19
·. \ ' t - PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action Itams from 4/11/79 Technical Review Meeting. 3. Review "0800. April 15. 1979 Tasks Liata."

Upload: others

Post on 23-Mar-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

·. \

'

~ ·

t -

PUNNING MEETING

0900 4/15/79

1. Revhv "Top hioritiu., 1iet.

2. Review Action Itams from 4/11/79 Technical Review Meeting.

3. Review "0800. April 15. 1979 Tasks Liata."

-~

Page 2: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

~ .

Page 3: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action
Page 4: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

-- ----- --~- ----- --- ~.,..,.---------______.,.--=-:--=-~~..,.,.----__,..

. . ...

Page 5: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

oaoo 4/U/19

Top Pdol'ities

1. lnn~u filters iJl air aj"tor cliaebarae.

Statui: System ia ~talled aa4 a .odifieation to auction line (in•tallat1on drain) in proare•• ·

2. Chana• out c:hAreoal filtara 1n oua SO% train iJl Audliary Bu1ld1na.

St&tua: Sn&D (7) fUtera out. Sldppin& c:cmtaiuer for NRC filter available.

3. Chua• out c:h.uc:oal fUtau 1n cue SO% uaiD of Fuel Handliq luilcUq.

Statu•: Vork ac:heduled to b«ain upon c:oapletion of ehan&in& out Al.lxlliary JuUdiq ~iltara.

4. lnnall liquid w.•te tank lam.~ 1n ~nt fuel pool "A".

Statu•: Ste&l !or fuel pool "A" r"b clelivered 4!12/79; five (OS) tank~ available. ruaainins 15000 &allon tank.

Radiation levda in fuel handlina bulldin& prervent entrance for inttallation of tank supporta . Welder qualification in proare ...

5. Install C.p-<:un •ystna in ChCDical Cleanin& luUdina.

Status: Coc:ooni.lls of buildina, 110noraU openiq, 110norail foundation and off-alta fabrication of 110noraU 1a in proar•••. Coe­pletion of th .. a Ktivitiea plua IA.tallation of 110norail by 4/23/79. thia c:oapletion elate t. 4 daya beyond tbe ori&ioal plalllled data of 4/19/79 due to delay& in ateal fabrication.

6. l>eeay Heat a-oval s,..t ...

Status: Buildina elaanrocna around entrance to dia .. l generator room (completion expected 4/14/79). l>ec:ontamination to atart 4/lS/79. lndust. cooler duct to be relocated .

7. Nitroaen p~esaurized tank P/V control aystam.

Status: Flov diagraa •ehltdulee ara bdns reviewed by CPU and NRC. !atiaated tn.~lation date baa been chanced from 4/22/79 to 5/02/79.

8. Containment •UIIP lnel uuuremant inatrumentation.

Statua: Two (02) Beiae aausea •~• available and calibrated. Operational/ inatallation p~oceduree are prepared and awaiting NRC approval. Cauges installed.

Page 6: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

--""l-- --··.o.J: - ..

Top hiodtle,•

9. Bydroae.n llac.nbincr hp.ajn.

Status: lleeotabin.er 12. repair-ed aul! in ••rvie•. #1 lc aundby.

Page 7: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

~---

\.ACTION 1TDIS

~••k Maaac-=-nt/Schedule

_otoo 4/14/7!

1. t>e-eon aa.pla roo.; C:Olaplete \10-r'k 01\ au.u Gauae ancl p tr&A&CJ.tter.

2. leaolve air aupply probl ... ; cotttinua rPIOY&l of Audltary JuJ.ldiA& flltara .

3. Stack Mo.U.tora: 219 ahoulcS ba in ..rviea by 1200; 220 twa. bad pump. Place both ill sen1.c:e.

4. Dlwal.op OtsC ahall umperatiau/co'al!ecsar pn .. u:re c:orrela­tioo.

S. Coufira atatu. of Atlll0apher1c. Steaa Puap •a.lve lult oa "lS" OTSC. Contira U ve are periodically feadin& the ,.a" OTSC.

6 . !valuate nece .. 1t:y for periodic pTilllary u:rplaa (possible boron dUutian) .

7. Develop concept of on-site umplin& aiU! analysis capability.

8. Complete installAtion of Hebe Caua•• for Containment Sump level ind1~tion.

9. !ltrviw propo .. d alternate DB& Syaua aiU! cotDeat.

