- .. . * . * ::, - 10 CFR 50.55 (g) . O - . Boston Edieon Pilgrim Nuclear Power Station Rocky Hdi Road ' Plymouth, Massachusetts 02360 E. T. Boulette, PhD Senior Vice President-Nuclear : ' March 17, 1995 BECo Ltr.#95 036 U.S. Nuclear Regulatory Commission . Attention: Document Control Desk Washington, DC 20555 Docket No, 50-293 License No. DPR-35 Pilgrim Nuclear Power Station in-Service inspection Plan for 1995 Refuelino Outace #10 This Letter provides the Pilgrim Nuclear Power Station In-Service Inspection (ISI) Plan for the 1995 Refueling Outage (RFO) #10, as required by 10 CFR 50.55a. The RFO #10 is currently scheduled to begin on Mach 25,1995. The Enclosure provides a list of scheduled ISI examinations that will complete the third period of the Pilgrim second ten year inspection interval in accordance with Section XI of the ASME Boiler and Pressure Vessel Code,1980 Edition with Winter 1980 Addenda (Enclosure (A)). ASME Code required examinations planned for RFO#10 include nondestructive and visual examinations of safety related piping systems, welds, attachments, botting and pipe supports. In addition, the following augmented examinations have been scheduled for RFO #10: 1. Remote and manual ultrasonic examination of Reactor Pressure Vessel shell welds . 4 prescribed in ASME Section XI, Table IWB-2500-1, item B1.10, in accordance with 10 CFR | 50.55(a)(g)(6)(ii)(A). The scope of this inspection is explained by a separate letter to the NRC. 2. 31 ultrasonic piping weld examinations for the detection of Intergranular Stress Corrosion Cracking (IGSCC) in accordance with NRC Generic Letter 88-01 requirements. i i 3. 22 ultrasonic thickness examinations to detect flow-assisted corrosion in piping in accordan::e with the requirements of NRC Generic Letter 89-08. 4. Visual and ultrasonic thickness examinations of Salt Service Water piping in accordance with NRC Generic Letter 89-13. A portion of the inspection scope (Enclosure (A) and Item 4) may be performed on-line during power operations with examinations beginning in March 1995. The remaining examinations will be completed during the refueling outage. | pk|A 9503280171 950317 PDR ADDCK 05000293 Q PDit

Upload: others

Post on 18-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

-

.. .*

.

*::, - 10 CFR 50.55 (g).

O-

.

Boston EdieonPilgrim Nuclear Power Station

.

Rocky Hdi Road'

Plymouth, Massachusetts 02360

E. T. Boulette, PhDSenior Vice President-Nuclear

:

'

March 17, 1995BECo Ltr.#95 036

U.S. Nuclear Regulatory Commission .

Attention: Document Control DeskWashington, DC 20555

Docket No, 50-293License No. DPR-35

Pilgrim Nuclear Power Stationin-Service inspection Plan for 1995 Refuelino Outace #10

This Letter provides the Pilgrim Nuclear Power Station In-Service Inspection (ISI) Plan for the 1995Refueling Outage (RFO) #10, as required by 10 CFR 50.55a. The RFO #10 is currently scheduled tobegin on Mach 25,1995.

The Enclosure provides a list of scheduled ISI examinations that will complete the third period of thePilgrim second ten year inspection interval in accordance with Section XI of the ASME Boiler andPressure Vessel Code,1980 Edition with Winter 1980 Addenda (Enclosure (A)). ASME Coderequired examinations planned for RFO#10 include nondestructive and visual examinations of safetyrelated piping systems, welds, attachments, botting and pipe supports. In addition, the followingaugmented examinations have been scheduled for RFO #10:

1. Remote and manual ultrasonic examination of Reactor Pressure Vessel shell welds . 4

prescribed in ASME Section XI, Table IWB-2500-1, item B1.10, in accordance with 10 CFR |

50.55(a)(g)(6)(ii)(A). The scope of this inspection is explained by a separate letter to the NRC.

2. 31 ultrasonic piping weld examinations for the detection of Intergranular Stress CorrosionCracking (IGSCC) in accordance with NRC Generic Letter 88-01 requirements.

i

i

3. 22 ultrasonic thickness examinations to detect flow-assisted corrosion in piping in accordan::ewith the requirements of NRC Generic Letter 89-08.

4. Visual and ultrasonic thickness examinations of Salt Service Water piping in accordance withNRC Generic Letter 89-13.

A portion of the inspection scope (Enclosure (A) and Item 4) may be performed on-line during poweroperations with examinations beginning in March 1995. The remaining examinations will be completedduring the refueling outage. |

pk|A9503280171 950317PDR ADDCK 05000293Q PDit

1,

.

'

,This inspection scope is developed based upon the following:

Thd Second Ten Year in-Service inspection Program Amendment #92-01, BECo letter #93-017,.

dated February 11,1993 and BECo letter #94-054, dated May 5,1994, in response to NRCRequest for Additional Information dated February 7,1994.

Request for relief from ASME, Section XI, Articles IWC-2500 and IWF-2500, RHR/FPC Intertie.

piping welds and supports, BECo Letter # 95-015, dated February 9,1995.

