procedures, field quality control plan, witnessed welding procedure qualification tests (PQR’s), reviewed & approved for welding procedure specification (WPS’s), witnessed welder’ performance qualification tests (WQT’s), reviewed & approved qualification certificates.

- Main duties were to carried out materials receiving inspection, monitored & report on all materials traceability, carried out fitting up, visual inspection, witnessed NDT tests, hydrostatic testing, etc., for various tanks and piping systems specialized, supervised to fabricated & installation piping spools (carbon steel, stainless steel, alloy-steel pipe intended high temperature, high pressure, and severe sour service) that working in different conditions as A106 Gr B; SA 350, P No:1, Group No 2, SA 333 GR.6, SA 312 TP 304, TP 316/316L, SA/A 790 UNS S31803 etc.

- I also prepared all project procedures like ITPs, Non-conformance control procedure, document control procedures, welding control procedure, technical requirement for steel plates, and review technical requirement for equipments to make sure that all ABS’s requirements are fulfilled. I am responsible for inspection of materials like steel plates, piping and various equipments at Manufacturer's Storage before shipment.

Mar-Oct 2010: I Implemented Plan to holder U-Stamp, R-Stamp and Certificates of ASME Organization

- As a team leader in preparing all the necessary procedures as well as building a system of strict quality control , Quality Control Manual during manufacturing until finished .we have just get certificates U-Stamp and R-stamp of ASME organizational and NBIC.

- Monitor and control involved in the Project as from Material Inspection Receiving shop welding fabrication, Forming inspection, test equipments of pressure vessel fowling in ASME section IX, ASME section VIII Div I, ASME section II including part A and C.

- Regular review of the applicable ASME Code and Addenda and any consequential update of the Manual revised and approved sections and Form of the Manual and shall replace obsolete copies of all controlled Manual copies.

- Compliance and execution of this Manual at the Shop and Field.

- Review and certification of Welding Procedure Specification (WPS), Procedure Qualification Records (PQR), and Welder / Welding Operator Performance Qualification (WPQ).

- Liaison with the Authorized Inspector for the timely execution of inspections and document reviews. Submitting all supplementary procedures to A.I for his review and acceptance.

Page 10: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 10 of 13)

- Liaison with the ASME for the Joint Review.

- Certification Compliance of Manufacturer Data Reports.

Jan-Oct 2010: I was QA/QC Manage & QC inspector position Fabrication Compact Manifold –Te Giac Trang. Client was Hoang Long-Hoan Vu JOC

- Monitor and control involved in the Project as form Material Inspection Receiving shop welding fabrication, inspection, test equipments of structure and piping.

- Qualified PVD Tech Welders for Project; witnessed welding procedure qualification tests, prepared welding procedure specification and submitted to HLJOC for approval, prepared various quality control procedures as field quality control plan (FQCP), welding repair procedure for piping systems, weld map and NDT map for fabrication of storage tanks and piping systems. Checked incoming materials, carried out fitting up, visual inspection, reviewed radiographic films during construction as well as witnessed various testing works as vacuum box test, oil penetrate test, magnetic particle test, ultrasonic test, hydrostatic test, pipe laying-out, etc.

- In addition, employed as Welding Inspector/ QA/QC Manager in the duration working for PVD tech at the Te Giac Trang-Compact Manifold Project. Client is Hoang Long JOC, with main duties were to prepare PQR’s and WPS’s for various kinds of steels, critical piping as SA333 P1, SA 350,SA 106, API 5L X52, etc., qualified Welders for Project, site inspection, controlled all welding and NDT activities that performed by various PVD Tech involves in the Project.

- Applicable codes and standards for the Project as AWS D1.1; ASME IX; ASME II; ASME V; ASME B31.3…

Modified and Installation, Assembly Lifeboat No: 01 and 05 Project Offshore at the Rig PVD-I, client was PVD Drilling Division Company.

- Written installation procedure for lifeboat No.05, Responsible control, supervised installation lifeboat and also Supervised of project installation lifeboat platform offshore Under Helideck Station Offshore at the Rig PVD-I

- Monitor and control involved in the Project Modification Flow line piping system at the Rig PVD – III in Singapore.

Repair Pedestal Adapter Crane of Su Tu Den Project, client was Cuu Long JOC & FAVCO. Crane 78.5 tons

Monitor and control involved in the Project as form Material Inspection Receiving shop welding fabrication, inspection, and test equipments of structure. Supervised of project Su Tu Den repair Pedestal Adaptor Crane.

Fabricated and Installation Chemical Piping System of Dam Phu My Project.

