RRV Safety Improvement Programme

DECT Duplex

RRV communications System:-

Contractors’ Brief

Page 2: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

2

Contents

• Plant Manual

• Equipment Overview

• Implementation

• Communications Protocols

• Contacts

Page 3: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

3

Network Rail’s Plant Manual Issue 5 published 2 3 2013

NR/Plant/0200/Infrastructure Plant Manual

Mandates use of Duplex Communications System for all RRV operations

Section number to go here

RRV Safety Improvement Programme

Page 4: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

4

Network Rail’s Plant Manual Issue 5 The use of Duplex Communication is mandated, and is included in Network Rail’s Plant Manual Issue 5 published 2nd March 2013. In

Section 4 Communication equipment, this states:

• “Where personnel are required to undertake activities involving on-track machines or on-track plant on or about Network Rail managed infrastructure, mobile voice communication systems shall be provided for the Machine Controller and Machine Operator.

• Any such system shall be a full digital duplex communication system and as a minimum provide instant simultaneous communications, voice clarity, durability, and enhanced weatherproofing of the equipment.

• The communication system shall meet applicable EMC and other environmental requirements of Network Rail standards and other applicable mandatory or statutory requirements as appropriate.”

Standard affected: NR/L2/RMVP/0206 (Issue 1), Safe Use of Plant for Infrastructure Work

• ‘Where personnel are required to undertake OTP activities on Network Rail managed infrastructure, mobile voice and radio communication systems shall be provided. Any such system shall be a full digital duplex communication system and as a minimum provide instant simultaneous communications, voice clarity, durability and enhanced weatherproofing of the equipment.’

• Duplex comms systems must meet NR/L2/TEL/30156 tech spec.

• The only NR Product Approved equipment which meets the above requirements are: 3M Peltor DECT-Com, or 3M Peltor DECT-Com II

• Network Rail Contractors Compliance Date is 31st March 2012

Page 5: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

5

Network Rail’s Plant Manual Issue 5

Approved equipment which meets these requirements is the 3M manufactured Peltor DECT Com and Peltor Dect-Com II.

In addition dBD Communications bluetooth Athena product is approved, providing two headsets. This maybe appropriate in some circumstances but does not offer the flexibility of DECT-com II, including for tandem lifts.

Page 6: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

6

Network Rail’s Plant Manual Issue 5How will Contractors comply with this?

• Principal Contractors are expected to manage the implementation of this requirement.

• Principal Contractors are expected to purchase, lease or hire sufficient Duplex communications equipment to comply with the Plant Manual.

• Following issue of OJEU notices Network Rail has awarded an Employers Facilitated Contract to:

• All of NR’s Contractors and Suppliers are able to purchase equipment direct from Cromwell at the agreed preferential rates.

• PC’s need to determine how best to deploy Duplex Comms on their sites e.g. controlled from Site Access Control or Personal Issue etc {NB: Do not ask your RRV Supplier to provide!}

Page 7: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

7

DECT COM ii Duplex Communications

Equipment overview

Section number to go here

RRV Safety Improvement Programme

Page 8: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

8

DECT-Com II

• DECT – Digitally Enhanced Cordless Telephone

• 3M Peltor DECT-Com II is a wireless duplex intercom system, operating on the 1.8 GHz DECT-frequencies, which is license free in most countries.

• The products in the Peltor DECT-Com II family offer simple and efficient wireless duplex communication with up to 9 active users talking in full conference.

• Due to low power output and high frequency, it is a short range communication system. The nominal working range is approximately 150 metres outdoors in line of sight from the base. The working range may be shorter due to actual environmental conditions.

Page 9: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

9

New DECT-Com IIUp to 9 simultaneous portable units in a conference logged on to a base unit, which can also accept a headset making a total of 10.

Page 10: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

10

Main unitThere are basically two versions of the DECT-Com II main unit- Portable- Base/Portable

There is also an Extension Base/Portable (for link to external communications devices) Black ring). This is rarely used.

Page 11: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

11

Dect Com II

Portable Unit

Portable Unit

Portable Unit

Portable Unit

2

Page 12: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

12

Throat mic

• Throat mics provide hygiene, noise reduction and the wearing of protective glasses advantages.