Should you wish further information on this subject matter, please contact Walter Lobo of ourLicensing Staff at (508) 830-7940.

hA QLLNE. T. Boulette, PhD

ETBNVGURap95/RFO10

Enclosure: NDE and Visual Examination Scope

cc: Mr. R. Eaton, Project ManagerDivision of Reactor Projects - 1/IIMail Stop: 14D1U. S. Nuclear Regulatory Commission1 White Flint North11555 Rockville PikeRockville, MD 20852

U.S. Nuclear Regulatory CommissionRegion 1475 Allendale RoadKing of Prussia, PA 19406

Senior Resident inspectorPilgrim Nuclear Power Station

Mr. Fred P. BartonSupervising District Engineering inspectorDivision of InspectionDepartment of Public Safety1 Ashburton Place, Room 1301Boston, MA 02108

Factory Mutual EngineeringMr. Kevin McTagueanilsBoston District Office1151 Boston Providence HighwayNorwood, MA 02062

. ,

*.' *

'

Enclosure (A),

PILGRIM NUCLEAR POWER STATION, ,

INSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10.

COMPONENT DESCRIFI'lON CATECORY CODE ITEM SYSTEM ISOMETRIC EXAM

RIT Bil-C1 IIEAD CIRCUMF WELD B-A B 1.21 RPV 151-1-54-3 UT

RPV-Til-C llEAD CIRCUMF WELD B-A . B l .21 RPV 151-I-54-2 UT

RPV-811-MI MERID HEAD WELD 40 B-A Bl.22 RPV 151-1 5 & 3 UT

.........

RPV-NIB-NIR NOZZLE INNER RADIUS B-D B3.100 RPV 1S1-1-54-1 UT

RPV-N2D-NIR NOZZLE INNER RADIUS B-D B3.100 RPV 151-1-5 & l UT

RPV-N2E NIR NOZZLE !NNER RADIUS B-D B3.100 RPV 1S1-1-5& 1 UT

RPV-N2F-NIR NOZZLE INNER RADIUS B-D B3.100 RPV 151-1-5 & 1 UT

RPV N23-NIR NOZ71E INNER RADIUS B-D B3.100 RPV 151-1-5 & 1 UT

RPV-N4A-NIR NOZZLE INNER RAD / BORE BD B3.100 RPV 1S1-1-5&1 UT

RPV-N4B NIR NOZZLE INNER RAD / BORE B-D B3.100 RPV ISI-1541 UT,

RPV-N4C-NIR NOZZLE INNER RAD / BORE B-D B3.100 RPV 151-1 54-1 UT

RPV-N4D-NIR NOZZLE INNER RAD / BORE B-D B3.100 RPV 1S1-15&l UT

RPV-N7A NIR NOZZLE INNER RADIUS B-D B3.100 RPV 151-1-5 & 2 UT

RPV-N78-NIR NOZZLE INNER RADIUS BD B3.100 RPV 151-1-5 & 2 UT

RPV N1B-NV NOZZLETO VESSEL B-D B3.90 RPV 151-1-5 & 1 UT

RPV-N2D-NV NOZZLE TO VESSEL BD B3.90 RPV ISI-I-5&l UT

RPV-N2E-NV NOZZLE TO VESSEL B-D B3.90 RPV 151-1-541 UT

RPV-N2F-NV NOZZLE TO VESSEL B-D B3.90 RPV 151-1-541 UT

RPV N2J-NV NOZZLE TO VESSEL BD B3.90 RPV 1511-541 UT

RPV-N4A-NV NOZZLETO VESSEL B-D B3.90 RPV ISI-I-541 UT

RPV N4B-NV NOZZLETO VESSEL BD B3.90 RPV 151-1-541 UT

RPV N4C NV NOZZLETO VESSEL B-D B3.90 RPV ISI-I 5&l UT

RPV-N4D-NV NOZZLE TO VESSEL B-D B3.90 RPV 151-1 5 & 1 UT

RPV-N7A-NV NOZZLETO VESSEL B-D B3.90 RPV ISI-I-5&2 UT

RPV-N7B-NV NOZZLE TO VESSEL BD B3.90 RPV 151-I-5 & 2 UT|

|

!.........

l

1

Pap I of 12

:'

_ __ _ __

-

, .'

'* '

Enclosure (A)'

PILGRIM NUCLEAR POWER STATION

aNSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10,

COMPONENT DESCRIPTION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

RPV-Nil NV PART PENET NOZZLE B-E ~.4.11 RPV 151-1-12-1 VT-2,

RPV N14-NV PART PENET NOZZLE BE B4.11 RPV 1S1-1-11 1 VT-2

RPV-NI5A NV PART PENET NOZZLE B-E B4.11 RPV 1S1-1-54-1 VT-2

RPV NISB.NV PART PENET NOZZLE B-E B4.11 RPV 1S1-1 54-1 VT-2

RPV-N16A NV PART PENET NOZZLE B-E B4.ll RPV 151-1-54-1 VT-2

RPV-N16B NV PART PENET NOZZLE B-E B4.11 RPV 151-1-54-1 VT-2

.........

