Page 1: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

1

Team

Core TeamBill CardozaJohn IngallsLeo MarshWarren McClureAnthony NeunerMark PorterMike FerrarisJill Winkelman

Assists

Rudy Escobedo

Page 2: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

2

Before

Page 3: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

3

Brainstorming & Observations

Made ___ + observations

Page 4: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

4

Picture of Human and Layout

Page 5: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

5

Prioritization

Page 6: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

6

Newspaper

Page 7: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

7

5S Outlying AreasSSE Area –

Before and After

Page 8: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

8

Page 9: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

9

Maintenance Area –Before and After

Page 10: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

10

5S Office

Page 11: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

11

Entryways

Before

Improved

Page 12: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

12

Tacky Mats

Before:

Now: Pull them up regularly, written in cleaning contract

Page 13: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

13

Traffic ReductionVideo taping7 to 2 doorsErrorproof – changing locks and tape for the code changerAndon lightCleaning crews no longer empty trashMorning meeting no longer held inside room(est. number of trips no longer being made through room on a daily basis – meeting, shortcut, cleaners, tours, audits/leadership)

Page 14: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

14

Visitor Guidelines

Page 15: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

15

Material Characterization

Sourced labs that could retrieve and characterize particles found on scopes.

1. Internal2. Georgia Tech Research Institute Materials Analysis Center3. Analytical Services, Inc

Determination: Best source is Analytical Services, Inc.

Page 16: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

16

Material Characterization

2 rejected scopes

1. Found one particle that was not within Combat System Test specs (?)

As we had additional samples at no additional cost analyzed. Reviewed and took action on the following:

All periscopes have particles missing off of the flanges that are hot-dipped coated. Zinc or stainless steel will flake.

Recorded instance in Standardized Work Login Process database. Discussed re-coating, lubricants, shoes – and determined that cost

outweighs benefit for single instance. Will watch for repeats.Noted new scopes have rollers and shoes, preventing friction between

flange and mast (?) so already prevented in future designs/scopes.

Page 17: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

17

Material Characterization

Purchased collection equipment to do material characterization.

Recommend interim acceptance criteria of:

When finding:Do root causeEnter in Standard Work Login Process database

for trending and info sharing across sites

Page 18: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

18

Newspaper Summary

Items Generated TBD

Items Closed TBD

Completion Date for Final Item TBD

Items Generated TBD

Items Closed TBD

Completion Date for Final Item TBD

Page 19: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

19

Parking Lot

Follow up/Follow through (i.e. root cause project 11/07)5S warehouse and mezzanine (storage areas for other material)Periscope DesignView across all sitesEvaluate sites like a golf game/handicapMake sure improvement is occurringChoose investment based on nature of improvement, volume, performance, criticalnessStandards: At shop, POSR, In use (R&R – consistent evaluation among different sites/people, and consistent evaluation over time/in different instances with same site/person )e a greater response to customer’s needs.Facilities Manager

Page 20: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

20

Implementation Plans while Floor Construction

Just Do It – Clean outside pier/end of building

5S other areas – Paint Area, Old Machine Shop

Fleet Parking – 5S/Inventory

Page 21: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

21

Implementation Plans after Floor Construction

Dust guards at bottom of furniture

Page 22: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

22

Summary

Improved productivity through creating more available time and space to provide a greater response to customer’s needs.

Created a safer and cleaner work environment.

Improved morale of department.

Page 23: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

23

Ceiling replacement

Floor replacement

Page 24: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

24

SummaryOriginal State

Seven Entrances / Exits from Optical Repair Room Tiled floor chipping & requires waxingNo positive pressure in Repair Room

Future StateEntrances restricted (only two personnel entrances) New Epoxy-based flooring being installedRecommendations for positive pressure installation

Goal: Eliminate Sources of Contamination in “Clean Room”

Executive Summary • Installed Intercom system to reduce traffic in and out of Repair area• New cleaning contract • Ceiling Tiles have been replaced• Recorded traffic into and out from the facility to monitor patterns, travel

in the facility, entrances / exits used, etc.

Page 25: 1 Team Core Team Bill Cardoza John Ingalls Leo Marsh Warren McClure Anthony Neuner Mark Porter Mike Ferraris Jill Winkelman Assists Rudy Escobedo

25

A special thank you to the following people