• As the microphones are tight against the user’s neck, only their voice is heard and outside noise is virtually eliminated.

• As there is no boom mic’, the hygiene issue with the boom mic’ is eliminated. The invisi tube earpieces should be personal issue.

• For Network Rail, these are available from High Motive through i-procurement

Page 13: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

13

3M™ Peltor™ Headsets Available as a non-attenuation, medium , high attenuation and level dependant headset

The same J11 connector connects any of these headsets to the Dect Com II Portables/Base or Base Extension units.

Page 14: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

14

1 x DC2812 Dect Com II Base unit without external input (Red Ring Unit)

1 x DC2068 Dect Com II Base power supply holder (For Base Unit) 

1 x 12 volt power cable (For Base Unit)

1 x DC2811 Dect Com II Portable handset (Green Ring Unit)

1 x DC2064 Dect Com II Charging holder

2 x J-TTM03/NP2/NB Throat mics

Typical Single RRV Kit Contents

Page 15: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

15

Implementation

Section number to go here

RRV Safety Improvement Programme

Page 16: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

16

Implementation:- SuperUsers

Super Users

• Consider nominating DECT Super Users who will become expert in use and setting up of the equipment. (This will probably be someone

who regularly carries out the MC/CC role for you)

Brief MC/CC/Operators

• The Super User can support briefing of all MCs, CCs and RRV Operators.

• Use of this equipment is incorporated into NR OTP Training material.

Page 17: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

17

Implementation: Things to Consider

Charging facilities

• Green Ring Portable Units have a battery life of 40 Hours.

• The Charging chassis’ can be fixed to a wall.

• You should establish a charging point and nominate someone to look after it.

• Batteries will last for 500 re-charges and can be replaced.

• Black & Red Ring Base Units have a 5 hour battery life. They should be plugged into the cigar lighter socket on the RRV when in use. (They can also be charged via the mains).

Page 18: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

18

Implementation: Things to Consider

Maintenance of Kit

• Periodic software and firmware upgrades may be required.

• For best results, certain functions should be locked out or applied, such as Auto talk, eliminating the need to double click PTT1 to join a conference.

• Batteries will need replacing after 500 charges. Installation is simple. (Replacements will be available on the system to buy).

• Marking of each kit is highly recommended. Units should go to site already paired (paired units to be marked KIT1 1A/1B, KIT2 2A2/B,KIT3 3A/3B etc).TANDEMS to be marked KIT1 1/A1/B/1C (clearly marked and not scratched in).

• Consider PAT testing for mains chargers

Page 19: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

19

Hygiene

• Microphones can be protected by ‘Mic Tape’. This should be changed by each User prior to use.

• Headset Hygiene Kits are also available from Cromwell.

• Consider what arrangements you need to establish to make Hygiene Kits and Mic tape available to your staff.

• Cool Pads – self adhesive pads which stick to the earmuff cushions to aid absorption of perspiration.

• Periodically wipe with an anti bacterial wipe as used for cleaning a telephone.

• Throat mics and Lightweight Headsets are fairly cheap. You may wish to personally issue these to your regular CCs and Operators

Implementation: Things to Consider

Page 20: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

20

Implementation: Things to Consider

Throat mics

NOTE: When a throat mic’ is used, there are hygiene, noise reduction and the wearing of protective glasses advantages.

As the microphones are tight against the user’s neck, only their voice is heard and outside noise is virtually eliminated. As there is no boom mic’, the hygiene issue with the boom mic’ is eliminated. The invisi tube earpieces should be personal issue.

Security

• Consider the Security arrangements for the kit. How are you going to ensure it is kept together and in good condition?

• It is strongly recommended that DECT kit is not left on RRVs.

Page 21: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

21

Implementation: Planning

Works Planning

• Battery life of Green Ring Portable Units is approximately 40 hours.

• In the event of jobs being 52 hours, or longer such as for long weekend working, or blockades, exchanging handsets every 24 hours eliminates battery issues on the long shift.

–This means ordering additional handsets from your supplier with the kit labeled e.g. KIT 1(1A,1B.1C) where handset A/B are used for the first 24 hours and then handset C/B are used for the remainder of the shift.

Page 22: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

22

Black Ring Base Units

• Black Ring Base Units can be connected to Motorola GP30 back to back radios via the lead provided. These are rarely used.

