Page 1: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

1

WP1 Technical OverviewProgress since last meeting

Barcelona 4-5th March 2005

Milan Lalovic, BT

Page 2: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

2

WP1 tasks

WP 1.1Applications and

Service Development

WP 1.2BusinessModelling

WP 1.3Architecture and

Inter-working

BT 6,4,4Bute 0,0,6UPC 6,0,0

Polito 3,0,0GSI 0,0,3

Skylinc 1,1,0

Page 3: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

3

WP1 Overview

WP1 : Applications and ServicesWP1.1 Applications and Services Development

D01 was delivered in Feb 04No activity since last meeting

WP1.2 Business ModellingM9 delivered in July 04M12 delivered 17th Nov 2004 on business models, acceptance criteria and some example models of servicesHAPS Strategy Document (work started)

WP1.3 Architecture Design / InterworkingTrial and measurements for Internet to trains and moving vehicles, report issued 5th Oct 04Network and applications designed and demonstrated in trial 1 at Pershore, report issued 10th Nov 04No activity since last meeting

Page 4: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

4

Exploration and Audit

26th January 2005, IEE Satellite Broadband Seminar, London, “Mobile Hotspots” (WLAN on trains) paper presented

Fairly wide audience

Very well received

31st January 2005, ISM Mobile and Wireless Summit, Japan, June 2005, Capanina paper sent out (BT co-author)

10th February 2005, Brussels, Annual Review Meting and Audit

Passed – Congratulations !!!

Page 5: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

5

Audit – Concluding Remarks

The project seems to be off to a good start and has the opportunity to produce state-of-the-art results on HAP communications.

The project should carry on its technical work, but more attention on the business models validation needs to be provided.

The issue of frequency availability needs to be urgently addressed.

Matrix work on WP1 and contributions to other WPs need improving,…

Page 6: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

6

WP1 Remaining work

WP1 : Applications and ServicesWP1.1 Applications and Services Development

Deliverable document “Revised applications and Services for BB HAP delivery” (due October 2006) – post trial

WP1.2 Business ModellingDeliverable D10: “Strategy Document: Delivering Broadband for All from Aerial Platforms including commercial and technical risk assessments” (due May 2005)

Milestone M20: “Development of commercial risk assessment methodology” (due Jun 2005)Milestone M24: “Reviewed and updated Strategy Document” (due October 2005)

WP1.3 Architecture Design / InterworkingDeliverable D11: “General network architecture requirements” (due May 2005)

Milestone M20: “Development of technical risk assessment methodology” (due Jun 2005)

Page 7: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

7

BT future work

Due to the company restructuring, BT is unable to contribute to CAPANINA after the end of April 2005

BT will however stay within the consortium if possible (pending internal agreement) as a silent partner.

Page 8: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

8

Contribution to other WPs – Possible Hand-over

WP1 Applications and Services

WP2.5 Networking and QoS AspectsDeliverable D24: Report defining network architecture and protocols (M36)

WP3.1 Communications equipment for trialsTrial II contributions

WP4.4 Trials and MeasurementsDeliverable D19: Test Results Summary Report (M34)

WP6 Project Management

Page 9: 1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT

9

WP1 Discussion