2R N1B-1 NOZZLE TO SAFE END B-F B5.10 FJV ISI-I-2R-A IT UT

2R N2C-1 SAFE END TO NOZ71.E BF B5.10 RPV ISI-1-2R-A IT UT

2R N2D-1 SAFE ENDTO NOZZLE B.F B5.10 RP' IS1-1-2R-A W

2R-N2E-1 SAFE END TO NOZZLE BF B5.10 RPV ISI-1-2R-A UT

2R N2F-1 SAFE END TO NOZZLE BF B5.13 RPV IS1-1-2R.B IT UT

2R-N23. I SAFE END TO NOZZLE B-F B5.10 RPV ISI-1-2R B IT UT -

11-1 NOZZLE TO CAP B-F BS.10 RPV 151-I-3-1 UT,

6N4A 1 SAFE END TO NOZZLE B-F B5.10 RPV 151-1-6-1 MT UT

6 N4B 1 SAFE END TO NOZZLE B-F 15.10 RPV 151-141 MT UT

6N4C-1 SAFE END TO NOZZLE BF B5.10 RPV 1S1-141 MT UT

AN4Dl SAFE ENDTO NO7.2LE B-F B5.10 RPV 151-141 MT UT

kPV-N7A-1 NO72LE TO FLANGE B-F B5.10 'O'V 151-I-54-4 MT UT

RPV N7B-1 NOZZLE TO FLANGE B-F B5.10 RPV 151-1544 MT UT

RPV-N9A 1 NOZZLE TO SAFE END .LF B5.10 RPV 151-1-54-4 UT

&N11.I NOZZLE TO PIPE B-F B5.11 RPV 1S1-1-12-1 VT-2

RPV N16B-R-l NOZZLE TO SAFE END B-F B5.11 RPV 151-1-54-4 IT

PfV N16B R.2 SAFE END TO REDUCER B-F B5.51 RPV 151-1 54-4 li

12R-BC 14R VALVETO PIPE B-F B5 52 RWCU 151-1-12-1 IT

.........

RPV CS.I-18 (GE) CLOSURE STUDS B-G.I B6.20 RPV 151-1-54-2 UT

Page 2 of 12

,

. .

'* *

Enclosure (A)' '

PILGRIM NUCLEAR POWER STATION, .

.'NSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10

COMPONENT DESCRII TION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

RPV-CS-19-36 (GE) CIDSURE STUDS B-G-1 B6.20 RPV 151-1-542 UT

RPV-CS-37-56 (GE) CLOSURE STUDS B-G-1 B6.20 RPV 151-1-54-2 UT

RPV-IIB-41 (GE) CLOSURE STUDS B-G1 B6.30 RPV 151-1-5 & 2 MT UT

SPVJ18 42 (GE) CIDSURE STUDS B-G1 B6.30 RPV 151-1-5 & 2 MT UT

RPV.llB-43 (GE) Cl.DSURE STUDS B-GI B6.30 RPV 151-1 5 & 2 hit UT

RPV-IIB-44 (GE) CLOSURL2.0DS Bol B6.30 RPV 1S1-1-542 MT UT

.........

2R-FB-BPA-1 FLANGE BOLTING B-G2 E'.50 RECIRC ISI 1-2R- A VT-1

14-VB.140(16A VALVE BOLTING B-G2 B7.?O CS 1S1-1-14-1 VT-1

14-VB 1400 9A VALVE BOLTING B-G2 B7.70 CS 1S1114-1 VT-1

6VB-62A VALVE BOLTING it-G2 B7.70 ITV 151-141 VT-1

2-VB-202-5B VALVE BOLTING B-G2 B7.70 RECIRC ISI-1-2R-B VT-1

2 Vil-63A VALVE BOLTING B-G-2 B7.70 RECIRC ISI 1-2R-A VT-1

12-VB 1201-39 VALVE BOLTING B&2 ri7.,0 RWCU 1S1-1 12-1 VT-1

12-VB 1201-65 VALVE BOLTING B-G-2 B7.70 RWCU 151-1-12-1 VT-1

12-Vil-1201-82 VALVE BOLTING Il-G2 B7.70 RWCU 151-1-12-2 VT 1

.........

RPV-SW 240-360 SKIRT WELD B-li B8.10 RPV 1S1-1543 UT

.........

14-A-10 PIPE TO ELBOW B-J B9.11 CS 151-1-101 MT UT

14-A-19 VALVE TO PIPE B-J B9.11 CS 151-1-141 UT

14R-A 16 PENETRATION TO ELBOW B-J B9.11 CS 1S1-1-141 UT

4N4D 11 PIPETO PIPE B-J B9.11 FW 151 1-6-1 hit UT

GN4D.12 PIPETO PIPE B-J B9.11 ITV '151-1-6 1 hiTUT,

| 6N4fk13 REDUCER TO PIPE B-J B9.1 i FW 151-141 Nfr UT1

6 N41k14 PIPE TO REDUCER B-J B9.11 FW 151-141 MT UT

I23-Ill PIPE TO ELBOW B-J B9.11 IIPCI ISI-I-23-1 MT UT

Page 3 of 12

. .

*

Enclosure (A). .