• This allows someone else with another back to back radio to speak into the DECT conference. (and conference members to speak out)

• This external person might be the Engineering Supervisor or another Machine Controller waiting to receive an RRV from a ‘send and receive’ movement.

Black Band

Extension Lead

Socket

DC2-5030 GP30 Motorola Cable

Connected

Page 23: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

23

Black Ring Base Units

Machine Controller 1

Send & Receive Movement

Onboard RRV

Connected

Machine Controller 2

Able to contact with the DECT Conference throughout movement

Ready to join DECT conference when RRV comes within range. Or sent with the RRV from MC1

Black Ring Base Unit

Page 24: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

24

Mark Prescott

RRV Safety Improvement Programme

Duplex-RRV Comms

Communications Protocols

Page 25: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

25

Radio Communications - Protocols• DECT DUPLEX Radios operate in an ‘Open’ Channel conference.

• This means that your microphone is always live/active.

• Every time you speak it will be heard by those connected to your open channel conference.

• It is not reasonable to expect you to remain silent for the length of the shift.

• It is important to know when you are giving and receiving safety critical information and/or instructions.

• Using Open channel communications requires some discipline and some simple rules to know when safety critical info/instructions are being transmitted.

Page 26: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

26

RRV Comms – Protocols, Basic Rules

• The Machine/Crane Controller is responsible for establishing the rules for communications and confirming what communications ‘phrases’ and ‘call signs’ are to be used.

• Remember using radios with RRVs will be new to many MC/CCs and Operators.

• Remember when Tandem Lifting each Machine will need an easily understandable name or call sign to ensure each Operator knows when he is being addressed.

• Before RRV operations commence the MC/CC must brief the Operator(s) and come to a clear understanding on the names and protocols that are going to be used.

Page 27: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

27

RRV Comms – Protocols:- Commencing Operations

• When the RRV is required to commence an operation (movement or lift etc) the Machine or Crane Controller must alert the Operator(s) that he is about to give safety critical information or an instruction. This will stop any background conversation that may be taking place and the Operator(s) must pay attention. The following phrase should be used:-

“Machine/Crane Controller speaking. Standby for Instruction.”

The Operator must respond with the phrase:- “Standing by”

• When the task has been completed and the RRV can be stood down to wait for the next task the Machine/Crane controller should inform the Operator and state:-

“Operation complete stand down.”

Page 28: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

28

RRV Comms – Protocols:- Emergency Commands

• In the event of an Emergency the command is:-

“Emergency! Stop! Stop! Stop!”Operators must cease or freeze

all wheel and jib movement immediately.

Crane Controllers can then give further instructions to bring the machine and or jib/load to a position of safety in a controlled manner.

Page 29: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

29

RRV Comms :– Actions in the event of Radio Equipment Failure

• In the event of Radio equipment failure after work has started and the

MC/CC and Operator are unable to resolve then the following actions

must be instigated by the MC/CC:-

1. The MC/CC must attempt to source replacement equipment.

2. If the time required to source alternative equipment imports risk to

successfully completing the task within the given possession working

time, an alternative agreed safe system of work can be used.

3. The MC/CC MUST record on his RRV Work Plan why an agreed

alternative safe system of work is being used and the type/reason of

failure of the Radio equipment and report the defect to the Site or Line

Manager.

4. Equipment failure and consequent actions must be reported through the

Close Call system.

Page 30: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

30

A Step Change in RRV Safety!

Implementation

• The use of this equipment has been mandated for all RRV operations since 31st March 2012.

• Using this equipment represents a step change in RRV Safety.

• This will only work if you effectively manage the robust implementation of its use.

• Please engage with your MCs, CCs and RRV Operators and take an interest in how they are getting on with the kit.

• Get involved with your Super User.

• Ask your Supervisors to undertake site visits when Duplex Comms are in use.

Page 31: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

31

Mark Prescott

RRV Safety Improvement Programme

Contacts

Page 32: 1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

32

RRV Safety Improvement Programme

• Contacts:-

• Project Manager:- John Sidebotham

[email protected]

–Mobile:- 07711 602057

• Programme Manager: Gerald Forward

[email protected]

–Mobile:- 07711601899