10. Pro-ride uauncat of the imp•ct if DB-V6B doea not cloaa after takiq containment e\llllp lnel ..uurea.nt. Conddar p-renuruinc line outaide contd.nlaeDt (uatna 11olST bead) and teat for luka&e throuah DH-V6B bS!!., ·openin&.

11. Place cora exit thermocouples on reco-rding ayatem.

£/14/79

Action

lerbtin

VU.an

VUaon lerbein

Berbdn

DC lAC

Co baa a

Berbeia A.elterma n

Page 8: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

1. ~leu. 1uta.U.at1on aod Moc:b .. dtiq of pruaurtur ptu•v.t• u.u. aava• aod Pru.-u'fe Tr-..ittu.

1. Coaplate rap.S.ra to 11 !b'1i'l"'J"«G hcocabber. ~k 12 neoabi.nu for daal.~r !aUure _,4•.

l. Vue pruauti.zar oac:a per cl&.y fo-r U &L=c: ...

4. Cheek duian ~itiona ol p~ .. .urbu vet ~ to a .. un c:a.patabllit)' vith cu.rrut sUTtee ecoaditlou.

S. Co=plete by 0900 4/15/79 tn.tallatioll of e~llt.a~t sump !eua Pr .. aura Caup.

6. Coapile uehnie&l araueent that supports nou-iutarehange ot vater at DB-V68.

7. leport ruulta of acac:k an.alysia p-cior to 0843 oo 8/15/79.

8. bvtew IUtua of U• liiOt'k. •

9. Pnpan rec:~nt&t1on oo uthcxt of tttilbina Spec:i.al b•t~t Group (A.c:ltel"MD)

10. T.U K.U. Tack 1aple \then tuk preuuu iDereuaa co 10 pd.

u. Cheek eu.itahUitl' of ulna Inatra.ect Air Syac- for Air lruchina- Datendu bov to but us• lut~c: Air Syat• tor Air Bruthina purpo••• (hov .-ny auppor~ed).

12. <Aati.Due vort on upla.e••ct of aux1U..ary builclilll filuu .

U. 1l•port on IMthods to S..prove Procedures.

14. Contiaue ~d1f1e.atioaa to air ajeetor filtration uoic:.

4/14179

kt:Lon

Cobunl\lilaoa

Barbe in

Bultb & Safety (c.yu)/Cobeu

Barbe in

llllaoa

Co bun

Page 9: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

Ts-l

ts-3

TS-4

TS-10

TS-ll

1063

ts-6

ts-6

TS-14

---- ·--~- ---- ------.....----0800 4/15/79

Plant Modifications

De•er1ption Priority

Decon. v•ur in AB usinc 1 Cap-Curl ion exeb&oae process

Develop complau pac:kaa• 1 for ahort-tera coolie& of ,.A" 8D4 "B" OTSC.

~alop caapln• pa.ck.aae tor lona-tarm coolin& of S.C. "A" and S.C. "I"

Develop CO!IIpleu package for meAaurina vater level inside aeactor !uildioa

Decide location deaisn/ install 2·2500 kV diesel a•ceratora

D.velop electrical dt.tri­bution ayac:.a. Iutall ub.l.iq and svitcbaur froa DC • • to current 101' load a requiriaa lo .. of off-alta power protection

tnatal1 atora&e ••••al• in Fuel Pool "Au

Install roll-up door air­lock to Fuel Handlin& llda.

Condenser vaeuus pump fUtera

lC loop passive pressure control ayata

lC loop active preaaure control system

Shield for decay heat pump piu

1

1

1

1

1

1

1

1

1

1

Statua/Date Due

Complete procureaent-4/17: Equip. avail. 4/18; Inatall Camp. 4/22. 14 of 22 !CK'a iaaued.

!CH by 4/15; lnatall eo.p. "A" 4/20; ":au 4/21.

Scheduh being developed

Tuk Coord.