'

PILGRIM NUCLEAR POWER STATION'

P.NSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10

COMPONENT DESCRIITION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

13-1-16 VALVETO PIPE B-J B9.11 RCIC 1S1-1-13-1 MT UT

2R-ilA-1 IIFADER TO BEND B-J B9.11 RECIRC ISI-1-2R-A IT UT

2R-NIA 13 PIPE TOTEE B-J B9.11 RECIRC IS1-1-2R B PT UT

2R-NI B-15 PIPE TO TEIIROSS BJ B9.11 RECIRC ISI-1-2R-A PTUT

2R N2B-3 flEADER TO PIPE B-J 89.11 RECIRC ISl-1-2R-A PT UT

2R N2D-3 IIEADER TO PIPE BJ B9.11 RECIRC ISI-i-2R-A PT UT

10 IA-14 PIPETO FLUED lIEAD B-J B9.11 RilR 1S1-1-141 UT

10-IA 15 VALVE TO PIPE B-J B9.11 RHR 151-1-10-1 UT

l' R-1A 1 P!PETO TEE B-J B9.11 RHR 151-1 10 1 PT UT

:0R-IA-12 PENETRATION TO ELBOW B-J B9.11 RilR 1S1-1-10-1 UT

iuR-IA 2 ELBOW TO PIPE B-J B9.11 RHR 151-1-10-1 PT UT

10R-!A-3 PIPE TO ELBOW BJ B9.11 RHR 151-1-10-1 PT UT

10R-IA 6 PIPE TO VALVE B-J B9.11 RHR 1S1-1101 IT UT

10R-la 7 VALVE TO PIPE B-J B9.11 RHR 1S1-1-10-1 PTUT

10R 1A-8 PIPE TO VALVE B-J B9.11 RllR 151-1-10 1 IT UT

12-1-11 PIPE TO PIPE B.J B9.11 RWCU ISl-1-12-2 MT UT

12112 VALVE TO PIPE B.J B9.11 RWCU 1S1-1-12 2 MT UT

12-1 26 ELBOW TO PIPE BJ B9.11 RWCU 151-112-2 UT

12-1 27 PIPE TO ELBOW B-J B9.11 RWCU 151-i-12-2 UT

12-O'24 PENLTRATION TO PIPE B1 B9.11 RWCU 1S1-1-12-1 UT

12-0-25R PIPE TO PIPE BJ B9.11 RWCU 151-1-12-1 UT

12R-O-23 ELBOW TO PENETRATION B-J B9.11 RWCU 151-1 12-1 UT

.........

6-N4A-911Ll(8) SUPPORT LUG B-K-1 B10.10 FW ISI I-6-1 MT

2R N1 A 12ilL2(4) IIANGER LUGS B-R 1 B10.10 RECIRC ISI-1-2R-B PT

2R.NI A-411Ll(4) 4 IIANGER LUGS B-K-1 B 10.10 RECIRC ISl-1-2R-B IT

10R IA 81(Ll(4) 4 ilANGER LUGS B K-1 B10.10 R11R 1511-10 1 IT

I%ge 4 of 12

*

Enclosure (A)-

. .,

PILGRIM NUCLEAR POWER STATION* -

' '

INSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAt .E 10,

COMPONENT DESCRllTION CATEGORY CODE ITEM SYSTEM ISOMETRIC -EXAM

10%IA-EllL2(4) 4 IIANGER LUGS B-K-1 B10.10 RiiR 151-1 10-1 FT

10R-0-10llL 1(8) 8 IIANGER LUGS B-K 1 B10.10 RilR ISI-i-101 A IT

10R-O-4}IL-1(2) 211 ANGER EYES B-K 1 B10.10 RIIR ISI-1101 A PT

- 2-P201 A-L1 SUPIURT LUGS B-K-1 B10.20 RECIRC ISI-I-2R-A FT '

2-P201 A L2 SUPPORT LUGS B-K 1 B10.20 RECIRC ISI-1-2R-A PT

2-P201 A-L3 SUPIURT LUGS B-K 1 B10.20 RECIRC ISI-1-2R-A PT

.........

EE-1 VBW2-1 VALVE BODY WELD B-M-1 B12.30 MS 1S1-1-11 MT

IT>1-VBW2-2 VALVE BODY WELD B M-1 B12.30 MS 151-1-1-1 MT

.........

RPV INTERIOR VESSEL INTERIOR BN1 B13.10 RPV N/A VT-3

.........

RPV INT ATTACil INTERIOR ATTACllMENTS li-N 2 B13.20 RPV N/A VT-1

RPV CSS CORE SUPIURT STRUCT B-N-2 B13.21 RPV N/A VT-1

.........

RPV-CRI111SG-1 CRD llOUSING WELD B-O B14.10 RPV N/A IT

RPV-CRilllSG-2 CRD flOUSING WELD B-O B14.10 RPV N/A IT

RPV-CRik}lSG-3 CRD llOUSING WELD B-O B14.10 RPV N/A IT

RPV-CRIlllSG-4 CRD ilOUSING WELD B-O B 14.10 RPV N/A IT

.........

GB-14 2PIIL2(4) SUPIURT LUGS C-C C3.40 CS ISI-1-14-2A MT

llB-10 2f,ltL1(2) 211 ANGER LUGS C-C C3.40 RilR ISI-1-101 B MT

llB-10 29411Ll(B) 8 IIANGER LUGS C-C C3.40 RiiR ISI-1-10-1 B MT

llB-1(L83PS PIPE STANClllON C-C C3.40 RilR 151-1-10-1 B MT

14-P215A IIL PUMP !NTEGRAL ATTMT C-C C3.70 CS ISl-1-14-2A MT

10'P203A-ILL PUMP INTEGRAL ATTMT C-C C3.70 RilR ISI-1 10'2A MT

.........

