1 US Testing Update-Anthony Affolder racker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update of Readiness Description of Production New Studies of CMN Modules

Post on 21-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

1US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

US Module Testing UpdateUS Module Testing Update

Anthony Affolder(On behalf of the US testing group)

Update of ReadinessDescription of Production

New Studies of CMN Modules

Page 2: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

2US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

Hybrid Wire Bonding/Thermal CyclerHybrid Wire Bonding/Thermal Cycler•80 hybrids bonded and thermal cycled

4 PLL failures at -20 C 2 APV failures Opens

• 2 hybrids with 1 open• 3 hybrids with 2 opens• 1 hybrid with 3 opens• 1 hybrid with 4 opens• Opens due to AL

pulling off PA

•UCSB thermal cycler fully commissioned•FNAL thermal cycler built and being shipped•Beginning to assemble test stand for Mexico City

SetSet--up in Clean Roomup in Clean Room

SetSet--up in Clean Roomup in Clean Room

ChillerChiller

Cold BoxCold Box

PC for MonitoringPC for Monitoring+ Controlling+ Controlling

ElectronicsElectronics

Gas/Water Flow ControlGas/Water Flow Control

Soon will have capability of ~90 hybrid thermal cycles per day

Page 3: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

3US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

FNAL Vienna BoxFNAL Vienna Box

• Fully Operational Installed F-MUX, TPO,

NIM2LVDS, electrometers Calibrated electometers readout

• Ready to thermo-cycle 10 modules at one time, ready to run 10-14 hours scenario with 3 thermal cycles, PedRun, CalRun, IVRun. Multiple people are trained to

operate Lt stand (2 grad. students, 2 technicians)

Insert new Thermal cycler Picture here

Page 4: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

4US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

UCSB 150 Module ProductionUCSB 150 Module Production

• Goals To establish new peak production capacity (15 modules/day)

• Determine if testing capabilities sufficient

Build as many modules as possible using new ST sensors as agreed upon in December

• Use sensor grading scheme to find out if subclass of perfect sensors exists

• Results Easily met testing capacity needs Extremely low rate of introduced failures seen CMN modules occurred at same rates as previous builds

using re-probed sensors• Did not appear to depend on production period or sensor grading

Page 5: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

5US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

New UCSB ProductionNew UCSB Production

•Expected peak production rate of 15 modules/day maintained over a two week period (150 modules)

Modules used sensor grading scheme by Vienna (A+,A,B)

•Complete set of module tests made

ARCS quick test Module thermal cycle (Vienna

Box)• 1 thermal cycle for each

module (~7 hours)

After thermal cycle LED tests

•From this exercise, it is clear that we will be able to test the 15 module/day peak rate

Page 6: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

6US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

UCSB Module Quality/GradingUCSB Module Quality/Grading

•117 modules tested so far

•Failure rates/sources (excluding CMN modules)

0.39% Bad channels on average• 0.26% Known bad sensor

channels

• 0.13% Unmarked bad sensor channels

• 0.004% open hybrid-APV bonds

• 0.001% module bonding

• 0.002% testing errors

Less than 0.01% bad channels introduced during assembly/bonding/testing

•Module Grading 5 Grade B

• All due to sensor faults

7 Grade A/F• 6 CMN modules

• 1 after thermal cycle

• 1 module fails to operate at -20 C• Tested in 3 different Vienna box

slots

2 Grade C/F• 12 mid-sensor opens in aluminum

strips (lithographic error)

• 1 CMN module

Page 7: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

7US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

UCSB Thermal Cycling ResultsUCSB Thermal Cycling Results

• 101 modules thermal cycled One module does not function at -20 C

• Tested in 3 different cold box slots

• Hybrid bonded and thermal-cycled at UCSB without seeing this effect

One module developed CMN• Prior to thermal cycling, the channel had 10 ADC noise

• Now consistently has CMN

One module have a single APV channel burn-out Multiple noisy channels (2-5 ADC) appeared and disappeared after

cycling

Page 8: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

8US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

CMN modules and sensor gradingCMN modules and sensor grading

•Sensors graded using Vienna rules All sensors were re-probed prior to assembly Worst sensor grading out of two measurements used

•Sensors sub-divided into three time periods Prior to Week 39, 2002 (Pre-production) Week 39, 2002-Week 12, 2003 (Production improvements being implemented) Week 13, 2003-now (Final Production)

•7 Common mode modules found (6% of production) Same rate as seen previously with re-probed sensors 1 after thermal cycling

