KOCHI KOTTANAD BANGALROE MANGALORE PIPELINE INSPECTION TEST PLAN FOR PLASTERING CLIENT: GAIL( INDIA) LIMITED LOCATION CONSULTANT: MECON LIMITED FORMAT NO : CONTRACTOR: JAIHIND PROJECTS LIMITED REPORT NO. DOC: JPL/KKBMPL/CIVIL/10/ITP Rev 01 DATE S.No ACTIVITY FREQUENCY OF INSPECTION JPL GAIL MECON 1 Approval of procedure W R A 2 Plaster preparation & Checking o W RM RM 3 Check for thickness W RM RM 4 Check for surface finishing W RM RM 5 Curing W RM RM 6 W RM RM LEGEND: A - Approval H - Hold Point W - Witness Point R - Review Documents FOR JPL FOR MECON/GAIL Signture Name Date Check for grooves,opening,rounding of the corners,hollows on plaster

Upload: sachein-anand

Post on 04-Dec-2015

247 views

Category:

Documents


0 download

DESCRIPTION

10 Itp- Plastering Rev01

TRANSCRIPT

Page 1: 10 Itp- Plastering Rev01

KOCHI KOTTANAD BANGALROE MANGALORE PIPELINE

INSPECTION TEST PLAN FOR PLASTERING

CLIENT: GAIL( INDIA) LIMITED LOCATION

CONSULTANT: MECON LIMITED FORMAT NO :

CONTRACTOR: JAIHIND PROJECTS LIMITED REPORT NO.

DOC: JPL/KKBMPL/CIVIL/10/ITP Rev 01 DATE

S.No ACTIVITYFREQUENCY OF INSPECTION

REMARKSJPL GAIL MECON

1 Approval of procedure W R A

2 Plaster preparation & Checking of mix W RM RM

3 Check for thickness W RM RM

4 Check for surface finishing W RM RM

5 Curing W RM RM

6 W RM RM

LEGEND:

A - Approval H - Hold Point W - Witness Point R - Review Documents RM - Random Inspection

FOR JPL FOR MECON/GAIL

Signture

Name

Date

Check for grooves,opening,rounding of the corners,hollows on plaster