Page 5 of 12

- __ _ _. _

*'

Enclosure (A)-

,.

'*'

PILGRIM NUCLEAR POWER STATION''

INSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10,

COMPONENT DESCRIPTION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM|

l

IID-2LF12 PIPETO PUMP GF C5.11 IIPC! 151-1-23-4 MT ]l

; lid-21F17 VALVETO PIPE CF C5.11 IIPCI 1S1-1-214 MT

l11B-13-2-10 TEE TO FLANGE OF C5.11 RCIC 151-1-13-3 MT

'

ilB 13-F30 ELBOW TO PIPE OF C5.11 RCIC 1S1-I-13-3 MT-

liF 26-F238 VALVE TO PIPE C-F C5.11 RCIC 151-1-13-5 MT

llE-26 F248 PIPE TO ELilOW GF C5.11 RCIC 151-1 1 % 4 MT

IIE 26-F42A ELBOW TO VALVE OF C5.11 RCIC 151-1-13-4 MT

Gil.10-3002-2-2 ELBOW TO PIPE C-F C5.11 RiiR ISI-1-10-4 A MT

Gil-10-6-2B ELBOW TO PIPE C-F C5.11 R}{R 1S1-1-10-4B MT

Gil 10-6-6C PIPE TO ELBOW C-F C5.11 RiiR ISI 1-104A MT

GB-10-710 PIPE TO ELBOW CF C5.11 R11R ISI-I-10-4B MT

GB-10-F239 ELBOW TO PIPE CF C5.11 RI-IR 151-1-104B MT

Gil-14 F45 PIPE TO ELBOW C-F C5.11 RIIR 151-1-104 B MT

GB 14F46 ELBOW TO PIPE CF C5.11 RIIR 151-1-10-4B MT

GB.IGF52A PIPE TO ELBOW CF C5.11 R}{R 151-1-10-4B MT

GB 14F53 P1PE TO PIPE CF C5.11 R11R ISI-1 10-4 B MT

GB 14F59 PIPE TO WELDOLET GF C5.11 RilR ISI-1 10-4A MT

GB-10 F71 ELBOW TO PIPE C-F C5.I l Ri!R 151-1-10-4 B MT

GL-10-F39R PIPETO FLUED lIEAD CF C5.11 RIIR ISl-1 10-4A MT

11B 10-30012 2 PIPE TO ELBOW CF C5.11 RiiR 151-1-10-1C MT

IIB-10L300L2 3 ELBOW TO P!PE OF C5.11 RiiR ISI.1-10-1C MT

IIB 10-F63 ELBOW TO PIPE C-F C5.11 RilR ISI-1-101C MT

llB-10-F79 VALVE TO ELBOW CF C5.11 RilR 151-1-10-IC MT

IIL-10 5-1B PIPE TO ELBOW C-F C5.11 R}iR ISI-1-104A MT

IIL-10 F106 i ELBOW TO PIPE OF C5.11 RiiR ISI-1-10 4A MT

IR lol1a7 12 BOW TO P!PE C-F C5.11 RifR ISI 1-104A MT

DEUDC-14 3002-31 ELBOW TO PIPE OF C5.21 CS ISl-1-14-2A UF

Page 6 of 12

-

. .

*

Enclosure (A)-. ,

PILGRIM NUCLEAR POWER STATION~-.

'.NSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10*

-

. .

COMPONENT DESCRIFilON CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

DC-l&F31 PIPE TO VALVE CF C5.21 CS 1S1-1-14-1 W

DB-23-F42 VALVETO PIPE C-F C5.21 IIPCI 151-1-215 MT UT

EB-211-5C PIPE TO ELBOW CF C5.21 IIPCI 151-I-23-2 MT W

EU 23-2-lE TEE TO PIPE C-F C5.21 IIPCI 151-1-23-2 MT UT

EB 21F61 ELBOW TO PIPE CF C5.21 IIPCI 151-I-23-2 MT UT

Ell 2LF66A PIPETO TEE CF C5.21 IIPCI 1S1-1-212 MT UT,

DB/DC-10-3002-L3 PIPETO PIPE C-F C5.21 R1IR ISl-1-10-4 A W

DC10-F9 PIPE TO VALVE C-F C5.21 RI-IR IS1-1-104A W

.........

Dil 14-VilW24A 1 VALVE llODY WELD C-G C6.20 CS ISI-1-l&2A MT

DB-14 VilW24A 2 VALVE BODY WELD C-G C6.20 CS ISI-1-l&2A Mr

GB.1&VBW36A-1 VALVE BODY WELD C-G C6.20 CS ISI-I-l&2A MT

GB 1&VBW36A-2 VALVE IlODY WELD C-G C6.20 CS 1S1-1-14-2A MT

DB 2LVBWlo 1 VALVE BODY WELD C-G C6.20 llPCI ISl 123-5 MT

Dil-23-VBW13-2 VA1.VE BODY WELD CG C6 20 IIPCI 151-1-23-5 MT

Gil 14VBW67A-1 VALVE BODY WEl.D C-G C6.20 RilR ISI-110 3A MT

GB-14VBW67A-2 VALVE BODY WELD C-G C6.20 RIIR ISI-I-10 3A MT

GL-10 VBW23A-1 VALVE BODY WELD C-G C6.20 RIIR ISI-1 10-4A MT

GL 10.VBW23A-2 VALVE BODY WELD CG C6.20 RilR ISI-1-10-4 A MT

.........

