10-3350 Li
As a financial manager in a firm
You are often faced with the decision whether to invest in some potential projects.
For example, should a firm buy a new production line?
10-4350 Li
Discount rate = required return
From the project, we need to earn at least the required return to compensate our investors for the financing they have provided.
The required return is the same as the appropriate discount rate and is based on the risk of the cash flows from the project.
How to decide the appropriate discount rate (to discount future FCFs from the project)?
10-5350 Li
Estimate discount rate in a project
One simple approach is to ASSUME that the new project has the same risk as the existing business or assets in the firm.
We can estimate what is the required return on the firm’s existing assets.
Then use this required return as the discount rate for the new project.
Of course, if the new project has risk very different from the existing business, one CANNOT do this.
10-6350 Li
Cost of Capital Company Cost of Capital (COC) is the
required return on the existing firm assets. It is based on the risk of assets.
The risk of firm’s overall assets is equal to the weighted average risks of firm’s debt, preferred stock and common equity.
Thus the cost of capital of a firm equals the weighted average of the cost of debt, the cost of preferred stock, and the cost of common equity.
10-7350 Li
What is the required return on the firm’s existing assets?
A firm’s cost of capital is the required return on the firm’s existing assets; it is also the weighted average required rates of return for all investors of the firm.
Investors may include debt investor, preferred stock investor, and common stock investor.
10-8350 Li
Firm Cost of Capital = WACC
WACC is the weighted average of the after-tax cost of each of the sources capital used by a firm to finance its project, where the weight reflect the proportion of total financing raised from each source.
10-9350 Li
Calculating the weighted average cost of capital
WACC = wdrd(1-T) + wprp + wcrs
The w’s refer to the firm’s capital structure weights. wc refers to weight on common stock.
The r’s refer to the cost of each component.
10-10350 Li
rd , rp , rs
rd: cost of debt=required rate of return for debt investors.
rp : cost of preferred stock= required rate of return for preferred stock holders.
rs: cost of equity= required rate of return for common stock holders.
10-11350 Li
How are the weights determined?
WACC = wdrd(1-T) + wprp + wcrs
Use market value to determine weights.
10-12350 Li
cost of debt
WACC = wdrd(1-T) + wprp + wcrs
rd is the cost of debt capital. The yield to maturity on
outstanding L-T debt is often used as a measure of rd.
Why tax-adjust, i.e. why rd(1-T)?
10-13350 Li
cost of debt We are concerned with after-tax cash
flows, so we need to consider the effect of taxes on the various components of costs of capital.
Interest expense reduces our tax liability This reduction in taxes reduces our
cost of debt After-tax cost of debt = rd(1-T)
10-14350 Li
A 5-year, 12% annual coupon bond sells for $1,075.81. What is the cost of debt (rd)?
INPUTS
OUTPUT
N I/YR PMTPV FV
5
10
120 1000-1075.81
10-15350 Li
cost of debt
Interest is tax deductible, so After-Tax rd
= Before Tax rd (1-T)
= 10% (1 - 0.40) = 6%
10-16350 Li
cost of preferred stock
WACC = wdrd(1-T) + wprp + wcrs
rp is the cost of preferred stock. The rate of return investors
require on the firm’s preferred stock.
10-17350 Li
What is the cost of preferred stock?
The cost of preferred stock can be solved by using this formula:
rp = Dp / Pp
= $10 / $111.10 = 9%
10-18350 Li
cost of preferred stock
Preferred dividends are not tax-deductible, so no tax adjustments necessary. Just use rp .
rp = Dp / Pp
10-19350 Li
cost of equity
WACC = wdrd(1-T) + wprp + wcrs
rs is the cost of equity. The cost of equity is the return
required by equity investors given the risk of the cash flows from the firm
10-20350 Li
Two ways to determine the cost of common equity, rs
CAPM: rs = rRF + (rM – rRF) β
DCF: rs = (D1 / P0) + g
DCF stands for “discounted cash flow model”, also called the dividend growth model.
10-21350 Li
If the rRF = 7%, RPM = 6%, and the firm’s beta is 1.2, what’s the cost of common equity based upon the CAPM?
rs = rRF + (rM – rRF) β
= 7.0% + (6.0%)1.2 = 14.2%
10-22350 Li
If D0 = $4.19, P0 = $50, and g = 5%, what’s the cost of common equity based upon the DCF approach?
D1 = D0 (1 + g)
D1 = $4.19 (1 + .05)
D1 = $4.3995
rs = (D1 / P0) + g
= ($4.3995 / $50) + 0.05= 13.8%
10-23350 Li
A firm’s capital consists of has 30% in debt, 10% in preferred stock, and 60% in common equity. T=40%, rd=10%,rp=9%, rs=14%.
WACC = wdrd(1-T) + wprp + wcrs
= 0.3(10%)(0.6) + 0.1(9%) + 0.6(14%)
= 1.8% + 0.9% + 8.4%= 11.1%
10-24350 Li
What factors influence a company’s composite WACC?
Interest rates Tax rates. The firm’s capital structure and
dividend policy. The firm’s investment policy.
Firms with riskier projects generally have a higher WACC.
10-25350 Li
The risk of a project When calculating the discount rate of a
potential investment project, we have often assumed that the project to be taken has the same risk as the existing business or assets of the firm. If this assumption is valid, then we can use WACC as our discount rate to discount future cash flows from a project.
Of course, if the new project has very different risk from existing business, one cannot do so.
10-26350 Li
Should a company use the composite WACC as the hurdle rate for any of its projects?
Ok for a project with average risk. The composite WACC reflects the risk of
an average project undertaken by the firm. Therefore, the WACC only represents the “hurdle rate” for a typical project with average risk in the firm.
Not Ok for a project with very different risk.
10-27350 Li
Using WACC for All Projects - Example
What would happen if we use the WACC for all projects regardless of risk?
Assume the WACC = 15%Project Required Return Expected
ReturnA 20% 17%B 15% 18%C 10% 12%
10-28350 Li
If using one WACC for all projects
You might mistakenly reject project C and take project A. That is, you tend to favor risky projects.
If you keep making such mistakes, the firm may become more and more risky.
10-29350 Li
We should consider the project’s risk
If the project is more risky than the firm, use a discount rate greater than the WACC
If the project is less risky than the firm, use a discount rate less than the WACC
10-30350 Li
Questions What are the approaches for computing the
cost of equity? How do you compute the cost of debt and
the after-tax cost of debt? How do you compute the capital structure
weights required for the WACC? What is the WACC? What happens if we use the same WACC as
the discount rate for projects with very different risk levels?