1 project cost management by sserwadda tamuzadde 0772979303 email- [email protected]

63
1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- [email protected]

Upload: patrick-roberts

Post on 04-Jan-2016

221 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

1

PROJECT COST MANAGEMENT

by

Sserwadda Tamuzadde

0772979303

[email protected]

Page 2: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

2

Project cost management includes the processes required to ensure that the project is completed within the approved/authorised budget

Page 3: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

3

It provides an overview of the following major processes:

Resource Planning – determining what resources (people, equipment, materials, etc) and what quantities of each should be used to perform project activities.

Cost Estimating – developing an approximation (estimate) of the cost of the resources needed to complete project activities.

Page 4: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

4

Cost Budgeting – allocating the overall cost estimate to individual work items.

Cost Control – controlling changes to

the project budget.

Page 5: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

5

RESOURCE PLANNING

1. Inputs

- work breakdown structure

- Historical information

- Scope statement

- Resource pool description

- Organisational policies

Page 6: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

6

2. Tools and Techniques

- Expert judgment

- Alternatives identification

3. Output

- Resource requirements

Page 7: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

7

COST ESTIMATING

1. Inputs

- Work breakdown structure

- Resource requirements

- Resource rates

- Activity duration estimates

- Historical information

- Chart of accounts

Page 8: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

8

2. Tools and Techniques

- Analogous estimating

- Parametric modeling

- Bottom-up estimating

- Computerised tools

3. Outputs

- Cost estimates

- Supporting detail

- Cost management plan

Page 9: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

9

COST BUDGETING

1. Inputs

- Cost estimates

- Work breakdown structure

- Project schedule

Page 10: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

10

2. Tool and Techniques

- Cost estimating tools and techniques

3. Output

- Cost baseline/Budget

Page 11: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

11

COST CONTROL

1. Inputs

- Cost baseline/budget

- Performance reports

- Change requests

- Cost Management plan

Page 12: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

12

2. Tools and Techniques

- Cost change control system

- Performance measurement

- Additional planning

- Computerised tools

Page 13: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

13

3. Outputs

- Revised cost estimates

- Budget updates

- Corrective action

- Estimate At Completion (EAC)

- Lessons learned

Page 14: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

14

COST CONTROL

• Cost control is concerned with (a) influencing the factors which create changes to the cost baseline to ensure that changes are beneficial, (b) determining that the cost baseline has changed, and (c) managing the actual changes when and as they occur

Page 15: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

15

Cost Control includes:-• Monitoring cost performance to detect

variances from plan• Ensuring that all appropriate changes are

recorded accurately in the cost baseline • Preventing incorrect, inappropriate, or

unauthorised changes from being included in the cost baseline

• Informing appropriate stakeholders of authorised changes

Page 16: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

16

Cost control includes searching out for the “whys” of both positive and negative variances. It must be thoroughly integrated with the other control processes (scope change control, schedule control, quality control etc). For example, inappropriate responses to cost variances can cause quality or schedule problems or produce an unacceptable level of risk later in the project.

Page 17: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

17

PROJECT EXPENDITURE

MONITORING AND CONTROL

WBS

CODE

WBS

DESCRIP

TION

CURENT AUTHORISED/APPROVED

INCURRED COST TO DATE

COMMITTED COST TO DATE

ESTIMATED COST TO COMPLETION

ESTIMATED FINAL TOTAL COST

Page 18: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

18

What to consider when monitoring

• What to monitor?

• The Data required (indicators)?

• Sources of data required (from where?)

• Who is responsible for data collection?

• How often should the data be collected?

• How is the information to be used?

Page 19: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

19

Key Areas for Monitoring

• Time

• Cost

• Work quantity

• Work quality

Page 20: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

20

Control Reports

Top Level

Middle Level

Junior Level

Supervisory Level

Page 21: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

21

Cost Variances Table

Month Budgeted cost

Actual Cost

Budgeted Cost for Work Done

Spending Variance

Schedule Variance

Total Variance

August 225,000 275,000 200,000 50,000 25,000 75,000

September 300,000 345,000 260,000 45,000 40,000 85,000

October 365,000 415,000 310,000 50,000 55,000 105,000

Page 22: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

22

Cost Reports

• Activity Cost Report

• Cash Flow Report

• Variance Report

Page 23: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

23

Financial Reports

• Monthly Commitment and Expenditure

• Monthly cash flow forecast

• Monthly bank reconciliation statement

• Monthly outstanding payments

Page 24: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

24

Steps involved in cost control/Monitoring:-

• Prepare the budget/cost baseline

• Track down actual expenditure

• Compare actual expenditure with the budget/cost baseline

• Investigate the variances (significant ones)

• Take corrective action

Page 25: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

25

Cont

- No action to be taken

- Carry out re-allocations

- Replan/change the budget

- Terminate the project or abort.