GE 1 X208A-IIL INTEGRAL ATTACIIMENT D-B D2.20 MS N/A VT-3

19 E200A Ill llX INTEGRAL ATTMT D-B D2.20 RBCCW 151-I-342 \T-3

30 E122A-IIL IIX INTEGRAL ATTMT D-B D2.20 RIICCW 151-1-29-1 \T-3

34 E209A-lit ilX INTEGRAL ATTMT D-B D2.20 RBCCW 151-1-30 2 \T-3

IIG30-104PS STANCillON D-il D2.20 RBCCW 151-I-301 VT 3

liG30-10PS STANClllON D-B D2.20 RitCCW 151-I-30-1 VT-3

IIE 3011PS STANClllON D-13 D2.20 RBCCW 1S1-I-301 VT-3

i

IPage 7 of 12

|1

*Enclosure (A). .

- ' PILGRIM NUCLEAR POWER STATION-

*

INSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10-

.-

COM* ONENT DESCRIITION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

. HG30-121PS STANCillON / D-B D2.20 RBCCW ISI-I-30-1 VT 3

11630121IL HANGER LUG D-B D2.20 RBCCW 1S1-1-30.I VT-3

}IE30-130PS STANCillON D-B D2.20 RBCCW ISI-I-30-1 _ VT-3

' IIE30-13 t PS STANCillON D-B D2.20 RBCCW 151-1-30-1 VT-3

11630-13241(L 1lANGER LUG D-B D2 20 RBCCW 1S1-1-30-1 VT-3

11530-till IlANGER LUG D-B D2.20 RBCCW 151-1-30 2 \T-3

IIS30-238PS STANCillON D-B D2.20 RBCCW 151-1-30-2 VT-3

liG30-2411L IIANGER LUG IKB D2.20 RBCCW 151-I-30 2 VT-3

IIG30-2611L llANGER LUG D-B D2.20 RBCCW ISI-l-B2 VT-3

Il&30 27PS STANCillON D-B D2.20 RBCCW 151-1-30-2 VT 3

IIS30 285]IL liANGER LUG IKB D2.20 RECCW 1S1-I 30-1 VT-3

IIS30 294PS STANCillON D.B D2.20 RBCCW 151-1 30-1 VT-3

!!D30 29PS STANCillON D-B D2.20 RBCCW ISI-1 E2 VT-3

IIE30-30llL liANGER LUG D-B D2.20 RBCCW 151-I-30 2 W-3

IIG30-3111L llANGER LUG D-B D2.20 RBCCW ISI-l E2 VT 3

IIS30-3461tl 11 ANGER LUG D-B D2.20 RBCCW ISI-I-B2 VT 3

IIE30-3611L llANGER LUG D-li D2.20 RBCCW 1S1-1-30-1 VT-3

I!G B 3711L(4) IIANGER LUGS D-B D2.20 RBCCW 151-1-30-1 VT 3

IIG30-411tL(4) IIANGER LUGS D-B D2.20 RBCCW ISI-1-B 1 VT 3

IIE 30-4211L IIANGER LUG D-B D2.20 RBCCW 151-I-30 1 VT-3

IIS30-437PS STANClilON D-B D2.20 RBCCW 1S1-1-30-1 VT-3

IIG30-438PS STANClllON 11B D2.20 RBCCW 151 1 30-1 VT-3

Il&30 439PS STANCillON ILB D2.20 RBCCW 1S1-1-30 1 VT-3

11E30-431IL(4) IIANGER LUGS D-B D2.20 RBCCW 151-1-30-1 VT-3

IlE B 440PS STANCillON D-B D2.20 RBCCW ISI-I-Mi VT 3

IIS30-441PS STANCillON D-B D2.20 RBCCW ISI-l-El VT 3

IIE30-442PS STANClllON D.B D2.20 RBCCW ISI-1-B 1 VTA

Page 8 cf 12

.

Enclosure (A)-, ,

PILGRIM NUCLEAR POWER STATION*-

.

INSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10*

*

,

COMPONENT DESCRilTION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

ll&30-46PS - STANC1110N D.B D2.20 RBCCW 151-1-30-1 VT-3

il&30-52PS STANCillON D-B D2.20 RBCCW 151-1-30-2 VT 3

liG30-53PS STANClilON D-B D2.20 RBCCW - 1S1-1-30 2 VT-3

IIE30 54PS STANCillON DB D2 20 RBCCW 1S1-1-30-2 VT-3 '