•No statistically significant difference rate in CMN modules for the different sensor grading

Sensor 2001-2 2002-3 2003

Grade NUMBER CMN % NUMBER CMN % NUMBER CMN %

GRADE A+ 29 1 3.4% 4 1 25.0% 12 0 0.0%

GRADE A 38 2 5.3% 11 1 9.1% 16 1 6.3%

GRADE B 0 0 0.0% 6 1 16.6% 1 0 0.0%

Page 9: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

9US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

New CMN Module IV CurvesNew CMN Module IV Curves

30200020005048

100

1000

10000

100000

0 100 200 300 400 500

Voltage

Bia

s C

urr

en

t (n

A)

Current(DB)

Current(probing)

Current(Bonded)

30200020005063

100

1000

10000

0 100 200 300 400 500

Voltage

Bia

s C

urr

en

t (n

A)

Current(DB)

Current(probing)

Current(Bonded)

30200020005156

100

1000

10000

0 100 200 300 400 500

Voltage

Bia

s C

urr

en

t (n

A)

Current(DB)

Current(probing)

Current(Bonded)

After Thermal Cycle

30200020005081

100

600

1100

1600

2100

2600

0 100 200 300 400 500

Voltage

Bia

s C

urr

en

t (n

A)

Current(DB)

Current(probing)

Current(Bonded)

Page 10: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

10US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

CMN Module Bias CurrentCMN Module Bias Current

I(Measured-QTC) at 450V of CMN modules

0

2

4

6

8

10

12

14

1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 10000+

A large fraction (7/23) of CMN noise modules show a less than 5 A current increase relative to the sensor QTC expectations!

4 of the modules built with re-probed bad sensors with >10 mA increase in bias current

Page 11: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

11US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

FNAL module testing summary FNAL module testing summary

• 7 modules are produced in December-January

• Sensors were selected to have current below 1.5 m

Module 709 710 711 712 713 714 715

sensors # of bad channels

5

(72,74,82,511,512)

0 1 (333) 1 (232 -Istrip)

2 (143) (201 – Istrip)

1 (202)

1 (281 - Istrip)

Module

Information

Current (A) 4.0 4.0 3.6 3.6 3.5 3.2 3.5

# of bad channels

5 (72,74,82,511,512)

0 1 (333) 0 2 (143, 486)

1 (202)

0

Grade A A A A A A A

After Long term

ok ok 278 (noisy)

ok ok ok ok

Additional information

PH (#512) repaired

PH (#512) repaired

Metallization problem

Pinhole #486 pulled

Page 12: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

12US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

FNAL Retesting of CMN ModulesFNAL Retesting of CMN Modules

• 5 CMN modules still at FNAL studied further Standardization of CMN module measurements

• Turn-on point, determination of bad sensors, etc.

Serves as a measure of the stability of CMN modules

• Results 2 of the 5 modules had degraded even further

• Addition pinhole and additional CMN chip found

Turn-on of CMN effects occur near depletion voltage

Page 13: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

13US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

Module Time Degradation- Module 689Module Time Degradation- Module 689

•After 3 months on shelf, module retested

•Second chip now has a high noise channel which causes common mode noise

Channel previously only had a slightly higher noise (0.3 ADC)

Page 14: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

14US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

•After assembly module was tested (09/08) on ARCS at 400 V and graded “B” (6 faulty channels). No problems observe.

•After sitting on shelf for more than 3 months, module re-tested. A new pinhole is found

Module Time Degradation-705Module Time Degradation-705

•After LT, one chip shows CMN

Page 15: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

15US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

CMN Turn-on Voltage Vs. Depletion VoltageCMN Turn-on Voltage Vs. Depletion Voltage

CMN Turn-on V/Depletion V

0

1

2

3

4

5

6

7

8

0.5 1 1.5 2 2.5 3

Vturn on/Vdep

UCSB

FNAL

Page 16: 1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update

16US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004

ConclusionsConclusions

• The last few months has been a period of extreme growth in the US

Rod burn-in stands under commissioning at both FNAL and UCSB (see P. Tipton’s talk)

Both sites have commissioned Vienna cold boxes with all 10 slots operational

• At UCSB, ability to test at peak production rate of 15/day demonstrated for 2 week period

Modules have excellent quality BUT CMN modules are still being produced at the ~5% rate!!!!

• Same as rate seen before in modules using good re-probed sensors

• At FNAL, 2 of the 5 CMN modules still available are showing an increasing number of problems

More CMN chips and pinholes CMN turn-on occurs near depletion voltage

• Same as UCSB