Page 26: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

26

FINANCE/COST MONITORING Information to be collected

Sources of Information

Use of Information

Project budget and Expendit

ure

•Expenditure by project

•Expenditure by budget head

•Balance of budget remaining this year

•Regularly recurring items of expenditure, eg rent

•Previous year’s budget and expenditure

•Rates of inflation

•Exchange rates

•Invoices and vouchers

•Budget breakdown

•Analysis of budget and expenditure, eg using computer spreadsheets

•Newspapers, banks

•Predict expenditure for budgeting

•Compare costs of different projects

•Identify areas of excessive expenditure

•Identify any savings

•Compare costs with project achievements to assess cost

effectiveness

Page 27: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

27

Information to be collected

Sources of Information

Use of Information

Staff Salaries •Salaries

•Tax, insurance , etc

•Annual increments

•Final pay

•Other payments e.g health allowance, staff loans etc

•Staff records •Pay slips •Salary records

•Ensure staff are paid according to pay scale reflecting nature of job and length of service

•Ensure other payments are made according to correct procedures

•Ensure all staff know what benefits they are entitled to

Page 28: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

28

Information to be collected

Sources of Information

Use of Information

Cash flow analysis

•When is cash needed for project

•Where will cash come from (might include loan re-payments, community contributions, etc

•What and when are cash outgoings? (regular and irregular)

•Cash record system (cashbook)

To ensure sufficient but not excessive cash is available

Page 29: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

29

BUDGETING

• Definition: A plan translated in financial terms for the resource and operations of a business, organisation or project for a stated period in the future.

• Or simply a statement of incomes and expenditures.

Page 30: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

30

Budgeting

Development project managers have several major tasks to perform in respect of managing project funds. These can be summarised as follows:-

1. Determining the requirement for funds to service the needs of scheduled activities during a defined period

Page 31: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

31

2. Controlling the project through the allocation of project funds to different activities.

2. Making adjustments in the allocation of funds between activities during the planned time period.

Page 32: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

32

The advantages of the budget system can, therefore, be summarised as follows:-

1. It can be directly linked to the implementation planning exercise and therefore directly reflect the objectives of the project.

2. The organisational structure of the project is defined in terms of zones of financial responsibility under the budget.

3. Each project subsection is involved in determining its own objectives and work programme through the exercise.

Page 33: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

33

4. It stimulates communication within the project and helps to resolve conflicts.

5. It provides a basis for allocating priorities and assists with resource allocation throughout the project structure

6. It provides the basis for a monitoring and control system which can allow for speedy corrective action if required.

7. Budgeting allows management personnel to take responsibility for planning their work, setting targets and measuring their performance which can all add up to a stimulus to obtaining higher levels of achievement.

Page 34: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

34

FINANCIAL MANAGEMENT AND ACCOUNTING

While the project budget represents the implementation plan in financial terms, the actual operational aspects of handling the finance requires the development of appropriate organisational structures and systems.

Most managers of development projects are not accountants, nor need they be .

Page 35: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

35

A basic understanding of accounting, however, may be of help to managers.

All projects of any size, need an accounts section which supports three basic tasks:

1.Planning, control and

recording of transactions

2.Presentation of information

3.Financial decision-making

The information resulting from the first two tasks allows management to undertake the third.

Tasks of accounts section

Management functions

Page 36: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

36

WHY BUDGET

• To help management in the planning of annual operations.

• To co-ordinate the activities of the various parts of the organisation/project and ensure that the parts are in harmony with each other.

• To communicate plans to the various responsibility centre managers.

Page 37: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

37

• To motivate managers to strive to achieve the organisational/project goals/objectives

• To control activities (organisational or project)

• To evaluate the performance of managers

Page 38: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

38

APPROACHES TO BUDGETING

• Incremental budgeting

• Zero base budgeting (ZBB)

Page 39: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

39

TYPES OF BUDGETS

• Operating Budgets – Recurrent

• Capital Budgets – Development

• Financial Budgets (cash budgets, projected income and expenditure statement and projected balance sheet).

Page 40: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

40

CASH FLOW STATEMENT/BUDGET

• A cash budget is a detailed statement of the expected cash receipts and payments during the next period (usually a year divided into twelve months).

• The cash budget shows the expected cash position for each of the periods ahead. This enables the organisation/project to assess whether operations can continue as planned.

Page 41: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

41

Whether expenditure needs to be reduced or curtailed, whether there is the need to approach the bank for a loan or overdraft, etc.