ilS30-571tL IIANGER LUG D-B D2.20 RBCCW 1S1-I-30-1 VT 3

llS30-61}il llANGER LUG D-B D2.20 RBCCW 1S1-1301 VT-3

1IS30-61PS STANCillON D-B D2.20 RBCCW 1S1 I-30 2 VT 3

IIG30-62PS STANCillON D-B D2.20 RBCCW 1S1-1-30 1 VT-3

IIE30-6311L liANGER LUG D-B D2.20 RBCCW 151-!-30 2 VT-3

Il&30-641IL llANGER LUG DB D2.20 RBCCW 151-I 30-2 VT-3

Il&30-66PS STANCillON D-B D2.20 RBCCW 151-1-30-2 VT-3

IIG30 67PS STANCillON D-B D2.20 RBCCW 1S1-1-30 2 VT 3

IIE E 68PS STANClllON D-B D2.20 RBCCW 151-1-30-2 VT-3

IIS30-69PS STANCillON D-B D2.20 RBCCW 151-1 30-2 VT-3

Il&30 7PS STANCillON D-B D2.20 RBCCW 151-1-30-1 VT-3

!!L30-Sill llANGER LUG D-B D2.20 RBCCW 1S1-1-30-1 VT-3

IIE30-99PS STANCillON D-B D2.20 RBCCW 151-1-30 2 VT 3

IIE30-SS1211L llANGER LUG D-B D2.20 RBCCW 151-I 30-2 VT-3

29 l'208A IIL PUMPINTEGRAL ATTMT D-B D2.20 SSW 151-1-29-1 VT 3

JF-29-13211tL liANGER LUG DB D2.20 SSW 151-1-29-1 VT 3

JF-29-13331Il llANGER LUG D-B D2.20 SSW 1S1-1-29 1 VT 3

.........

Il 14-1 P21SA PUMP SUPIORT F-A F(13) CS 151-1-14-1 VT-3

112%1.P205 PUMP SUPIURT F-A F(13) IIPCI 1S1-1-23-4 VT-3

Il-19-1 E206A IIT EX SUPPORT F-A F(1-3) RBCCW ISl-130-2 VT-3

11-341 E122A Irr EX SUPPORT F-A F(1-3) RBCCW 1S11-29-1 VT-3

Il-M 1-E209A IIT EX SUPIORT F-A F(1-3) RBCCW 1S1-I 30 2 VT-3

Page 9 ef 12

,

"

Enclosure (A)* -

* 'PILGRIM NUCLEAR POWER STATION-

*'

INSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10

COMPONENT DESCRIPTION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

ll-301 l'2s." PUMP SUP10RT F-A F(13) RBCCW ISI-I-342 VT-3

Il13-1P206 PUMP SUPIURT FA F(1-3) RCIC 151-1-13-2 VT-3

11-101 P203A PUMP SUP10RT F-A F(13) RilR ISl-110 2A VT-3

H-541 1 RPV SUP10RT FA F(1-3) RPV N/A VT 3

11.Il 1-P207A PUMP SUPIURT F-A F(1-3) SBLC 1S1-1-11 1 VT-3

Il-39-1 P208A PUMP SUP10RT F-A F(13) SSW ISI 1-291 VT 3

.........

11141-1 RIGID llANGER F-B F(l-3) CS ISI-1-1&2A VT-3

Il-141 195 R]GID llANGER F-B F(13) CS 151-1-142A VT-3

11-1412 RlGID ilANGER FB F(13) CS ISI-1-l&2A VT 3

11-14-1 21S LATERAL RESTRAINT F-11 F(13) CS ISI-1 1&2A VT-3

11-141225 RlGID SUPIURT F.B F(13) CS ISI-1-14 2A VT-3

11-14-1 23S LATERAL RESTRAINT F-B F(1-3) CS ISI-1-14-2A VT-3

11-14-1 38 RlGIDilANGER F-B F(1-3) CS ISI-I-1&2A VT-3

11-1 & 1 39 RIGID ilANGER F-B F(1-3) CS ISI 1-1&2A VT-3

11 14-1-6 RIGIDilANGER FB F(13) CS ISI-1 l&2A VT 3

||-341 119 RIGID ilANGER F-B F(1 3) RBCCW ISI-130-1 VT 3

||-M 1 120 RIGID ilANGER F-B F(13) RBCCW 1S11-30-1 VT 3

11-30-|-12 i RlGID 1lANGER F-B F(1-3) RBCCW 1511301 VT-3

!! 3a l-29 RIGIDilANGER FB F(1-3) RllCCW 1S1-I-342 VT 3

11341 294 RIGID ilANGER F-B F(1 3) RilCCW ISI-1-B1 VT-3

|l 301-30 RIGlDilANGER F.B F(1-3) RBCCW ISI-l M2 VT-3

11-30 1 392 R1GID llANGER F-B F(13) RBCCW ISI.1-30-1 VT-3

11-30-1 438 RIGIDllANGER F-B F(1-3) RilCCW 1S1-I-341 VT-3

11-34 1-439 RIGID ilANGER F-B F(13) RBCCW ISI-l-301 VT 3

114G1-6S5 RIGID ilANGER FB F(1-3) RBCCW 1S1-1-30 1 VT-3

114173Sii RIGID itANGER F-B F(13) RBCCW 1S1-1-30-2 VT-3

rag 10 or 12 ;1

-

. .

