1 pa River/Napa Creek Flood Protection Projec and Consolidated Remedial Action Area Consolidated Remedial Action Area SF Bay Downtown Napa Hwy 29 Bridge ~ 7 miles Tulocay Creek Gasser Property Figure 1 3 Nord Vineyard N

Upload: egbert-garrison

Post on 03-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Napa River/Napa Creek Flood Protection Project and Consolidated Remedial Action Area Consolidated Remedial Action Area SF Bay Downtown Napa Hwy 29 Bridge

1

Napa River/Napa Creek Flood Protection Projectand Consolidated Remedial Action Area

Consolidated RemedialAction Area

SF BayDowntownNapa

Hwy 29 Bridge

~ 7 miles

Tulocay Creek

Gasser Property

Figure 1

3

Nord Vineyard

N

Page 2: 1 Napa River/Napa Creek Flood Protection Project and Consolidated Remedial Action Area Consolidated Remedial Action Area SF Bay Downtown Napa Hwy 29 Bridge

2

Consolidated Remedial

Action Area

• Four petroleum release sites

• Former bulk fuel oil storage

• Large (>100,000-gal.) above-ground tanks adjacent the Napa River

• Within footprint of Napa River Flood Protection Project

Napa R

iver

Former Basalt Rock Co.(Dillingham Const.)

Former PhillipsOil Terminal

(Texaco, Phillips)

Former Basalt Rock Co.(Dillingham Const.)

Former North BayOil Terminal

(Chevron, Bay CitiesOil Marketers

Limit of FloodProtection Project

Terrace

Phase 1 Area

Phase 2 Area

Figure 2

4

Nord Vineyard

Page 3: 1 Napa River/Napa Creek Flood Protection Project and Consolidated Remedial Action Area Consolidated Remedial Action Area SF Bay Downtown Napa Hwy 29 Bridge

3

NapaRiver

GroundSurface

Above-Ground andUnderground Tanks atBulk Fuel Terminals

Marsh Plain andFlood Plain Terraces

Petroleum Pollution

WaterTable

Figure 3

Cross-section showing a conceptual view of pollution in the consolidated area

5