Co bean

Wilson/ Co bun

llU.e Gauge calibration Devine/ underway. Co bean

Equip. avail! 4/11 Cobean Eat . ready for teat 4/20

!quip. avaU. 4/10 Install camp. 4/20

Co bean

ECM' •; 4/15, In.atallation Cobuu/ complete 4/19 Cuou

On Hold Vllson

Installation complete Cuun/ 4/14. Funct~oaal Teat- Toole iDa 4/15

ECH eo.pleta 4/17 Io.tall. coap. 5/2 per verbal ••tillate

5/2 ... e •• ~aaaive aya

On hold Wilson

Page 10: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

----... - -- ·-.. ----------·-- __. .. __. ---0800 4/U/79

PlAnt 11odHlcat1ona

WG-1 tn.tall A!/ FHI FiltaT Syat•

ts-9 PTovi.cl• aupeted 1natru­..at Ur ayat-

WG-3 Veat atac.k -aa!t or KPl-219 recovery •7•t•

TS-13

TS- 5

TS-8

Inatall and c~l•t• turn­over paebae of elect.rJ.c.a.l heaters in ~upply aid• of Aux. !lda •.

Method for c:ontaGnm~t floodina with 10 ft of \l'&ter

Inst~ll housina for ~ (2) lona-tera RP ORR ay•t ...

o .. tan l% •b.le.ld vall at c.ond. daiaa

Prtorttx

2

2

z

J

2

3

Status£0.te Due

Equip. avail. - 4/16 Ia.tall. ~oap. - 4/16

On hold

Iaat. ea.p. - 4/13 -Fuact. T••t - 4/14 -hed f/0 pq. to SU'T

To he aett.dulecl

n .. tan - 4/20 Install - .S/31

On hole!

1' .. k Coord.

Bac.hofer

Cwm

Vlleon

Page 11: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

_ .. -__ .._._,- · --- --- . -·-- ... ·-----·-· - - -.---. - .... - --0800 4/ls/79

Plant Q2e~ationa Staff

task. ~ Descr12tion Prioriti Status£Date Due CN)rd .

1 Obtain RCS pressuri~ed sam- 1 Sample 12 (B&lol) Hetrick./ plu. 4/15 Shift Supt.

2 rr .. aurtze:- .A P tr&OSllitte:- .. 1 Shift Supt. &ad BeUe &•\ll•

l Saaple make-up tank aas apace 1. Pressurization Shift Supt . / in progress Be trick pd&@

4 Wuc:tion of RCS teap. .

1 On&oiq, Dr:vi:rle/ to 230 r . Shift Supt.

s bturn ~ Jtecomhinu 2 Shift Supt./ to s.rvi • Poje

6 &estore pressurizer heaters 2 . lolorking Porter - 1392 k.W of total 1638 avail .

7 Issue III&Ster organizational 2 Being developed Colitz/ plan Christman

8 Atmos. dUIDp on OTSC "B". 2 Shift Supt./ Leaka&e to M20 area (l" Shovlin Yalve baa body/ boa.net luk)

9 Security split UDit2/UDit 1 2 Est. 4 / 16 Troffer

10 F&ilure of BP-1221! & 222 1 Shift Supt./ (HP-a 219 vas returned to 1WDkal. service-Ebe~line)

ll Monitor par anJ let dovn for 1 On goi.q Killer/ de-aaa i:rlcU.cations Shift Supt.

12 Put In Co~e Thermocouples on 2 Miller/ recordet' Porter

13 Deline Q.C. level on 2 Cuun/ IIOClifications bei:rla aade llright to plant (auppot't systems)

Page 12: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

Technical Support

~ Descdtioa Sueu.£Due Date ~t IM-23A Passive llCS P/V Capodanno

Control System

'IM-2Ja Active RCS P/V Capoc!anno Coatrol Syn•

C-10 Loss of Pztt Heaters Issued for ltcviev VU.on Approval 4/16 ·

c-13 to .. of Pn Vent Issued for l.niew Viboo Valves ! Approval 4/16

m-Jo Deteraine ~t I.O.P. Issued for l.eviaw Capoda=o loada oeed backup 4/13 el« t. pove-r

C-lS In core tbermoeouplea, B.TSa, MO tank level,

Expected Approval 4/17

Wilson

JI.CS flov inat.

Page 13: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

........... ·--- - ·--.. ·--- - -·-0800 4/15/79

Waste Manas.ament Crou2

Task ~ O.acrition Pdodt;( Statua£0ate Due Coord.

1 Set-up to change AB/FH 1 In prosr••• Shovlin/ !lela. vent. filtera (enaure (7) of 90 out Futrll/ aero lubae - QC to follow) Bitel

2. A. Deaip and coataacthi&h 1 Eat, 032; iuuad Bitel/ 1 .. e1 liq. waste atorqe EQI'a co.plete Co bun/ veuela ua~aa 1pent fuel 4/!S; iaatalla- Cwm atoraae pool. tioa 4/20

I. 1.5~ pl. t.aDb returned 1 Lut tank to be to VDR. aDd teat - total delivered (4) req'ct.

c. laaued hZC W 1909 to 1 No natua remo.e pipe in pool .