~

Enclosure (A)* -

*

PILGRIM NUCLEAR POWER STATION-

' '

.NSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10

COMPONENT DESCRII'FION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM

ll-301-SR10 RlGIDilANGER F-B F(1-3) RBCCW 151-1-30 1 VT-3

Il-101 14SG GUIDE F-B F(13) RHR 151-1-101C VT-3

11-12-1-99 GUIDE F-B F(13) RWCU 1S1-1-12-1 VT-3

11-29-1-1 RIGIDilANGER F-B F(13) SSW 151-1-29-1 \T-3

11-29-1 115G GUIDE FB F(1-3) SSW 151-1-29-1 VT-3

11-29-1-25 RIGIDilANGER FB F(1-3) SSW 1S1-1-29-1 VT-3

11-29-1-26 RIGIDilANGER F-B F(13) SSW 1S1-1-29 1 VT 3

il-291-4S A RIGID 11 ANGER F-B F(1-3) SSW 151-I-29-1 VT-3

.........

it.10-1-120SR LATERAL RESTRAINT F-C F(13) RIIR ISI-1-LMB VT-3

11-10 1 156 RIGIDllANGER F-C F(1-3) RilR 151-I-10-4 A VT 3

11-10 1 164 RIGIDllANGER F-C F(13) RilR ISl-1-10-4B VT-3 -

11141 257 RIGID SUPPORT F-C F(1-3) RilR 151-1-10-4B VT-3

11-10 1 51 RIGID ilANGER F.C F(1-3) RiiR ISI-1-10-4 A \T-3

Il-10-1-51S R RESTRAINT F-C F(1-3) RiiR 151-1-10-1 B \T-3

Il-10152SR RESTRAINT F-C F(1-3) RilR 151-1-10-1 B VT-3

11-10 1 58 RlGID HANGER F-C F(13) RilR 1S1-1-10-4B VT-3

11-10 1 59 RlGID llANGER F-C F(13) RilR 151-1-10-4B VT-3

Il-10'l 63 RIGID 1IANGER F-C F(l-3) RiiR 1S1-1 10-4 B VT-3

Il-10-1-63SR LATERAL RESTRAINT F-C F(1-3) RifR 151-1-10-4 B \T-3

11-10 1 97 RIGID IIANGER F-C F(13) R11R 1S1-1-10-48 57-3

11-1015G16 1ATERAL RESTRAINT FC F(1-3) RIIR ISI-I-10-1 B \T 3

11-1015G16 RESTRAINT F-C F(1-3) RiiR ISI 1-10 2A ST-3

111015G19 RESTRAINT F-C F(1-3) RiiR 151-1-10-1 B \T-3

11-101 SG22 LATERAL RESTRAINT FC F(1-3) R11R ISI-1-10 3A \T-3

11-30 1 5512 SNUBBER F-C F(1-4) RBCCW 151-1-30-2 \T-3

| 11-2-1 1112 SPRING ilANGER FC F(1-4) RECIRC ISI-1-2R- A VT-3

IWe il of 12

. .,

' *

Enclosure (A)'

PILGRIM NUCLEAR POWER STATION.

-

INSERVICE INSPECTION PLAN FOR 1995 REFUEL OUTAGE 10

COMPONENT DESCRIPTION CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM-

11-2-1 119 SPRING llANGER F-C F(1-4) RECIRC ISI-1-2R B VT-3

11-2 1-S512 ' SNUBBER F-C F(1-4) RECTRC ISI-1-2R-A VT-3

1121.SS14 SNUBBER F-C F(1-4) RECIRC ISI-1-2R-B VT-3

- 11-2-1.SS 16 SNUBBER F-C F(1-4) RECIRC ISI-1-2R-B VT 3

11-2-1 5524 SNUBBER F-C F(1-4) RECIRC ISI-1-2R-B VT-3

Il-2-1 SS3 SNUBBER F-C F(1-4) RECIRC ISI-l-2R A VT 3

Il-21SS7 SNUBBER F-C F(1-4) RECIRC ISI-l-2R-A VT-3

11-10 1 116 SPRING ilANGER F-C F(1-4) RilR 151-1-10-3B VT-3

11-141 119 SPRING ilANGER F-C F(14) RilR 151-1-101 B VT-3 4

11-141 120 SPRING llANGER F-C F(1-4) RHR ISI-1-10-1B VT 3

11141-176 SPRING ilANGER F-C F(1-4) RilR ISI-1-101 A VT-3

11141 183 SPRING SUPIORT F-C F(14) RllR ISI-1-10-IC VT3

11-10 1 184 SPRING SUP10RT F-C F(1-4) RilR ISI-1 10-1C VT-3

1114|185 SPRING SUPIURT F-C F(1-4) RilR 151-1-10-1C VT-3

Il i41 186 SPRING 1 LANCER F-C F(1-4) R1iR 151-|-101C VT 3

Il141i87 SPRING ilANGER F-C F(1-8) RilR ISI-1-10-lc VT-3

11-10 1 198 SPRING llANGER F-C F(1-4) RilR 151-1 10-4A VT-3

11 10 1-200 SPRING ilANGER F-C F(1-4) RilR ISI-1-10-4A VT-3

|

Il 141-2SS SPRING SUPlURT F-C F(1-4) RIIR ISI-1-10-3A VT 3

1112-12 SFR!NG SUPIURT F-C F(1-4) RWCU 151-I-12-2 VT-3

11-12-1-20 SPRING llANGER F-C F(l-4) RWCU 1S1-1-121 VT-3

.........

|

|

'

.

|

Page 12 of 12