It is important to note that cash flow for a period does not necessarily equal the profits for that period

Page 42: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

42

Cost Terms and Concepts • Cost Object • Direct and Indirect Costs • Period and Product Costs • Cost behaviour in relation to volume of activity

(fixed Vs variable costs) • Relevant and irrelevant costs• Avoidable and unavoidable costs• Sunk costs• Opportunity costs• Incremental and marginal costs

Page 43: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

43

Budgetary Expenditure Control Process:-

• Preparation of a budget

• Identification of responsibility centre

• Adoption of mutually agreed targets

• Periodic monitoring and recording of actual performance

• Careful comparison of actual with planned performance.

Page 44: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

44

• Assessment of deviations or variances and investigating their causes

• Initiation of corrective action to carry out the necessary adjustments.

Page 45: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

45

Corrective action:- Anything done to bring expected future project performance into line with the project plan•Preventing incorrect, inappropriate or unauthorised changes from being included in the cost baseline/budget•Informing appropriate stakeholders of the authorised changes•An estimate at completion (EAC). This is a forecast of total project costs based on the project performance to date.

Page 46: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

46

REASONS FOR TIME AND COST OVERRUNS

Power Shortage of power Delay in the completion of transmission

lines

Page 47: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

47

Equipment Delay in the erection of major equipment Delay in placing orders for critical

machinery Delay in the delivery of imported and/or

indigenous equipment Shortage of critical items in the advanced

stage of commissioning Shortfall in acquisition of equipment

Page 48: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

48

Delay in the finalisation of foreign/indigenous suppliers

Shortage of construction equipment Delay due to the addition of equipment

Page 49: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

49

Shortage of Inputs

Land acquisition Water for construction Technical personnel Skilled labour Construction material, e.g. cement, steelTransport bottlenecks Free supply items from users

Page 50: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

50

Designs/Scope of Work

Delay in the appointment or selection of consultants

Delay in receipt of drawingsChanges in scope due to unexpected

situations

Page 51: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

51

Labour Problems

Strikes, go-slow, etc Surplus labour

Page 52: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

52

FINANCE

Delay in sanctioning the projectDelay in release of fundsDelay in sanction and release of foreign

exchange Fluctuations in the price of foreign

exchange Delay in tying up credit/collaboration

Page 53: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

53

Delay in approval of revised cost estimate Change in rates of taxes and duties Increase in capital cost due to price

escalation

Page 54: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

54

Others

Delay in the finalisation of foreign exchange

Delay in the supply of drawingsDelay in finalising the designs/drawing Delay in finalisation of contracts –

indigenous and foreign Delay in the actual placing of orders

Page 55: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

55

Legal disputes/stay orders awaiting arbitration

Delay due to contractorsInadequate release of scarce material, i.e.

cement, steel, etcTime gap between the feasibility report and

revised cost estimatesChange in scope due to inadequate initial

investigation

Page 56: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

56

Change in scope of work due to revised requirements

Increase in the target capacity Delay in the site selection/clearanceDelay in the development of infrastructure

facilities Delay in the construction of railway

siding/railway line, etc

Page 57: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

57

Slow civil construction Delay in completion of linked projectsDelay in commissioning

Page 58: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

58

Internal Control

Internal control system – Financial and non- financial controls instituted in the organisation to ensure that the operations of the organisation run in an orderly manner. They also establish safeguards on assets and promotes efficient use of resources.

Page 59: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

59

FINANCIAL OR ACCOUNTING CONTROLS:- • Controls over cash receipts

• Controls over payments

• Controls over financing operations

• Controls over accounts receivables and payables.

Page 60: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

60

NON-FINANCIAL OR ADMINISTRATIVE

CONTROLS:-• Controls over the personnel section

• Controls over fixed assets

• Controls over laid down policies

• Controls over laid down procedures

Page 61: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

61

SOME TYPES OF INTERNAL CONTROLS

• Organisation plan

• Segregation of duties

• Physical controls

• Authorisation and approval

• Arithmetical and Accounting controls

• Competent staff

Page 62: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

62

• Supervision

• Budgeting

• Meetings

• Acknowledging Performance

• Filling System

• Serially numbering documents

• Periodic reports

• Audit function (internal) etc

Page 63: 1 PROJECT COST MANAGEMENT by Sserwadda Tamuzadde 0772979303 Email- mtsserwadda@yahoo.com

Group work

• Assuming you have been appointed to head a big project on HIV/AIDS in your District.

• (a)Discuss the various ways and means you will use to monitor project costs.

• (b)What challenges do you expect to experience

• (c) For each challenge identified in(b) above recommend remedial strategies

63