D. Determine 1~ceasiaa l No atatua requlremeata.

3. A. Dec:on. water in AB using 1 lludy for test Co bun/ Cap-Cue ion exc:hanaer 4/23 Cuna process - prepare c:hem. cla. blda. (Cap-Cun 2)

B. Initiate teat requir- 1 Toole aenta (&eneric pro-c:eduru)

4. Traia/JalP c:oaat. aupport 1 0a JOin& Troffer p.apl•

s. O.coa. diesel aenarator 2 Eatillatad Cuaa/ building CWeatin&house) atart 4/15 Bitel

Delayed

6. Puap Bleed Tanks - 2 Hold pecdias Shift Supt. U~t 2 to U~t l 1. Ko apace avail.

2. NRC questions

7. Coordinate all vater l Seellaaer IIOV ... nt, radvaste ayatc; transfers in Unit 2 AB

.-

Page 14: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

--- --.-. --· _....,. ---------·-----~----__ _... _______ ... __ 0800 4/15/79

lDdustq Advboq Ct'oup

1. Detend.ne uthod of fiadina leak in vent h&ader

Priority

1+ .

2.

3.

4.

s.

6.

1.

8 .

9.

10.

11.

12.

Provide uc~tation for 1 altarutiv-e .. tbods of P/V control

!valuate Hre ill contaitu~~tnt 1

Loo.a ten. hNt ra.oval 1

Unit 2 Contaimlent lkdldJ.Da a. Possible ~es of chana• e!

state b. P/T suitable for 30 days

c . Cleanup options for containaent atlDOiphere

Cun •aat assess=ent of core status a . Froa thermal-hydraulics

iastruMDt data b. Sequ~• of .vente and

core d..cripti•• froa nau tmderst«ndtoc

Provide Doc:UIIntation of co.­plated it ...

2

1

1

2

Surveillance of Work Met. Croup 2

'Oil Unit 1 Start-up Securins 3 Cortonia

leflux Boiler 2 a. Non-tondenaible /Vate-r level/

uv b. Teaperature 6o Prauure Study 2 .

of low reactor pressu-re

tnatruwent Diagnostics (reaetot' core inatruaentatioa)

1

Specifications for leflux Boiler Test a . l'eu1b1Uty 2 b. Specific: Parameter 2

Starus/Date Due

In pro&ress

Cotlpleted 4/13 CJ.oae-o'ut IIICIIO

la1.o.a ?:utucUed

eo.pleud Close-out aemo Cocpleted Close-out aemo

Ia proaress

Completed 4/13

,.!aslr ..... orCJ.

H. La\iborslti

~,.kerman

Thieaina IA-3

TMuina

L\-SA

L\-SB

1Awosk1

~ :Jlbri& Close-out INDO IA-6.A Colllpl&ted 4/13 rletrich Close-out .eao IA-6L

No Action To Be Asatsned

No Action To Be A .. tgned

Initiated M.Jencb

Completed 4/12 ~ler Close-out ~~~~ IA-10B

Onaoina (Continual)

tn P~ogress In Progress

Aclten&an

Fornando& 1'ornandoz

Page 15: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

-----------------------------~----------------- - ------ --------------0800 4/15/79

lnduat~ Adviaorz Croue

.!!!E. Deseri(!tion hiorit% Task

StatuslDate Due Coord •

13. Water Level/R.aetor P/V a. Short-form 2 Not Studied Yet Fornaodoz b. Lona-form 2 Not Studied Yet Fornan.doz

14. Model for boron/&U in 2 In prosress l.oler pdaary SJatea

15. Ev&luate RHR System (WE) 1 In J!tOgTesa L1cbte.nberger

16. Put &11 TC (bactoT) in 1 In progress Ackeralan Hoeordors

17. On-Line Monitoring of Boron and 1 In progress Acbnaan Cas au

18. IU.sk.a/Advantagu of going to 1 In progress Paddle! or Natural CiTeulation as is va. Present Plan

Page 16: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

---· - -0800 4/U/79

I ' . vr.srpcaousx

Status/Date Due Task

Task Desenptioa Moritz Coord.

