1 nausca summer meeting boston june 30, 3009 david w. hadley vice president state regulatory...

18
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

Upload: martina-higgins

Post on 18-Jan-2016

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

1

NAUSCASummer Meeting

BostonJune 30, 3009

David W. HadleyVice President State Regulatory Relations

Midwest ISO

Page 2: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

2

Midwest ISO Reliability Footprint

Page 3: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

3

Electric System Development – Historical View• Traditional Electric System Development (Generation and

Transmission)– Planned at a single company level– Designed for single company use– Funded at company / state level

• Decision basis– Meet local requirements (i.e., load growth)– With local natural resources– Few national policy issues – Limited regional use

• Last major build out of baseload capacity and transmission ended in the early 1980s

• Traditional Electric System Development (Generation and Transmission)– Planned at a single company level– Designed for single company use– Funded at company / state level

• Decision basis– Meet local requirements (i.e., load growth)– With local natural resources– Few national policy issues – Limited regional use

• Last major build out of baseload capacity and transmission ended in the early 1980s

Page 4: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

4

WECC

MIDWEST

NORTHEAST

ERCOT

SOUTH

Coal

Nuclear

Gas

Hydro

Wind

Other

The current regional generation fleets reflects the natural resources of each region – with gas being the

default peaking fuel for all

Page 5: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

5

WECC

MIDWEST

NORTHEAST

ERCOT

SOUTH

Coal

Nuclear

Gas

Hydro

Wind

Other

… and the sources of each regions’ electrical energy reflects those generation portfolios and resources

Page 6: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

6

…While the transmission system reflects the desire to move energy from a company’s generation to the load it serves – without a robust “backbone”

Page 7: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

7

Xcel Energy Transmission

Page 8: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

8

Page 9: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

9

Midwest ISO Transmission Map

Page 10: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

10

800 MW Load

RPS

RPS

RPS

10,000 – 12,000 MW

Page 11: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

11

Who Pays?

• Remember Open Access – Transmission Owners cannot discriminate & favor their own generation over another's

• So – the utility must open it’s transmission lines to others generation

• Today the developer pays for transmission from the generator to the transmission 100%

• Transmission upgrades needed have the developer pay 50% and the utility pay 50%

Page 12: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

12

Midwest ISO Planning Principles reflect need to address local and regional issues

• Make the benefits of a competitive energy market available to customers by providing access to the lowest possible electric energy costs

• Provide a transmission infrastructure that safeguards local and regional reliability

• Support state and federal renewable energy objectives by planning for access to all such resources (e.g. wind, biomass, demand-side management)

• Create a mechanism to ensure investment implementation occurs in a timely manner

• Develop a transmission system scenario model and make it available to state and federal energy policy makers to provide context and inform the choices they face

Midwest ISOBoard ofDirectorPlanningPrinciples

FundamentalGoal

The development of a comprehensive expansion plan that meetsboth reliability and economic expansion needs

Page 13: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

13

Midwest ISO is actively engaged in planning from local to regional level

RGOS IMTEP & RGOS II

JCSP

EWITS

RGOS = Regional Generation Outlet StudyMTEP= Midwest ISO Transmission Expansion PlanJCSP = Joint Coordinated System PlanEWITS = Eastern Wind Integration and Transmission Study

RGOS = Regional Generation Outlet StudyMTEP= Midwest ISO Transmission Expansion PlanJCSP = Joint Coordinated System PlanEWITS = Eastern Wind Integration and Transmission Study

Page 14: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

14

Different policy assumptions result in very different siting outcomes with different transmission system requirements.

Page 15: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

15

The transmission overlay for the Reference Case (Status Quo) establishes the need for some backbone development…

Page 16: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

16

…While the 20% Wind Energy Case highlights the need for substantial transmission backbone development

Page 17: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

17

We must effectively manage our current infrastructure while carefully planning and

developing our future infrastructure

• 60% of the electric grid infrastructure (T/D/G) is at or near the end of original planned life

• 20% of T/D/G is past original planned life

• In the Midwest, the average age of infrastructure is very high– Baseload generation = 42 years– Transmission = 40+ years

• The region use of the electric system is also increasing the transmission congestion

• 60% of the electric grid infrastructure (T/D/G) is at or near the end of original planned life

• 20% of T/D/G is past original planned life

• In the Midwest, the average age of infrastructure is very high– Baseload generation = 42 years– Transmission = 40+ years

• The region use of the electric system is also increasing the transmission congestion

Current InfrastructureCurrent Infrastructure

• Planning must balance many issues– Use of existing generation fleet– National policy issues– Efficient use of natural resources– Demand response– Costs

• Construction• Operating• Fuel• Decommissioning• Environmental

• Regional / national use of the electric system must be considered as the planning is done

• Unknowns (policy and financial) challenge planning

• Planning must balance many issues– Use of existing generation fleet– National policy issues– Efficient use of natural resources– Demand response– Costs

• Construction• Operating• Fuel• Decommissioning• Environmental

• Regional / national use of the electric system must be considered as the planning is done

• Unknowns (policy and financial) challenge planning

Future InfrastructureFuture Infrastructure

Page 18: 1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

18

Planning Activities

Key Issues

CongestionRenewable

PolicyOperational Impacts

New Generation and

Demand Response

ChangingRegulatory

Requirements

FairCost

Allocation

Load Growth and DSM

AgingInfrastructure

Key Issues