1 wp1 technical overview progress since last meeting barcelona 4-5 th march 2005 milan lalovic, bt
TRANSCRIPT
1
WP1 Technical OverviewProgress since last meeting
Barcelona 4-5th March 2005
Milan Lalovic, BT
2
WP1 tasks
WP 1.1Applications and
Service Development
WP 1.2BusinessModelling
WP 1.3Architecture and
Inter-working
BT 6,4,4Bute 0,0,6UPC 6,0,0
Polito 3,0,0GSI 0,0,3
Skylinc 1,1,0
3
WP1 Overview
WP1 : Applications and ServicesWP1.1 Applications and Services Development
D01 was delivered in Feb 04No activity since last meeting
WP1.2 Business ModellingM9 delivered in July 04M12 delivered 17th Nov 2004 on business models, acceptance criteria and some example models of servicesHAPS Strategy Document (work started)
WP1.3 Architecture Design / InterworkingTrial and measurements for Internet to trains and moving vehicles, report issued 5th Oct 04Network and applications designed and demonstrated in trial 1 at Pershore, report issued 10th Nov 04No activity since last meeting
4
Exploration and Audit
26th January 2005, IEE Satellite Broadband Seminar, London, “Mobile Hotspots” (WLAN on trains) paper presented
Fairly wide audience
Very well received
31st January 2005, ISM Mobile and Wireless Summit, Japan, June 2005, Capanina paper sent out (BT co-author)
10th February 2005, Brussels, Annual Review Meting and Audit
Passed – Congratulations !!!
5
Audit – Concluding Remarks
The project seems to be off to a good start and has the opportunity to produce state-of-the-art results on HAP communications.
The project should carry on its technical work, but more attention on the business models validation needs to be provided.
The issue of frequency availability needs to be urgently addressed.
Matrix work on WP1 and contributions to other WPs need improving,…
6
WP1 Remaining work
WP1 : Applications and ServicesWP1.1 Applications and Services Development
Deliverable document “Revised applications and Services for BB HAP delivery” (due October 2006) – post trial
WP1.2 Business ModellingDeliverable D10: “Strategy Document: Delivering Broadband for All from Aerial Platforms including commercial and technical risk assessments” (due May 2005)
Milestone M20: “Development of commercial risk assessment methodology” (due Jun 2005)Milestone M24: “Reviewed and updated Strategy Document” (due October 2005)
WP1.3 Architecture Design / InterworkingDeliverable D11: “General network architecture requirements” (due May 2005)
Milestone M20: “Development of technical risk assessment methodology” (due Jun 2005)
7
BT future work
Due to the company restructuring, BT is unable to contribute to CAPANINA after the end of April 2005
BT will however stay within the consortium if possible (pending internal agreement) as a silent partner.
8
Contribution to other WPs – Possible Hand-over
WP1 Applications and Services
WP2.5 Networking and QoS AspectsDeliverable D24: Report defining network architecture and protocols (M36)
WP3.1 Communications equipment for trialsTrial II contributions
WP4.4 Trials and MeasurementsDeliverable D19: Test Results Summary Report (M34)
WP6 Project Management
9
WP1 Discussion