I.B.l. Dec:ontc.i.n&te tor IJHR Sis•

~ cbeckout l. D.o. Bldc· Siano .lux. Bldc·

t.D.2. btall Aux. Blda· 'f. v. 2 Arter c!econ • JDOrd.tor tor e:d.etUc .mR qstea.

I.D.4- D:urtal.l I8!l raote operatic= 1 .uter c!econ. • equipmeut.

I.a.s. DB!l nw/pressure testa 1 Jtter c!econ. • n.A.l. maR (ow) .,-stc c!edp 1:

approval. 1 ongoin& •

n • .t.J. .&DBR t.inal test procedure 1 ongoiDc • II • .A.l. :r1.Dal .IIEll 1Dstal.l.at.1on 1 onaoixlc • ~

II.A.2 • . AIIDl~ 1 ODI01Dc • n.B. Jim 1nstallation 1 l'lo statu •

110rl3s

1 4/u./79, l:b.t%7 Tent completed 'tu aubeontractor. De con could be c!elqed u a result ot. CatalJ-tic Manpover aho-cta.ge c!urlca EAate~: Sunday.

2 '1' .v. Mmitor 'rraUer 8pOttecl 4/lJ./79 3 Dea~ lWrlft started 4/l3/79 ...... Gt~r:wt::al. JrrancellleDt Dva· due J./lJ./79

Note

l.

2

Page 17: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

'll ~

-- ~ --- -~ -

~~ - ~ -~ ~ - ---- -~ -.

-\() --·-~

-- . -- · -~ -'" -- ~ ~

f) ~

::.-.

-- - · - - --- -·

----· - ---· .. --·· -.

-.. - · - -· .. ... --...

- .

-

~- ·--·

~ -- ~

t' --· ... .: ... .ll\ j~

....... ·-· -~

~

~ -- -

ll! f\:

.-- -- - ... __ .:-_.. -

- ~ .....,~

--------------~ ~ ~ ......

~~ ~~

~ j~-- __ --_-______ _J! . . -· ---- --------· . - - -1--~

-. --~ ~

~ ~ lo': ~ ~ ~ ~, ~ ;::

~ --~~......... ~ ~ ""-J

~ . ~ . ~~~ - --~ -- -· ~ ------ ~\: ~ . lu (.;i ·- --·-. - -M~ __ Jii _ .-- ~ - - ----

. \.. -. ___ __;_...:: - --~ ~ --- --~----· -~~ - --- ----- ~ ; T ~ ~ ~-- . --·- ' _ i __ _ . ·- ______ __:___...:_· - .. ~

- - --· - -·--=--···-- -~- - . -... - .- - .-- ---- ..

~ . --- ---___ __.:.._ _ __ ~ ~

• . - - ··-- - - -- !__ _ __ - -.;::,.. ·-- - --

~ ----:-----~

~ -~ ______ .:...._ ~

I

- l

Page 18: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

~-----: ·"' -·

~'' ) l ,,,~ I ,,u I ,;161 : ., I ,,u I .;u I .~,o I ,;u I ,;u I ,,2) I .~,.1 ,}u I ,;,, I ··m I . .. . . . I . . . . I I • I 1 J . ~!II':T Tf..al FCoJ:lt.\it¥ COOLJKt: IOJTII '"A" OTSC ! ; I • : I I I I . I

!:!.;ti~ ! I I I I I ' -1- - ----- .. L --L- ·:· ---1·- ~--L-- ---1-1- -··· ---::x'_ m<uu Allll b1mLL (Wo ~UlrttM I . . __ ~ __ .._1 If\ !rullJI J auk I ._;

1 1 1. , , 1 • r ! _ ; j\ i~

• I ' ~ ! I I I I I i Sill:"' ~ 11::-.:r SttON>AR't COOLUIC Vlt\4 "I P I ... . · . - - ·· 1-- -· !- --! ·· · --- ~-- ·--j- ·-~·- ·- - · 1 I P:£.\Ll1"' I I . I I I I •

~t~•.sm::$ I · I j · · ----;-·-- ,-·-·f- ·-;· ····- -· t------· .. J ' J;< · PROCUU AIID IIIIT.W. ;.w. T.QUl'na.Jr • I . .