Checked Fit up, Visual joint weld, issued Daily Fit-up reports, Daily Welding report, NDT Requested, Welding and NDT Summary reports.

Page 11: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 11 of 13)

Issued MDR, inspected for piping system at Blow down of Dam Phu My Project

Repaired and Replace Bracing and Main-Chord Offshore at the RuBy A-Offshore. Clients was Petronas Malaysia. Monitored by FAVCO . Crane Boom 59.6 Tons

Carry out do load test of Crane Boom on Ruby offshore. Repair , reinforce Crane Boom, Replace wire rope of Crane Boom, Checked material come in, Fit up, Visual joint weld, made Daily Fit-up, Daily Welding, NDT Requested and Made Manufacture’s Data Records (MDR).

Fabricated and Inspected for Chemical Tanks of Nam Rong- Doi Moi Wellhead Platform Projects. Client was Vietsovpetro

Monitor and control involved in the Project as form Material Inspection Receiving shop welding fabrication, inspection, test equipments of structure, piping system.

Checked Fit up, Visual joint weld, made Daily Fit-up, Daily Welding, NDT Requested and Made Manufacture’s Data Records (MDR).

Oct 2008 to Apr 2009: POSLILAMA E&C Co., Ltd. (Working as Project Engineer) Piping engineer

I Worked at Posco – VietNam Cold Rolling Mill Project

Duties

Design Isometric Drawing, Control Fabrication and install Entry section Hydraulics piping spool and Pickling Tank Circulation’s piping spool including carbon steel, stainless steel and galvanized pipes.

Supervisor and check fabrication, installation from material, bevel, fit up, welding, and painting of stamping machine, rail shipping bracket.

May 2008 to Oct 2008: HOA HIEP M&C Co., Ltd. (MITSUBISHI HEAVY INDUSTRIES LTD AND MITSUBISHI CORPORATION) Working as Project Engineer Piping Supervisor

I Worked at O Mon Thermal Power Plant And Mekong Delta Transmission Network Project (I). Consortium of Mitsubishi Heavy Industries Co., Ltd and Mitsubishi Corporation. Client was PVN

Duties

Control piping Fabrication and install Water Treatment’s facility and FGD’s piping spool include carbon steel, stainless steel and galvanize (total 40,000 diameter inch)

Check P&ID and determine location of equipment’s nozzles before carry out install piping.

Issued daily report everyday

Have to meeting with Japanese’s supervisor at 18h pm every day, notify my schedule for next day.

Page 12: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 12 of 13)

Managing the development and implementation planning, fabrication, inspection, and support QA/QC team preparation documentation, and operations activities including:

Planning duties within the QA/QC staff and related work schedules.

Advancing quality achievement and performance improvement throughout the organization.

Carrying out fit-up and visual inspection on structure, piping and vessel

Closed and control of nonconformities.

Planning and preparing hydro test packages following Mitsubishi’s Plan.

Support manpower to commissioning Mitsubishi’s team

Sep 2007 to Apr 2008: NACAP ASIA PACIFIC SDN BHD CO., LTD. (Working as Project Engineer) QC Inspector

I Worked at Phu My -Ho Chi Minh Gas Pipeline Project, Client was PVGas

Duties

Welding: checked fitting up, welder’s ID card, visual, issued Daily welding Reports and NDT request.

Coating: I have to check Air temperature, Dew point temperature, Surface temperature

Humidity, Blast profile, Holiday detection and check Adhesion by peel test

Made Report: Blasting Adhesion, Field Joint Coating, Holiday Detection

Infill Concrete Joint Coating

2007 : APAVE VIETNAM Co., Ltd.

NDT Inspector and Third Party Inspector (TPI)

Duties

Inspected MT and RT for pressure vessel of Chien Thang- DooSan project.

Inspected RT for Lan Tay of BP project.

Inspected at PVE –Technip project.

And worked part time for VIG & Schlumberger

Supervised field assembly of piping systems at Viet Nam Industries Gas (VIG )Project in Phu My II Zone

I inspected piping at VIG project,

Checked Fit up, Visual joint weld, made Daily Fit-up, Daily Welding, NDT Requested

Preparation of project's Quality Documents and report on findings.

Page 13: 1. Mr. Dinh Quang Nham

The Velosi Group DINH QUANG NHAM’s CURRICULUM VITAE

(Page 13 of 13)

I inspected for 3 Gas Tanks Schlumberger project.

2006 to 2007 : PEB STUCTURE STEEL Co., Ltd.

QC Inspector

Duties

Inspected: From Cutting, Build up, Fit-up, Welding, Painting, and Painting lines for various Pre-Engineering Buildings.

REMUNERATION