1• .• .. • - · ••• ... • • • • f

I ~'.!U.hl! I I I .. , -.. -· . - - ·---- - .. - -1- -- --1- -- . ~ d ! : I. I .. . ... - -'--· -·---,'- - --1-- .. ----l __ _ , ; 'C'WI.:lll<.l - Z6JO 1- %J0° • I I ! . IJSOt:Afl :'A.. I : 1 u)a:~~: .. _, .. otsc 1 I I J j· · 1·- ; "a"' orsc sOLID I - c~lll11' ' ............._ B . . · . AJtD ~ruiLtzt 1 · I"•, CENfU

4/21 I 4n'l HlO

. .. . -I

I . S ·;cuaa: ICP Ut', •

I "Jl .! Sf

J · I r:.\lUUJ. CliiCUUT 10:1 £0rK OTSG'S.I£0Ut£ IC PWS.

l . ~ . . , . - - - . . ' I -. t.u:.r. PIJI:.UY .

!'~~*u .. ~~~ o · 0~:st~t~:o;•e·~ :soLID 1 "' ~ ~ SEC0!(DA1.Y C' D f/

1

l: .... • Pll. SYST. · t · -.. , .. I SOLto-1•

• ; I I )1.\TVJ. Ciat

I I SEC. 5Ut.

. · . 1 r f A - I - ·- I - '- 7 -r-j·l- • rLf Orl l I . ,.. I ~ • ?.'S~ P&.t _CH, . r , I . _ ---j . . •. _, _ .. ·-· ~- .. .. I -· .. __ _

I 0800 ' • : I I I ls~noc.rH rarssurmrn ~t. I~ 'fv ~:smc ., · · I · ---'· ·I ·t --- · ~-- ·-,-- ·-r--c•JttiL\ I PllL. nc li:VlEII J 1 • • . . • I -1-- · .. · · ... , · · ·-- -~ I I t • I t I I I

- - - - - - - - - - )-1 SOLJD,•LO:II ft»l Ht.\f !\CIO'JAL.

f") l m :.\Llt!: tiJCS. ' II.OCUU ' UST IQUIPK!ItT I_ !.. . .J _ - __ _! _ ...i ___ -I •• • • f ; • ~

its i PLt ~;oosm I . I j I ! I i. . i . - . i ·--. J ~Tl\'t Ht! P:trssuu: cc:cnoL SY~TDI ·; · I · · ' ! · -j .. · · .. -- ···I . I '-B. I • , ~n ottnu 1 1 1 i : ' -· · · .. 1

• • . I I • t

[) . "';~:~:..~··· I . : . . .~. ·1' i "j'" I I i ,---~· ·- - +- ·~,· ---~-1,. I ... (Uit) I • I f) I I I . - I .

'.~ .. • • I ,; . I : • • ..

t

i j I . i .. . ' : : . I ! I

~..!.---:---- --yl

I! A ~F.· ~ r-. ·: -~r,,:!,. ····'·•V.-1<\

Page 19: 1. Revhv Top hioritiu., 1iet. - Idaho National Laboratory1979-04-15) 0900 hrs, Planning Meeting (2...t PUNNING MEETING 0900 4/15/79 1. Revhv "Top hioritiu., 1iet. 2. Review Action

.... ..

• f ... . .

,ACTION ITEMS

.Task Management/Schedule

.0900 4/1.4/79

1. De-con sample roo=; complete work on Heise Cauge and P transmitter.

2. Resolve air supply problema; continue removal of Auxiliary Builc!ing filters.

3. Stack Monitors: 219 should be in service by 1200; 220 has bad pump. Place both in service.

4. Develop otSC shell temperature/condenser pressure correla­tion.

. I

S. Confirm natus of Atmospheric Steam Pump valve luk on "B" OTSC. Confirm if we are periodically feeding the "B" OTSC.

6. Evaluate necessity for periodic primacy sa=ples (possible boron dilution).

7. Develop concept of on-site samplin§ and analysis capability.

8. Complete installation of Heise Gauges for Contain .:ent Sump level indication.

9. Review proposed alternate DBR Syste= and comment.

10. Provide assessment of the impact if DB-V6B does not close after taking containmant sump level 111eaauruaent. Consider pressurizing line outside contaiament (using BWST head) and teat for leakage throus;h DB-V6B b~·openJ.na.

11. Place core exit thermocouples on recording systea.

4/14/79

Aetion

Berbein

Berbein

Berbein

Wilson

llerbein

Wilson ·aerbein

Ackerman

Berbeiil

lUlC lAG

Co bean

Berbein Ackerman